Search NASA⌕ Search

SEARCH · Search NASA

Results for “appendix”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

Johnson, Jill W.↗

Calendar Year 2009 Groundwater Monitoring Report, U.S. Department of Energy, Y-12 National Security Complex, Oak Ridge, Tennessee

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2009 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2009 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12. The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2009 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2009 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0). Collectively, the groundwater and surface water monitoring data obtained during CY 2009 by the Y-12 GWPP and BJC address DOE Order 450.1A (Environmental Protection Program) requirements for monitoring groundwater and surface water quality in areas: (1) which are, or could be, affected by operations at Y-12 (surveillance monitoring); and (2) where contaminants from Y-12 are most likely to migrate beyond the boundaries of the ORR (exit pathway/perimeter monitoring). Section 4 of this report presents a summary evaluation of the monitoring data with regard to the respective objectives of surveillance monitoring and exit pathway/perimeter monitoring, based on the analytical results for the principal groundwater contaminants at Y-12: nitrate, uranium, volatile organic compounds (VOCs), gross alpha activity, and gross beta activity. Section 5 of this report summarizes the most pertinent findings regarding the principal contaminants, along with recommendations proposed for ongoing groundwater and surface water quality monitoring performed under the Y-12 GWPP. Narrative sections of this report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Appendix C contains construction details for the wells in each regime that were sampled during CY 2009 by either the Y-12 GWPP or BJC. Field measurements recorded during collection of the groundwater and surface water samples and results of laboratory analyses of the samples are in Appendix D (Bear Creek Regime), Appendix E (East Fork Regime and surrounding areas), and Appendix F (Chestnut Ridge Regime). Appendix G contains data for the QA/QC samples associated with monitoring performed in each regime by the Y-12 GWPP.

54 ENVIRONMENTAL SCIENCES↗

2020 natural gas LCA data appendices

This collection is the data-centric appendices for the report Life Cycle Analysis of Natural Gas Extraction and Power Generation: U.S. 2020 Emissions Profile. It consists of Appendix A: Additional Modeling Parameters [spreadsheet]; Appendix B: Water Burdens [spreadsheet]; Appendix D: Simulation of Liquids Unloading [python script and spreadsheet]; Appendix E: Detailed GHG Results for All Scenarios [spreadsheet]; Appendix F: Full Inventory Results [spreadsheet]; and Appendix I: Stage-Level Natural Gas Loss and Consumption Rates [spreadsheet].

Appendices↗

2020 natural gas LCA appendices Rev1

This collection is the data-centric appendices for the report Life Cycle Analysis of Natural Gas Extraction and Power Generation: U.S. 2020 Emissions Profile. It consists of Appendix A: Additional Modeling Parameters [spreadsheet]; Appendix B: Water Burdens [spreadsheet]; Appendix D: Simulation of Liquids Unloading [python script and spreadsheet]; Appendix E: Detailed GHG Results for All Scenarios [spreadsheet]; Appendix F: Full Inventory Results [spreadsheet]; and Appendix I: Stage-Level Natural Gas Loss and Consumption Rates [spreadsheet]. These results have been updated from the previous version (https://edx.netl.doe.gov/dataset/2020-natural-gas-lca-data-appendices) to correct a modeling error where the same post-processing natural gas composition was used instead of the intended regional compositions.

Appendices↗

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2011

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2011 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2011 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2011 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2011 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2011 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2011) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2012

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2012 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2012 is in accordance with the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. Modifications to the CY 2012 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2012 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2012) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

54 ENVIRONMENTAL SCIENCES↗

Remediation Guidance for Major Airports after a Bioterrorist Attack

This document provides general guidelines for airport managers, local officials, and other stakeholders for developing a response and recovery plan for a major airport following the release of a biological warfare agent, with specific guidance for remediation. San Francisco International Airport was selected as the example airport during development of the guidance to illustrate specific details. The spore-forming bacterium Bacillus anthracis was selected as the biological agent of primary concern because it is the most difficult of known bioterrorism agents to inactivate and is considered to be one of the agents most likely to be used as a biological weapon. The focus of the guidance is on cleanup and disposal activities associated with the Characterization, Decontamination, and Clearance Phases that are defined herein. Activities associated with the Notification and First-Response Phases are brieÀy discussed in Appendixes A and B, respectively. In addition to the main text of this Remediation Guidance document and associated appendixes, a data supplement was developed specifically for San Francisco International Airport. Requests for the data supplement must be made directly to the Emergency Planning Operations Division of San Francisco International Airport. This document does not describe public health responses to release of a biological warfare agent. If laboratory analytical results confirm the presence of a biological agent, the responsible public health agency involved in the response will commence appropriate public health actions, such as treatment (CDC 2004) and decontamination of potentially contaminated individuals, distribution of prophylaxis, and medical examinations. See the Centers for Disease Control and Prevention web site for more information on emergency public health responses (http://www.bt.cdc.gov/). Effective communication with the media and the public is an essential component of airport remediation and recovery. Whereas such communication is beyond the scope of this document, many helpful resources are available. (See Section 1.1 for more information.) The concept of operations described in this document for cleanup of a Bacillus anthracis release at a major airport conforms to the National Response Framework (NRF) (DHS 2008) and implementation of the National Incident Management System (NIMS 2004). In most cases, a Unified Command would be formed to direct the cleanup process jointly and to take ultimate responsibility for all cleanup decisions. The Unified Command would likely include the Airport Manager or Airport Emergency Operations Manager, representatives from state and local public health and emergency management agencies, and Federal agencies, such as the U.S. Environmental Protection Agency. The Unified Command and Incident Command Staff would ideally be co-located in an Incident Command Post in an uncontaminated area of the airport. If a release is large or complex, co-location of all key players may not be possible. If a major incident is declared, a Principal Federal Official may be appointed by the Department of Homeland Security to facilitate Federal support to the Unified Command. In some facilities and jurisdictions, additional response plans or procedures (such as BioWatch or other emergency response plans, procedures, or protocols) may govern notification and first response. Facility personnel, responders, and emergency management coordinators should be aware of all applicable plans and procedures and how to implement them. Cleanups following the anthrax attacks of 2001 in the U.S. pre-dated the NRF and NIMS and did not make use of a NIMS Incident Command System as we know it today. Most Incident Commanders for the larger of those cleanups chose to convene a Technical Working Group (TWG) of multi-agency, multi-disciplinary, outside experts to advise in developing sampling and decontamination plans. Most of the Incident Commanders also convened a separate Environmental Clearance Committee (ECC) to independently review pre- and post decontamination sampling data as well as data on decontamination parameters, to evaluate whether the decontamination was effective, and to add credibility regarding a decision that decontaminated areas may be reoccupied. Use of such specialized technical expertise is strongly recommended, although it would now operate within the construct of the NIMS Incident Command System. The TWG, if convened, would act in an advisory capacity to the Environmental Unit within the Planning Section. Likewise, the ECC, if convened, would provide independent peer review of products and recommendations by the Environmental Unit. For maximum impartiality, the ECC could also provide recommendations directly to the Unified Command. Cleanup activities commence with site characterization. The principal goal of characterization is to define the extent of contamination and to gather information needed to design the decontamination approach. Initial sampling data collected by first responders are assessed to approximate the location(s) of contamination. Confirmation of the agent type and viability is obtained from a Laboratory Response Network laboratory. Additional characterization data are collected to determine the extent of contamination and where decontamination actions are needed. Areas suspected of being contaminated are contained and isolated to the degree possible to prevent further movement of an agent to uncontaminated areas or the environment, and to reduce the potential for future exposure from the agent or fumigant, if fumigation is needed. Agent air monitoring in areas adjacent to the contained contamination zones is done to ensure the protection of remediation personnel and to monitor any release from the contained zones. Various sampling approaches are considered. For example, wipe samples can be used to sample hard, nonporous surfaces. Swab samples can be used to sample nooks, crannies, joints, and seams. Appendix I is a template for preparing an incident-specific, operational characterization plan. Upon completion of the characterization plan, an internal review is initiated. Upon approval of the plan by the Unified Command, characterization commences. The Site Safety Officer develops a Health and Safety Plan to ensure that coordinated health and safety measures are in place for all responding personnel. This plan describes physical, chemical, and biological hazards at the site, personal protective equipment, personal decontamination procedures, and emergency procedures to be used by sampling and remediation personnel. An incident-specific Remediation Action Plan is developed, which describes the decontamination methods to be used and other details, including waste disposal. Under NIMS, this overall plan, as well as other plans described below, are implemented through a series of standardized, shorter-term Incident Action Plans, which describe specific activities that will take place during a shift or a day. The template in Appendix J is designed to facilitate preparation of the Remediation Action Plan. If fumigation will be done, a Sampling and Analysis Plan will be needed, as well as an Ambient Air Monitoring Plan, which can be a component of the Remediation Action Plan. These three plans are needed to obtain a crisis exemption from the U.S. Environmental Protection Agency for authorized use of an unregistered sterilant or pesticide during cleanup. If pesticide products become registered for inactivation of B. anthracis in the future, the three plans will likely be required by the product’s labeling, but the plans would no longer be submitted to the U.S. Environmental Protection Agency for approval; rather, the Incident Commander would approve them. If fumigation is used, an Emergency Response Plan is also recommended, although such a plan is not required for a crisis exemption. For some nonpersistent biological warfare agents, natural attenuation may be an adequate decontamination option. In cases where contamination is not extensive or an agent is not persistent, application of surface decontaminants or other methods of medical infection control may be effective. For extensive contamination by persistent agents, such as Bacillus anthracis, fumigation may be necessary. In those cases, the Decontamination Phase commences with source reduction, such as pre-cleaning surfaces to reduce the contaminant load. To expedite cleanup and prevent costs from escalating unnecessarily, a cost–benefit analysis should be incorporated in the decision process related to retention versus disposal of facility items and materials. Certain materials and structural components can be decontaminated for reuse, but it may not be feasible or cost-effective to decontaminate other items. Those items must be pre-treated, packaged (with the package decontaminated externally), and removed for disposal as waste. Site preparation includes sealing openings to prevent leaks and setting up equipment. Decontamination reagents and delivery systems are selected, and pre-testing all systems is done before carrying out chemical treatment(s). The important choice of decontamination technologies depends on characteristics of the agent, the nature and extent of contamination, and other site parameters identified during characterization. Decontamination-related decisions can have a major impact on waste-disposal costs, and it is necessary to develop a disposal plan that identifies a means of disposal, necessary approvals, transportation, and other details. A clearance strategy is developed to ensure that after decontamination, the risk of exposure to residual contamination is negligible. A clearance sampling plan is developed, which sets clearance criteria, specifies how to determine whether the criteria have been met, and describes how and where to collect clearance samples after decontamination. In most cases, clearance sampling includes both surface and aggressive air samples. Appendix K is a clearance plan template that identifies the types of required information. To determine whether the decontaminated area may be reoccupied, the Environmental Unit (and the ECC separately, if one is convened) evaluates the results of clearance samples. For the anthrax incidents to date, and given methods that have been used, cleanup was considered successful only when there was no growth of B. anthracis cultured from any environmental samples taken after decontamination. Other factors that will be considered include the decontamination process parameters (e.g., temperature, relative humidity, decontaminant concentration, and contact time) and the results from post-decontamination culture of biological indicators that may have been used during fumigation or sterilization processes. From such an evaluation the Environmental Unit or ECC, or both, recommend whether the area may be reoccupied, or whether further decontamination is necessary. The UC makes the final decision that a facility is appropriately decontaminated for reoccupancy. The facility owner or responsible public health agency makes the final decision to reopen a decontaminated facility. A theme that is emphasized throughout this document is that many activities can greatly reduce the time required to restore airport operations if those activities are conducted prior to an actual release of biological warfare agent. A summary of specific resources (such as Federal, state, and local agency contacts; contractors; prospective team members; subject-matter experts; laboratory facilities; and other entities) that should be identified in advance by airport officials is provided in each pertinent section of this document, and summary contact lists of such resources are provided in Appendix L. A summary of overall pre-planning actions that should be completed by airport officials is presented at the end of this document.

59 BASIC BIOLOGICAL SCIENCES↗

Y-12 Groundwater Protection Program Groundwater and Surface Water Sampling and Analysis Plan (CY 2021)

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2021 at the U.S. Department of Energy Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring is performed by the GWPP. Groundwater and surface water monitoring will be performed in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley and the Chestnut Ridge Regime is located south of Y-12. Additional surface water monitoring will be performed north of Pine Ridge along the boundary of the Oak Ridge Reservation. The following sections of this report provide details regarding the CY 2021 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding a data summary table presented in Section 4) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2021) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F. Modifications to the CY 2021 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. Each modification to the monitoring program will be approved by the Y-12 GWPP manager and documented as an addendum to this sampling and analysis plan.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2020 (Rev. 0)

This report provides the results of the annual post-closure use restriction (UR) inspections at corrective action sites (CASs) located on the Tonopah Test Range (TTR) and Nevada Test and Training Range (NTTR). This report covers post-closure UR inspections for calendar year 2020, and includes visual inspections and repair activities completed at the following corrective action units (CAUs): • CAU 407, Roller Coaster RadSafe Area (TTR) • CAU 424, Area 3 Landfill Complexes (TTR) • CAU 453, Area 9 UXO Landfill (TTR) • CAU 487, Thunderwell Site (TTR). Note: CAU 400, Bomblet Pit and Five Points Landfill (TTR) (CASs TA-19-001-05PT, Ordnance Disposal Pit; and TA-55-00-TAB2, Ordnance Disposal Pit) no longer requires inspection and reporting, as described in the Post-Closure Inspection Report for the Tonopah Test Range and Nevada Test and Training Range, Nevada for Calendar Year 2019. Site figures are included in Appendix A. The Post-Closure Inspection Plans and Record of Technical Change modifying the requirements for each UR are included in Appendix B. The Post-Closure Inspection Checklists are included in Appendix C. Field Notes are included in Appendix D. Appendix E, Inspection Photographs, does not include photographs because none were taken during the 2020 post-closure inspections. Appendix F, Post-Closure Vegetation Monitoring Report, does not include any data because vegetation monitoring was not conducted or required at any CAU in 2020. Visual inspections were conducted according to the post-closure requirements outlined in specific CAU and CAS URs, and approved by NDEP. The annual post-closure inspections for CASs associated with CAUs 407, 424, 453, and 487 were conducted on May 20, 2020. No maintenance or repair issues were noted at CAUs 487, or at CASs associated with CAU 424 (except CASs 03-08-002-A304 and 03-08-002-A308). Maintenance items and subsequent repairs include the following: • CAU 407, CAS TA-23-001-TARC (Roller Coaster RadSafe Area): A UR sign was loose and was rehung during the inspection. • CAU 424, CAS 03-08-002-A304 (Landfill Cell A3-4): The northeast monument needed a UR sign. The UR sign was attached to the monument on August 11, 2020. • CAU 424, CAS 03-08-002-A308 (Landfill Cell A3-8): The southeast monument needed additional lava rock. The lava rock was added during the inspection. • CAU 453, CAS 09-55-001-0952 (Area 9 Landfill): Two animal burrows were noted in the western portion of the northern and southern trenches (one burrow per trench). The animal burrows were repaired on August 11, 2020.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Groundwater And Surface Water Sampling And Analysis Plan For Calendar Year 2010

This plan provides a description of the groundwater and surface water quality monitoring activities planned for calendar year (CY) 2010 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) that will be managed by the Y-12 Groundwater Protection Program (GWPP). Groundwater and surface water monitoring performed by the GWPP during CY 2010 will be in accordance with requirements of DOE Order 540.1A and the following goals: (1) to protect the worker, the public, and the environment; (2) to maintain surveillance of existing and potential groundwater contamination sources; (3) to provide for the early detection of groundwater contamination and determine the quality of groundwater and surface water where contaminants are most likely to migrate beyond the Oak Ridge Reservation property line; (4) to identify and characterize long-term trends in groundwater quality at Y-12; and (5) to provide data to support decisions concerning the management and protection of groundwater resources. Groundwater and surface water monitoring during CY 2010 will be performed primarily in three hydrogeologic regimes at Y-12: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located in Bear Creek Valley, and the Chestnut Ridge Regime is located south of Y-12 (Figure A.1). Additional surface water monitoring will be performed north of Pine Ridge, along the boundary of the Oak Ridge Reservation. Modifications to the CY 2010 monitoring program may be necessary during implementation. Changes in programmatic requirements may alter the analytes specified for selected monitoring wells or may add or remove wells from the planned monitoring network. All modifications to the monitoring program will be approved by the Y-12 GWPP manager and documented as addenda to this sampling and analysis plan. The following sections of this report provide details regarding the CY 2010 groundwater and surface water monitoring activities. Section 2 describes the monitoring locations in each regime and the processes used to select the sampling locations. A description of the field measurements and laboratory analytes is provided in Section 3. Sample collection methods and procedures are described in Section 4, and Section 5 lists the documents cited for more detailed operational and technical information. The narrative sections of the report reference several appendices. Figures (maps and diagrams) and tables (excluding data summary tables presented in the narrative sections) are in Appendix A and Appendix B, respectively. Groundwater Monitoring Schedules (when issued throughout CY 2010) will be inserted in Appendix C, and addenda to this plan (if issued) will be inserted in Appendix D. Laboratory requirements (bottle lists, holding times, etc.) are provided in Appendix E, and an approved Waste Management Plan is provided in Appendix F.

54 ENVIRONMENTAL SCIENCES↗

Annual Report for 2008 - 2009 Detection Monitoring at the Environmental Management Waste Management Facility, Oak Ridge, Tennessee

This annual Environmental Monitoring Report (EMR) presents results of environmental monitoring performed during fiscal year (FY) 2009 (October 1, 2008 - September 30, 2009) at the Environmental Management Waste Management Facility (EMWMF). The EMWMF is an operating state-of-the-art hazardous waste landfill located in Bear Creek Valley (BCV) west of the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee (Appendix A, Fig. A.1). Opened in 2002 and operated by a DOE prime contractor, Bechtel Jacobs Company LLC (BJC), the EMWMF was built specifically to accommodate disposal of acceptable solid wastes generated from Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) remedial actions for former waste sites and buildings that have been impacted by past DOE operations on the ORR and at DOE sites off the ORR within the state of Tennessee. Environmental monitoring at the EMWMF is performed to detect and monitor the impact of facility operations on groundwater, surface water, stormwater, and air quality and to determine compliance with applicable or relevant and appropriate requirements (ARARs) specified in governing CERCLA decision documents. Annually, the EMR presents an evaluation of the groundwater, surface water, stormwater, and air monitoring data with respect to the applicable EMWMF performance standards. The purpose of the evaluation is to: (1) identify monitoring results that indicate evidence of a contaminant release from the EMWMF to groundwater, surface water, stormwater, or air, and (2) recommend appropriate changes to the associated sampling and analysis requirements, including sampling locations, methods, and frequencies; field measurements; or laboratory analytes that may be warranted in response to the monitoring data. Sect. 2 of this annual EMR provides background information relevant to environmental monitoring at the landfill, including short descriptions of the facility, the hydrogeologic setting, CERCLA decision document requirements for environmental monitoring, and a summary of the EMWMF monitoring history to date. Sect. 3 identifies the respective groundwater, surface water, stormwater, and air monitoring locations at the EMWMF and outlines the associated sampling frequencies, field measurements, and laboratory analytes. Sect. 4 presents a concise technical evaluation of the groundwater, surface water, stormwater, and air monitoring data. Sect. 5 summarizes key monitoring results and data evaluation conclusions along with any recommended changes to groundwater, surface water, stormwater, or air monitoring at the EMWMF. Sect. 6 lists the documents and other technical reports referenced in the preceding narrative sections. Maps and other illustrations referenced in the narrative sections of this annual EMR are in Appendix A. Referenced summary tables of FY 2009 environmental monitoring data are in Appendix B (Groundwater), Appendix C (Surface Water), Appendix D (Stormwater), and Appendix E (Ambient Air).

54 ENVIRONMENTAL SCIENCES↗

Voyager electronic parts radiation program. Volume 2: Test requirements and procedures

Documents are presented outlining the conditions and requirements of the test program. The Appendixes are as follows: appendix A -- Electron Simulation Radiation Test Specification for Voyager Electronic Parts and Devices, appendix B -- Electronic Piece-Part Testing Program for Voyager, appendix C -- Test Procedure for Radiation Screening of Voyager Piece Parts, appendix D -- Boeing In Situ Test Fixture, and appendix E -- Irradiate - Anneal (IRAN) Screening Documents.

Stanley, A. G.↗

Antiproton Trapping for Advanced Space Propulsion Applications

The Summary of Research parallels the Statement of Work (Appendix I) submitted with the proposal, and funded effective Feb. 1, 1997 for one year. A proposal was submitted to CERN in October, 1996 to carry out an experiment on the synthesis and study of fundamental properties of atomic antihydrogen. Since confined atomic antihydrogen is potentially the most powerful and elegant source of propulsion energy known, its confinement and properties are of great interest to the space propulsion community. Appendix II includes an article published in the technical magazine Compressed Air, June 1997, which describes CERN antiproton facilities, and ATHENA. During the period of this grant, Prof. Michael Holzscheiter served as spokesman for ATHENA and, in collaboration with Prof. Gerald Smith, worked on the development of the antiproton confinement trap, which is an important part of the ATHENA experiment. Appendix III includes a progress report submitted to CERN on March 12, 1997 concerning development of the ATHENA detector. Section 4.1 reviews technical responsibilities within the ATHENA collaboration, including the Antiproton System, headed by Prof. Holzscheiter. The collaboration was advised (see Appendix IV) on June 13, 1997 that the CERN Research Board had approved ATHENA for operation at the new Antiproton Decelerator (AD), presently under construction. First antiproton beams are expected to be delivered to experiments in about one year. Progress toward assembly of the ATHENA detector and initial testing expected in 1999 has been excellent. Appendix V includes a copy of the minutes of the most recently documented collaboration meeting held at CERN of October 24, 1997, which provides more information on development of systems, including the antiproton trapping apparatus. On February 10, 1998 Prof. Smith gave a 3 hour lecture on the Physics of Antimatter, as part of the Physics for the Third Millennium Lecture Series held at MSFC. Included in Appendix VI are notes and graphs presented on the ATHENA experiment. Portable antiproton trap has been under development. The goal is to store and transport antiprotons from a production site, such as Fermilab near Chicago, to a distant site, such as Huntsville, AL, thus demonstrating the portability of antiprotons.

Smith, Gerald A.↗

Efficient Analysis of Complex Structures

Last various accomplishments achieved during this project are : (1) A Survey of Neural Network (NN) applications using MATLAB NN Toolbox on structural engineering especially on equivalent continuum models (Appendix A). (2) Application of NN and GAs to simulate and synthesize substructures: 1-D and 2-D beam problems (Appendix B). (3) Development of an equivalent plate-model analysis method (EPA) for static and vibration analysis of general trapezoidal built-up wing structures composed of skins, spars and ribs. Calculation of all sorts of test cases and comparison with measurements or FEA results. (Appendix C). (4) Basic work on using second order sensitivities on simulating wing modal response, discussion of sensitivity evaluation approaches, and some results (Appendix D). (5) Establishing a general methodology of simulating the modal responses by direct application of NN and by sensitivity techniques, in a design space composed of a number of design points. Comparison is made through examples using these two methods (Appendix E). (6) Establishing a general methodology of efficient analysis of complex wing structures by indirect application of NN: the NN-aided Equivalent Plate Analysis. Training of the Neural Networks for this purpose in several cases of design spaces, which can be applicable for actual design of complex wings (Appendix F).

Kapania, Rakesh K.↗

Mobilization Protocols for Hybrid Sensors for Environmental AOP Sampling (HySEAS) Observations

The protocols presented here enable the proper mobilization of the latest-generation instruments for measuring the apparent optical properties (AOPs) of aquatic ecosystems. The protocols are designed for the Hybrid Sensors for Environmental AOP Sampling (HySEAS) class of instruments, but are applicable to the community of practice for AOP measurements. The protocols are organized into eleven sections beyond an introductory overview: a) cables and connectors, b) HySEAS instruments, c) platform preparation, d) instrument installation, e) cable installation, f) test deployment, g) test recovery, h) maintenance, i) shipping, j) storage, and k) smallboat operations. Each section concentrates on documenting how to prevent the most likely faults, remedy them should they occur, and accomplishing both with the proper application of a modest set of useful tools. Within the twelve sections, there are Socratic exercises to stimulate thought, and the answers to these exercises appear in Appendix A. Frequently asked questions (FAQs) are summarized in a separate section after the answers to the exercises in Appendix B. For practitioners unfamiliar with the nautical terms used throughout this document plus others likely encountered at sea, an abbreviated dictionary of nautical terms appears in Appendix C. An abbreviated dictionary of radiotelephone terms is presented in Appendix D. To ensure familiarity with many of the tools that are presented, Appendix E provides a description of the tools alongside a thumbnail picture. Abbreviated deployment checklists and cable diagrams are provided in Appendix F. The document concludes with an acknowledgments section, a glossary of acronyms, a definition of symbols, and a list of references.

Mobilizarion↗

Single institutional experience with initial ultrasound followed by computed tomography or magnetic resonance imaging for acute appendicitis in adults

Purpose: The objectives of this study was to assess the performance of ultrasound (US) for suspected appendicitis in adult patients and to evaluated the additive value of short-interval (within 1 week) computed tomography (CT) or Magnetic Resonance Imaging (MRI) after performing an initial US. Methods: In this IRB-approved, HIPAA-compliant, retrospective study, electronic medical records (EMRs) were queried for “US appendicitis” performed over a 2-year interval. EMR was reviewed for CT or MRI performed within 1 week of this exam, and if any new or additional information was available at subsequent exam. White count, patient disposition, and pathology, if surgery was performed, were also recorded. Results: 682 patients underwent US for appendicitis over a 2-year duration, age range from 18 to 92 years (average: 30.1 years, M:F = 141:541). Findings showed 126/682 patients with normal appendix, 75/682 uncomplicated appendicitis, and 4/682 with complicated appendicitis. When performed, no additional findings were seen in these groups on short-interval CT or MRI. 2/682 patients had equivocal findings on US but eventually had normal appendix identified on CT. Four hundred and seventy-three patients had non-visualized appendix, of which only 14/473 (3.1%) eventually had appendicitis. Conclusions: Ultrasound is an effective initial modality for evaluating appendicitis even in adult patients. Once a normal appendix, uncomplicated or complicated appendicitis is identified on US, no further imaging is necessary. Very few patients with non-visualization of the appendix eventually have appendicitis. Hence, these patients can be managed with active clinical follow-up rather than immediate CT or MRI. Symptoms and clinical scoring systems can be used for triage of these patients.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspection plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗