Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical issues”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

ISO New England Dual Fuel Capabilities to Limit Natural Gas and Electricity Interdependencies

Since 2000, natural gas has seen tremendous growth as a fuel source for electricity generation in the United States (U.S.) with annual installations exceeding 20 GW in all but four years. It also accounts for an increasingly significant share of the nation’s electricity generation, growing from around 15 percent in the early part of the 2000s to between 26 and 29 percent in the last three years. (1) Increasing reliance on natural gas has led to concerns that an extreme weather event – which may cause curtailments in gas delivery – or a natural gas infrastructure failure could lead to local or regional electric reliability issues. (2) These concerns stem from differences in delivery methods of natural gas to electric generating units (EGUs) contrasted with the fuel delivery and storage methods for traditional baseload power systems (i.e. coal and nuclear units).1 (3) Although it seems that there is an abundance of natural gas in a post-shale gas world, infrastructure limitations and differences in electric and natural gas markets persist that differentiate natural gas-fired generators from traditional baseload power generators. Such concerns can be partially mitigated by modifying natural gas EGUs for operation on secondary fuels and installing on-site fuel storage for the secondary fuel, thus ensuring continuity of operation in the case of a gas delivery problem.2 This report examines technical, regulatory, and market issues associated with operating power plants primarily fueled with natural gas, on a secondary fuel, such as fuel oil or liquefied natural gas (LNG). In addition, a regional case study was completed to identify the current and near-term potential for dual fuel operation in New England, along with a market impact analysis of potential cost savings during an extreme weather event. The New England Independent System Operator (ISO-NE) was selected as the study area based on a preponderance of natural gas-fired generators contributing to the regional generating capacity mix (nearly 50 percent natural gas), limited natural gas supply infrastructure, and the potential for natural gas delivery disruptions due to cold weather events, exacerbated by the lack of bulk natural gas storage in the region.

03 NATURAL GAS↗

The Future of Low-Carbon Electricity

We review future global demand for electricity and major technologies positioned to supply it with minimal greenhouse gas (GHG) emissions: renewables (wind, solar, water, geothermal, and biomass), nuclear fission, and fossil power with CO2 capture and sequestration. We discuss two breakthrough technologies (space solar power and nuclear fusion) as exciting but uncertain additional options for low-net GHG emissions (i.e., low-carbon) electricity generation. In addition, we discuss grid integration technologies (monitoring and forecasting of transmission and distribution systems, demand-side load management, energy storage, and load balancing with low-carbon fuel substitutes). For each topic, recent historical trends and future prospects are reviewed, along with technical challenges, costs, and other issues as appropriate. Although no technology represents an ideal solution, their strengths can be enhanced by deployment in combination, along with grid integration that forms a critical set of enabling technologies to assure a reliable and robust future low-carbon electricity system.

09 BIOMASS FUELS↗

Final Assessment of Manual Ultrasonic Examinations Applied to Detect Flaws in Primary System Dissimilar Metal Welds at North Anna Power Station

PNNL conducted a technical assessment of the NDE issues and protocols that led to missed detections of several axially oriented flaws in a steam generator primary inlet dissimilar metal weld at North Anna Power Station, Unit 1 (NAPS-1). This particular component design exhibits a significant outside-diameter (OD) taper that is not included as a blind performance demonstration mock-up within the industry’s Performance Demonstration Initiative, administered by EPRI. For this reason, the licensee engaged EPRI to assist in the development of a technical justification to support the basis for a site-specific qualification. The service-induced flaws at NAPS-1 were eventually detected as a result of OD surface machining in preparation for a full structural weld overlay. The machining operation uncovered the existence of two through-wall flaws, based on the observance of primary water leaking from the dissimilar metal weld. A total of five axially oriented flaws were detected in varied locations around the weld circumference. The field volumetric examination that was conducted at NAPS-1 was a non-encoded, real-time manual ultrasonic examination. PNNL conducted both an initial assessment, and subsequently, a more rigorous technical evaluation (reported here), which has identified an array of NDE issues that may have led to the subject missed detections. These evaluations were performed through technical reviews and discussions with NRC staff, EPRI NDE Center personnel, industry and ISI vendor personnel, and ultrasonic transducer manufacturers, and laboratory tests, to better understand the underlying issues at North Anna.

cracks↗

Issues in Formation of Cryogenic Pellets for Fusion Applications

Cryogenic pellets are used for injection into fusion plasmas to add fuel to build up density and replace the ions lost from fusion reactions and imperfect confinement in the plasma. These pellets are formed at cryogenic temperatures with pure hydrogenic isotopes or mixtures of the isotopes. Technology to make these pellets and inject them into plasmas has been under development for many years, and various methods using freezing or desublimation have been shown to produce high-quality solid pellets suitable for injection. The throughput needed and possible impurity content from the necessary recirculation of fusion exhaust gases are two of the key issues to overcome for fusion pellet fueling systems in long-pulse burning plasmas. Here, we describe the technical challenges associated with these issues and the capability of pellet formation extruders to overcome them.Cryogenic pellets of deuterium, neon, and argon are also used in fusion tokamak devices for disruption mitigation in the form of large pellets that can be injected on demand to quickly dissipate the plasma thermal energy through radiation and add significant density in order to prevent runaway electron formation. Here, the issue is not throughput as with the fueling pellets but rather is the time it takes to form pellets of the size needed and the ability to dislodge them immediately on demand when needed to mitigate a disruption. The method used to make these pellets by desublimation is described, and examples related to how pellet size and input gas parameters affect the formation time are provided.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Executive summary of major NuMI lessons learned: a review of relevant meetings of Fermilab's DUSEL Beamline Working Group

We have gained tremendous experience with the NuMI Project on what was a new level of neutrino beams from a high power proton source. We expect to build on that experience for any new long baseline neutrino beam. In particular, we have learned about some things which have worked well and/or where the experience is fairly directly applicable to the next project (e.g., similar civil construction issues including: tunneling, service buildings, outfitting, and potential claims/legal issues). Some things might be done very differently (e.g., decay pipe, windows, target, beam dump, and precision of power supply control/monitoring). The NuMI experience does lead to identification of critical items for any future such project, and what issues it will be important to address. The DUSEL Beamline Working Group established at Fermilab has been meeting weekly to collect and discuss information from that NuMI experience. This document attempts to assemble much of that information in one place. In this Executive Summary, we group relevant discussion of some of the major issues and lessons learned under seven categories: (1) Differences Between the NuMI Project and Any Next Project; (2) The Process of Starting Up the Project; (3) Decision and Review Processes; (4) ES&H: Environment, Safety, and Health; (5) Local Community Buy-In; (6) Transition from Project Status to Operation; and (7) Some Lessons on Technical Elements. We concentrate here on internal project management issues, including technical areas that require special attention. We cannot ignore, however, two major external management problems that plagued the NuMI project. The first problem was the top-down imposition of an unrealistic combination of scope, cost, and schedule. This situation was partially corrected by a rebaselining. However, the full, desirable scope was never achievable. The second problem was a crippling shortage of resources. Critical early design work could not be done in a timely fashion, leading to schedule delays, inefficiencies, and corrective actions. The Working Group discussions emphasized that early planning and up-front appreciation of the problems ahead are very important for minimizing the cost and for the greatest success of any such project. Perhaps part of the project approval process should re-enforce this need. The cost of all this up-front work is now reflected in the DOE cost of any project we do. If we are being held to an upper limit on the project cost, the only thing available for compromise is the eventual project scope.

43 PARTICLE ACCELERATORS↗

Utah FORGE: Optimization of a Plug-and-Perf Stimulation (Fervo Energy)

Information around the plug-and-perf treatment design at Utah FORGE by Fervo Energy. Objective and Purpose: - Develop a multistage hydraulic stimulation approach designed specifically to target the top three factors that control the technical and commercial viability of an EGS system: i) Achieving sufficient injectivity to support high cross-well flow rates ii) Distributing flow evenly across the wellbore and reservoir to maximize heat mining efficiency, ensure sustained heat transfer, and mitigate thermal breakthrough iii) Overcoming the effects of stress heterogeneity, stress shadowing, and variations in natural fracture properties during the stimulation treatment, leading to a more predictable stimulated reservoir volume and offset well placement - The following activities will be performed: i) Design, plan, and execute a multistage plug-and-perf stimulation treatment at a Fervo site with data acquisition and well testing activities aimed at addressing key technical aspects of the issues above ii) Perform data processing and interpretation of field results to translate the results form the Fervo site to a site-specific design at the Utah FORGE site iii) Design, plan, and execute a multistage plug-and-perf stimulation treatment design at the Utah FORGE site Methods and Approach: - Design a detailed data acquisition plan to maximize learning around: i) DFIT testing ii) Petrophysical logging, image logging iii) Permanent DAS/DTS fiber optic monitoring iv) Deep borehole microseismic monitoring v) Shallow borehole induced seismicity monitoring vi) Injection/production testing (RTA analysis, tracer testing) vii) Integrated numerical modeling and production forecasting

15 GEOTHERMAL ENERGY↗

Solar Energy Research Institute for India and the United States (SERIIUS): Lessons and Results from a Binational Consortium

This book describes the development, functioning, and results of a successful binational program to promote significant scientific advances in Earth-abundant photovoltaics (PV) and concentrated solar power (CSP), advanced process/manufacturing technologies, multiscale modeling and reliability testing, and analysis of integrated solar energy systems. SERIIUS is a consortium between India and the United States dedicated to developing new solar technologies and assessing their potential impact in the two countries. The consortium consists of nearly 50 institutions including academia, national laboratories, and industry, with the goal of developing significant new technologies in all areas of solar deployment. In addition, the program focused on workforce development through graduate students, post-doctoral students, and an international exchange program. Particular emphasis was placed on the following efforts: creating disruptive technologies in PV and CSP through high-impact fundamental and applied research and development (R&D); identifying and quantifying the critical technical, economic, and policy issues for solar energy development and deployment in India; overcoming barriers to technology transfer by teaming research institutions and industry in an effective project structure; building a new platform for binational collaboration using a formalized R&D project structure, along with effective management, coordination, and decision processes; creating a sustainable network and workforce development program from which to build large collaborations and fostering a collaborative culture and outreach programs. This includes using existing and new methodologies for collaboration based on advanced electronic and web-based communication to facilitate functional international teams. The book summarizes the general lessons learned from these experiences.

14 SOLAR ENERGY↗

Prevention of Intracranial In-stent Restenoses: Predilatation with a Drug Eluting Balloon, Followed by the Deployment of a Self-Expanding Stent

Stenting in intracranial atherosclerotic disease (ICAD) is increasingly debated, due to issues of procedural safety, technical efficacy, and in-stent recurrent stenoses (ISR). In the present study, feasibility, safety, and efficacy of angioplasty using a drug-eluting balloon (DEB) followed by the implantation of a self-expanding stent (Enterprise) were evaluated for the treatment of ICAD lesions. Fifty-two patients (median age: 71 years; range: 54-86 years; male/female ratio 37:15) underwent stenting of high-grade ICAD lesions between February 2010 and November 2011 in a single center. Angioplasty using a paclitaxel coated SeQuent Please (B. Braun, Germany) or DIOR (Eurocor, Germany) coronary PTCA balloon, followed by the implantation of a self-expanding stent (Enterprise, Codman, USA) was performed in 54 lesions. Angiographic and clinical follow-up was performed at 6 and 12 weeks, 6 and 12 months, and yearly thereafter. Technical success rate, periprocedural complications, occurrence of recurrent ischemic symptoms, and the development of an ISR were analyzed. Angioplasty using a DEB followed by stent implantation was successfully performed in 44 (81 %) cases. DEB insertion failed in 19 % of the cases and angioplasty was finally performed using a conventional PTCA balloon. The combined procedure related permanent neurologic morbidity and mortality rate (stroke, ICH, and subarachnoid hemorrhage) at 30 days and beyond was 5 %. Angiographic and clinical follow-up were obtained in 33 (61 %) lesions in 32 patients. Recurrent stenosis was seen in one (3 %) lesion. Angioplasty and stenting using a DEB is safe and yields encouragingly low ISR rates. Further technical developments to improve lesion accessibility are, nevertheless, mandatory.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Quantitative Assessment of Workload and Stressors in Clinical Radiation Oncology

Purpose: Workload level and sources of stressors have been implicated as sources of error in multiple settings. We assessed workload levels and sources of stressors among radiation oncology professionals. Furthermore, we explored the potential association between workload and the frequency of reported radiotherapy incidents by the World Health Organization (WHO). Methods and Materials: Data collection was aimed at various tasks performed by 21 study participants from different radiation oncology professional subgroups (simulation therapists, radiation therapists, physicists, dosimetrists, and physicians). Workload was assessed using National Aeronautics and Space Administration Task-Load Index (NASA TLX). Sources of stressors were quantified using observational methods and segregated using a standard taxonomy. Comparisons between professional subgroups and tasks were made using analysis of variance ANOVA, multivariate ANOVA, and Duncan test. An association between workload levels (NASA TLX) and the frequency of radiotherapy incidents (WHO incidents) was explored (Pearson correlation test). Results: A total of 173 workload assessments were obtained. Overall, simulation therapists had relatively low workloads (NASA TLX range, 30-36), and physicists had relatively high workloads (NASA TLX range, 51-63). NASA TLX scores for physicians, radiation therapists, and dosimetrists ranged from 40-52. There was marked intertask/professional subgroup variation (P<.0001). Mental demand (P<.001), physical demand (P=.001), and effort (P=.006) significantly differed among professional subgroups. Typically, there were 3-5 stressors per cycle of analyzed tasks with the following distribution: interruptions (41.4%), time factors (17%), technical factors (13.6%), teamwork issues (11.6%), patient factors (9.0%), and environmental factors (7.4%). A positive association between workload and frequency of reported radiotherapy incidents by the WHO was found (r = 0.87, P value=.045). Conclusions: Workload level and sources of stressors vary among professional subgroups. Understanding the factors that influence these findings can guide adjustments to the workflow procedures, physical layout, and/or communication protocols to enhance safety. Additional evaluations are needed in order to better understand if these findings are systemic.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Comparisons of linear and nonlinear plasma response models for non-axisymmetric perturbations

With the installation of non-axisymmetric coil systems on major tokamaks for the purpose of studying the prospects of ELM-free operation, understanding the plasma response to the applied fields is a crucial issue. Application of different response models, using standard tools, to DIII-D discharges with applied non-axisymmetric fields from internal coils, is shown to yield qualitatively different results. The plasma response can be treated as an initial value problem, following the system dynamically from an initial unperturbed state, or from a nearby perturbed equilibrium approach, and using both linear and nonlinear models [A. D. Turnbull, Nucl. Fusion 52, 054016 (2012)]. Criteria are discussed under which each of the approaches can yield a valid response. In the DIII-D cases studied, these criteria show a breakdown in the linear theory despite the small 10{sup −3} relative magnitude of the applied magnetic field perturbations in this case. For nonlinear dynamical evolution simulations to reach a saturated nonlinear steady state, appropriate damping mechanisms need to be provided for each normal mode comprising the response. Other issues arise in the technical construction of perturbed flux surfaces from a displacement and from the presence of near nullspace normal modes. For the nearby equilibrium approach, in the absence of a full 3D equilibrium reconstruction with a controlled comparison, constraints relating the 2D system profiles to the final profiles in the 3D system also need to be imposed to assure accessibility. The magnetic helicity profile has been proposed as an appropriate input to a 3D equilibrium calculation and tests of this show the anticipated qualitative behavior.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The scientific case for a JET D-T experiment

After the first high power D-T experiment in JET in 1997 (DTE1), when JET was equipped with Carbon PFC's, a proposed second high power (up to ∼40MW) D-T campaign (DTE2) in the current Be/W vessel will address essential operational, technical, diagnostics and scientific issues in support of ITER. These experiments are proposed to minimize the risks to ITER by testing strategies for the management of the in-vessel tritium content, by providing the basis for transferring operational scenarios from non-active operation to D-T mixtures and by addressing the issue of the neutron measurement accuracy. Dedicated campaigns with operation in Deuterium, Hydrogen and Tritium before the D-T campaign proper will allow the investigation of isotope scaling of the H-mode transition, pedestal physics, heat, particle, momentum and impurity transport in much greater detail than was possible in DTE1. The D-T campaign proper will include validations of the baseline ELMy H-Mode scenario, of the hybrid H-mode and advanced tokamak scenarios, as well as the investigation of alpha particle physics and the qualification of ICRH scenarios suitable for D-T operation. This paper reviews the scientific goals of DTE2 together with a summary of the results of DTE1.

07 ISOTOPE AND RADIATION SOURCES↗

Design, discovery and growth of novel materials

This editorial introduces the special issue on design, discovery, and growth of novel materials. The papers of this special issue review and reveal technical details of of how specific growths are developed and implemented.

36 MATERIALS SCIENCE↗

A Project Lifetime Approach to the Management of Induced Seismicity Risk at Geologic Carbon Storage Sites

The geologic storage of carbon dioxide (CO 2 ) is one method that can help reduce atmospheric CO 2 by sequestering it into the subsurface. Large-scale deployment of geologic carbon storage, however, may be accompanied by induced seismicity. We present a project lifetime approach to address the induced seismicity risk at these geologic storage sites. This approach encompasses both technical and nontechnical stakeholder issues related to induced seismicity and spans the time period from the initial consideration phase to postclosure. These recommendations are envisioned to serve as general guidelines, setting expectations for operators, regulators, and the public. They contain a set of seven actionable focus areas, the purpose of which are to deal proactively with induced seismicity issues. Although each geologic carbon storage site will be unique and will require a custom approach, these general best practice recommendations can be used as a starting point to any site-specific plan for how to systematically evaluate, communicate about, and mitigate induced seismicity at a particular reservoir.

58 GEOSCIENCES↗

IFT&E Industry Report: Wind Turbine-Radar Interference Test Summary

Wind turbines have grown in size and capacity with today's average turbine having a power capacity of around 1.9 MW, reaching to heights of over 495 feet from ground to blade tip, and operating with speeds at the tip of the blade up to 200 knots. When these machines are installed within the line-of-sight of a radar system, they can cause significant clutter and interference, detrimentally impacting the primary surveillance radar (PSR) performance. The Massachusetts Institute of Technology's Lincoln Laboratory (MIT LL) and Sandia National Laboratories (SNL) were co-funded to conduct field tests and evaluations over two years in order to: I. Characterize the impact of wind turbines on existing Program-of-Record (POR) air surveillance radars; II. Assess near-term technologies proposed by industry that have the potential to mitigate the interference from wind turbines on radar systems; and III. Collect data and increase technical understanding of interference issues to advance development of long-term mitigation strategies. MIT LL and SNL managed the tests and evaluated resulting data from three flight campaigns to test eight mitigation technologies on terminal (short) and long-range (60 nmi and 250 nmi) radar systems. Combined across the three flight campaigns, more than 460 of hours of flight time were logged. This paper summarizes the Interagency Field Test & Evaluation (IFT&E) program and publicly- available results from the tests. It will also discuss the current wind turbine-radar interference evaluation process within the government and a proposed process to deploy mitigation technologies.

Karlson, Benjamin↗

ISO New England Dual Fuel Capabilities to Limit Natural Gas and Electricity Interdependencies

This report examines technical, regulatory, and market issues associated with operating power plants primarily fueled with natural gas, on a secondary fuel, such as fuel oil or liquefied natural gas (LNG). In addition, a regional case study was completed to identify the current and near-term potential for dual fuel operation in New England, along with a market impact analysis of potential cost savings during an extreme weather event. The New England Independent System Operator (ISO-NE) was selected as the study area based on a preponderance of natural gas-fired generators contributing to the regional generating capacity mix (nearly 50 percent natural gas), limited natural gas supply infrastructure, and the potential for natural gas delivery disruptions due to cold weather events, exacerbated by the lack of bulk natural gas storage in the region.

03 NATURAL GAS↗

Closeout Briefing for PSL Technical Survey of MSTS SCP (JASPER) [PowerPoint]

NNSA Order 56XB (Chapter 13.2) requires the Primary Standards Laboratory (PSL) to perform technical surveys on the integrated contractors participating in the NNSA Standards and Calibration Program. In addition to Chapter 13.2, the surveys check for compliance with ISO/IEC 17025 and the PSLM. The PSL Technical Survey is a joint activity of the NNSA and the PSL. The PSL is responsible for the technical portion of the survey and the NNSA is responsible for the quality portion. The Technical Survey report is issued by the NNSA.

42 ENGINEERING↗