An onsite disposal facility (OSDF) was constructed at the Fernald Preserve, Ohio, for the disposal of contaminated soil and debris generated during a Comprehensive Environmental Response, Compensation, and Liability Act site cleanup. Completed in October of 2006, the 30 ha facility contains 2.26 million m{sup 3} of waste materials, has a maximum height of approximately 19.8 m, and consists of eight individual cells. The dimensions of cells 1-7 are approximately 213 m x 122 m each, or 26,000 m{sup 2} (2.60 ha). The dimensions of cell 8 (the last cell constructed) are larger than those of the other cells (approximately 3.8 ha). Each cell was constructed with a leachate collection system (LCS) that collected rainwater and storm-water runoff during waste placement and prevented it from entering the underlying environment. Other engineered features include a multilayer composite liner system, a leak detection system (LDS) positioned beneath the primary liner, and a multilayer composite cover that was placed over each cell following the completion of waste-placement activities. The LCS and LDS layers are designed to convey (by gravity) any leachate/fluid that enters the system through pipes to the west side of the facility and into tanks located in valve houses. From there, leachate can be sampled and conveyed to treatment. Groundwater is monitored beneath each cell via monitoring wells. In November 2006, the US DOE Office of Legacy Management (LM) assumed responsibility for the long-term care and maintenance of the OSDF. LM has nine years of monitoring and maintenance experience with the Fernald OSDF. Monitoring data is reported each year in the Fernald Annual Site Environmental Report. The data collected and inspections conducted indicate that the facility is operating as designed. The past nine years has provided LM with the opportunity to evaluate how well many of the design and as-built features of the facility have functioned over time as they pertain to environmental monitoring, valve-house operation and maintenance, and leachate transmission. Lessons learned concerning the long-term care and maintenance of the OSDF at the Fernald Preserve are presented. The main lessons learned include the following: How bivariate plots can be used to address environmental monitoring challenges created by installing an engineered disposal facility in a location where contamination is above the background level but below cleanup standards. How valve-house design decisions can help to alleviate long-term monitoring challenges. How scale buildup can lead to leachate transmission issues. Some additional minor lessons learned are also presented. (authors)
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗