Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Beaming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Threshold magnitudes for a multichannel correlation detector in background seismicity

Colocated explosive sources often produce correlated seismic waveforms. Multichannel correlation detectors identify these signals by scanning template waveforms recorded from known reference events against "target" data to find similar waveforms. This screening problem is challenged at thresholds required to monitor smaller explosions, often because non-target signals falsely trigger such detectors. Therefore, it is generally unclear what thresholds will reliably identify a target explosion while screening non-target background seismicity. Here, we estimate threshold magnitudes for hypothetical explosions located at the North Korean nuclear test site over six months of 2010, by processing International Monitoring System (IMS) array data with a multichannel waveform correlation detector. Our method (1) accounts for low amplitude background seismicity that falsely triggers correlation detectors but is unidentifiable with conventional power beams, (2) adapts to diurnally variable noise levels and (3) uses source-receiver reciprocity concepts to estimate thresholds for explosions spatially separated from the template source. Furthermore, we find that underground explosions with body wave magnitudes m b = 1.66 are detectable at the IMS array USRK with probability 0.99, when using template waveforms consisting only of P -waves, without false alarms. We conservatively find that these thresholds also increase by up to a magnitude unit for sources located 4 km or more from the Feb.12, 2013 announced nuclear test.

54 ENVIRONMENTAL SCIENCES↗

FRIB operations: first three years

During the first three years since May 2022, FRIB has been operating safely meeting expectations of both scientific and industrial users with high machine availability, while ramping up the beam power to 20 kW for heavy ions including uranium. The paper summarizes the operational experience and challenges, accelerator improvement projects, expansions in user stations, accelerator R&D and workforce growth programs, and preparation for facility upgrades.

Wei, Jie [Michigan State U.]↗

Controls at the Fermilab PIP-II Superconducting Linac

PIP-II is an 800 MeV superconducting RF linac under development at Fermilab. As the new first stage in our accelerator chain, it will deliver high-power beam to multiple experiments simultaneously and thus drive Fermilab’s particle physics program for years to come. In a pivot for Fermilab, controls for PIP-II are based on EPICS instead of ACNET, the legacy control system for accelerators at the lab. This paper discusses the status of the EPICS controls work for PIP-II. We describe the EPICS tools selected for our system and the experience of operators new to EPICS. We introduce our continuous integration / continuous development environment. We also describe some efforts at cooperation between EPICS and ACNET, or efforts to move towards a unified interface that can apply to both control systems.

43 PARTICLE ACCELERATORS↗

Design of the LBNF Beamline

The Long Baseline Neutrino Facility (LBNF) will utilize a beamline located at Fermilab to provide and aim a neutrino beam of sufficient intensity and appropriate energy range toward DUNE detectors, placed deep underground at the SURF Facility in South Dakota. The primary proton beam (60 - 120 GeV) will be extracted from the MI-10 section of Fermilab's Main Injector. Neutrinos are produced after the protons hit a solid target and produce mesons which are subsequently focused by magnetic horns into a 194 m long decay pipe where they decay into muons and neutrinos. The parameters of the facility were determined taking into account the physics goals, spacial and radiological constraints and the experience gained by operating the NuMI facility at Fermilab. The Beamline facility is designed for initial operation at a proton-beam power of 1.2 MW, with the capability to support an upgrade to 2.4 MW. LBNF/DUNE obtained CD-1 approval in November 2015. We discuss here the design status and the associated challenges as well as the R&D and plans for improvements before baselining the facility.

43 PARTICLE ACCELERATORS↗

The Energy Efficiency of High Intensity Proton Driver Concepts

For MW class proton driver accelerators the energy efficiency is an important aspect; the talk reviews the efficiency of different accelerator concepts including s.c./n.c. linac, rapid cycling synchrotron, cyclotron; the potential of these concepts for very high beam power is discussed.

43 PARTICLE ACCELERATORS↗

Effects of Synchrotron Motion on Nonlinear Integrable Optics

An integrable Rapid-Cycling Synchrotron (iRCS) has been proposed as a replacement for the Fermilab Booster to achieve multi-MW beam power for the Fermilab high-energy neutrino program.* The successful application of nonlinear integrable optics to proton synchrotrons requires careful examination of single-particle longitudinal effects, especially synchrotron motion. For example, synchrobetatron coupling may excite transverse resonances in the ring. We will use the Synergia code to simulate the effects of this synchrobetatron coupling on the iRCS design with nonlinear inserts. Our goal will be to identify new invariants in the presence of this coupling. Assuming the synchrotron tune is sufficiently small, we have identified one or more adiabatic invariants of the motion. These invariants suggest that integrable optics with synchrobetatron coupling retains integrability when averaged over a synchrotron period.

43 PARTICLE ACCELERATORS↗

12 GeV CEBAF Initial Operational Experience and Challenges

The 12 GeV Upgrade for the Continuous Electron Beam Accelerator Facility (CEBAF) achieved CD-4B, or Project Completion, on September 27, 2017. The 13-year $338M project doubled the beam energy of the CEBAF accelerator while also adding a fourth experimental hall. The scope of work for the accelerator complex was completed in 2014. Over the subsequent three years the upgrades for the experimental halls were completed, beamlines and spectrometers commissioned and transitions made to production running for the Nuclear Physics program. This paper will present an overview of the operational experience gained during initial accelerator commissioning through the recent achievements of simultaneous 4-Hall operations at full beam power.

Spata, Michael F.↗

H⁰ Stark Stripping and Component Irradiation in Fermilab Booster

In foil stripping of H⁻ some fraction of the emerging neutral H⁰ will be in excited states, which can then strip through the Stark effect in the magnetic field of the downstream orbit bump magnet. The resultant H⁺ will experience a depleted net kick compared to protons emerging from the foil and will track on trajectories different from the nominal circulating beam. This will lead to irradiation of downstream machine components. An analysis of these processes is of particular importance looking forward to the much higher beam power of the Fermilab PIP-II era. This study investigates where these errant protons will be lost, how much power is deposited, and whether this will be a shielding concern.

43 PARTICLE ACCELERATORS↗

Diffusion bonding of tungsten-vanadium-zirconium using vacuum hot pressing for the development of a low decay heat cladding solution for tungsten spallation targets

Tantalum has been used as cladding material for water-cooled solid tungsten targets at many leading spallation neutron production facilities thanks to its high neutron yield, manageable radiation damage behavior, and excellent corrosion/erosion resistance in radiation environments. However, from a safety hazard perspective, thermal neutron capture of tantalum in spallation environments causes a high specific decay heat in the target volume, which often becomes a limiting factor in increasing the beam power on the target. In this paper, we studied vacuum hot pressing (VHP) parameters to diffusion bond zirconium to tungsten to explore the feasibility of using zirconium alloys as an alternative cladding material to tantalum. Zirconium alloys have long been used as cladding material for early generation solid spallation targets, and nuclear fuel rods. In spallation environments zirconium has significantly lower decay heat with shorter decay time compared to tantalum. The hot isostatic pressing (HIP) of zirconium and tungsten is known to produce limited bonding quality due to the formation of the brittle ZrW2 intermetallic layer. To overcome this problem, placing a vanadium interlayer between tungsten and zirconium has been proposed by exploring parameter space in binary alloy phase diagrams. Under the VHP conditions, 860 ◦C at 70 MPa for 4 hours, Zr-V and V-W showed good diffusion bonding, which demonstrates the feasibility of a single step HIP process to make the zirconium alloy clad tungsten spallation volumes.

Lee, Yong Joong↗

Design and Prototyping of the Electron Ion Collider Electron Storage Ring 591 MHz Elliptical SRF Cavity

The Electron Ion Collider (EIC) is a new nuclear phys-ics research facility to be constructed at Brookhaven Lab (BNL). It consists a few accelerator complexes, each re-quires some different SRF and RF systems. Among them, the electron storage ring?s (ESR) 591 MHz fundamental RF system is one of the most challenging. This 17 cavi-ties system will handle a variable beam current of up to 2.5 A, and replenish up to 10 MW of beam power losses from both synchrotron radiation (SR) and high-order modes (HOM). In this paper, we will report the progress and findings of the ongoing design and prototyping of this cavity.

Guo, J.↗

Design and Prototyping of the Electron Ion Collider Electron Storage Ring SRF cavity

Among the EIC?s numerous RF subsystems, the electron storage ring?s (ESR) 591 MHz fundamental RF system is one of the most challenging. Each cavity in the system will handle up to 2.5 A of beam current and supply up to 600 kW beam power under a wide range of voltage. The EIC R&D plan includes the design, fabrication and testing of such a cavity. In this paper, we will report the latest status and findings of the ongoing design and prototyping of this cavity, including the RF and mechanical/thermal design, fabrication design, and the progress of fabrication.

Guo, Jiquan↗

Interband Cascade Photovoltaic Cells

In this project, we are performing basic and applied research to systematically investigate our newly proposed interband cascade (IC) photovoltaic (PV) cells [1]. These cells follow from the great success of infrared IC lasers [2-3] that pioneered the use of quantum-engineered IC structures. This quantum-engineered approach will enable PV cells to efficiently convert infrared radiation from the sun or other heat source, to electricity. Such cells will have important applications for more efficient use of solar energy, waste-heat recovery, and power beaming in combination with mid-infrared lasers. The objectives of our investigations are to: achieve extensive understanding of the fundamental aspects of the proposed PV structures, develop the necessary knowledge for making such IC PV cells, and demonstrate prototype working PV cells. This research will focus on IC PV structures and their segments for utilizing infrared radiation with wavelengths from 2 to 5 μm, a range well suited for emission by heat sources (1,000-2,000 K) that are widely available from combustion systems. The long-term goal of this project is to push PV technology to longer wavelengths, allowing for relatively low-temperature thermal sources. Our investigations address material quality, electrical and optical properties, and their interplay for the different regions of an IC PV structure. The tasks involve: design, modeling and optimization of IC PV structures, molecular beam epitaxial growth of PV structures and relevant segments, material characterization, prototype device fabrication and testing. At the end of this program, we expect to generate new cutting-edge knowledge in the design and understanding of quantum-engineered semiconductor structures, and demonstrate the concepts for IC PV devices with high conversion efficiencies.

36 MATERIALS SCIENCE↗

Fundamental Aspects of Selective Melting Additive Manufacturing Processes

Certain details of the additive manufacturing process known as selective laser melting (SLM) affect the performance of the final metal part. To unleash the full potential of SLM it is crucial that the process engineer in the field receives guidance about how to select values for a multitude of process variables employed in the building process. These include, for example, the type of powder (e.g., size distribution, shape, type of alloy), orientation of the build axis, the beam scan rate, the beam power density, the scan pattern and scan rate. The science-based selection of these settings con- stitutes an intrinsically challenging multi-physics problem involving heating and melting a metal alloy, reactive, dynamic wetting followed by re-solidification. In addition, inherent to the process is its considerable variability that stems from the powder packing. Each time a limited number of powder particles are placed, the stacking is intrinsically different from the previous, possessing a different geometry, and having a different set of contact areas with the surrounding particles. As a result, even if all other process parameters (scan rate, etc) are exactly the same, the shape and contact geometry and area of the final melt pool will be unique to that particular configuration. This report identifies the most important issues facing SLM, discusses the fundamental physics associated with it and points out how modeling can support the additive manufacturing efforts.

36 MATERIALS SCIENCE↗

The PIP-II Conceptual Design Report

The Proton Improvement Plan-II (PIP-II) encompasses a set of upgrades and improvements to the Fermilab accelerator complex aimed at supporting a world-leading neutrino program over the next several decades. PIP-II is an integral part of the strategic plan for U.S. High Energy Physics as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 and formalized through the Mission Need Statement approved in November 2015. As an immediate goal, PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing proton beam power in excess of 1 MW on target at the initiation of the Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) program, currently anticipated for the mid- 2020s. PIP-II is a part of a longer-term goal of establishing a high-intensity proton facility that is unique within the world, ultimately leading to multi-MW capabilities at Fermilab....

43 PARTICLE ACCELERATORS↗

Improving extraction efficiency of the third integer resonant extraction using higher order multipoles

The new accelerator complex at J-PARC will operate with both high energy and very high intensity proton beams. With a design slow extraction efficiency of greater than 99% this facility will still be depositing significant beam power onto accelerator components [2]. To achieve even higher efficiencies requires some new ideas. The design of the extraction system and the accelerator lattice structure leaves little room for improvement using conventional techniques. In this report we will present one method for improving the slow extraction efficiency at J-PARC by adding duodecapoles or octupoles to the slow extraction system. We will review the theory of resonant extraction, describe simulation methods, and present the results of detailed simulations. From our investigations we find that we can improve extraction efficiency and thereby reduce the level of residual activation in the accelerator components and surrounding shielding.

43 PARTICLE ACCELERATORS↗

29 mm Diameter Target Test Report

After numerous delays, the test of the 29 mm diameter target was conducted on 8/18/2017. The complete target design report, dated 8/15/2016, is reproduced below for completeness. This describes in detail the 10 disk target with varying thickness disks. The report presents and discusses the test results. In brief summary, there appears to have been multiple instrumentation errors. Measured temperatures, pressures and IR camera window temperature measurement are all suspect. All tests were done at 35 MeV, with 171 μA current, or 6 kW of beam power.

43 PARTICLE ACCELERATORS↗

Testing of 90° beam-line prototype at 55 MeV electron linac

Argonne National Laboratory, in cooperation with NorthStar Medical Technologies and Los Alamos National Laboratory, is developing a technology for the production of Mo-99 via photonuclear reaction on a Mo-100 target. The new facility will utilize electron accelerators with high beam power.

07 ISOTOPE AND RADIATION SOURCES↗

The Long-Baseline Neutrino Facility [Slides]

The Long-Baseline Neutrino Facility is the infrastructure necessary to send a powerful beam of neutrinos 800 miles through the earth, and measure them deep underground at South Dakota’s Sanford Underground Research Facility (SURF). LBNF supports DUNE. The Deep Underground Neutrino Experiment will be a game-changing experiment for neutrino science, potentially transforming our understanding of why the universe exists as it does. The LBNF/DUNE project will be the first internationally conceived, constructed, and operated mega-science project hosted by the Department of Energy in the United States.

43 PARTICLE ACCELERATORS↗