Search NASA⌕ Search

SEARCH · Search NASA

Results for “Completion Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

The Planned Soil Moisture Active Passive (SMAP) Mission L-Band Radar/Radiometer Instrument

The Soil Moisture Active/Passive (SMAP) mission is a NASA mission identified by the NRC 'decadal survey' to measure both soil moisture and freeze/thaw state from space. The mission will use both active radar and passive radiometer instruments at L-Band. In order to achieve a wide swath at sufficiently high resolution for both active and passive channels, an instrument architecture that uses a large rotating reflector is employed. The instrument system has completed the preliminary design review (PDR) stage, and detailed instrument design has begun. In addition to providing an overview of the instrument design, two recent design modifications are discussed: 1) The addition of active thermal control to the instrument spun side to provide a more stable, settable thermal environment for the radiometer electronics, and 2) A 'sequential transmit' strategy for the two radar polarization channels which allows a single high-power amplifier to be used.

radiometer↗

Gripping Mechanisms for Microgravity and Extreme Terrain and Vertical Climbing Micro Ground Vehicle

Asteroids and comets may provide insight into the origins of our solar system and the precursors to life on our planet. Near Earth objects offer an accessible target of opportunity, but are small and lack the gravity necessary for conventional wheeled travel. Therefore, it is necessary to develop alternative methods for maneuvering in these environments. This project researched and developed a method for gripping rock surfaces. Work has been completed on the design and prototyping of several possible hooked gripping mechanisms. Future work includes quantitative testing, downselection to a final design, and attachment to the robotic platform, Lemur IIb. A second project focuses on the development of a 100g, crash-proof robot capable of climbing vertical surfaces using a novel silicone adhesive. Capable of carrying video/audio payloads the robot may serve as a surveillance tool for the Department of Defense or as a method of pre-flight spacecraft inspections. A specialized track was developed to provide the specific loading conditions necessary for proper engagement of the adhesive. Both of these projects rely heavily on the shape deposition manufacturing process, being researched at JPL, and 3D printing.

robotic locomotion↗

Importance of Requirements Analysis & Traceability to Improve Software Quality and Reduce Cost and Risk

The goal of this paper is to emphasize the importance of developing complete and unambiguous requirements early in the project cycle (prior to Preliminary Design Phase). Having a complete set of requirements early in the project cycle allows sufficient time to generate a traceability matrix. Requirements traceability and analysis are the key elements in improving verification and validation process, and thus overall software quality. Traceability can be most beneficial when the system changes. If changes are made to high-level requirements it implies that low-level requirements need to be modified. Traceability ensures that requirements are appropriately and efficiently verified at various levels whereas analysis ensures that a rightly interpreted set of requirements is produced.

Kapoor, Manju M.↗

Web Based Tool for Mission Operations Scenarios

A conventional practice for spaceflight projects is to document scenarios in a monolithic Operations Concept document. Such documents can be hundreds of pages long and may require laborious updates. Software development practice utilizes scenarios in the form of smaller, individual use cases, which are often structured and managed using UML. We have developed a process and a web-based scenario tool that utilizes a similar philosophy of smaller, more compact scenarios (but avoids the formality of UML). The need for a scenario process and tool became apparent during the authors' work on a large astrophysics mission. It was noted that every phase of the Mission (e.g., formulation, design, verification and validation, and operations) looked back to scenarios to assess completeness of requirements and design. It was also noted that terminology needed to be clarified and structured to assure communication across all levels of the project. Attempts to manage, communicate, and evolve scenarios at all levels of a project using conventional tools (e.g., Excel) and methods (Scenario Working Group meetings) were not effective given limitations on budget and staffing. The objective of this paper is to document the scenario process and tool created to offer projects a low-cost capability to create, communicate, manage, and evolve scenarios throughout project development. The process and tool have the further benefit of allowing the association of requirements with particular scenarios, establishing and viewing relationships between higher- and lower-level scenarios, and the ability to place all scenarios in a shared context. The resulting structured set of scenarios is widely visible (using a web browser), easily updated, and can be searched according to various criteria including the level (e.g., Project, System, and Team) and Mission Phase. Scenarios are maintained in a web-accessible environment that provides a structured set of scenario fields and allows for maximum visibility across the project. One key aspect is that the tool was built for a scenario process that accounts for stakeholder input, review, comment, and concurrence. By creating well-designed opportunities for stakeholder input and concurrence and by making the scenario content easily accessible to all project personnel, we maximize the opportunities for stakeholders to both understand and agree on the concepts for how their mission is to be carried out.

Boyles, Carole A.↗

Workstation-Based Avionics Simulator to Support Mars Science Laboratory Flight Software Development

The Mars Science Laboratory developed the WorkStation TestSet (WSTS) to support flight software development. The WSTS is the non-real-time flight avionics simulator that is designed to be completely software-based and run on a workstation class Linux PC. This provides flight software developers with their own virtual avionics testbed and allows device-level and functional software testing when hardware testbeds are either not yet available or have limited availability. The WSTS has successfully off-loaded many flight software development activities from the project testbeds. At the writing of this paper, the WSTS has averaged an order of magnitude more usage than the project's hardware testbeds.

WSTS↗

Process for Upgrading Cognitive Assessment Capabilities Onboard the International Space Station

MOTIVATION: Spaceflight poses varied and unique risks to the brain and cognitive functioning including radiation exposure, sleep disturbance, fatigue, fluid shifts (increased intracranial pressure), toxin exposure, elevated carbon dioxide, and traumatic brain injury, among others. These potential threats to cognitive functioning are capable of degrading performance and compromising mission success. Furthermore, the threats may increase in severity, and new types of threats may emerge for longer duration exploration missions. This presentation will describe the process used to identify gaps in our current approach, evaluate best practices in cognitive assessment, and transition new cognitive assessment tools to operational use. OVERVIEW: Risks to brain health and performance posed by spaceflight missions require sensitive tools to assess cognitive functioning of astronauts in flight. The Spaceflight Cognitive Assessment Tool for Windows (WinSCAT) is the automated cognitive assessment tool currently deployed onboard the International Space Station (ISS). WinSCAT provides astronauts and flight surgeons with objective data to monitor neurocognitive functioning. WinSCAT assesses 5 discrete cognitive domains, is sensitive to changes in cognitive functioning, and was designed to be completed in less than 15 minutes. However, WinSCAT does not probe other areas of cognitive functioning that might be important to mission success. Researchers recently have developed batteries that may expand current capabilities, such as increased sensitivity to subtle fluctuations in cognitive functioning. Therefore, we engaged in a systematic process review in order to improve upon our current capabilities and incorporate new advances in cognitive assessment. This process included a literature review on newer measures of neurocognitive assessment, surveys of operational flight surgeons at NASA regarding needs and gaps in our capabilities, and expert panel review of candidate cognitive measures and assessment issues and procedures. SIGNIFICANCE: Our process and the results that flowed from it may be helpful to aeromedical professionals charged with transitioning research findings to operational use. Our specific findings regarding cognitive assessment tools are of significance to professionals who must assess readiness to perform in mission critical situations in environments involving threats to cognition and performance

Picano, J. J.↗

Simplified Methodology to Estimate the Maximum Liquid Helium (LHe) Cryostat Pressure from a Vacuum Jacket Failure

The aircraft-based Stratospheric Observatory for Infrared Astronomy (SOFIA) is a platform for multiple infrared astronomical observation experiments. These experiments carry sensors cooled to liquid helium temperatures. The liquid helium supply is contained in large (i.e., 10 liters or more) vacuum-insulated dewars. Should the dewar vacuum insulation fail, the inrushing air will condense and freeze on the dewar wall, resulting in a large heat flux on the dewar's contents. The heat flux results in a rise in pressure and the actuation of the dewar pressure relief system. A previous NASA Engineering and Safety Center (NESC) assessment provided recommendations for the wall heat flux that would be expected from a loss of vacuum and detailed an appropriate method to use in calculating the maximum pressure that would occur in a loss of vacuum event. This method involved building a detailed supercritical helium compressible flow thermal/fluid model of the vent stack and exercising the model over the appropriate range of parameters. The experimenters designing science instruments for SOFIA are not experts in compressible supercritical flows and do not generally have access to the thermal/fluid modeling packages that are required to build detailed models of the vent stacks. Therefore, the SOFIA Program engaged the NESC to develop a simplified methodology to estimate the maximum pressure in a liquid helium dewar after the loss of vacuum insulation. The method would allow the university-based science instrument development teams to conservatively determine the cryostat's vent neck sizing during preliminary design of new SOFIA Science Instruments. This report details the development of the simplified method, the method itself, and the limits of its applicability. The simplified methodology provides an estimate of the dewar pressure after a loss of vacuum insulation that can be used for the initial design of the liquid helium dewar vent stacks. However, since it is not an exact tool, final verification of the dewar pressure vessel design requires a complete, detailed real fluid compressible flow model of the vent stack. The wall heat flux resulting from a loss of vacuum insulation increases the dewar pressure, which actuates the pressure relief mechanism and results in high-speed flow through the dewar vent stack. At high pressures, the flow can be choked at the vent stack inlet, at the exit, or at an intermediate transition or restriction. During previous SOFIA analyses, it was observed that there was generally a readily identifiable section of the vent stack that would limit the flow – e.g., a small diameter entrance or an orifice. It was also found that when the supercritical helium was approximated as an ideal gas at the dewar condition, the calculated mass flow rate based on choking at the limiting entrance or transition was less than the mass flow rate calculated using the detailed real fluid model2. Using this lower mass flow rate would yield a conservative prediction of the dewar’s wall heat flux capability. The simplified method of the current work was developed by building on this observation.

Ungar, Eugene K.↗

Enabling Science and Deep Space Exploration through Space Launch System (LSL) Secondary Payload Opportunities

For the first time in almost 40 years, a NASA human-rated launch vehicle has completed its Critical Design Review (CDR). By reaching this milestone, NASA's Space Launch System (SLS) and Orion spacecraft are on the path to launch a new era of deep space exploration. NASA is making investments to expand science and exploration capability of the SLS by developing the capability to deploy small satellites during the trans-lunar phase of the mission trajectory. Exploration Mission 1 (EM-1), currently planned for launch no earlier than July 2018, will be the first mission to carry such payloads on the SLS. The EM-1 launch will include thirteen 6U Cubesat small satellites that will be deployed beyond low earth orbit. By providing an earth-escape trajectory, opportunities are created for advancement of small satellite subsystems, including deep space communications and in-space propulsion. This SLS capability also creates low-cost options for addressing existing Agency strategic knowledge gaps and affordable science missions. A new approach to payload integration and mission assurance is needed to ensure safety of the vehicle, while also maintaining reasonable costs for the small payload developer teams. SLS EM-1 will provide the framework and serve as a test flight, not only for vehicle systems, but also payload accommodations, ground processing, and on-orbit operations. Through developing the requirements and integration processes for EM-1, NASA is outlining the framework for the evolved configuration of secondary payloads on SLS Block upgrades. The lessons learned from the EM-1 mission will be applied to processes and products developed for future block upgrades. In the heavy-lift configuration of SLS, payload accommodations will increase for secondary opportunities including small satellites larger than the traditional Cubesat class payload. The payload mission concept of operations, proposed payload capacity of SLS, and the payload requirements for launch and deployment will be described to provide potential payload users an understanding of this unique exploration capability.

Singer, Jody↗

Lander Technologies

Since 2006 NASA has been formulating robotic missions to the lunar surface through programs and projects like the Robotic Lunar Exploration Program, Lunar Precursor Robotic Program, and International Lunar Network. All of these were led by NASA Marshall Space Flight Center (MSFC). Due to funding shortfalls, the lunar missions associated with these efforts, the designs, were not completed. From 2010 to 2013, the Robotic Lunar Lander Development Activity was funded by the Science Mission Directorate (SMD) to develop technologies that would enable and enhance robotic lunar surface missions at lower costs. In 2013, a requirements-driven, low-cost robotic lunar lander concept was developed for the Resource Prospector Mission. Beginning in 2014, The Advanced Exploration Systems funded the lander team and established the MSFC, Johnson Space Center, Applied Physics Laboratory, and the Jet Propulsion Laboratory team with MSFC leading the project. The lander concept to place a 300-kg rover on the lunar surface has been described in the New Technology Report Case Number MFS-33238-1. A low-cost lander concept for placing a robotic payload on the lunar surface is shown in figures 1 and 2. The NASA lander team has developed several lander concepts using common hardware and software to allow the lander to be configured for a specific mission need. In addition, the team began to transition lander expertise to United States (U.S.) industry to encourage the commercialization of space, specifically the lunar surface. The Lunar Cargo Transportation and Landing by Soft Touchdown (CATALYST) initiative was started and the NASA lander team listed above is partnering with three competitively selected U.S. companies (Astrobotic, Masten Space Systems, and Moon Express) to develop, test, and operate their lunar landers.

Chavers, Greg↗

Secondary Payload Opportunities on NASA's Space Launch System (SLS) Enable Science and Deep Space Exploration

For the first time in almost 40 years, a NASA human-rated launch vehicle has completed its Critical Design Review (CDR). With this milestone, NASA's Space Launch System (SLS) and Orion spacecraft are on the path to launch a new era of deep space exploration. This first launch of SLS and the Orion Spacecraft is planned no later than November 2018 and will fly along a trans-lunar trajectory, testing the performance of the SLS and Orion systems for future missions. NASA is making investments to expand the science and exploration capability of the SLS by developing the capability to deploy small satellites during the trans-lunar phase of the mission trajectory. Exploration Mission 1 (EM-1) will include thirteen 6U Cubesat small satellites to be deployed beyond low earth orbit. By providing an earth-escape trajectory, opportunities are created for the advancement of small satellite subsystems, including deep space communications and in-space propulsion. This SLS capability also creates low-cost options for addressing existing Agency strategic knowledge gaps and affordable science missions. A new approach to payload integration and mission assurance is needed to ensure safety of the vehicle, while also maintaining reasonable costs for the small payload developer teams. SLS EM-1 will provide the framework and serve as a test flight, not only for vehicle systems, but also payload accommodations, ground processing, and on-orbit operations. Through developing the requirements and integration processes for EM-1, NASA is outlining the framework for the evolved configuration of secondary payloads on SLS Block upgrades. The lessons learned from the EM-1 mission will be applied to processes and products developed for future block upgrades. In the heavy-lift configuration of SLS, payload accommodations will increase for secondary opportunities including small satellites larger than the traditional Cubesat class payload. The payload mission concept of operations, proposed payload capacity of SLS, and the payload requirements for launch and deployment will be described to provide potential payload users an understanding of this unique exploration capability.

Singer, Jody↗

Space Launch System Trans Lunar Payload Delivery Capability

NASA Marshall Space Flight Center (MSFC) has successfully completed the Critical Design Review (CDR) of the heavy lift Space Launch System (SLS) and is working towards first flight of the vehicle in 2018. SLS will begin flying crewed missions with an Orion to a lunar vicinity every year after the first 2 flights starting in the early 2020's. So as early as 2021 these Orion flights will deliver ancillary payload, termed "Co-Manifested Payload", with a mass of at least 5.5 metric tons and volume up to 280 cubic meters to a cis-lunar destination. Later SLS flights have a goal of delivering as much as 10 metric tons to a cis-lunar destination. This presentation will describe the ground and flight accommodations, interfaces, and resources planned to be made available to Co-Manifested Payload providers as part of the SLS system. An additional intention is to promote a two-way dialogue between vehicle developers and potential payload users in order to most efficiently evolve required SLS capabilities to meet diverse payload requirements.

Jackman, A. L.↗

High Temperature Thermoplastic Additive Manufacturing Using Low-Cost, Open-Source Hardware

Additive manufacturing (or 3D printing) via Fused Filament Fabrication (FFF), also known as Fused Deposition Modeling (FDM), is a process where material is placed in specific locations layer-by-layer to create a complete part. Printers designed for FFF build parts by extruding a thermoplastic filament from a nozzle in a predetermined path. Originally developed for commercial printers, 3D printing via FFF has become accessible to a much larger community of users since the introduction of Reprap printers. These low-cost, desktop machines are typically used to print prototype parts or novelty items. As the adoption of desktop sized 3D printers broadens, there is increased demand for these machines to produce functional parts that can withstand harsher conditions such as high temperature and mechanical loads. Materials meeting these requirements tend to possess better mechanical properties and higher glass transition temperatures (Tg), thus requiring printers with high temperature printing capability. This report outlines the problems and solutions, and includes a detailed description of the machine design, printing parameters, and processes specific to high temperature thermoplastic 3D printing.

Gardner, John M.↗

SLS Payload Transportation Beyond LEO

NASA has successfully completed the Critical Design Review (CDR) of the heavy lift Space Launch System (SLS) and is working towards the first flight of the vehicle in 2018. SLS will begin flying crewed missions with an Orion capsule to the lunar vicinity every year after the first 2 flights starting in the early 2020's. As early as 2021, in addition to delivering an Orion capsule to a cislunar destination, SLS will also deliver ancillary payload, termed "Co-manifested Payload (CPL)", with a mass of at least 5.5 mT and volume up to 280 m3 simultaneously to that same destination. Later SLS flights have a goal of delivering as much as 10 mT of CPL to cislunar destinations. In addition to cislunar destinations, SLS flights may deliver non-crewed, science-driven missions with Primary Payload (PPL) to more distant destinations. SLS PPL missions will utilize a unique payload fairing offering payload volume (ranging from 320 m3 to 540 m3) that greatly exceeds the largest existing Expendable Launch Vehicle (ELV) fairing available. The Characteristic Energy (C3) offered by the SLS system will generate opportunities to deliver up to 40 mT to cislunar space, and deliver double PPL mass or de-crease flight time by half for some outer planet destinations when compared to existing capabilities. For example, SLS flights may deliver the Europa Clipper to a Jovian destination in under 3 years by the mid 2020's, compared to the 7+ years cruise time required for current launch capabilities. This presentation will describe ground and flight accommodations, interfaces, resources, and performance planned to be made available to potential CPL and PPL science users of SLS. In addition, this presentation should promote a dialogue between vehicle developers, potential payload users, and funding sources in order to most efficiently evolve required SLS capabilities to meet diverse payload needs as they are identified over the next 35 years and beyond.

Creech, S. D.↗

The LUVOIR Surveyor: Decadal Mission Concept Update

The Large Ultraviolet/Optical/Infrared (LUVOIR) Science and Technology Definition Team (STDT) identified a broad range of science objectives for LUVOIR that include the direct imaging and spectral characterization of habitable exoplanets and an array of general astrophysics and Solar System observations. To meet these objectives, the LUVOIR Study Office completed the first design iteration of a 15-m segmented-aperture observatory that includes four serviceable instruments: the Extreme Coronagraph for Living Planetary Systems (ECLIPS); the LUVOIR UV Multi-object Spectrograph (LUMOS); the High Definition Imager (HDI); and Pollux, a high-resolution UV spectro-polarimeter being contributed by Centre National d'Etudes Spatiales (CNES). The study team is now executing a second design iteration to further improve upon the 15-m concept, while simultaneously studying a 9-m concept. In these proceedings, we provide an update on these architectures.

LUVOIR↗

The Large UV/Optical/Infrared Surveyor (LUVOIR): Decadal Mission Study Update

NASA commissioned the study of four large mission concepts, including the Large Ultraviolet / Optical / Infrared (LUVOIR) Surveyor, to be evaluated by the 2020 Decadal Survey in Astrophysics. In response, the Science and Technology Definition Team (STDT) identified a broad range of science objectives for LUVOIR that include the direct imaging and spectral characterization of habitable exoplanets around sun-like stars, the study of galaxy formation and evolution, the exchange of matter between galaxies, star and planet formation, and the remote sensing of Solar System objects. To meet these objectives, the LUVOIR Study Office, located at NASA's Goddard Space Flight Center (GSFC), completed the first design iteration of a 15-m segmented-aperture observatory that would be launched by the Space Launch System (SLS) Block 2 configuration. The observatory includes four serviceable instruments: the Extreme Coronagraph for Living Planetary Systems (ECLIPS), an optical / near-infrared coronagraph capable of delivering 10(exp -10) contrast at inner working angles as small as 2 lambda/D; the LUVOIR UV Multi-object Spectrograph (LUMOS), which will provide low- and medium-resolution UV (100 - 400 nm) multi-object imaging spectroscopy in addition to far-UV imaging; the High Definition Imager (HDI), a high-resolution wide-field-of-view NUV-Optical-NIR imager; and Pollux, a high-resolution UV spectro-polarimeter being contributed by Centre National d'Etudes Spatiales (CNES). The study team has executed a second design iteration to further improve upon the 15-m concept, while simultaneously studying an 8-m concept. In these proceedings, we provide an update on these two architectures.

cosmic origins↗

Compass Final Report: Europa Tunnelbot

The Compass Final Report: Europa Tunnelbot, is a summary of three Compass concurrent engineering team designs for penetrating the ice of Europa and reaching the ocean, while sampling for biomarkers and communicating back to the surface. These conceptual designs, while providing complete conceptual layouts for these penetrators, or 'Tunnelbots' along with the associated communication 'Repeaters' primarily focused on the power and thermal systems needed for these devices. Trades for these systems will provide advantages and challenges for each option. These results will be used to guide power technology development.

probe↗

Is Structured Agile an Oxymoron? Tales from Implementing and Executing Agile in a US Government Environment

To paraphrase a famous quote, "No plan survives contact with the reality." Software (SW) development is often a classic example of this: whatever the plan was for a particular development, it often does not survive contact with technical realities, budget realities, program realities and schedule realities. Traditionally, SW development has followed a waterfall methodology with requirements being rigorously specified before the design, which was completed before the coding and unit testing started, which were in turn finished before validation and verification started. This model of SW engineering derives much from the HW engineering of large systems, and has been the standard methodology used in US government software acquisitions and systems for decades, with highly variable results. US Government SW requirements are built around Waterfall concepts, which assume that the plan will survive contact with reality, or at least that modifications to the plan are relatively small, and relatively few.Because of the inefficiencies and difficulties inherent in Waterfall, the commercial SW world started using a different SW development methodology called Agile more than 20 years ago. Agile believes that a plan should evolve and learn rapidly in response to the realities encountered. At its core, there are a few key elements of Agile:- A small team of people which is highly flexible and adaptive. The team collaborates and interoperates through sophisticated development architectures and release environments- An iterative, incremental development and release approach which is based upon the concept that knowledge comes from experience within the team, and that the team makes decisions based upon what it knows- A team culture which prizes transparency, inspection and adaptation. These values are necessary so that the team experience and decision making is transparent and responsive to the realities encountered during development and testingSo, how to use Agile in a US Government environment? GMSEC (Goddard Mission Services Evolution Center) develops satellite ground system software for NASA and other US Government agencies. The SW developed by the team contains a large code base of many applications used within satellite mission operations centers. It spans the full gamut of SW development types: from SW which is in a classic maintenance and sustainment mode, to new developments with a fairly well understood scope and approach, to new developments whose scope and approach are quite unclear and which require significant research and prototyping. Team members move between all of these different types of SW development. Waterfall was inadequate to the programmatic and technical needs of the team, as well as the various types of SW development being done. The software plan was not surviving contact with the technical and programmatic realities experienced by the team. To address this, the team started a small pilot project in 2016 to test the use of Agile within a small subset of the team for a new web services application. In early 2018, the use of Agile was expanded to the whole team and all the software, but we had to fulfill the NASA SW development requirements. And we needed to do this while still remaining true to the key Agile elements of transparency, inspection and adaption. In order to do this, the team worked very closely with the Software Process Improvement (SPI) team at NASA Goddard, as well as NASA engineering manageme

Beech, Theresa W.↗