Search NASA⌕ Search

SEARCH · Search NASA

Results for “Grid Connection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Connecting Restricted, High-Availability, or Low-Latency Resources to a Seamless Global Pool for CMS

The connection of diverse and sometimes non-Grid enabled resource types to the CMS Global Pool, which is based on HTCondor and glideinWMS, has been a major goal of CMS. These resources range in type from a high-availability, low latency facility at CERN for urgent calibration studies, called the CAF, to a local user facility at the Fermilab LPC, allocation-based computing resources at NERSC and SDSC, opportunistic resources provided through the Open Science Grid, commercial clouds, and others, as well as access to opportunistic cycles on the CMS High Level Trigger farm. In addition, we have provided the capability to give priority to local users of beyond WLCG pledged resources at CMS sites. Many of the solutions employed to bring these diverse resource types into the Global Pool have common elements, while some are very specific to a particular project. This paper details some of the strategies and solutions used to access these resources through the Global Pool in a seamless manner.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Two-Party secret key distribution via a modified quantum secret sharing protocol

We present and demonstrate a method of distributing secret information based on N-party single-qubit Quantum Secret Sharing (QSS) in a modied plug-and-play two-party Quantum Key Distribution (QKD) system with N 2 intermediate nodes and compare it to both standard QSS and QKD. Our setup is based on the Clavis2 QKD system built by ID Quantique but is generalizable to any implementation. We show that any two out of N parties can build a secret key based on partial information from each other and with collaboration from the remaining N 2 parties. This method signicantly reduces the number of resources (single photon detectors, lasers and dark ber connections) needed to implement QKD on the grid.

97 MATHEMATICS AND COMPUTING↗

Advanced Vehicle Testing Activity Benchmark Testing of the Chevrolet Volt Onboard Charger

The Chevrolet Volt onboard charge module, which converts alternating current (AC) power into direct current (DC) power to charge the vehicle’s onboard energy storage system, was benchmark tested for AC to DC efficiency by the Idaho National Laboratory as part of its conduct of the U.S. Department of Energy’s Advanced Vehicle Testing Activity. Charging with Level 2 electric vehicle supply equipment (EVSE) at 208 VAC input (60 Hz), the Volt onboard charge module was calculated to be 91.7% efficient while operating between 3.0 AC kW and 3.3 AC kW. Charging with Level 1 EVSE at 120 VAC input (60 Hz) the Volt onboard charge module was calculated to be 90.6% efficient while operating near 1.3 AC kW. Given that most Level 2 EVSE are greater than 99% efficient1 when operating above 3.0 AC kW (Level 2) and a Level 1 EVSE was measured to be 98% efficient2 when operating above 1.25 AC kW (120VAC), the average overall AC to DC charging efficiency for the Chevrolet Volt connected to an EVSE (from the AC grid through the EVSE and the Volt’s onboard charge module OBCM) is 90.8% for Level 2 and 88.8% for Level 1.

25 ENERGY STORAGE↗

Inverter Load Rejection Over-Voltage Testing: SolarCity CRADA Task 1a Final Report

Various interconnection challenges exist when connecting distributed PV into the electrical distribution grid in terms of safety, reliability, and stability of electric power systems. One of the urgent areas for additional research - as identified by inverter manufacturers, installers, and utilities - is the potential for transient over-voltage from PV inverters. In one stage of a cooperative tests were repeated a total of seven times. The maximum over-voltage measured in any test did not exceed 200% of nominal, and typical over-voltage levels were significantly lower. The total voltage duration and the maximum continuous time above each threshold are presented here, as well as the time to disconnect for each test. Finally, we present a brief investigation into the effect of DC input voltage as well as a series of no-load tests. This report describes testing conducted at NREL to determine the duration and magnitude of transient over-voltages created by several commercial PV inverters during load-rejection conditions. For this work, a test plan that is currently under development by the Forum on Inverter Grid Integration Issues (FIGII) has been implemented in a custom test setup at NREL. Through a cooperative research and development agreement, NREL is working with SolarCity to address two specific types of transient overvoltage: load rejection overvoltage (LRO) and ground fault overvoltage (GFO). Additional partners in this effort include the Hawaiian Electric Companies, Northern Plains Power Technologies, and the Electric Power Research Institute.

14 SOLAR ENERGY↗

Mitigating Interconnection Challenges of the High Penetration Utility-Interconnected Photovoltaic (PV) in the Electrical Distribution Systems: Cooperative Research and Development Final Report, CRADA Number CRD-14-563

Various interconnection challenges exist when connecting distributed PV into the electrical distribution grid in terms of safety, reliability, and stability of the electric power systems. Some of the urgent areas for research, as identified by inverter manufacturers, installers and utilities, are potential for transient overvoltage from PV inverters, multi-inverter anti-islanding, impact of smart inverters on volt-VAR support, impact of bidirectional power flow, and potential for distributed generation curtailment solutions to mitigate grid stability challenges. Under this project, NREL worked with SolarCity to address these challenges through research, testing and analysis at the Energy System Integration Facility (ESIF). Inverters from different manufacturers were tested at ESIF and NREL's unique power hardware-in-the-loop (PHIL) capability was utilized to evaluate various system-level impacts. Through the modeling, simulation, and testing, this project eliminated critical barriers on high PV penetration and directly supported the Department of Energy's SunShot goal of increasing the solar PV on the electrical grid.

14 SOLAR ENERGY↗

5G Enabled Transformative Co-design and Co-simulation Framework for Grid Decarbonization and Modernization

5G is a breakthrough technology to enable a fully mobile and connected society, and a 5G-enabled digital continuum will be one of the critical foundations for clean energy economy and grid modernization. The clean energy transformation not only requires innovative manufacturing, algorithm, application, and cross-domain co-simulation, but also a systematic evaluation and comprehensive support on the microelectronic and architectural computing customization to enable and maximize the high renewable penetration in the future power grid. The co-design of decarbonized grid, reliable yet efficient communication, and affordable yet ubiquitous computing will unlock the potential of almost any available tools for the undergoing clean energy transformation. 5G is also an opportunity to rethink the paradigm of infrastructure planning, as computing will be one of the core services for society alongside electricity and communication services.

5G↗

Disruption avoidance via island suppression: the crucial roles of DIII-D and foundational research

The FESAC long range plan calls out disruption avoidance and mitigation as key remaining technical gaps. In discussing the roles of DIII-D and NSTX-U, the FESAC long range plan says “Additional research on these facilities, in combination with private and international collaborations, continuing support of existing university tokamak programs, and utilization of US expertise in theory and simulation, is needed to find solutions to remaining technical gaps. These gaps include disruption prediction, avoidance, and mitigation …”. Disruptions pose an existential threat to ITER and to FPPs. For a fusion reactor, unplanned shutdowns caused by disruptions will be a significant barrier to connecting such a reactor to the electric grid, even if disruption mitigation is successful. Disruption studies for ITER in recent years have largely focused on disruption mitigation (e.g., pellet injection), motivated by near-term deadlines for finalizing the design of the mitigation hardware. It is recognized, however, that mitigation alone will not suffice. The 2022 U.S. ITER Research Needs Workshop Report states that ”[d]isruptions are considered the largest threat to the ITER Research Program”, and that “[m]itigation should be a last resort”. As we discuss below, there are unresolved foundational issues that play a critical role in avoidance, and DIII-D is an ideal device for generating the data needed to address these issues.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

National Wind Technology Center Dynamic 5-Megawatt Dynamometer

The National Wind Technology Center (NWTC) offers wind industry engineers a unique opportunity to conduct a wide range of tests. Its custom-designed dynamometers can test wind turbine systems from 1 kilowatt (kW) to 5 megawatts (MW). The NWTC's new dynamometer facility simulates operating field conditions to assess the reliability and performance of wind turbine prototypes and commercial machines, thereby reducing deployment time, failures, and maintenance or replacement costs. Funded by the U.S. Department of Energy with American Recovery and Reinvestment Act (ARRA) funds, the 5-MW dynamometer will provide the ability to test wind turbine drivetrains and connect those drivetrains directly to the electricity grid or through a controllable grid interface (CGI). The CGI tests the low-voltage ride-through capability of a drivetrain as well as its response to faults and other abnormal grid conditions.

17 WIND ENERGY↗

Unlocking the price

To help balance load and power generation that ensue from the electrification of transportation and the increased connection of variable power sources to the grid, ABB has developed an RL-based dynamic price model for EV charging with the required flexibility to respond to changing grid conditions.

Suryanarayana, Harish↗

Predicting Geologic Behavior in Carbon Storage Projects Using Graph Neural Network

This study was invited to presented at NVIDIA's GTC conference to highlight the potential of Graph Neural Network as a novel and promising methodology for predicting pressure and saturation evolution in carbon storage projects. Carbon capture and storage (CCS) technology plays a pivotal role in mitigating greenhouse gas emissions, facilitating the transition to a low-carbon future. Effective management of subsurface reservoirs is essential to ensure the safe and efficient storage of captured carbon dioxide (CO₂). Accurate predictions of pressure and saturation over time are critical for evaluating the long-term performance and integrity of CCS projects. In recent years, Graph Neural Network (GNN) has emerged as a powerful framework for analyzing complex data in graph-structured domains. This abstract explores the application of GNN to forecast pressure and saturation evolution in carbon storage projects. Traditional numerical simulations of subsurface reservoirs have proven successful in providing pressure and saturation forecasts. However, these simulations involve massive amounts of computational effort and require extensive domain expertise for proper model calibration and validation. Graph Neural Operator offers an alternative approach that harnesses the inherent graph structure of reservoirs, where nodes represent reservoir grid cells and edges represent the geological connectivity between them.

Shih, Chung Yan↗

Highly Available Nuclear Power for Mission-Critical Applications

Some energy consumers require power on an anytime, all-year-round basis with a high level of certainty, including defense installations, isolated communities, and some industrial processes. For these customers, interruptions in electricity or heat can mean substantial financial loss or even loss of life. In the absence of grid-scale energy storage, a high level of power availability can be accomplished only through the robustness and redundancy of power generators. The NuScale small modular reactor design is well suited to provide highly available power because of several features related to both the nuclear steam supply system and the overall plant design. In analogy to Redundant Array of Independent Disks (RAID) systems used to provide highly reliable data storage, a NuScale plant can assure sustained power generation by virtue of its Redundant Array of Integral Reactors (RAIR).This paper describes the NuScale RAIR plant features and summarizes the results of a rigorous analysis of RAIR availability as a function of power or, conversely, the RAIR plant output power as a function of power availability. The analysis utilized the Matrix Laboratory code (MATLAB) and included probability distributions for the frequency and duration of module outages due to planned and unplanned events. Further, the study evaluated the impact of implementing turbine bypass rather than module shutdown and using one or more modules to supply house loads in the case of loss of off-site power (LOOP). Availability results are presented for a 12-module RAIR plant with and without turbine bypass enabled during a LOOP and for different possible connections to the off-site power distribution grid and dedicated service loads. Results indicate that a very high level of availability can be achieved at relatively high power output levels, regardless of turbine bypass and dedicated load connection, compared to the operating fleet.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Multi-modular power plant with off-grid power source

A multi-modular power plant may include a plurality of on-site nuclear power modules configured to generate a power plant output, wherein one or more of the nuclear power modules may be designated as service module units which are configured to generate a first portion of the power plant output. A remainder of the nuclear power modules may be configured to generate a second portion of the power plant output. A number of power plant systems may be configured to operate using electricity associated with a house load of the power plant, wherein the first portion of the power plant output is equal to or greater than the house load. Additionally, a switchyard may be configured to electrically connect the power plant to a distributed electrical grid. The distributed electrical grid may be configured to service a plurality of geographically distributed consumers, and the switchyard may be configured to apply the second portion of the power plant output to the distributed electrical grid. The switchyard may further be configured to apply at least part of the first portion of the power plant output to the power plant systems during a loss of power from the distributed electrical grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Reference Model for Distribution Grid Control in the 21st Century

Intensive changes in the structure of the grid due to the penetration of new technologies, coupled with changing societal needs are outpacing the capabilities of traditional grid control systems. The gap is widening at an accelerating rate with the biggest impacts occurring at the distribution level due to the widespread adoption of diverse distribution-connected energy resources (DER) . This paper outlines the emerging distribution grid control environment, defines the new distribution control problem, and provides a distribution control reference model. The reference model offers a schematic representation of the problem domain to inform development of system architecture and control solutions for the high-DER electric system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Superconducting Properties of Indium Nanostructured in Pores of Thin Films of SiO{sub 2} Microspheres

Samples of a superconducting indium nanocomposite based on a thin-film porous dielectric matrix prepared by the Langmuir–Blodgett method are obtained for the first time, and their low-temperature electrophysical and magnetic properties are studied. Films with thickness b ≤ 5 μm were made from silicon dioxide spheres with diameter D = 200 and 250 nm; indium was introduced into the pores of the films from the melt at a pressure of P ≤ 5 kbar. Thus, a three-dimensional weakly ordered structure of indium nanogranules was created in the pores, forming a continuous current-conducting grid. Measurements of the temperature and magnetic field dependences of the resistance and magnetic moment of the samples showed an increase in the critical parameters of the superconductivity state of nanostructured indium (critical temperature T{sub c} ≤ 3.62 K and critical magnetic field H{sub c} at T = 0 K H{sub c}(0) ≤ 1700 Oe) with respect to the massive material (T{sub c} = 3.41 K, H{sub c}(0) = 280 Oe). In the dependence of the resistance on temperature and the magnetic field, a step transition to the superconductivity state associated with the nanocomposite structure was observed. A pronounced hysteresis M(H) is observed in the dependence of the magnetic moment M of the nanocomposite on the magnetic field at T < T{sub c}, caused by the multiply connected structure of the current-conducting indium grid. The results obtained are interpreted taking into account the dimensional dependence of the superconducting characteristics of the nanocomposite.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Assessment of the Electrical Substation-Grid Testbed with Inside/Outside Devices and Distributed Ledger Technology

The electrical substation-grid testbed was created to integrate the GOOSE and/or DNP (Distributed Network Protocol) messages with time synchronized sources and Distributed Ledger Technology (DLT). The objective was to study the impact of faults and cyber-events at an electrical substation with inside (protective relays) and outside (power meters) substation devices. The electrical substation-grid testbed was based on the design of a 34.5/ 12.47 kV electrical substation (sectionalized bus configuration) with two power transformers, connected to radial power lines and load feeders. The electrical substation-grid testbed was installed at 252 lab space (Advanced Power System Protection), Grid Research Integration and Deployment Center (GRID-C), Oak Ridge National Laboratory. This testbed was created for Task 5, DarkNet project. The electrical substation-grid testbed was created to simulate fault and/or cyber events that could potentially result in damage to the electrical infrastructure. In addition, tests were run that are usually not allowed to be performed in an operational electrical power grid, because these test scenarios could trip breakers and/or generate fault situations that could potentially damage equipment. The number of tests performed in the electrical substation-grid testbed were executed in a better way than in a real electrical substation and/or power grid, because multiple tests could be run in a short period of time, and complex permits, and safety/ schedule restrictions like in a real electrical substation environment were not needed. The electrical substation-grid testbed was created using real measurement, communication, and protection devices that are used by electrical utilities, to have same conditions that we could observe in a real power grid or electrical substation. The electrical substation-grid testbed was based on using a real time simulator and expansion box with amplifiers that were wired to electrical substation-grid devices. This hardware-in-the-loop (HIL) was provided by protective relays, power meters, ethernet switches, remote terminal units, synchronized timing network clock, DLT devices, workstations, and servers. This report includes the design, installation, and assessment of the electrical substation-grid testbed that was similar to an operational electrical substation, integrating the power system protection, communication, and control systems. The results for the electrical substation-grid testbed were based on:• verifying the analog signals for protective relays and power meters, • observing the synchronized time source frame at devices, • authenticating the GOOSE (IEC 61850) and DNP messages from power meters and protective relays, and • verifying the trip conditions of protective relays at fault tests with the power system fault event detection, using DLT devices. For future work, the electrical substation-grid testbed with protective relays and power meters, using DLT and synchronized time source from DarkNet, will be used to study the impact of cyber-events at inside and outside substation devices. Advanced algorithms for detecting cyber-events produced by non-desired protective relay settings will be studied, to improve the detection and reliability of protection, control, and communication systems at power grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Connected Thermostat Alternatives for Room Air Conditioners and Minisplit Heat Pumps

The availability of smart, connected thermostats has improved climate control, energy efficiency, and grid demand-response programs for central HVAC systems. However, a significant gap exists in addressing integrated control systems for point-source heating and cooling systems such as window air-conditioners (window ACs) and mini-split heat pumps (MSHPs). This report examines the emerging market of third-party connected thermostats tailored for these systems, focusing on their effectiveness, reliability, and potential barriers to adoption.This study evaluates several commercially available products designed for room ACs and MSHPs through a series of laboratory tests. While these infrared-based (IR-based) thermostats offer remote temperature control and scheduling via mobile apps, our findings reveal that none are seamless, with reliability of basic functions being a critical factor. Promising features include integration of indoor air quality metrics and time-of-use pricing, but the latter are not yet available in the U.S. Barriers to broad user acceptance include non-seamless setup processes, challenges in thermostat placement, and unclear product differentiation. There is a pressing need for research and development in enabling MSHPs and central thermostats to coordinate, enhancing energy savings and comfort in retrofit applications. This study underscores the importance of further innovation in connected thermostat technology to address the diverse needs of single-zone HVAC systems and promote efficient energy management in households.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A high-order staggered meshless method for elliptic problems

Here, we present a new meshless method for scalar diffusion equations, which is motivated by their compatible discretizations on primal-dual grids. Unlike the latter though, our approach is truly meshless because it only requires the graph of nearby neighbor connectivity of the discretization points. This graph defines a local primal-dual grid complex with a virtual dual grid, in the sense that specification of the dual metric attributes is implicit in the method's construction. Our method combines a topological gradient operator on the local primal grid with a generalized moving least squares approximation of the divergence on the local dual grid. We show that the resulting approximation of the div-grad operator maintains polynomial reproduction to arbitrary orders and yields a meshless method, which attains $O(h^{m})$ convergence in both $L^2$- and $H^1$-norms, similar to mixed finite element methods. We demonstrate this convergence on curvilinear domains using manufactured solutions in two and three dimensions. Application of the new method to problems with discontinuous coefficients reveals solutions that are qualitatively similar to those of compatible mesh-based discretizations.

97 MATHEMATICS AND COMPUTING↗