Search NASA⌕ Search

SEARCH · Search NASA

Results for “Highways”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

96 Park Way Vicinity Property Remediation Challenges at the FUSRAP Maywood Superfund Site, Maywood, New Jersey - 19216

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS), 'the Project,' was transferred to the US Army Corps of Engineers (USACE) in 1997. Shortly thereafter, USACE initiated FUSRAP remediation efforts on 24 commercial and residential properties and, in addition, the Project team evaluated properties previously addressed at the FMSS. One of those properties was located at 96 Park Way in Rochelle Park, New Jersey. The property history included removal of contaminated soil in 1985 by the US Department of Energy (US DOE). Soil sampling performed after removal of contaminated soil indicated the cleanup met applicable guidelines in place at the time. A Five-Year Review of the FMSS conducted by the US Environmental Protection Agency (USEPA) in 2009 found that 96 Park Way did not meet the current residential cleanup levels for the site and recommended additional study and remediation, if warranted. The current levels are established in the approved cleanup plan for the FMSS (known as the Record of Decision [ROD]) issued in 2003. Based on USEPA's recommendation, USACE carefully reviewed all available records for the property. The review considered the differences between the soil cleanup standards used in the 1980's and the 2003 ROD standards, which are slightly more restrictive for deeper soils. The USACE conducted detailed field studies at 96 Park Way in 2014-15 to address the USEPA findings. This work included gamma walkover surveys and soil sampling to depths of approximately 3.5 meters. The results identified three discrete areas at depth that did not meet the ROD residential soil cleanup standard: two areas bordering an adjacent highway (New Jersey Route 17) and one along railroad property adjacent to the site. To address these areas, soil removal actions were conducted in 2016-17. The principal challenge with construction, engineering, and community relations was the property housed two sensitive facilities: a long-term assisted care living facility and a short-term post-surgery rehabilitation center. The operations at these facilities could not be interrupted in any way during FUSRAP activities. The three FUSRAP-impacted areas were addressed and restored in coordination with the USEPA, property management, and local officials. Site restoration presented a particular challenge well after the remedial action was completed, as the property owner and the government disagreed on the level of restoration. Those negotiations are ongoing as of this writing. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lidar Mapping and Surveillance of Nuclear Infrastructure

Wear is unavoidable, whether it occurs in a nuclear facility or abridge on the highway its detection is crucial to preventing the failure of a system. While tools capable of detecting localized damage exist, industry lacks methods to evaluate the health of larger infrastructure. Routine inspection of nuclear facilities must be undertaken to ensure the safety of personnel and proper containment of nuclear materials. Most systems in a nuclear facility are designated as radioactive and confined spaces. To constantly monitor such systems in person would be hazardous but with a remote inspection tool it can be done in a safer and easier way. Lidar: Operates by emitting a laser pulse and looking for the reflected light. Allows user to gain 3D information of the environment. Project Objective: To develop an inspection tool for evaluating the health of large scale infrastructure using Lidar and machine learning. Autonomous Platform + Lidar + Data Fusion + Big Data. Use SLAM to build a 2D map of the environment. Point cloud created by transforming the points between reference frames. Point cloud to Surface: Inherent representation of surface geometry; Difficult to process with conventional techniques. Point cloud to Image: Easily processed by conventional machine learning algorithms. The quantity of data generated will necessitate a big data framework to manage the data for processing. Additional Sensors: Detecting the temperature (a) chemical makeup (b) and radiation emission (c) of a surface could assist in detecting problems. Human inspection can detect irregularities in both physical objects and their point-cloud representations. This is a good indication that mapping nuclear sites using Lidar will provide qualitative insight into the health of the facility. If deep learning can be used to automatically identify problem areas then the completed tool could become an invaluable asset.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Retrieval of Transuranic Drums with Deflagration to Detonation Potential from a Vault at the Oak Ridge National Laboratory - 20207

During the final phase of a long-term project, a total of 80 TRU waste drums at ORNL have been retrieved from a below-grade storage vault in which they have remained untouched for about 25 years. The drums, which house material generated from past ORNL operations, are now stored and ready for eventual transfer to the Transuranic Waste Processing Center, located on Highway 95 in Oak Ridge. The Transuranic Waste Processing Center will process and ship the drums to WIPP in Carlsbad, New Mexico, for disposal. Workers lifted the drums one-by-one from the underground storage vault with a 110-ton crane over a one-week period in October 2017. Although the physical work was performed in one week, years of detailed planning preceded the fieldwork. A key obstacle needed to be overcome before the project could safely proceed. This obstacle involved the need to ensure controls were developed for the Deflagration to Detonation Transition (DDT) potential. DDT refers to a phenomenon in ignitable mixtures of a flammable gas and air (or oxygen) when a sudden transition takes place from a deflagration type of combustion to a detonation type of explosion. Basically, these drums, under certain circumstances, have a potential to detonate and overpressurize. Extensive analysis of the drums verified that detonation, while unlikely, was possible. Of the total 103 drums that were retrieved or moved in preparation for retrieval, 18 had DDT potential. Extensive security requirements were also necessary, due to the nature of the material, and this added another layer of complexity to the fieldwork. Prior to retrieving the drums from the underground storage vault, space needed to be made for them within the various above-grade facilities. Inventory and security requirements dictated what could be stored where, and the first step of the field work involved a number of drum movements in preparation for storage of the newly retrieved drums. This effort involved moving 21 drums already in the storage area to facilitate the addition of the newly retrieved ones. The retrieval project required a total of 107 critical lifts using the 110-ton crane, under 3 critical lift plans. The TRU waste storage facility is a Category 2 Nuclear Facility and is managed under an extensive Documented Safety Analysis. The TRU retrieval project was conducted in accordance with DOE Order 425.1D and included three Implementation Verification Reviews, two Management Assessments, one Readiness Assessment, and seven mock-ups in preparation for the field work. Despite being stored for 25 years, the drums were in good shape due to the integrity of the facilities where the drums were stored. Of the 80 drums that were retrieved, 12 were placed in special containers called 'overpacks' based on their content. The drums were removed safely and without incident, thanks to a lot of preparation and the efforts of a highly skilled team. Lessons learned through the DDT control development and the drum retrieval and overpacking process could be beneficial to others having to manage similar drums of TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2D Dam-Break Analysis of L Lake and PAR Pond Dams Using HEC-RAS

In 1991 a dam-break study was conducted for the high hazard dams located at L Lake and PAR Pond on the Savannah River Site. Two scenarios were considered, over topping from a Probable Maximum Flood (PMF), and a fair weather dam-break for either or both dams. Unfortunately, no inundation map was developed from the study. The purpose of this project was to redo the original dam-break study with improved data and methodology to generate Inundation maps to assist with emergency response and evacuation plans. The Hydrologic Engineering Center's River Analysis System (HEC-RAS) is a free to download river analysis modeling program developed by the US Army Corps of Engineers capable of 1D and 2D hydraulic calculations. Version 5.0.7 (released March 2019) was used for this project. Digital elevation models for the area were retrieved from the US Geological Survey database and converted to a .hdf file within the program. Then the 2D flood area was identified from the contours. Both L Lake and PAR Pond were inputted as 1D storage areas because DEM data does not contain elevation values under water bodies. An elevation vs volume curve was available for both storage areas. Initial elevations were set for both scenarios. Both dams are earthen dams. The Steel Creek dam at L Lake has 6 ft diameter conduit with an upper and lower sluice gate. PAR pond dam consist of a weir and sluice gate connected to an 8 x 8 ft channel. Both outlets were modeled with a pool elevation vs discharge curve. The steel creek dam sluice gates were assumed to be fully open in all cases. As in the previous study, the dams were set to breach when they were overtopped by 1.5 ft during PMF conditions (Figure 1). A fair weather breach was set to be due to a piping failure (Figure 1). In the dual dam break during fair weather conditions the PAR pond dam fails 3 hours after Steel Creek to achieve maximum flooding in the down stream reaches. Simulation was run 3 days for each case and with a 1 minute computational interval. Maximum flooding occurs under PMF conditions with the failure of both dams. PAR pond dam fails first 16 hours and 32 minutes after the start of the simulation with the Steel creek dam failing 6 minutes later. In all cases, the bridges and roads spanning Steel Creek and Lower Three Runs will be inundated and potentially washed away. The Burtons Ferry Highway south of the storage areas will be partially flooded during PMF failure, dual fair weather failure, and PAR pond failure under fair weather conditions.

54 ENVIRONMENTAL SCIENCES↗

Opportunities to Implement Solutions to Achieve Remedial Action Objectives in Consideration of Stakeholder Interests - 20365

A case study in the implementation of a soils excavation and removal project conducted at a Formerly Utilized Sites Remedial Action Program (FUSRAP) Maywood Superfund Site (FMSS) vicinity property; an active commercial business, in a densely populated area, with significant operational, technical and, logistical constraints that were expected to limit areas that could be remediated. The United States Army Corps of Engineers-led (USACE) team successfully navigated complex overlapping stakeholder interests to achieve a more efficient and complete removal of contaminated soils and debris while minimizing unnecessary excess costs to the Government. This paper centers on FUSRAP activities at the FMSS vicinity property located at 149-151 Maywood Avenue, Maywood, Bergen County, New Jersey. For most of its FUSRAP history, this ∼109,000 square meter (27-acre) property housed a now-demolished ∼26,000 square meter (6.5-acre) warehouse operated by Sears Logistics Services, a unit of the Sears Roebuck Company (Figure 2). Sears ended its property lease and vacated the warehouse in December 2016. Given that long history and for the purposes of this paper, the property will be referred to as the 'Sears property' or simply 'the property.' The Sears property is approximately 109,000 square meters (27-acres) and is currently zoned for commercial use. The property is bound to the north and northwest by 100 West Hunter Avenue (the Stepan Company), to the northeast by 205 Maywood Avenue, to the east by Maywood Avenue, to the south by 23 West Howcroft Road, and to the west by businesses on NJ Route 17 and the NJ Route 17 roadway. Until December 2016, the property housed a warehouse and distribution center operated by Sears Logistical Services. On-site structures were demolished by the property owner in 2017. The warehouse covered the north section of the property along the Stepan Company property line. A railroad spur from the adjacent property now known as the Maywood Interim Storage Site (MISS) ended at the northeast corner of the warehouse. Wetlands were located east of the warehouse; the rest of the property was covered with paved parking lots and grassed areas. During remediation at the property, opportunities frequently arose where the project team was able to coordinate effectively with stakeholders to sequence remediation activities to facilitate removal of otherwise inaccessible soils and identify opportunities for materials reuse when supported by residual radiological and chemical levels. Some specific opportunities include: - remediating individual truck loading dock bays to maintain tenant operations; - working along a busy highway and in a utility corridor containing a 30-inch high pressure gas main; - remediating Lodi Brook and associated wetlands requiring bypass pumping and other diversionary structures to maintain local community stormwater drainage; - protecting during remediation and supporting access to facilitate tenant/owner maintenance of critical fire protection and water supply system service lines buried in contaminated soils and necessary for safe warehouse operations; and - coordinating with stakeholders to ensure non-radiological contaminants of concern for the site (unaffiliated with FUSRAP) were addressed by the responsible party in a manner that maximized benefit to all parties while supporting an efficient overall site remediation program. Once the property was vacant and the warehouse structure and radiologically non-impacted above-grade structures were demolished, the project identified an opportunity to significantly reduce the volume of waste associated with the foundation of the former warehouse, a foundation suspected of being partially constructed in radiologically contaminated soils. The project developed and implemented supplemental radiological verification survey and sampling strategies based on radiological cross-contamination risk potential with process flow-charts and screening-level based decision points; a program that classified saw-cut sections of concrete based on observed residual surface radioactivity conditions using a combination of gamma sensitive sodium-iodide scans and beta sensitive Geiger-Muller direct measurements. The proposed approach was reviewed with stakeholders with feedback, including consideration of applicable State of New Jersey Site Remediation Program criteria and guidance before implementation. Once classified, additional sampling was performed at frequencies driven by screening. The sampling methods, stockpile sampling frequencies, criteria and, approach to data evaluation were developed in consideration of existing site cleanup standards, regional background ranges, State of New Jersey radiological remediation program guidance, and specific stakeholder input With the property remediation and survey efforts nearly completed, it is relevant to examine retrospectively the objectives, assumptions and limitations in the remedial design (i.e., what was planned) versus what was able to be accomplished through effective teaming. Benefits to other environmental remediation site programs include better understanding of how to work effectively with stakeholders to achieve win-win outcomes, and approaches to site remediation, waste minimization and materials reuse that were successful in their overall outcomes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

"Designing, simulating, and performing the 100-AV field test for the CIRCLES consortium: Methodology and Implementation of the Largest mobile traffic control experiment to date"

Previous controlled experiments on single-lane ring roads have shown that a single partially autonomous vehicle (AV) can effectively mitigate traffic waves. This naturally prompts the question of how these findings can be generalized to field operational, high-density traffic conditions. To address this question, the Congestion Impacts Reduction via CAV-in-the-loop Lagrangian Energy Smoothing (CIRCLES) Consortium conducted MegaVanderTest (MVT), a live traffic control experiment involving 100 vehicles near Nashville, TN, USA. This article is a tutorial for developing analytical and simulation-based tools essential for designing and executing a live traffic control experiment like the MVT. It presents an overview of the proposed roadmap and various procedures used in designing, monitoring, and conducting the MVT, which is the largest mobile traffic control experiment at the time. The design process is aimed at evaluating the impact of the CIRCLES AVs on surrounding traffic. The article discusses the agent-based traffic simulation framework created for this evaluation. A novel methodological framework is introduced to calibrate this microsimulation, aiming to accurately capture traffic dynamics and assess the impact of adding 100 vehicles to existing traffic. The calibration model's effectiveness is verified using data from a six-mile section of Nashville's I-24 highway. The results indicate that the proposed model establishes an effective feedback loop between the optimizer and the simulator, thereby calibrating flow and speed with different spatiotemporal characteristics to minimize the error between simulated and real-world data. Finally, We simulate AVs in multiple scenarios to assess their effect on traffic congestion. This evaluation validates the AV routes, thereby contributing to the execution of a safe and successful live traffic control experiment via AVs.

Ameli, Mostafa↗

MUTCD 11th Edition - What's New in Signage for Electric Vehicle Charging and Parking

This handout summarizes key changes to the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) with respect to signage for electric vehicle (EV) charging and parking. The final rule for the 11th edition of the MUTCD was published in the Federal Register on Dec. 19, 2023, and became effective Jan. 18, 2024. The previous edition was issued in 2009. Going forward, the Bipartisan Infrastructure Law requires updates every four years. Visit the MUTCD 11th Edition for full details.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Control and Optimization of Energy Storage System in Power Distribution System

The widespread adoption of electric vehicles (EVs) and transportation electrification is encumbered by two chief barriers: i) the limited driving range of EVs in the market today and ii) inadequate fast-charging infrastructure for long-distance trips. Extreme fast charging (XFC) technology can recharge EVs in less than 10 minutes for 200 miles range. Firstly, a novel robust optimization-based mixed integer linear programming model is proposed to size a battery energy storage system (BESS) and PV system in an XFCS. In this part, it is assumed that the sizing and location of the XFCS are known. Secondly, the aforesaid assumption is relaxed, and a strategic multi-period coordinated planning model is proposed to optimally site and size BESS-assisted charging stations in a highway transportation network and PV systems in a power distribution network by considering the coupling between both networks. Optimal operation and control of BESS-assisted EV charging stations are vital to alleviate the adverse impact of extreme fast charging of EVs on the host power network. A joint solution is proposed to mitigate the steady state and transient impact of extremefast charging of EVs and ensure grid-friendly integration of XFCSs with the host grid. Lastly, to make the operation of the XFCS cost-effective, a multi-layered energy management framework is proposed for the XFCS by considering forecast uncertainties, monthly demand charges reduction, and BESS degradation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Novel Air System for 300 kW Heavy Duty Fuel Cell

Hydrogen fuel cell powered vehicles for heavy duty trucks is a potential path for reducing heavy duty vehicle emissions in the future. The air handling system delivers the proper amount of air (oxygen) to react with fuel (hydrogen) in the fuel cell to produce power. Air delivery requires significant power and is the largest parasitic loss for a 300 kW fuel cell. Today’s systems use an electric motor to power an air compressor that supplies oxygen to the fuel cell stack. In addition to parasitic power loss, hydrogen fuel cell systems often have reliability issues associated with the air handling system. Reliability is of significant concern for heavy duty applications (especially long-haul applications). This project aims to improve both the electrical power consumption and reliability of hydrogen fuel cell air handling systems to meet the needs of heavy duty on-highway vehicle applications. The air handling is provided by a twin vortices series (TVS) compressor in addition to adding a TVS expander to recover waste heat energy back into the compressor. The final configuration includes a 600 V, 39 kW motor connected with a single shaft to the compressor and expander. This configuration reduced the total electrical power consumption from 48.6 kW to 37 kW at full load, 27 kW to 9 kW at half load and 0.44 kW to 0.22 kW at idle. The response time requirement was to be less than 2 seconds while the final demonstration yielded 0.62 sec. The study includes additional technologies including water dosing into the compressor, a recuperator and elimination of the intercooler.

Reich, Evan [Eaton Corporation, Southfield, MI (Un↗

A Machine Learning Approach for Hourly Traffic Prediction Used in EV-Charging Sites

Reliable forecasting of hourly traffic volumes on highways is critical for planning and operating electric-vehicle charging infrastructure without overloading the grid. In this work, we develop and evaluate a station-specific machine-learning approach based on NeuralProphet, enhanced with conditional seasonality to better distinguish weekday, weekend, and holiday patterns. For each station, the model automatically retrieves the same calendar day from the prior years as an AR-Net initialization, fits trend and Fourier-based seasonality components, and then applies short-term auto-regressive corrections. We train and test on 2021 and 2022 TMAS data, respectively, and validate performance over the whole year. We chose to demonstrate how the model performs on a typical weekday (3/15/2022), weekend (3/27/2022), and a special holiday (12/25/2022). Our results yield MAPE of 7.4%, 23.6%, and 32.0%, respectively. Over the entire year 2022, the overall MAPE was 17%. This demonstrates that station-specific models with conditional seasonality can achieve accurate, scalable hourly forecasts for EV-charging load planning.

99 - GENERAL AND MISCELLANEOUS↗

Multi-Modal Integrated Safety, Security & Environmental Program Strategy

This paper describes an approach to assessing and protecting the surface transportation infrastructure from a network science viewpoint. We address transportation security from a human behavior-dynamics perspective under both normal and emergency conditions for the purpose of measuring, managing and mitigating risks. The key factor for the planning and design of a robust transportation network solution is to ensure accountability for safety, security and environmental risks. The Oak Ridge National Laboratory (ORNL) Multi-Modal Integrated Safety, Security and Environmental Program (M2IS2EP) evolved from a joint US Department of Energy (DOE) Oak Ridge Office (ORO) Assets Utilization Program and ORNL SensorNet Program initiative named the Identification and Monitoring of Radiation (in commerce) Shipments (IMRicS). In November of 2002 the first of six pilot demonstrations was constructed at the Tennessee I-40/75 Knox County Weigh Station outside of Knoxville. Over the life of the project four more installations were deployed with various levels of ORNL oversight. In October of 2004 the ORNL SensorNet Program commissioned a research team to develop a project plan and to identify/develop a strategic vision in support of the SensorNet Program, keeping in mind the needs of the various governmental constituencies (i.e., DOT/DHS/EPA) for improving the safety/security/environment of the highway transportation system. Ultimately a more comprehensive ORNL SensorNet Program entitled Trusted Corridors was established and presented to ORNL, DOE, DOT, DHS, EPA and State leaders. Several of these entities adopted their own versions of these programs and are at various stages of deployment. All of these initiatives and pilots make up the foundation of the concepts and ideas of M2IS2EP and will be discussed further on in this paper.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Plug-in hybrid electric vehicles : How does one determine their potential for reducing U.S. oil dependence?

Estimation of the potential of plug-in hybrid electric vehicles (PHEV's) ability to reduce U.S. gasoline use is difficult and complex. Although techniques have been proposed to estimate the vehicle kilometers of travel (VKT) that can be electrified, these methods may be inadequate and/or inappropriate for early market introduction circumstances. Factors that must be considered with respect to the PHEV itself include (1) kWh battery storage capability; (2) kWh/km depletion rate of the vehicle (3) liters/km use of gasoline (4) average daily kilometers driven (5) annual share of trips exceeding the battery depletion distance (6) driving cycle(s) (7) charger location [i.e. on-board or off-board] (8) charging rate. Each of these factors is actually a variable, and many interact. Off the vehicle, considerations include (a) primary overnight charging spot [garage, carport, parking garage or lot, on street], (b) availability of primary and secondary charging locations [i.e. dwellings, workplaces, stores, etc] (c) time of day electric rates (d) seasonal electric rates (e) types of streets and highways typically traversed during most probable trips depleting battery charge [i.e. city, suburban, rural and high vs. low density]; (f) cumulative trips per day from charger origin (g) top speeds and peak acceleration rates required to make usual trips. Taking into account PHEV design trade-off possibilities (kW vs. kWh of battery, in particular), this paper attempts to extract useful information relating to these topics from the 2001 National Household Travel Survey (NHTS), and the 2005 American Housing Survey (AHS). Costs per kWh of PHEVs capable of charge depleting (CD) all-electric range (CDE, or AER) vs. those CD in 'blended' mode (CDB) are examined. Lifetime fuel savings of alternative PHEV operating/utilization strategies are compared to battery cost estimates.

02 PETROLEUM↗

U.S. Department of Energy -- Advanced Vehicle Testing Activity: Plug-in Hybrid Electric Vehicle Testing and Demonstration Activities

The U.S. Department of Energy’s (DOE) Advanced Vehicle Testing Activity (AVTA) tests plug-in hybrid electric vehicles (PHEV) in closed track, dynamometer and onroad testing environments. The onroad testing includes the use of dedicated drivers on repeated urban and highway driving cycles that range from 10 to 200 miles, with recharging between each loop. Fleet demonstrations with onboard data collectors are also ongoing with PHEVs operating in several dozen states and Canadian Provinces, during which trips- and miles-per-charge, charging demand and energy profiles, and miles-per-gallon and miles-per-kilowatt-hour fuel use results are all documented, allowing an understanding of fuel use when vehicles are operated in charge depleting, charge sustaining, and mixed charge modes. The intent of the PHEV testing includes documenting the petroleum reduction potential of the PHEV concept, the infrastructure requirements, and operator recharging influences and profiles. As of May 2008, the AVTA has conducted track and dynamometer testing on six PHEV conversion models and fleet testing on 70 PHEVs representing nine PHEV conversion models. A total of 150 PHEVs will be in fleet testing by the end of 2008, all with onboard data loggers. The onroad testing to date has demonstrated 100+ miles per gallon results in mostly urban applications for approximately the first 40 miles of PHEV operations. The primary goal of the AVTA is to provide advanced technology vehicle performance benchmark data for technology modelers, research and development programs, and technology goal setters. The AVTA testing results also assist fleet managers in making informed vehicle purchase, deployment and operating decisions. The AVTA is part of DOE’s Vehicle Technologies Program. These AVTA testing activities are conducted by the Idaho National Laboratory and Electric Transportation Engineering Corporation, with Argonne National Laboratory providing dynamometer testing support. The proposed paper and presentation will discuss PHEV testing activities and results. INL/CON-08-14333

33 ADVANCED PROPULSION SYSTEMS↗

Trends in on-road vehicle emissions of ammonia

Motor vehicle emissions of ammonia have been measured at a California highway tunnel in the San Francisco Bay area. Between 1999 and 2006, light-duty vehicle ammonia emissions decreased by 38 {+-} 6%, from 640 {+-} 40 to 400 {+-} 20 mg kg{sup -1}. High time resolution measurements of ammonia made in summer 2001 at the same location indicate a minimum in ammonia emissions correlated with slower-speed driving conditions. Variations in ammonia emission rates track changes in carbon monoxide more closely than changes in nitrogen oxides, especially during later evening hours when traffic speeds are highest. Analysis of remote sensing data of Burgard et al. (Environ Sci. Technol. 2006, 40, 7018-7022) indicates relationships between ammonia and vehicle model year, nitrogen oxides, and carbon monoxide. Ammonia emission rates from diesel trucks were difficult to measure in the tunnel setting due to the large contribution to ammonia concentrations in a mixed-traffic bore that were assigned to light-duty vehicle emissions. Nevertheless, it is clear that heavy-duty diesel trucks are a minor source of ammonia emissions compared to light-duty gasoline vehicles.

25 ENERGY STORAGE↗

Position and Velocity Tracking in Cellular Networks Using the Kalman Filter

Access to the right information anytime, anywhere is becoming the new driving force for the information technology revolution. The 'right' information's relevance is based on the user's profile and his/her current geographical position and/or time. Location Based Service (LBS) is an innovative technology that provides information or makes information available based on the geographical location of the mobile user. Analysts predict that LBSs will lead to new applications, generating billions of US dollars worldwide (Leite, 2001; Searle, 2001). The need for an efficient and accurate mobile station (MS) positioning system is growing day by day. The ability to pinpoint the location of an individual has an obvious and vital value in the context of emergency services (Chan, 2003; Olama et al., 2008). Pinpointing the location of people and other valuable assets also opens the door to a new world of previously unimagined information services and m-commerce probabilities. For example, availability of services like 'Where is the nearest ATM?', 'Check traffic conditions on the highway on my route', 'Find a parking lot nearby', as well as answers to 'Where is my advisor?', and 'Where is my car?' will be an everyday rule in our lives (Charalambous & Panayiotou, 2004). A technology independent LBS architecture can be considered as comprised by three main parts (Girodon, 2002): A user requesting information, a mobile network operator and its partners, and several content providers (e.g. data, maps). The subscriber requests a personalized service dependant on his geographic location. The system will ask the Location Services Manager (which is in charge of handling requests, i.e., send/receive to the Location Calculator and the Content Providers) to pinpoint the location of the mobile. The Location Services Manager (LSM), using the Location Calculator, will ask the Content Provider (CP) to supply qualified information according to the mobile's geographical position. The LSM will eventually receive the answer from the CP and send it to the mobile, performing the essential data translations. Fig. 1 outlines the precedent concept. For effective provision of LBS, one has to provide an accurate location, as well as suitable information for users required by the corresponding service, with minimal expenditure. Thus, there are three main technology issues that have to be resolved for LBS: positioning technology, application technology, and location services (Dru & Saada, 2001). A very important technology is of course the positioning technology, the way to find out the location of a mobile device accurately. Due to the unique characteristics of the cellular environment, it is a great challenge to locate the user precisely. However, in many cases, application technology and location services are important consideration of LBS. Application technology manages the geographic information and delivers the customer requests to the appropriate service provider, thus it constitutes the communication system involved. LBS uses the geographic information to provide geographically sensitive information and services. Location-based applications and services are not sensitive to the type of location technology that is used - they merely rely on reasonably accurate geographic coordinates (Chan, 2003). This chapter is structured as follows: In Section 2, we describe the use and applications of LBSs. The current location determination technologies and standards are presented in Section 3. In Section 4 we describe the mathematical models used for the location and velocity estimation algorithms. An initial attempt for MS location estimation via received signal level using the maximum likelihood estimation (MLE) approach and triangulation is presented in Sections 5. Since the former approach lacks acceptable accuracy for demanding services as numerical results reveal, the extended Kalman filter (EKF) approach, which is the main topic in this chapter, is introduced in Sections 6. In Section 7 we present numerical results. Section 8 provides concluding remarks.

99 GENERAL AND MISCELLANEOUS↗

Driving and the Built Environment: The Effects of Compact Development on Motorized Travel, Energy Use, and CO2 Emissions

The vast majority of the U.S. population-some 80 percent-now lives in metropolitan areas, but population and employment continue to decentralize within regions, and density levels continue to decline at the urban fringe. Suburbanization is a long-standing trend that reflects the preference of many Americans for living in detached single-family homes, made possible largely through the mobility provided by the automobile and an extensive highway network. Yet these dispersed, automobile-dependent development patterns have come at a cost, consuming vast quantities of undeveloped land; increasing the nation's dependence on petroleum, particularly foreign imports; and increasing greenhouse gas (GHG) emissions that contribute to global warming. The primary purpose of this study is to examine the relationship between land development patterns, often referred to as the built environment, and motor vehicle travel in the United States and to assess whether petroleum use, and by extension GHG emissions, could be reduced through changes in the design of development patterns (see Appendix A for the full statement of task). A key question of interest is the extent to which developing more compactly would reduce vehicle miles traveled (VMT) and make alternative modes of travel (e.g., transit, walking) more feasible. The study is focused on metropolitan areas and on personal travel, the primary vectors through which policy changes designed to encourage more compact development should have the greatest effect.

02 PETROLEUM↗

USING A RISK-BASED METHODOLOGY FOR THE TRANSFER OF RADIOACTIVE MATERIAL WITHIN THE SAVANNAH RIVER SITE BOUNDARY

Shipment of radioactive materials (RAM) is discussed in the Code of Federal Regulations in parts of both 49 CFR and 10 CFR. The regulations provide the requirements and rules necessary for the safe shipment of RAM across public highways, railways, waterways, and through the air. These shipments are sometimes referred to as in-commerce shipments. Shipments of RAM entirely within the boundaries of Department of Energy sites, such as the Savannah River Site (SRS), can be made using methodology allowing provisions to maintain equivalent safety while deviating from the regulations for in-commerce shipments. These onsite shipments are known as transfers at the SRS. These transfers must follow the requirements approved in a site-specific Transportation Safety Document (TSD). The TSD defines how the site will transfer materials so that they have equivalence to the regulations. These equivalences are documented in an Onsite Safety Assessment (OSA). The OSA can show how a particular packaging used onsite is equivalent to that which would be used for an in-commerce shipment. This is known as a deterministic approach. However, when a deterministic approach is not viable, the TSD allows for a risk-based OSA to be written. These risk-based assessments show that if a packaging does not provide the necessary safety to ensure that materials are not released (during normal or accident conditions) then the worst-case release of materials does not result in a dose consequence worse than that defined for the SRS. This paper will discuss recent challenges and successes using this methodology at the SRS.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Leaching of Mixtures of Biochar and Fly Ash

Increasing atmospheric levels of greenhouse gases, especially CO2, and their effects on global temperature have led to interest in the possibility of carbon storage in terrestrial environments.2, 5, 6 Both the residual char from biomass pyrolysis7-9, 12 (biochar) and fly ash from coal combustion1, 13, 14 have the potential to significantly expand terrestrial sequestration options. Both biochar and fly ash also have potentially beneficial effects on soil properties. Fly ash has been shown to increase porosity, water-holding capacity, pH, conductivity, and dissolved SO42-, CO32-, Cl- and basic cations.10, 11, 16 Adding biochar to soil generally raises pH, increases total nitrogen and total phosphorous, encourages greater root development, improves cation exchange capacity and reduces available aluminum.3, 17 Combinations of these benefits likely lead to the observed increased yields for crops including corn and sugarcane.17 with biochar addition to soil. In addition, it has been found that soils with added biochar emit lower amounts of other greenhouse gases (methane and nitrous oxide) 8, 17 than do unammended soils. Biochar and fly ash amendments may be useful in promoting terrestrial carbon sequestration on currently underutilized and degraded lands. For example, about 1% of the US surface lands consist of previously mined lands or highway rights-of-way.18 Poorly managed lands could count for another 15% of US area. Biochar and fly ash amendments could increase productivity of these lands and increase carbon storage in the soil Previous results showed minimal leaching of organic carbon and metals from a variety of fly ashes.15 Here, we are examining the properties of mixtures of biochar, fly ash, and soil and evaluating leaching of organic carbon and metals from the mixtures.

01 COAL, LIGNITE, AND PEAT↗