Search NASA⌕ Search

SEARCH · Search NASA

Results for “Scheduling Service”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Remediation of the FGMSP at Sellafield: The First Transfer of Bulk Sludge - 17133

The very first bulk transfers of radioactive sludge have commenced from one of the most hazardous nuclear plants in Europe, using equipment and systems researched, designed, installed and commissioned by Jacobs as part of the ACKtiv alliance. Sellafield is a nuclear fuel reprocessing and decommissioning site, close to the village of Seascale on the coast of the Irish Sea in Cumbria, England. Sellafield incorporates the original nuclear reactor site at Windscale, which is currently undergoing decommissioning, and dismantling, and Calder Hall, the world's first nuclear power generating reactor. The first nuclear facilities were built in the 1940's.The First Generation Magnox Storage Pond (FGMSP) dates back to the 1950's as part of the UK's expanding nuclear programme and was constructed to store, cool and prepare used Magnox nuclear fuel for recycling into new fuel. It urgently needs to be emptied of 1500 cubic metres of radioactive sludge. In this paper we describe the work undertaken by Jacobs to deliver a very challenging programme of work to provide the capability to remove sludge from the pond. The FGMSP Retrievals Project was awarded in March 2007 to supply equipment and services for the removal of sludge and miscellaneous waste from the First Generation Magnox Storage Pond at Sellafield. The Project is being executed by ACKtiv Nuclear (Jacobs, Carillion and Atkins) of which Jacobs is a 40% stakeholder. ACKtiv Nuclear is a mature Joint Venture and has been operating continuously and successfully since 2002, the oldest JV still in operation on Sellafield Site. The roots of the JV can be traced back to the 1980's. The Project covers all project phases from front-end engineering through detailed design, procurement, installation and commissioning support. The Project places huge emphasis on off-Site testing and has several facilities for both installation and integrated testing. This proves equipment prior to installation in a radioactive environment. The Project has achieved success and recognition including winning the 2014 and 2015 Sellafield Business Excellence awards, as well as numerous internal Jacobs awards. The Project achieved a major decommissioning milestone in March 2016. Since the installation of a 31 m pipe-bridge in 2012, using a 1200 te mobile crane surrounded by several other facilities with nuclear inventory, the Project has successfully installed the sludge retrieval and effluent system into the FGMSP. This 4 year programme of work included 2 booster pump platforms, sludge recovery tooling, hoses, umbilicals and a deluge skip wash box which were all trialled and proven off-Site prior to installation in the pond. This milestone to commence transfer of sludge to modern stainless steel containment is a major step forward in the hazard reduction of the facility.The presentation will cover the installation of the pond de-sludging equipment, the innovations deployed that ensured that the milestone was achieved under budget and ahead of schedule, as well the benefits to the facility, the Site and the nuclear industry. It will also examine the challenges that needed to be overcome such as high dose, contamination, limited working times and space constraints. The presentation will describe why the work is of national Importance and conclude with the achievement of commencement of bulk sludge transfer to a modern facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aerospace Safety Advisory Panel

This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.

Source record↗

TT and C - First TDRSS, Then Commercial GEO and Big LEO and Now through LEO

The advent of low earth orbit (LEO) commercial communications satellites provides an opportunity to dramatically reduce Telemetry Tracking and Control (TT&C) costs of launch vehicles and Unpiloted Aerial Vehicles (UAVs) by reducing or eliminating ground infrastructure. Personnel from the Goddard Space Flight Center Wallops Flight Facility (GSFC/WFF) in Virginia have successfully used commercial GEO & Big LEO communications satellites for Long Duration Balloon flight TT&C. In addition, TDRSS capability for these balloons has been developed by WFF for the Ultra Long Duration Balloons with the first test flight launch in January 2001 for one global circumnavigation at 120,000 feet altitude launched from Alice Springs. Australia. Numerous other low cost applications can new utilize the commercial LEO satellites for TT&C. The Flight Modern became a GSFC/WFF Advanced Range Technology Initiative (ARTI) in an effort to streamline TT&C capability to the user community at low cost. Phase I ground tests of The Flight Modem verified downlink communications quality of service and measured transmission latencies. These tests were completed last year, Phase II consisting of aircraft flight tests provide much of the data presented in this paper. Phase III of the Flight Modern baseline test program is a demonstration of the ruggedized version of the WFF Flight Modem flown on one sounding rocket launched from Sweden. Flights of opportunity have been and are being actively pursued with other centers, ranges and users at universities. The WFF goal is to reduce TT&C costs by providing a low cost COTS Flight Modem with a User Handbook containing system capability and limitation descriptions. Additionally, since data transmission is by packetized Internet Protocol (IP), data can be received and commands initialed from practically any location with no infrastructure. The WFF, like most ranges, has been using GPS receivers on sounding rockets and long duration balloons for several years, The WFF Flight Modem contains a GPS receiver to provide vehicle position for tracking and vehicle recovery. The system architecture which integrates antennas, GPS receiver, commercial satellite packet data modem. and a single board computer with custom software is described and a number of technical challenges are discussed along with the plan for their resolution. These include antenna development, high Doppler rates, reliability, environmental ruggedness, hand over between satellites and data security. An aggressive test plan is included which in addition to environmental Testing measures bit error rate latency and antenna patterns. Additional flight tests are planned far the near future on aircraft, long duration balloons and sounding rockets and these results as well as the current status of the project arc reported. Use of the WFF Flight Modem on small satellites is also being pursued. The LEO satellite constellation altitude above 1400 km is not an obstacle because most spacecraft do not require continuous Communications. The challenge is scheduling where store and forward techniques for command are required and downlink when the communications link allows connection (above 60 percent of the time depending on the satellite altitude). Sophisticated scheduling techniques utilizing 2-line orbital element sets available on the NASA/NORAD Internet site could be implemented for rare special cases. The current 9600 baud rate of the LEO communications link may be increased With special techniques that are planned for development in the WFF Flight Modem project.

Morgan, Dwayne↗

Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System-Level Experimental Validations for Supersonic Commercial Transport Aircraft Entering Service in the 2018-2020 Time Period

This report describes the work conducted under NASA funding for the Boeing N+2 Supersonic Experimental Validation project to experimentally validate the conceptual design of a supersonic airliner feasible for entry into service in the 2018 -to 2020 timeframe (NASA N+2 generation). The primary goal of the project was to develop a low-boom configuration optimized for minimum sonic boom signature (65 to 70 PLdB). This was a very aggressive goal that could be achieved only through integrated multidisciplinary optimization tools validated in relevant ground and, later, flight environments. The project was split into two phases. Phase I of the project covered the detailed aerodynamic design of a low boom airliner as well as the wind tunnel tests to validate that design (ref. 1). This report covers Phase II of the project, which continued the design methodology development of Phase I with a focus on the propulsion integration aspects as well as the testing involved to validate those designs. One of the major airplane configuration features of the Boeing N+2 low boom design was the overwing nacelle. The location of the nacelle allowed for a minimal effect on the boom signature, however, it added a level of difficulty to designing an inlet with acceptable performance in the overwing flow field. Using the Phase I work as the starting point, the goals of the Phase 2 project were to design and verify inlet performance while maintaining a low-boom signature. The Phase II project was successful in meeting all contract objectives. New modular nacelles were built for the larger Performance Model along with a propulsion rig with an electrically-actuated mass flow plug. Two new mounting struts were built for the smaller Boom Model, along with new nacelles. Propulsion integration testing was performed using an instrumented fan face and a mass flow plug, while boom signatures were measured using a wall-mounted pressure rail. A side study of testing in different wind tunnels was completed as a precursor to the selection of the facilities used for validation testing. As facility schedules allowed, the propulsion testing was done at the NASA Glenn Research Center (GRC) 8 x 6-Foot wind tunnel, while boom and force testing was done at the NASA Ames Research Center (ARC) 9 x 7-Foot wind tunnel. During boom testing, a live balance was used for gathering force data. This report is broken down into nine sections. The first technical section (Section 2) covers the general scope of the Phase II activities, goals, a description of the design and testing efforts, and the project plan and schedule. Section 3 covers the details of the propulsion system concepts and design evolution. A series of short tests to evaluate the suitability of different wind tunnels for boom, propulsion, and force testing was also performed under the Phase 2 effort, with the results covered in Section 4. The propulsion integration testing is covered in Section 5 and the boom and force testing in Section 6. CFD comparisons and analyses are included in Section 7. Section 8 includes the conclusions and lessons learned.

Magee, Todd E.↗

The Training Process of the Organization Development and Training Office

The Organization Development and Training Office provides training and development opportunities to employees at NASA Glenn Research Center, as a division of the Office of Human Resources and Workforce Planning. Center-wide required trainings, new employee trainings, workshops and career development programs are organized by the OD&TO staff. They also arrange all academic, non-academic, headquarters, fellowship and learning center sponsored courses. They also service organizations wishing to work more effectively by facilitating teambuilding exercises. Equal Opportunity programs and upward mobility programs such as the STEP and GO programs for administrative staff. In working with my mentor I am very involved with Cuyahoga Community College classes, mandatory supervisory training and administrative staff workshops. My largest tasks are in the secretarial training category. The Supporting Organizations And Relationships workshop for administrative personnel, commonly known as SOAR, began last year and continued this summer with follow-up workshops. Months before a workshop or class is brought to Glenn, a need has to be realized. In this case, administrative staff did not feel they had an opportunity to receive relevant training and develop skills through teambuilding, networking and communication. A Statement of work is then created as several companies are contacted about providing the training. After the company best suited to meet the target group s needs is selected, the course is announced with an outline of all pertinent information. A reservation for a facility is made and applications or nominations, depending on the announcement s guidelines, are received from interested employees. Confirmations are sent to participants and final preparations are made but there are still several concluding steps. A training office staff member also assists the facilitator with setting up the facility and introducing the class. After the class, participants evaluations are read and summarized to determine the effectiveness of the class and instructor. In addition to the SOAR workshops, I have several projects and daily tasks to complete. Coding training applications, which require me to be familiar with Glenn s budgetary allocations and policies on training, is an ongoing process. It also requires verifying information reported by an employee via her C-478 form, more commonly known as the training application. I am also the point of contact for the Cuyahoga Community College Advising Sessions held here at NASA Glenn which involves coordinating counselors visits with employees schedules. Two databases had to be created. The first database holds information on administrative staff, and the other tracks supervisors training histories. Through these assignments I gained experience in Microsoft Access 2002 and spreadsheet creation, communicating with co-workers, and successfully facilitating a training to serve specific purposes. With trainings and evaluations to assessment them, the Organization Development and Training Office can assure a quality product and continued customer satisfaction.

Johnson, Melissa S.↗

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of Energy Storage System Economics and Controls by Incorporating Battery Degradation Costs in REopt

The use of stationary electrochemical energy storage systems utilizing lithium-ion batteries has increased rapidly as the production scale and price for lithium-ion batteries has decreased. These energy storage systems are crucial for maintaining grid resiliency, especially for grids operating with high penetration of renewable energy generation assets or for with a variety of distributed energy generation and storage systems. One challenging factor for the development of battery energy storage systems is estimating the proper sizing, in terms of both power and energy, that minimizes total costs over the lifetime of the systems; this calculation is difficult in simple cases, where a battery is costed independently, but is extremely challenging when building loads and electrical generation by photovoltaic resources are also considered. REopt is a techoeconomic optimization tool developed by NREL to address these challenges. Previously, battery degradation has been priced by simply assuming a 10-year replacement schedule for battery systems. However, this does not account for varying degradation trends observed across real-world batteries, or allow for batteries to be operated in a degradation-aware manner that optimizes battery dispatch based on operating costs. This work incorporates a battery life model into REopt. This battery life model is simple, so that it may be solvable within the constrains of a mixed-integer linear optimization problem, but is fit to accelerated aging data recorded in the lab. To achieve the best possible accuracy for lifetime estimates given these constraints, parameters for the battery life model in REopt are estimated by fitting 20-year simulations of battery life after identifying state-space battery degradation model from accelerated aging data. Comparisons of battery life predicted in REopt and from the state-space battery degradation model to ensure validity of lifetime estimates made by REopt. Battery life and cost is optimized by controlling three decision to minimize system life cost: battery sizing, daily state-of-charge, and daily energy-throughput. The cost of battery degradation as a function of these control variables is then estimated assuming two possible maintenance strategies: replacement, where the entire battery system is replaced if cell reach an end-of-life capacity threshold; and augmentation, which establishes a fund to pay for continual purchase of new batteries to maintain the initial energy capacity of the system. These two strategies offer conservative (for replacement) and optimistic (for augmentation) bounds for total system cost. The degradation cost incurred by these strategies is then used to control battery dispatch decisions, operating the battery in a degradation-aware manner that maximizes battery lifetime while also providing energy when favorable. Because the mixed-integer linear program has perfect foresight of future energy needs, batteries with degradation costs are always operated using 'just-in-time' charging, which is unrealistic, as no energy is left in the storage system to perform other energy services or to serve as emergency back-up power. To combat this, an inequality constraint on the average annual state-of-charge is imposed, and the sensitivity of system cost to average stored energy, e.g., the cost of system resiliency, can be quantified. Analysis of results has several conclusions, for instance, oversizing of battery storage systems is not a cost burden when battery storage is an optimal solution, as any additional battery capacity can simply be utilized to avoid costs of purchasing energy from a utility.

battery↗

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Development of Cable Aging Acceptance Criteria for Nuclear Facilities

The aging of nuclear power plant electrical cables has been the subject of substantial research and development (R&D) projects in the nuclear industry, national and international laboratories, universities, and vendor organizations for several years. More specifically, these R&D efforts were conducted to develop equipment and techniques for assessing age-related degradation of in-service cables in nuclear facilities including power plants, research reactors, waste facilities and fuel fabrication plants. In recent years, cable R&D efforts in the nuclear arena have also included work to develop new cables for the next generation of reactors. Over time, exposure to harsh environmental conditions such as elevated temperatures, radiation, and humidity in nuclear installations can result in age-related degradation and failure of cables. In the current fleet of nuclear reactors, there are thousands of miles of cabling installed in each plant and many of these cables are exposed to these harsh environmental conditions. For these cables, the jacket and insulation polymers harden and become brittle over time, making them more susceptible to crack formation and growth, moisture intrusion, and other mechanisms that can lead to cable failure. Moreover, the existing U.S. fleet of 98 nuclear reactors has an average operating age of 38 years. Many of these nuclear power plants have applied for and almost all have been granted regulatory approval for license renewals to operate for 60 years, 20 years beyond their original 40-year life. Further, subsequent license renewals (SLRs) are underway with a few commercial nuclear power sites already approved to operate up to 80 years. As these reactors pursue operating life extensions, utilities must find a way to address issues associated with age-related degradation of cables. Designers of small modular reactors are also in need of technologies to evaluate the performance of cables that will be installed in harsher environments (e.g. higher temperatures, radiation doses, dose rates, etc.) than those present in current-generation reactors. Today, a variety of cable condition monitoring (CM) techniques have been developed and successfully used in nuclear facilities. These techniques are used to identify age-related degradation and assess the condition of cables to determine if their performance characteristics have changed with age. However, objective criteria must be developed for these CM tests to help quantify cable condition and thereby develop repair and replacement schedules. With operating life extending to 80 years and more SLRs on the horizon, both nuclear facilities and regulators need an objective means to determine the aged condition of cables.

36 MATERIALS SCIENCE↗

Future of Work with Robotics - 18599

The DOE Environmental Management mission continues with remaining tasks that are high-hazards to human workers and high-consequences to the nation, resulting in potentially high risks to project costs and schedules. This is the mission pull. At the same time, robotic technologies are hitting a turning point with increased productivity and reliability within society, supporting a technology push. Enabling this push are better computer processing following Moore's Law, breakthroughs in biometric and learning algorithms,and riding a wave of venture funding for intended commercialization of mechatronic and Internet of Thing (IOT) projects. There has been overall improvements in material technologies, algorithms, and software standardization with tools/libraries such as the Robot Operating System (ROS). The internet has made knowledge ubiquitous and the cell phone sector has pushed the boundaries of systems-on-chip technology. This current growth is a race between large global technology companies, and between countries that understand that there is a prize with increased commerce based on being a leader in the field of robotics and automation. This technological advances have placed this technology solidly within the next 4. Industrial Revolution being tracked by the World Economic Council. Policies and law can slow this progression down, but technological changes in adjacent fields will put additional pressure on human workers by being more economical and in saving lives. A fundamental issue is will this change be gradual or disruptive such as with the forecasted singularity. There is also a realization with automation that the transition of human workers to other fields may be temporary, but in the long run, workers may run out of viable work and long-term occupations. The obvious future of human jobs are most assured by those who can embrace the change through the design, development, installment, and maintenance of the technology. Younger workers can be re-educated while older humans can be re-trained. The goal of this paper is to explore all the forces that are enabling this revolution, investigating its many impacts, and speculating on the future of human jobs during nuclear remediation. Automation has made an impact to the manufacturing sector, and has since expanded to the retail and services sectors. The question is will this same automation transition, including robotics and artificial intelligence, occur to the environmental management and cleanup sector, and how should we prepare ourselves for this change. (author)

42 ENGINEERING↗

The Manufacturing Process for the NASA Composite Crew Module Demonstration Structure

This paper will describe the approaches and methods selected in fabrication of a carbon composite demonstration structure for the Composite Crew Module (CCM) Program. The program is managed by the NASA Safety and Engineering Center with participants from ten NASA Centers and AFRL. Multiple aerospace contractors are participating in the design development, tooling and fabrication effort as well. The goal of the program is to develop an agency wide design team for composite habitable spacecraft. The specific goals for this development project are: a).To gain hands on experience in design, building and testing a composite crew module. b) To validate key assumptions by resolving composite spacecraft design details through fabrication and testing of hardware. This abstract is based on Preliminary Design data..The final design will continue to evolve through the fall of 2007 with fabrication mostly completed by conference date. From a structures perspective, the.CCM can be viewed as a pressure module with variable pressure time histories and a series of both impact and quasi-static, high intensity point, line, and area distributed loads. The portion of the overall space vehicle being designed and. fabricated by the CCM team is just the pressure module and primary loading points. The heaviest point loads are applied and distributed to the pressure module at.an aluminum Service Module/Alternate Launch Abort System (SM/ALAS) fittings and at Main and Drogue Chute fittings. Significant line loads with metal to metal impact is applied at.the Lids ring. These major external point and line loads as well as pressure impact loads (blast and water landing) are applied to the lobed floor though the reentry shield and crushable materials. The pressure module is divided into upper and lower. shells that mate together with a bonded belly band splice joint to create the completed structural assembly. The benefits of a split CCM far outweigh the risks of a joint. These benefits include lower tooling cost and less manufacturing risk. Assembly of the top and bottom halves of the pressure shell will allow access to the interior of the shell throughout remaining fabrication sequence and can also potentially permit extensive installation of equipment and .crew facilities prior to final assembly of the two shell halves. A Pi pre-form is a woven carbon composite material which is provided in pre-impregnated form and frozen for long term storage. The cross-section shape allows the top of the pi to be bonded to a flat or curved surface with a second flat plate composite section bonded between two upstanding legs of the Pi. One of the regions relying on the merits of the Pi pre-form is the backbone. All connections among plates of the backbone structure, including the upper flanges, and to the lobe base of the pressure shell are currently joined by Pi pre-forms. The intersection of backbone composite plates is formed by application of two Pi pre-forms, top flanges and lobed surfaces are bonded with one Pi pre-form. The process of applying the pre-impregnated pi-preform will be demonstrated to include important steps like surface preparation, forming, application of pressure dams, vacuum bagging for consolidation, and curing techniques. Chopped carbon fiber tooling was selected over other traditional metallic and carbon fiber tooling. The requirement of schedule and cost economy for a moderate reuse cure tool warranted composite tooling options. Composite tooling schedule duration of 18 weeks compared favorably against other metallic tooling including invar tooling. Composite tooling also shows significant cost savings over low CTE metallic options. The composite tooling options were divided into two groups and the final decision was based on the cost, schedule, tolerance, temperature, and reuse requirements.

Pelham, Larry↗

Accelerated Materials Deployment in Advanced Nuclear Power Plants

The purpose of this report is to begin the development of a maximally efficient process for licensing and deploying new materials in Advanced Non-Light-Water Reactors (ANLWRs). Some new materials that are to be used in some new plants are seen as possibly introducing risks, because our understanding of those new materials’ behavior in the conditions generated by some novel plant designs is less complete than our understanding of the behavior of materials with long use histories in existing designs. In these cases, an approved code/standard or a code case to support the use of these materials in the novel design’s safety case may not exist for the regulator to utilize as part of the licensing determination. This circumstance creates the potential for an extremely long licensing process for new designs using new materials. The present strategy is to show how to manage these risks proactively, in such a way as to permit licensing decisions to be made in a timely manner, based on this risk management process. The present report outlines the gaps in the current codes to support deployment and use of novel materials and begins the development of the necessary risk management framework that is focused on the subject materials issues; it is based on risk-informed in-service surveillance practices, carried out in such a way as to compensate for current limitations in our state of knowledge. This development will enable licensing and deployment of the subject materials, conditional on the proactive surveillance process to be established. While this report is occasioned by limitations in our knowledge of certain materials issues that may arise in advanced designs, in-service surveillance is always done in order to compensate for a lack of knowledge: if we knew that components were not already failed and not trending toward failure, we would not perform surveillance, even in current-generation plants (except that prescriptive requirements would force us to do so). What is different about the surveillance program discussed here is that the issues are newer and the relevant experience base is less complete, so the surveillance presently contemplated may need to measure new things and/or measure them more often than has been traditional for surveillance coupons. The present report is devoted to the risk management framework and applies American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Division [1] to establish the structure of a protocol for carrying out the necessary surveillance. These documents are generic: they do not tell us how often to surveille, or what to surveille, or what to measure, but rather how to determine those things, given certain technical inputs. The Regulatory Development R&D Program [2] is currently developing the companion supporting technical basis for the materials surveillance technology that, when completed and validated, can be used by owner/operator and NRC to implement a materials degradation management program for ANLWRs. This report also outlines salient points of discussion, positive potential outcomes, and potential concerns from industry and the USNRC. These aspects of the report intend to inform future work to develop a proposed technical process for adoption by the industry and endorsement by the USNRC to allow developers to propose a risk informed and conservative approach for the use of materials where operating experience/data and codes and standards may not exist for use of a novel material in an operating reactor environment. Additionally, such a technology could be leveraged to potentially reduce part of the upfront materials data requirements from ongoing long-term materials testing so that early action on license application could be undertaken by NRC, in parallel with the continuation of long-term data collection. This could accelerate the schedule for a first-of-a-kind ANLWR deployment or a nth-of-a-kind new materials insertion for established ANLWR designs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The Potential for Hosted Payloads at NASA

The 2010 National Space Policy encourages federal agencies to actively explore the use of inventive, nontraditional arrangements for acquiring commercial space goods and services to meet United States Government requirements, including...hosting government capabilities on commercial spacecraft. NASA's Science Mission Directorate has taken an important step towards this goal by adding an option for hosted payload responses to its recent Announcement of Opportunity (AO) for Earth Venture-2 missions. Since NASA selects a significant portion of its science missions through a competitive process, it is useful to understand the implications that this process has on the feasibility of successfully proposing a commercially hosted payload mission. This paper describes some of the impediments associated with proposing a hosted payload mission to NASA, and offers suggestions on how these impediments might be addressed. Commercially hosted payloads provide a novel way to serve the needs of the science and technology demonstration communities at a fraction of the cost of a traditional Geostationary Earth Orbit (GEO) mission. The commercial communications industry launches over 20 satellites to GEO each year. By exercising this repeatable commercial paradigm of privately financed access to space with proven vendors, NASA can achieve science goals at a significantly lower cost than the current dedicated spacecraft and launch vehicle approach affords. Commercial hosting could open up a new realm of opportunities for NASA science missions to make measurements from GEO. This paper also briefly describes two GEO missions recommended by the National Academies of Science Earth Science Decadal Survey, the Geostationary Coastal and Air Pollution Events (GEO-CAPE) mission and the Precipitation and All-weather Temperature and Humidity (PATH) mission. Hosted payload missions recently selected for implementation by the Office of the Chief Technologist are also discussed. Finally, there are technical differences specific to hosted payloads and the GEO environment that must be considered when planning and developing a hosted payload mission. This paper addresses some of payload accommodation differences from the typical NASA LEO mission, including spacecraft interfaces, attitude control and knowledge, communications, data handling, mission operations, ground systems, and the thermal, radiation, and electromagnetic environment. The paper also discusses technical and programmatic differences such as limits to NASA's involvement with commercial quality assurance processes to conform to the commercial schedule and minimizing the price that makes hosted payloads an attractive option.

Andraschko, Mark↗

Supporting ARPA-E Power Grid Optimization (Final Report)

Pacific Northwest National Laboratory (PNNL), Arizona State University (ASU), Georgia Institute of Technology (Georgia Tech), Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), The University of Texas at Austin (UT), and the University of Wisconsin-Madison (UW-M) supported the ARPA-E Grid Optimization (GO) Competition by providing a common problem formulation, data format, datasets, evaluation mechanism, scoring, rules, and results that resulted in the awarding of $\$9.24$ million dollars to teams from academia, industry, and national labs for solving three sets of increasingly difficult non-linear, security- constrained AC Optimal Powerflow (AC-OPF) optimization problems in order to increase the efficiency of the US Electric Grid. It is estimated that a 1% increase in efficiency can save $\$1$ billion. Current industry practices typically use a linear DC model (DC-OPF) in order solve the OPF problem within the time constraints of the operation schedule. The GO Competition challenges the best power engineers, mathematicians, and computer scientists to make possible operational decisions based on accurate physical models. To accomplish this, the GO Competition created a series of Challenges and funded teams to produce the best solver. Challenge 1 was to solve the security constrained Alternating Current Optimal Power Flow (ACOPF) problem. Challenge 2 extended that to by adding adjustable transformer tap ratios, phase shifting transformers, switchable shunts, price-responsive demand, ramp rate constrained generators and loads, and fast-start unit commitment (UC). Furthermore, Challenge 2 was a maximization problem while Challenge 1 was a minimization problem. While Challenge 3 was being developed, the entrants were invited to find better solutions to the Challenge 2 synthetic datasets with no restrictions on time, hardware, or algorithms. The Challenge 2 solutions turned out to be very good. Challenge 3 expanded the Challenge 2 problem further by using multiperiod dynamic markets, including advisory models for extreme weather events, day-ahead markets, and the real-time markets with an extended look-ahead. These problems included active bid-in demand and topology optimization. Together the Challenges used nearly 30 million CPU hours. Since each team was working on the same problem, using the same data, and running on the same hardware, fair comparisons could be drawn as to the best solver. The datasets were varied enough, however, that the best solver for one dataset was not necessarily the best at another, so cumulative scores were used. The process was managed by the PNNL maintained website https://GOCompetition.energy.gov, where Entrants could find information about the problem, the data, the rules, submit their solver for evaluation, and see the scores of all the competing teams on a Leaderboard. Interest was world-wide but only American teams were eligible for prizes. The Competition has produced 34 journal articles 115 papers and been cited over 500 times in the literature, including 12 dissertations (4 from foreign countries; Columbia (2), Germany, and Italy) and 3 from the DOE ExaScale project. Software developed by Pearl Street Technologies for Challenges 1 and 2 is now deployed by Southwest Power Pool (SPP) and Midcontinent Independent Service Operator (MISO). Other teams have received inquiries from venture capitalists. Google DeepMind has thanked the Competition for making the datasets developed for the Competition public. They are using it to train machine learning models. The larger datasets have billions of unknowns to be solved for, but only a small percent matter in the final solution. Knowing what unknowns are important can dramatically speedup the solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Estimation of Timing Performance with Pulsed Laser Links for Small Satellite PNT

Satellite constellations are growing in size and in utility for applications as diverse as providing reliable, low-latency internet service to rural areas orEarth science missions.This expansion of satellite constellations brings attention to the need for responsive and reliable satellite communication.Current research in the PrecisionSpace Systems Laboratory at the University of Florida focuses on using pulsed laser communications as the method of relaying time signals instead of the radio frequency (RF)signals.The upcoming CLICK (CubeSat Laser Infrared CrosslinK) missions (Massachusetts Institute of Technology, University of Florida, NASA Ames Research Center) will demonstrate a spacecraft-to-spacecraft laser communication link and time-transfer.For pre-flight technology assessment of missions such as CLICK, a simulation of a spacecraft constellation in Earth orbit has been created to estimate clock synchronization and precision orbit determination based on measured instrumentation performance.We have developed a novel MATLAB-based numerical simulator to model spacecraft-to-spacecraft laser time-transfer and estimate the offset between the spacecraft clocks over time.This simulation includes timing errors associated with laser pulse generation and detection, as well as non-Gaussian clock drift models.The two on-board clocks modeled are a cesium-based Chip-Scale Atomic Clock (CSAC) and a rubidium-based Miniature Atomic Clock (MAC), both produced by Microchip.An example case of two spacecraft in a circular, low-Earth orbit receiving GPS position, GPS timing, and laser pulse time-of-flight measurements is simulated.The positions and velocities of the two spacecraft at a reference epoch and the constant clock model coefficients are estimated.Polynomial models of different orders were used as clock models. The effect of clock model order on the root-mean-square (RMS) of the clock error is apparent in the case using GPS and lasing measurements, showing that the clock model improves with increasing clock model order. Results compare the estimated clock model of a mission operation that only uses GPS measurements and a mission operation that uses both GPS and laser pulse time-of-flight measurements between spacecraft referenced to their on-board CSACs or on-board MACs. Including lasing measurements reduces the RMS clock model error by approximately 80% of the RMS of the cases with only GPS measurements.This simulation tool can be used to optimize the lasing operations schedule based on mission timing performance objectives. During this presentation, I will discuss the details of the simulation and clock model estimation, as well as discuss the results.I will compare the results of incorporating lasing timing measurements to using only GPS measurements and the outcomes of using different orders of polynomials.

Timing Performance↗

Co-Simulation Model for Optimal Wind-Hydro Coordination Using Wind Farm Control Dynamics

The growing share of Variable Renewable Energy sources (VRES) in power systems presents challenges for regula- tors, grid operators and energy producers. The VRES’ operation has limited flexibility in their operations, as they are highly dependent on ambient environments. To address these challenges, decision-makers must consider multiple objectives, among these are revenue, power system services and mechanical load on wind turbines. Coordinated operation of power plants and different wind farm control strategies are examples of measures that can benefit these objectives. This study proposes a Multi-Objective Linear Programming (MOLP) model to simulate the optimum operation of wind and hydropower plants that share limited transmission capacity. Further, wind farm control dynamics are included to obtain realistic output power and accumulated damage. From this, a case study based on a relevant location in Norway is presented to analyze the improved effect of wind- hydro coordination and wind farm control in achieving the objectives of accumulated wind turbine damage and total revenue of the hybrid power system. In addition, the study considers the potential advantages of adding a variable-speed pump to the hydropower plant. The results demonstrate that by considering multiple objectives in the optimization, one may achieve better overall performance of the objectives. By utilizing the flexibility of hydro storage, the decision maker may adjust to obtain the most desired outcome. Moreover, the added flexibility of utilizing a pump for hydro storage shows great improvements for the combined revenue of the power plants and reduced curtailment of the wind farm. However, less impact is observed from using a variable speed pump compared to a fixed speed pump.

13 HYDRO ENERGY↗

Waste Management 2016 300-296 Soil Remediation Project. Developing Innovative Solutions to Overcome Design Challenges - 16229

The 324 Building is a non-reactor, Hazard Category 2, Nuclear Facility located in the 300 Area of the U.S. Department of Energy (DOE) Hanford Site, located near Richland, Washington. The building is undergoing deactivation, decommissioning, decontamination, and demolition by Washington Closure Hanford (WCH) under the River Corridor Closure Contract. During the Cold War Era, the facility was used for chemical and radionuclide processing associated with nuclear weapons production. Historical records indicate that in October 1986, approximately 516 L of a concentrated liquid waste stream containing cesium-137 and strontium-90 was spilled onto the floor of B-Cell. B-Cell is located in the Radiochemical Engineering Complex (REC) of the 324 Building. It is estimated that this spill contained approximately 1.3 million curies of radioactivity. Some fraction of the spill was recovered; however, an unknown quantity was released into the soil beneath the 324 Building through an undetected breach in the B-Cell floor sump. Unknown quantities of water were used after the spill to wash items contained in B-Cell. When B-Cell was taken out of service, wastes being removed from B-Cell were placed in Grout Containers (GCs) and stabilized using a particulate grout. In the course of grouting activities, grout was spilled on the floor of B-Cell, eventually filling the sump. The primary scope of this project is to design, test, and implement a process capable of removing and isolating contaminated soil below B-Cell. This remediation effort has been divided into two removal zones identified as the primary and secondary removal zones. Based on current assumptions and estimates, the primary phase of this cleanup effort will remove roughly 156.45 m{sup 3} of highly contaminated materials. B-Cell debris, particulate grout, and the floor slab and liner comprise about 21.24 m{sup 3} of the total. The remaining 135.21 m3 will be contaminated soil. All of this material must be disposed of within the existing 324 Facility or packaged for disposal at the Hanford site. The objective of this project is to remove the B-Cell floor and highly contaminated underlying soils from beneath B-Cell using remote equipment to reduce the radiation levels and allow open-air excavation for the remaining contaminated soil. The challenges and subsequent technological solutions encountered from the Conceptual Design phase to the 100% Design Issued For Fabrication/Issued For Construction (IFF/IFC) consisted in part of the following: Design an efficient remote cleanup strategy for highly contaminated Low Level Waste (LLW) given the unknowns. Maintain contamination control down to 18 feet below B-Cell in a highly radioactive environment (12,870 R/Hr Cs-137 and Sr-90). Perform facility upgrades to enable remediation process implementation while maintaining integrity of pre-existing facility structure and license. Designing first-of-a-kind remote equipment for use in high radiation areas. Developing first-of-a-kind operations sequences for remote equipment while minimizing usage of original facility equipment (i.e. cranes, manipulators, etc.). Conducting time-motion studies of operations sequences to maximize efficiency while keeping dose As Low As Reasonably Achievable (ALARA) in a high dose environment. Construction of a full scale mockup to conduct performance testing in a clean environment and train the work force to operate the equipment. Overcoming scope, budget and schedule constraints associated with a fast-track DOE project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗