Magnetohydrodynamics MHD Engineering Test Facility ETF 200 MWe power plant. Conceptual Design Engineering Report CDER. Volume 3: Costs and schedules

The estimated plant capital cost for a coal fired 200 MWE electric generating plant with open cycle magnetohydrodynamics is divided into principal accounts based on Federal Energy Regulatory Commision account structure. Each principal account is defined and its estimated cost subdivided into identifiable and major equipment systems. The cost data sources for compiling the estimates, cost parameters, allotments, assumptions, and contingencies, are discussed. Uncertainties associated with developing the costs are quantified to show the confidence level acquired. Guidelines established in preparing the estimated costs are included. Based on an overall milestone schedule related to conventional power plant scheduling experience and starting procurement of MHD components during the preliminary design phase there is a 6 1/2-year construction period. The duration of the project from start to commercial operation is 79 months. The engineering phase of the project is 4 1/2 years; the construction duration following the start of the man power block is 37 months.

Source record↗

High precision attitude determination for Magsat

A two phase approach to attitude determination software development is introduced. The prelaunch planning and software activities connected with the development and testing of the baseline system for processing nominal attitude data for MAGSAT are described and postlaunch analysis and modifications are outlined. Attitude data processing began 5 months after launch so that postlaunch anomalies could be accounted for. Another advantage of the two phase approach is that costs are reduced because the system is not burdened with software dealing with all possible contingencies. A definitive, continuous, time history of the three axis attitude of the spacecraft was generated to a precision of 20 arc sec (one standard deviation), in each axis. Sensor alignment determinations were done continuously because of the deletrious effects of changing alignments on attitude precision.

Abshire, G.↗

ATS-6 engineering performance report. Volume 2: Orbit and attitude controls

Attitude control is reviewed, encompassing the attitude control subsystem, spacecraft attitude precision pointing and slewing adaptive control experiment, and RF interferometer experiment. The spacecraft propulsion system (SPS) is discussed, including subsystem, SPS design description and validation, orbital operations and performance, in-orbit anomalies and contingency operations, and the cesium bombardment ion engine experiment. Thruster failure due to plugging of the propellant feed passages, a major cause for mission termination, are considered among the critical generic failures on the satellite.

Wales, R. O.↗

Summary and evaluation of the conceptual design study of a potential early commercial MHD power plant (CSPEC)

The conceptual design study of a potential early commercial MHD power plant (CSPEC) is described and the results are summarized. Each of two contractors did a conceptual design of an approximtely 1000 MWe open-cycle MHD/steam plant with oxygen enriched combustion air preheated to an intermediate temperatue in a metallic heat exchanger. The contractors were close in their overall plant efficiency estimates but differed in their capital cost and cost of electricity estimates, primarily because of differences in balance-of-plant material, contingency, and operating and maintenance cost estimates. One contractor concluded that its MHD plant design compared favorably in cost of electricity with conventional coal-fired steam plants. The other contractor is making such a comparison as part of a follow-on study. Each contractor did a preliminary investigation of part-load performance and plant availability. The results of NASA studies investigating the effect of plant size and oxidizer preheat temperature on the performance of CSPEC-type MHD plants are also described. The efficiency of a 1000 MWe plant is about three points higher than of a 200 MWe plant. Preheating to 1600 F gives an efficiency about one and one-half points higher than preheating to 800 F for all plant sizes. For each plant size and preheat temperature there is an oxidizer enrichment level and MHD generator length that gives the highest plant efficiency.

Staiger, P. J.↗

Support systems of the orbiting quarantine facility

The physical support systems, the personnel management structure, and the contingency systems necessary to permit the Orbiting Quarantine Facility (OQF) to function as an integrated system are described. The interactions between the subsystems within the preassembled modules are illustrated. The Power Module generates and distributes electrical power throughout each of the four modules, stabilizes the OQF's attitude, and dissipates heat generated throughout the system. The Habitation Module is a multifunctional structure designed to monitor and control all aspects of the system's activities. The Logistics Module stores the supplies needed for 30 days of operation and provides storage for waste materials generated during the mission. The Laboratory Module contains the equipment necessary for executing the protocol, as well as an independent life support system.

Source record↗

Satellite services system analysis study. Volume 4: Service equipment concepts

Payload deployment equipment is discussed, including payload separation, retention structures, the remote manipulator system, tilt tables, the payload installation and deployment aid, the handling and positioning aid, and spin tables. Close proximity retrieval, and on-orbit servicing equipment is discussed. Backup and contingency equipment is also discussed. Delivery and retrieval of high-energy payloads are considered. Earth return equipment, the aft flight deck, optional, and advanced equipment are also discussed.

Source record↗

The human role in space

Requirements for the future human role in space are considered. Human tasks were divided into normal scheduled activities, unscheduled activities, and contingency activities. A strawman mission model was developed. Projections were made of crew size, mission duration, pressurized spacecraft volume, and power requirements. Trends of human roles were likewise projected.

Hall, S. B.↗

Space Shuttle/Orbiter EVA and EVA provisions

EVA objectives, procedures, and equipment for the Shuttle are reviewed. The EVA will occur as a planned excursion, to complete a mission objective, or on a contingency basis as support for the mission or to effect repairs to the Orbiter or its payload. Configurations for the placement of the airlock for EVA with and without Spacelab payloads are discussed, along with the various EVA tasks which could be expected as necessary for mission completion. Handholds have been placed in strategic positions on the RMS and along the payload doors, and a safety tether has been incorporated with line extension out to 25 ft. Off-the-shelf tools such as needlenose pliers, forceps, diagonal cutters, etc. are carried as standard equipment for the repair of malfunctioning equipment and doorlatches. Finally, attention is given to EVA lighting, communication, life-support, and work station restraint systems.

Goodman, J. R.↗

Using known map category marginal frequencies to improve estimates of thematic map accuracy

By means of two simple sampling plans suggested in the accuracy-assessment literature, it is shown how one can use knowledge of map-category relative sizes to improve estimates of various probabilities. The fact that maximum likelihood estimates of cell probabilities for the simple random sampling and map category-stratified sampling were identical has permitted a unified treatment of the contingency-table analysis. A rigorous analysis of the effect of sampling independently within map categories is made possible by results for the stratified case. It is noted that such matters as optimal sample size selection for the achievement of a desired level of precision in various estimators are irrelevant, since the estimators derived are valid irrespective of how sample sizes are chosen.

Card, D. H.↗

Risk analysis of computer system designs

Adverse events during implementation can affect final capabilities, schedule and cost of a computer system even though the system was accurately designed and evaluated. Risk analysis enables the manager to forecast the impact of those events and to timely ask for design revisions or contingency plans before making any decision. This paper presents a structured procedure for an effective risk analysis. The procedure identifies the required activities, separates subjective assessments from objective evaluations, and defines a risk measure to determine the analysis results. The procedure is consistent with the system design evaluation and enables a meaningful comparison among alternative designs.

Vallone, A.↗

Field measurement of spectral reflectance

It is pointed out that success in acquiring remote sensing data for describing a given target, such as vegetation, is contingent upon an understanding of the reflectance properties of the target and its surroundings. Field measurements of a target's spectral reflectance are in most cases made with single-beam instruments by sequentially viewing the target and a white standard reflector, which is assumed to be Lambertian. Since variation in atmospheric transmission can occur between the times of measuring the target and the standard reflector, substantial errors in reflectance calculated from these measurements may result. To preclude this possibility the irradiance on, and the radiance reflected from, the target must be measured simultaneously. Measurements of the spectral hemispherical-conical reflectance of a target are made by simultaneously measuring irradiance and radiance with pairs of portable spectroradiometers. The techniques for calibrating the instruments and for collecting and analyzing spectral reflectance data on vegetative canopies are described. Significant instrumental sources of error and their magnitude are discussed, together with problems involved in making such measurements.

Duggin, M. J.↗

Measurement of cardiopulmonary performance during acute exposure to a 2440-m equivalent atmosphere

Each of 20 subjects (ranging in age from 18 to 38 years, 15 being male, five female) was given two Bruce Protocol symptom-limited maximum treadmill stress tests, breathing sea-level compressed air (20.9% O2) for one test and a 2440-m equivalent (15.5% O2) for the other. A significant difference was found to exist between measured VO2 max (p less than 0.0002) and exercise time (p less than 0.0004) for the two conditions. No significant differences were observed in heart rate or the recovery time to a respiratory quotient of less than 1. Hemoglobin saturation, as measured by an ear oximeter, averaged 95% for sea-level and 91% for the 2440-m equivalent gases. These results support a 2440-m equivalent contingency atmosphere in the Space Shuttle prior to donning a low-pressure suit for the purpose reducing nitrogen washout times.

Levitan, B. M.↗

Investigation of the combined effects of bedrest and mild hypoxia

Subjects were exposed to an 8-h mild hypoxia exposure (8000 ft. equivalent, 2438 m) with and without a 28-h period of 6 deg headdown bedrest. Anticipated responses to the bedrest and the hypoxia were observed. There was no indication that bedrest affected the arterial oxygenation or the oxygen gradient across the lungs of the subjects undergoing mild hypoxia. It is concluded that there is no evidence that would preclude an alveolar O2 pressure as low as 69 torr during contingency spacecraft operation.

Waligora, J. M.↗

Voyager 2 navigation to Uranus and Neptune

Key navigation issues and capabilities relating to the Voyager 2 Uranus/Neptune mission are presented. Predicted navigation performance at each encounter body (Uranus, Neptune, and Triton) is examined relative to mission navigation requirements and science return capabilities. Orbit determination accuracies are presented for several radio data types and for combinations of radio data with two optical data types. Maneuver strategies designed to accommodate the orbit determination results and satisfy mission navigation requirements are examined. Possible alternate aimpoints and contingency strategies are developed for situations of unexpected loss of propellant or optical navigation capability.

Van Allen, R. E.↗

Working in space

The capabilities of the NASA Neutral Buoyancy Simulator (NBS) water tank test facility are described, with reference to the proving of crew-operated mechanisms incorporated by the Space Telescope (ST). There are 24 Orbital Replaceable Units which are subject to handling in space by suited crewmen of the Space Shuttle, the largest of which is comparable to a telephone booth and weighs over 700 lb. The water volume of the simulator is sufficient to accept a full-size mockup of the Space Shuttle cargo bay, in which all ST operations will be conducted. Early ST simulations tested the mechanisms which astronauts would operate during contingency operations. More recently, the simulation tasks have reflected maintenance objectives of ST orbital life prolongation. With the recent addition of a fully functional Remote Manipulator System and the Manned Maneuvering Unit, the simulator constitutes the most complete training ground for extravehicular activities extant.

Sanders, F. G.↗

Teleoperator maneuvering system

The Teleoperator Maneuvering System (TMS) is a Shuttle launched, free-flying, remotely controlled reusable propulsive stage capable of performing spacecraft and payload placement services, retrieval functions, assembly/servicing support for large space systems, dexterous manipulator operations for planned or contingency satellite servicing, satellite viewing, and subsatellite science support. The basic TMS segments, subsystems and performance are described, beginning with the criteria and requirements derived from mission models. Examples of TMS benefits to the STS and user communities are demonstrated. TMS applications such as support and servicing of Space Station, materials processing and subsatellite missions are presented.

Turner, J. R.↗

Advanced service equipment

Orbiter-based service equipment needs/usage are identified by considering a broad spectrum of on-orbit operational scenarios associated with three primary mission events: initial launch, revisits, and Earth return. Nominal and alternate modes of operation, contingency situations (as remote manipulator system inoperative), and Orbiter close proximity operations are included. Satellite classes considered are direct delivery and servicing of the orbiter, low Earth orbiter/propulsion, sorties and DOD, geosatellites, and planetary and other satellites.

Mockovciak, J., Jr.↗