A Step Towards the Final Frontier: Lessons Learned from Acceptance Testing of the First HPE/Cray EX 3000 System at ORNL

In this paper, we summarize the deployment of the Air Force Weather (AFW) HPC11 system at Oak Ridge National Laboratory (ORNL) including the process followed to successfully complete acceptance testing of the system. HPC11 is the first HPE/Cray EX 3000 system that has been successfully released to its user community in a federal facility. HPC11 consists of two identical 800-node supercomputers, Fawbush and Miller, with access to two independent and identical Lustre parallel file systems. HPC11 is equipped with Slingshot 10 interconnect technology and relies on the HPE Performance Cluster Manager (HPCM) software for system configuration. ORNL has a clearly defined acceptance testing process used to ensure that every new system deployed can provide the necessary capabilities to support user workloads. We worked closely with HPE and AFW to develop a set of tests that used the United Kingdom’s Meteorological Office’s Unified Model (UM) and 4DVAR. We also included benchmarks and applications from the Oak Ridge Leadership Computing Facility (OLCF) portfolio to fully exercise the HPE/Cray programming environment and evaluate the functionality and performance of the system. Acceptance testing of HPC11 required parallel execution of each element on Fawbush and Miller. In addition, careful coordination was needed to ensure successful acceptance of the newly deployed Lustre file systems alongside the compute resources. In this work, we present test results from specific system components and provide an overview of the issues identified, challenges encountered, and the lessons learned along the way.

Melesse Vergara, Veronica↗

2021 ROMANIA TRANSPORT SECURITY TABLE-TOP EXERCISE (TTX) – LESSONS LEARNED AND GOOD PRACTICES

During the period of 15-18 March 2021, the IAEA conducted a national workshop addressing the security of radioactive material in transport. The workshop was jointly hosted by the Romanian regulatory authority and the General Inspectorate of Romanian Gendarmerie. The workshop assisted Romania in improving its capability to evaluate the ability of response forces to counter a malicious act against radioactive material in transport. The event consisted of briefings, exercises, a demonstration of transport security equipment, and a transport security table-top exercise (TTX). The workshop was conducted in a virtual-hybrid format in such a way as to meet the COVID-19 related requirements in compliance with Romania’s guidelines. This paper provides an overview of the workshop’s activities, lessons-learned, and good practices related to the transport security TTX exercises.

Maican, Catalin↗

Sustainability, Scalability and Resiliency of the Town of Innisfil Mobility-on-Demand Experiment: Preliminary Results, Analyses, and Lessons Learned: Preprint

In 2017, the Town of Innisfil, Ontario launched Innisfil Transit in partnership with Uber, a transportation network company, to provide a subsidized on-demand public mobility service as an alternative to investing in a new fixed-route bus service. The performance of Innisfil Transit is documented in a 2021 Ryerson University report which shows greater cost effectiveness of the mobility provided over the proposed bus alternative (Sweet, Mitra, and Benaroya 2021). This paper expands on those findings by assessing Innisfil Transit with respect to sustainability, scalability, and resiliency. First, we quantify the energy and emissions of this program relative to traditional transit and driving alone across varying powertrains. We then characterize a conservative first-order estimate of the percentage of US communities that fall within a similar spatial-demographic tier as Innisfil. Replicability also hinges on service cost and performance in comparison to average values for low-density transit in the US. Lastly, most transit agencies experienced a significant drop in demand (as much as 90%) with slowly rebounding ridership since the onset of the COVID-19 pandemic. The resiliency of the Innisfil program to the pressures induced by the pandemic is examined in comparison to other transit operations. The lessons learned across these three dimensions complement prior work to better understand the efficiency and sustainability of on-demand public mobility service for low-density communities like Innisfil.

ADVANCED PROPULSION SYSTEMS↗

Lessons Learned for Rapid Decarbonization of Power Sectors

This report covers key lessons learned for the rapid decarbonization of power sectors, emphasizing best practices in planning, building, and operating electricity systems. Decarbonization covers all greenhouse gases, including carbon dioxide and methane. The intended audience of this report consists of energy ministers and other high-level energy sector decisionmakers.

21CPP↗

Accelerator Science and Technology Breakthroughs, Achievements and Lessons from the Tevatron

For almost a quarter of a century, the Tevatron proton-antiproton collider was the centerpiece of the world's high energy physics program - beginning operation in December of 1985 until it was overtaken by LHC in 2011. The aim of this unique scientific instrument was to explore the elementary particle physics reactions with center of mass collision energies of up to 1.96 TeV. The initial design luminosity of the Tevatron was 1030cm-2s-1, however as a result of two decades of upgrades, the accelerator has been able to deliver 430 times higher luminosities to each of two high luminosity experiments, CDF and D0. The Tevatron will be shut off September 30, 2011. The collider was arguably one of the most complex research instruments ever to reach the operation stage and is widely recognized for many technological breakthroughs and numerous physics discoveries. In this John Adams lecture, I briefly present the history of the Tevatron, major advances in accelerator physics, and technology implemented during the long quest for better and better performance. Lessons learned from our experience are also discussed.

43 PARTICLE ACCELERATORS↗

Design, Manufacturing, Assembly, and Lessons Learned of the Pre-production 325 MHz Couplers for the PIP-II Project at Fermilab

Five 325 MHz high-power couplers will be integrated into the pre-production Single Spoke Resonator Type-II (ppSSR2) cryomodule for the PIP-II project at Fermilab. Couplers were procured by both Fermilab and IJCLAB for this effort. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life cycle, including design, manufacturing, and assembly, along with the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Decarbonization of the power sector with CCS: Case study in two regions in the U.S. and lessons for Latin America

This work consists of estimates of potential changes in the total systems cost (TSC) of two RTOs of the United States (U.S.), MISO-N and SPP RTO West, under the traditional decarbonization pathway of replacement of fossil-power plants with variable renewable energy (VRE) and the less traditional pathway of retrofitting fossil fuel units with carbon capture and storage (CCS). Although the power mixes of MISO-N and SPP RTO West are particular to these regions, results can apply to other regions, including Latin American countries that are planning to decarbonize their power sectors. This case study serves to highlight lessons on differences in technology costs between these two pathways, as well as the cost associated with decarbonization rates close to 100%.

Pena-Cabra, Ivonne A.↗

Decommissioning Nuclear Facilities: First lessons Learned from UP1, Marcoule, France

On September 30, 1997, UP1, Marcoule Fuel reprocessing facility, dissolved its last spent Fuel rod. Final shutdown and stage 1 decommissioning began immediately after, under the supervision of CODEM , a consortium composed of The French Atomic Energy Commission, COGEMA, France fuel Cycle Company and EDF, the French Electricity Utility. The goal of the decommissioning program was to achieve stage 2 decommissioning , as per IAEA standards, within a period of about 15 years. 10 years later, a significant amount of decontamination and decommissioning works has been conducted with success. The contractual structure under which the program was launched has been profoundly modified, and the capacity of The French Atomic Energy Commission (CEA) and AREVA NC to complete full decommissioning programs has been confirmed. In the present document, we propose to examine the main aspects involved in the management of such decommissioning programs, and highlight, with significant examples, the main lessons learnt. In conclusion: As of 2007, UP1 decommissioning program proves to be a success. The choice of early decommissioning, the partnership launched between the French Atomic Energy Commission as owner of the site and decommissioning fund, with AREVA NC as operator and main contractor of the decommissioning works has been a success. The French Atomic Energy commission organized a contractual framework ensuring optimal safety conditions and work completion, while AREVA NC gained a unique experience at balancing the various aspects involved in the conduction of complete decommissioning programs. Although such a framework may not be applicable to all situations and facilities, it provides a positive example of a partnership combining institutional regulations and industrial efficiency.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Technology Readiness Assessment of Department of Energy Waste Processing Facilities: Lessons Learned, Next Steps

In an effort to improve its oversight of major waste treatment construction projects DOE has piloted a Technical Readiness Assessment/Technology Maturation Plan (TRA/TMP) process based on similar processes employed by the United States Department of Defense (DoD) and the National Aeronautics and Space Administration (NASA. DOE has carried out TRAs for the Hanford Waste Treatment and Immobilization Plant (WTP), for supplemental treatment technologies that may be employed to process Hanford low activity waste (LAW), for the removal of Hanford K-Basin waste, and for treatment technologies for Savannah River Site's tank 48. This paper describes the TRA/TMP methodology and discusses the findings and lessons learned during its application. The paper also discusses the next steps in the technical assessment of DOE environmental projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Surveillance and Maintenance at Rocky Flats: Early Experiences and Lessons Learned

The U.S. Department of Energy's (DOE's) Rocky Flats Site was established in 1951 as part of the United States' nationwide nuclear weapons complex to manufacture nuclear weapons components. In 1992 weapons production halted, and the Rocky Flats mission changed to include environmental investigations, cleanup, and site closure. In October 2005, DOE and its contractor completed an accelerated 10-year, $7 billion cleanup of chemical and radiological contamination left from nearly 50 years of production. The cleanup required the decommissioning, decontamination, demolition, and removal of more than 800 structures; removal of more than 500,000 cubic meters of low-level radioactive waste; and remediation of more than 360 potentially contaminated environmental sites. The final remedy for the site was selected in September 2006 and included institutional controls, physical controls, and continued monitoring for the former industrial portion of the site. The remainder of the site, which served as a buffer zone surrounding the former industrial area, was transferred to the U.S. Fish and Wildlife Service in July 2007 for a national wildlife refuge. DOE's Office of Legacy Management is responsible for the long-term surveillance and maintenance of Rocky Flats, which includes remedy implementation activities and general site maintenance. Several factors have complicated the transition from closure to post-closure at Rocky Flats. The early experiences associated with the two years since the physical cleanup and closure work were completed have led to several valuable lessons learned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote-Handled Transuranic Waste Drum Venting - Operational Experience and Lessons Learned

Remote-handled transuranic (RH TRU) waste drums must be vented to meet transportation and disposal requirement before shipment to the Waste Isolation Pilot Plant. The capability to perform remote venting of drums was developed and implemented at the Idaho National Laboratory. Over 490 drums containing RH TRU waste were successfully vented. Later efforts developed and implemented a long-stem filter to breach inner waste bags, which reduced layers of confinement and mitigated restrictive transportation wattage limits. This paper will provide insight to the technical specifications for the drum venting system, development, and testing activities, startup, operations, and lessons learned. (authors)

42 ENGINEERING↗

Post-Closure Land Jurisdiction Transfer to the US Fish and Wildlife Service at Rocky Flats: Surviving the Safari Through Old Records and Other Lessons Learned

The U.S. Department of Energy's (DOE's) Rocky Flats Site (Rocky Flats), located near Denver, Colorado, was listed on the Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List (NPL) in 1989. Subsequent cleanup and closure activities were completed in October 2005 and the final remedy was selected in September 2006. The remedy is 'no further action' for the generally un-impacted Peripheral Operable Unit (OU), formerly known as the Buffer Zone, and institutional and physical controls with continued monitoring for the Central OU, formerly the industrialized area. The Peripheral OU has been deleted from the NPL and jurisdiction over the majority of land in that OU (3,953 acres) was transferred to the U.S. Fish and Wildlife Service (USFWS) on July 12, 2007, to establish the Rocky Flats National Wildlife Refuge. The remaining approximately 929 acres in the Peripheral OU were retained by DOE's Office of Legacy Management where outstanding mineral leases and mining operations exist. As mineral rights are purchased or mining operations and mineral leases are completed and fully reclaimed, jurisdiction of portions of the 929 acres will also be transferred to USFWS for inclusion into the refuge. During the almost 2 years since cleanup and closure work was completed at Rocky Flats, DOE and USFWS have worked the specific legal parameters, timing, and constraints of the 3,953-acre transfer. Many lessons have been learned, based on these early experiences. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Decarbonization of the power sector with CCS: Case study in two regions in the U.S. and lessons for Latin America

This paper estimates potential changes in the total systems cost (TSC) of two RTOs of the United States (U.S.), MISO-N and SPP RTO West, under the traditional decarbonization pathway of replacement of fossil-power plants with variable renewable energy (VRE) and the less traditional pathway of retrofitting fossil fuel units with carbon capture and storage (CCS). Although the power mixes of MISO-N and SPP RTO West are particular to those regions, the results can apply to other regions, including Latin American countries that are planning to decarbonize their power sectors. This case study serves to highlight lessons on the difference of technology costs between these two pathways, as well as the cost associated with decarbonization rates close to 100%.

Pena-Cabra, Ivonne A.↗

Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, the organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Overall results of and lessons learned from the IAEA CRP on sodium natural circulation test performed during the Phenix end-of-life experiments

In 2007, the International Atomic Energy Agency (IAEA) launched the Coordinated Research Project (CRP) 'Control Rod Withdrawal and Sodium Natural Circulation Tests Performed during the Phenix End-of-Life Experiments'. The overall purpose of the CRP, performed within the framework of the IAEA programme in support of innovative fast reactor technology development and deployment, is to improve the Member States' analytical capabilities in the various fields of research and design of sodium-cooled fast reactors through data and codes verification and validation. In particular the CRP, taking advantage of the End-of-Life set of experiments performed before the final shut-down of the French prototype fast breeder power reactor Phenix, aims at improving fast reactor simulation methods and design capabilities in the field of temperature and power distribution evaluation, as well as of the analysis of sodium natural circulation phenomena. The paper presents the overall results of the CRP, including blind calculations and post-test and sensitivity analyses carried out by the CRP participants, as well as lessons learned and recommendations for further future implementations to resolve open issues. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Project Plan, Status, and Lessons Learned for the LANL 3,706 m{sup 3} TRU Waste Campaign - 13085

The Los Alamos National Laboratory (LANL) is currently engaged in a campaign to disposition 3,706 m{sup 3} of transuranic (TRU) waste stored above grade at its Technical Area 54 (TA-54) Area G waste management facility before June 30, 2014. This campaign includes complete removal of all non-cemented above-grade TRU waste that was in storage on October 1, 2011, and is defined as 3,706 m{sup 3} of material. TRU waste containers were placed into storage up to 40 years ago, and most of the older containers must be remediated to address compliance issues before the waste can be characterized, certified as meeting the Waste Isolation Pilot Plant (WIPP) Waste Acceptance Criteria (WAC), and shipped for disposition. More than half of the remaining TRU waste volume stored above grade is contained within oversize boxes that contain waste items that must be repackaged or size reduced. Facilities and major types of equipment needed to remediate and characterize the TRU waste inventory include two additional oversize box processing lines that are being brought into service as Nuclear Hazard Category III facilities in fiscal year (FY) 2013. Multiple work shifts are scheduled for most remediation lines in FY 2013. An integrated risk-based project management schedule for all disposition activities has been developed that is based on a 'Solution Package' approach. Inventories of containers that have issues in common were compiled into about 15 waste categories and about 75 'Solution Packages' that identify all of the activities needed to disposition the inventory of TRU waste in storage. Scheduled activities include all precursor activities to begin remediation, remediation processing, characterization and certification to the WIPP WAC, and shipping of containers to WIPP. Other industrial processing practices that have been adopted to improve efficiency include staging of containers for remediation, characterization, and shipping; establishment of a transportation center; and load management practices for transportation payloads. Progress and accomplishments during FY 2012 are reviewed, and plans for FY 2013 are presented in some detail. Lessons learned on adoption of industrial processing practices are also discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience and Lessons Learned from Conditioning of Spent Sealed Sources in Singapore - 13107

In 2010, IAEA requested KAERI (Korea Atomic Energy Research Institute) to support Singapore for conditioning spent sealed sources. Those that had been used for a lightning conductor, check source, or smoke detector, various sealed sources had been collected and stored by the NEA (National Environment Agency) in Singapore. Based on experiences for the conditioning of Ra-226 sources in some Asian countries since 2000, KAERI sent an expert team to Singapore for the safe management of spent sealed sources in 2011. As a result of the conditioning, about 575.21 mCi of Am-241, Ra-226, Co-60, and Sr-90 were safely conditioned in 3 concrete lining drums with the cooperation of the KAERI expert team, the IAEA supervisor, the NEA staff and local laborers in Singapore. Some lessons were learned during the operation: (1) preparations by a local authority are very helpful for an efficient operation, (2) a preliminary inspection by an expert team is helpful for the operation, (3) brief reports before and after daily operation are useful for communication, and (4) a training opportunity is required for the sustainability of the expert team. (authors)

07 ISOTOPE AND RADIATION SOURCES↗