Siting GNEP at the Savannah River Site: Using Legacy and Infrastructure in a Commercial Energy Park Concept
The Savannah River Site (SRS) was proposed as one of eleven potential sites to be included in the U.S. Department of Energy Programmatic Environmental Impact Statement (PEIS) for the Global Nuclear Energy Partnership (GNEP) program. The approach to meet siting and infrastructure requirements for possible GNEP facilities at the SRS focused on available infrastructure including land, cooling water systems, high voltage power supplies, existing heavy haul roadways, existing analytical capabilities, and existing waste handling capabilities. Additional siting criteria and existing SRS capabilities and conditions were developed to locate the GNEP within a commercial Energy Park contained within, but separate from, the SRS. Included as part of, or corollary to, existing infrastructure at the SRS was the availability of a nuclear trained workforce living within the area. The SRS consists of approximately 803 square kilometers (310 square miles) in the Upper Atlantic Coastal Plain of South Carolina bordering along the Savannah River. Historic production reactors, processing, and laboratory facilities are currently being decommissioned and destroyed while new facilities such as the MOX facility are being built. Existing legacy infrastructure, beneficial to the potential GNEP facilities, continues to exist and operate. The SRS has a long history of processing, reprocessing and in the disposition of nuclear fuels and byproducts continuing through today with HCanyon as the only DOE facility currently capable of uranium reprocessing. Because of ongoing operations and maintenance of historic systems, SRS has existing infrastructure immediately available for GNEP facilities in or near the proposed Energy Park. The Energy Park location was chosen to achieve maximum use of this legacy infrastructure. In summary: Requirements for potential or conceivable GNEP facilities can be met using the existing facilities and infrastructure of the SRS. A potential commercially operated Energy Park located within the existing boundaries of the SRS can use existing site infrastructure to lessen the overall construction costs and decrease the start up time for our national GNEP program. (authors)