Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

System and method for testing missile components

A testing system for testing a missile component having a sense axis includes a centrifuge, a support arm, an orientation assembly, and a controller. The centrifuge rotates the orientation assembly about a vertical axis in a substantially horizontal plane. The orientation assembly includes a first motor, a first gimbal, and a gimballed support. The first motor has a first rotatable shaft defining a first gimbal axis. The first gimbal is coupled with the first rotatable shaft to rotate about the first gimbal axis while the centrifuge rotates the orientation assembly about the vertical axis such that missile component is simultaneously rotated about both the vertical axis and the first gimbal axis to simulate a missile launch of the missile component. The gimballed support is coupled with the first gimbal for supporting the missile component such that the sense axis of the missile component is not parallel to the substantially horizontal plane. The orientation assembly may also include a second gimbal that is rotated about a second gimbals axis by a second motor.

Prewitt, Steven Forrest↗

System and method for testing missile components

A testing system for testing a missile component having a sense axis includes a centrifuge, a support arm, an orientation assembly, and a controller. The centrifuge rotates the orientation assembly about a vertical axis in a substantially horizontal plane. The orientation assembly includes a first motor, a first gimbal, and a gimballed support. The first motor has a first rotatable shaft defining a first gimbal axis. The first gimbal is coupled with the first rotatable shaft to rotate about the first gimbal axis while the centrifuge rotates the orientation assembly about the vertical axis such that missile component is simultaneously rotated about both the vertical axis and the first gimbal axis to simulate a missile launch of the missile component. The gimballed support is coupled with the first gimbal for supporting the missile component such that the sense axis of the missile component is not parallel to the substantially horizontal plane. The orientation assembly may also include a second gimbal that is rotated about a second gimbals axis by a second motor.

Prewitt, Steven Forrest↗

Structural Analysis of Lightning Protection System for New Launch Vehicle

This project includes the design and specification of a lightning protection system for Launch Complex 39 B (LC39B) at Kennedy Space Center, FL in support of the Constellation Program. The purpose of the lightning protection system is to protect the Crew Launch Vehicle (CLV) or Cargo Launch Vehicle (CaLV) and associated launch equipment from direct lightning strikes during launch processing and other activities prior to flight. The design includes a three-tower, overhead catenary wire system to protect the vehicle and equipment on LC39B as described in the study that preceded this design effort: KSC-DX-8234 "Study: Construct Lightning Protection System LC3 9B". The study was a collaborative effort between Reynolds, Smith, and Hills (RS&H) and ASRC Aerospace (ASRC), where ASRC was responsible for the theoretical design and risk analysis of the lightning protection system and RS&H was responsible for the development of the civil and structural components; the mechanical systems; the electrical and grounding systems; and the siting of the lightning protection system. The study determined that a triangular network of overhead catenary cables and down conductors supported by three triangular free-standing towers approximately 594 ft tall (each equipped with a man lift, ladder, electrical systems, and communications systems) would provide a level of lightning protection for the Constellation Program CLV and CaLV on Launch Pad 39B that exceeds the design requirements.

Cope, Anne↗

Planning and Estimation of Operations Support Requirements

Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

Newhouse, Marilyn E.↗

The NASA Tracking and Data Relay Satellite System and its impact on spacecraft support in the space transportation system era

The space tracking, data acquisition and communication network systems and capabilities available to NASA are discussed, with emphasis on the Tracking and Data Relay Satellite System (TDRSS). Scheduled to come into operation in 1983, TDRSS will be the prime support system for communication with the Space Shuttle, Spacelab, and the automated spacecraft to be launched into earth orbit by the Space Transportation System. TDRSS will consist of two specialized data relay satellites in geosynchronous orbit, about 130 deg apart; each TDRSS spacecraft has a three-axis stabilized configuration, with sun-oriented solar panels, and will weigh about 2200 kg at launch. The NASA Spaceflight Tracking and Data Network, currently used to support 30-40 spacecraft per day, is described, and plans for changes in the network are discussed. The 26 antennas of the network will be consolidated into an expanded Deep Space Network, after TDRSS is in operation.

Smylie, R. E.↗

Port-O-Sim Object Simulation Application

Port-O-Sim is a software application that supports engineering modeling and simulation of launch-range systems and subsystems, as well as the vehicles that operate on them. It is flexible, distributed, object-oriented, and realtime. A scripting language is used to configure an array of simulation objects and link them together. The script is contained in a text file, but executed and controlled using a graphical user interface. A set of modules is defined, each with input variables, output variables, and settings. These engineering models can be either linked to each other or run as standalone. The settings can be modified during execution. Since 2001, this application has been used for pre-mission failure mode training for many Range Safety Scenarios. It contains range asset link analysis, develops look-angle data, supports sky-screen site selection, drives GPS (Global Positioning System) and IMU (Inertial Measurement Unit) simulators, and can support conceptual design efforts for multiple flight programs with its capacity for rapid six-degrees-of-freedom model development. Due to the assembly of various object types into one application, the application is applicable across a wide variety of launch range problem domains.

Lanzi, Raymond J.↗

Dense Non Aqueous Phase Liquid Source Area Delineation Using Membrane Interface Probe and Hydraulic Profile Tool Technology at Space Launch Complex 16, Cape Canaveral Air Force Station, Florida - 16352

The historical use and disposal of chlorinated solvents throughout Department of Defense and Department of Energy sites has resulted in subsurface contamination by dense non-aqueous phase liquids (DNAPL). The nature and environmental persistence of DNAPLs makes delineation and remediation of these compounds challenging and costly. This paper examines the utilization of data from a membrane interface probe (MIP) and hydraulic profile tool (HPT) to reduce a typical 18 to 24 month field investigation to 3 months; thereby, significantly reducing costs and resulting in a three-dimensional (3D) imagery of a deep DNAPL plume in order to support an aggressive remedial design for Space Launch Complex 16 (SLC16) at Cape Canaveral Air Force Station, Florida. During the early stages of the U.S. space program, chlorinated solvents were routinely used at space complexes. Spent solvents were discharged to surface impoundments where they migrated into the subsurface. Over time, these chlorinated solvents reached concentrations high enough to form a DNAPL plume. Recent investigations near SLC16 identified a previously unknown DNAPL plume co-mingled with dissolved-phase chlorinated compounds. The DNAPL source area (concentrations of trichloroethene [TCE] as high as 1,000,000 micrograms per liter [μg/L]) was discovered approximately 1,200 feet (ft) west of the existing monitoring network area. The U.S. Air Force, along with the U.S. Army Corps of Engineers, developed data quality objectives (DQO) to delineate the extent of the DNAPL and the dissolved-phase contaminant plume. A multi-phase investigation approach was developed by HydroGeoLogic, Inc. (HGL) emphasizing the use of MIP and HPT sampling technologies, conventional direct push technology (DPT), and monitoring well sampling methods. This approach allowed the collection of real-time data that supported the project DQOs and significantly reduced overall project costs and the field implementation schedule. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Construction bidding cost of KSC's space shuttle facilities

The bidding cost of the major Space Transportation System facilities constructed under the responsibility of the John F. Kennedy Space Center (KSC) is described and listed. These facilities and Ground Support Equipment (GSE) are necessary for the receiving, assembly, testing, and checkout of the Space Shuttle for launch and landing missions at KSC. The Shuttle launch configuration consists of the Orbiter, the External Tank, and the Solid Rocket Boosters (SRB). The reusable Orbiter and SRB's is the major factor in the program that will result in lowering space travel costs. The new facilities are the Landing Facility; Orbiter Processing Facility; Orbiter Approach and Landing Test Facility (Dryden Test Center, California); Orbiter Mating Devices; Sound Suppression Water System; and Emergency Power System for LC-39. Also, a major factor was to use as much Apollo facilities and hardware as possible to reduce the facilities cost. The alterations to existing Apollo facilities are the VAB modifications; Mobile Launcher Platforms; Launch Complex 39 Pads A and B (which includes a new concept - the Rotary Service Structure), which was featured in ENR, 3 Feb. 1977, 'Hinged Space Truss will Support Shuttle Cargo Room'; Launch Control Center mods; External Tank and SRB Processing and Storage; Fluid Test Complex mods; O&C Spacelab mods; Shuttle mods for Parachute Facility; SRB Recovery and Disassembly Facility at Hangar 'AF'; and an interesting GSE item - the SRB Dewatering Nozzle Plug Sets (Remote Controlled Submarine System) used to inspect and acquire for reuse of SRB's.

Brown, Joseph Andrew↗

OpenACC Profiling Support for Clang and LLVM using Clacc and TAU

Since its launch in 2010, OpenACC has evolved into one of the most widely used portable programming models for accelerators on HPC systems today. Clacc is a project funded by the US Exascale Computing Project (ECP) to bring OpenACC support for C and C++ to the popular Clang and LLVM compiler infrastructure. In this paper, we describe Clacc's support for the OpenACC Profiling Interface, a critical component of the OpenACC specification that standardizes an interface that profiling tools and libraries can depend upon across OpenACC implementations. As part of Clacc's general strategy to build OpenACC support upon OpenMP, we describe how Clacc builds OpenACC Profiling Interface support upon an extended version of OMPT. We then describe how a major profiling and tracing toolkit within ECP, the TAU Performance System, takes advantage of this support. We also describe TAU's selective instrumentation support for OpenACC. Finally, using Clacc and TAU, we present example visualizations for several SPEC ACCEL OpenACC benchmarks running on an IBM AC922 node, and we show that the associated performance overhead is negligible.

Coti, Camille↗

Launch Control Systems: Moving Towards a Scalable, Universal Platform for Future Space Endeavors

The redirection of NASA away from the Constellation program calls for heavy reliance on commercial launch vehicles for the near future in order to reduce costs and shift focus to research and long term space exploration. To support them, NASA will renovate Kennedy Space Center's launch facilities and make them available for commercial use. However, NASA's current launch software is deeply connected with the now-retired Space Shuttle and is otherwise not massively compatible. Therefore, a new Launch Control System must be designed that is adaptable to a variety of different launch protocols and vehicles. This paper exposits some of the features and advantages of the new system both from the perspective of the software developers and the launch engineers.

Sun, Jonathan↗

Geostationary Operational Environmental Satellite (GOES)-8 mission flight experience

The Geostationary Operational Environmental Satellite (GOES)-8 spacecraft was launched on April 13, 1994, at 06:04:02 coordinated universal time (UTC), with separation from the Atlas-Centaur launch vehicle occurring at 06:33:05 UTC. The launch was followed by a series of complex, intense operations to maneuver the spacecraft into its geosynchronous mission orbit. The Flight Dynamics Facility (FDF) of the Goddard Space Flight Center (GSFC) Flight Dynamics Division (FDD) was responsible for GOES-8 attitude, orbit maneuver, orbit determination, and station acquisition support during the ascent phase. This paper summarizes the efforts of the FDF support teams and highlights some of the unique challenges the launch team faced during critical GOES-8 mission support. FDF operations experience discussed includes: (1) The abort of apogee maneuver firing-1 (AMF-1), cancellation of AMF-3, and the subsequent replans of the maneuver profile; (2) The unexpectedly large temperature dependence of the digital integrating rate assembly (DIRA) and its effect on GOES-8 attitude targeting in support of perigee raising maneuvers; (3) The significant effect of attitude control thrusting on GOES-8 orbit determination solutions; (4) Adjustment of the trim tab to minimize torque due to solar radiation pressure; and (5) Postlaunch analysis performed to estimate the GOES-8 separation attitude. The paper also discusses some key FDF GOES-8 lessons learned to be considered for the GOES-J launch which is currently scheduled for May 19, 1995.

Noonan, C. H.↗

Integrated Launch Operations Applications Remote Display Developer

This internship provides the opportunity to support the creation and use of Firing Room Displays and Firing Room Applications that use an abstraction layer called the Application Control Language (ACL). Required training included video watching, reading assignments, face-to-face instruction and job shadowing other Firing Room software developers as they completed their daily duties. During the training period various computer and access rights needed for creating the applications were obtained. The specific ground subsystems supported are the Cryogenics Subsystems, Liquid Hydrogen (LH2) and Liquid Oxygen (LO2). The cryogenics team is given the task of finding the best way to handle these very volatile liquids that are used to fuel the Space Launch System (SLS) and the Orion flight vehicles safely.

Cryogenic Rocket Propellants↗

Integration of Mirror Design with Suspension System Using NASA's New Mirror Modeling Software

Advances in mirror fabrication are making very large space based telescopes possible. In many applications, only monolithic mirrors can meet the performance requirements. The existing and near-term planned heavy launch vehicles place a premium on lowest possible mass, and then available payload shroud sizes limit near term designs to 4 meter class mirrors. Practical 8 meter class and beyond designs could encourage planners to include larger shrouds, if it can be proven that such mirrors can be manufactured. These two factors, lower mass and larger mirrors, present the classic optimization problem. There is a practical upper limit to how large of a mirror can be supported by a purely kinematic mount system handling both operational and launch loads. This paper shows how the suspension system and mirror blank need to be designed simultaneously. We will also explore the concepts of auxiliary support systems which act only during launch and disengage on orbit. We will define required characteristics of these systems and show how they can substantially reduce the mirror mass.

Arnold, William R., Sr.↗

Integration of Mirror Design with Suspension System using NASA's New Mirror Modeling Software

Advances in mirror fabrication are making very large space based telescopes possible. In many applications, only monolithic mirrors can meet the performance requirements. The existing and near-term planned heavy launch vehicles place a premium on lowest possible mass, and then available payload shroud sizes limit near term designs to 4 meter class mirrors. Practical 8 meter class and beyond designs could encourage planners to include larger shrouds, if it can be proven that such mirrors can be manufactured. These two factors, lower mass and larger mirrors, present the classic optimization problem. There is a practical upper limit to how large of a mirror can be supported by a purely kinematic mount system handling both operational and launch loads. This paper shows how the suspension system and mirror blank need to be designed simultaneously. We will also explore the concepts of auxiliary support systems which act only during launch and disengage on orbit. We will define required characteristics of these systems and show how they can substantially reduce the mirror mass.

Arnold,William R., Sr.↗

Tracking and data relay satellite system configuration and tradeoff study, part 1. Volume 1: Summary volume

Study efforts directed at defining all TDRS system elements are summarized. Emphasis was placed on synthesis of a space segment design optimized to support low and medium data rate user spacecraft and launched with Delta 2914. A preliminary design of the satellite was developed and conceptual designs of the user spacecraft terminal and TDRS ground station were defined. As a result of the analyses and design effort it was determined that (1) a 3-axis-stabilized tracking and data relay satellite launched on a Delta 2914 provides telecommunications services considerably in excess of that required by the study statement; and (2) the design concept supports the needs of the space shuttle and has sufficient growth potential and flexibility to provide telecommunications services to high data rate users. Recommendations for further study are included.

Source record↗

Accelerance Decoupling: Removing the Influence of the Mobile Launcher from the Space Launch System Integrated Modal Test

Main objective for launch vehicle (LV) modal testing is to quantify the LV’s modal properties in the free-free state (i.e., post pad separation). Given the size of most LVs, free-free testing is a challenge and often not feasible. A test stand, typically the launch pad itself, is utilized as the means to support the LV an Integrated Modal Test (IMT). This shifts the challenge to developing robust numerical methods for removing the influence of the launch pad from the IMT. Preferably fully test driven (method’s that operate based on measured data only). The Accelerance Decoupling (AD) approach, developed and verified by NASA and ASD, is a method with the capability to “subtract out” the influence of the test stand from the IMT using measured data only

Joel Sills↗

Scientific and Technical Support for the Galileo Net Flux Radiometer Experiment

This report describes work in support of the Galileo Net Flux Radiometer (NFR), an instrument mounted on the Galileo probe, a spacecraft designed for entry into and direct measurements of Jupiter's atmosphere. Tasks originally proposed for the post launch period are briefly as follows: attend and support PSG (Project Science Group) and other project science meetings; support in-flight checkouts; maintain and keep safe the spare instrument and GSE (Ground Support Equipment); organize and maintain documentation; finish NFR calibration measurements, documentation, and analysis; characterize and diagnose instrument anomalies; develop descent data analysis tools; and science data analysis and publication. Because we had the capability to satisfy a project support need we also subsequently proposed and were funded to make ground- based observations of Jupiter during the period surrounding the Galileo arrival at Jupiter, using the Swedish Solar Telescope at La Palma, Canary Islands. The following section (11) provides background information on the NFR instrument.

Sromovsky, Lawrence A.↗

Advanced UVOIR Mirror Technology Development (AMTD) for Very Large Space Telescopes

ASTRO2010 Decadal Survey stated that an advanced large-aperture ultraviolet, optical, near-infrared (UVOIR) telescope is required to enable the next generation of compelling astrophysics and exoplanet science; and, that present technology is not mature enough to affordably build and launch any potential UVOIR mission concept. AMTD is the start of a multiyear effort to develop, demonstrate and mature critical technologies to TRL-6 by 2018 so that a viable flight mission can be proposed to the 2020 Decadal Review. AMTD builds on the state of art (SOA) defined by over 30 years of monolithic & segmented ground & space-telescope mirror technology to mature six key technologies: (1) Large-Aperture, Low Areal Density, High Stiffness Mirror Substrates: Both (4 to 8 m) monolithic and (8 to 16 m) segmented primary mirrors require larger, thicker, and stiffer substrates. (2) Support System: Large-aperture mirrors require large support systems to ensure that they survive launch and deploy on orbit in a stress-free and undistorted shape. (3) Mid/High Spatial Frequency Figure Error: Very smooth mirror is critical for producing high-quality point spread function (PSF) for high contrast imaging. (4) Segment Edges: The quality of segment edges impacts PSF for high-contrast imaging applications, contributes to stray light noise, and affects total collecting aperture. (5) Segment to Segment Gap Phasing: Segment phasing is critical for producing high-quality temporally-stable PSF. (6) Integrated Model Validation: On-orbit performance is driven by mechanical & thermal stability. Compliance cannot be 100% tested, but relies on modeling. AMTD is pursuing multiple design paths to provide the science community with options to enable either large aperture monolithic or segmented mirrors with clear engineering metrics traceable to science requirements.

Postman, Marc↗