At least 937 records · Page 52

Large-Scale Commercial Carbon Capture Retrofit of the San Juan Generating Station

Enchant Energy, L.L.C. (Enchant) was selected to conduct a Front-End Engineering Design study (FEED) for the addition of a full-scale carbon capture system to remove carbon dioxide from the flue gas emissions of the two coal-fired generating units (total of 847 MW net) at San Juan Generating Station (SJGS), using Mitsubishi Heavy Industries Americas (MHIA) KM CDR Process™. Sargent & Lundy LLC (S&L) was selected as the primary technical lead, and along with various other organizations, were able to support Enchant’s completion of the following FEED tasks: Task 1 – Project Management & Planning; Task 2 – FEED Study; Task 3 - Final FEED Study Package. The FEED study period was between October 15, 2019 to September 30, 2022.

01 COAL, LIGNITE, AND PEAT↗

Lawrence Livermore National Laboratory Experimental Test Site 300: Energetic Materials Development Enclave (EMDEC) Soil Sampling and Analysis Plan Addendum 1 (April 2023)

The purpose of this addendum is to amend and update the Energetic Materials Development Enclave [project] Soil Sampling and Analysis Plan (SAP) dated June 2022 (LLNL-AM-22- 21678). In July 2022, portions of the SAP were completed. Since then, the project scope and limits have been redefined to include potential additional buildings. The exact locations of the additional buildings have not been determined, but the Project Management Office (PMO) would like to investigate at this time additional areas adjacent to the investigation area subject to the June 2022 SAP. The information contained in this addendum supersedes the June 2022 SAP. However, this addendum only addresses elements of the June 2022 SAP that were modified. Elements of the June 2022 SAP that have not been modified are relevant and will remain in effect.

54 ENVIRONMENTAL SCIENCES↗

Omar Ishak: Bioengineer by day, sports car tinkerer by night

Omar Ishak was 13 when he got his first car — or rather, the pieces of his first car. He had helped in his dad’s auto shop in the summers from age 10 to 12, but the vehicle that his dad presented, an Acura Integra, was a challenging first car. Missing most of one side and without a working engine, it seemed to Omar as if it were better off as scrap metal. "If you can piece together all the parts," Omar remembers his dad saying, "you can have it." Omar, now a technical project manager in Weapons Production (ALDWP) with the Transition to Operations/Readiness (PPI-3) group, at first felt overwhelmed at the enormity of what needed to be finished. As a child, he’d played with Legos and liked to tinker and take broken things apart. Then he’d become fascinated with building smaller-scaled model cars and, by the time his dad owned that shop, the fascination had manifested into real cars.

99 GENERAL AND MISCELLANEOUS↗

Alternate Retrieval A-105 Application Assessment Report

This report summarizes the historical development of the Confined Sluicing End Effector (CSEE) technology as well scarification technology. We also summarize the systems integration and deployment of that technology in the Gunite and Associated Tanks (GAAT) at the Oak Ridge Reservation where the retrieval system successfully removed the remaining sludge and heel in the eight tanks for tank closure and disposition. We also summarize the lessons learned from the deployment at Oak Ridge. Simulant development and testing have been key activities for any waste retrieval effort as many of the physical properties of the waste are unknown; therefore, this report discusses a bounding series of simulants that helps to reduce uncertainty for operations. These simulants have been developed for potential Hanford waste retrieval deployment. The potential key attributes for retrieval, based upon information provided by Washington River Protection Services (WRPS), of single-shell tank A-105 are discussed along with the potential application of CSEE technology to the challenges presented by the unique nature of A-105. These unique features include a major tear in the bottom of the tank, which necessitates technologies other than past practice sluicing to be deployed to prevent further intrusion of waste into the vadose zone. In addition, significant in-tank hardware makes A-105 particular challenging. However, there appear to be a number of parameters that should be investigated through additional testing or review of prior testing that may demonstrate the applicability of the CSEE technology to A-105. Testing of the Waste Retrieval End Effector (WREE), which was based on the original CSEE design, to demonstrate the ability to remove sludge and hardpan from Tank 241-C-106 will be reviewed to determine relevance to the Tank A-105 retrieval. There may be new requirements for the deployment system that accesses the tank with the CSEE because the tank bottom may not be flat, requiring the ability to maneuver the CSEE to maintain the appropriate stand-off distance from the CSEE and the tank bottom. Finally, we provide a set of recommendations, a set of task descriptions, and a range of estimated costs for a demonstration of the technology by the end of FY17. These tasks are summarized as: Complete system-level functional requirements; Procure or access the capacity to perform; Generate simulant development and simulant testing; Develop CSEE functionality; Develop demonstration plan; Perform demonstration; Analyze and document testing results; Perform project management and engineering.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Fuel Cycle Cost Basis Report: Supporting Documents 2 Production Based Costing

The purpose of this section is to outline a method of cost analysis whereby a significantly better representation of “should achieve” costs may be attained for NOAK systems. Based on economists’ notions of producer theory, and grounded in the cost analysts’ and project managers’ tool called the Work Breakdown Structure (WBS), this section describes best practices in cost estimation. It then illustrates how the Code of Accounts (COA) structure, developed by the Economic Modeling Working Group (EMWG) of the Generation IV International Forum in “Cost Estimating Guidelines for Generation IV Nuclear Energy Systems [EMWG 2007] (hereafter “Gen IV Guidelines Document”), can be used to differentiate “should achieve” versus “did experience” costs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Engineering Scale Testing of Transformational Non-Aqueous Solvent-Based CO 2 Capture Process at Technology Center Mongstad

Progress is reported for the period from August 8, 2018 to June 30, 2023. This final report involves work performed under ten tasks spanning two budget periods. The tasks are Task 1 Project Management, Task 2 TCM EH&S Risk Evaluation and Permitting, Task 3 Solvent Qualification, Task 4 Preliminary Design of NAS Optimized System, Task 5 TCM Amine Plant Equipment Procurement, Modification and Commissioning, Task 6 Solvent Production, Task 7 NAS Modified Amine Plant Test Plan Development, Testing, and Data Analysis, Task 8 Decommissioning and Waste Handling, Task 9 Final Techno-Economic Assessment and EH&S Risk Assessment, and Task 10 Cost Benefit Analysis and Technology Maturation Planning.

01 COAL, LIGNITE, AND PEAT↗

First-generation college student forges ahead, now key to Lab's mission

Fatima Woody was just 17 and a student at Pojoaque Valley High School when she first started her career as a Los Alamos Neutron Science Center receptionist. Now she's in a crucial role that keeps plutonium pit production and other mission processes operating with as little interruption as possible. Over nearly four decades, Fatima has gradually advanced from her initial positions as a receptionist and administrative secretary to become a computer technician, then a computer system professional who specializes in project management. Today, she coordinates the workflow for nearly two dozen deployed information technology technicians who keep the computer systems and networks operating at the high-tech complex that houses the Lab's Plutonium Facility.

99 GENERAL AND MISCELLANEOUS↗

The Integration of The Cloudflare WAF

HTTP Strict Transport Security (HSTS) is a standard that ensures website visitor’s traffic is always sent using HTTPS ensuring that all traffic is protected during transit. This initiative was adopted in 2012 by the IETF and has grown in popularity all around the world. Because the traffic is encrypted with TLS/SSL, it can be used by attackers to bypass various cybersecurity capabilities such as a site firewall. To address this lack of visibility into encrypted traffic in motion, the CST at Fermilab acquired the Cloudflare Web Application Firewall (WAF). To help in the implementation and integration of the Cloudflare WAF, I was directed to learn about and aid in this process. This has been a profound learning experience into the on-goings of project management, web application firewalls, collaboration, and networking.

Blum, Ethan T.↗

Summary of Leach-Burn-Leach Round-Robin Test Results

Tristructural isotropic (TRISO) coated particle fuel is of interest to multiple member states associated with the Generation IV International Forum (GIF). Qualification and acceptance testing of TRISO fuel includes the determination of particle defect fractions and impurities in the as-fabricated TRISO fuel particle and/or composited fuel form, which are typically determined using burn-leach (BL) or leach-burn-leach (LBL) analysis methods. A round-robin test focusing on LBL analysis was undertaken by the GIF Very High Temperature Reactor System Fuel and Fuel Cycle Project Management Board. Participating in this LBL round-robin test were research staff from the Institute of Nuclear and New Energy Technology (INET) in the People’s Republic of China, the Korean Atomic Energy Research Institute (KAERI) in the Republic of Korea, and Oak Ridge National Laboratory (ORNL) in the United States of America. The motivation of this LBL benchmarking exercise was to explore consistency in results generated by LBL and to elucidate the potential influence of variations in the procedures used by the participating members on the accurate determination of the measured fuel properties.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Justice Underpinning Science and Technology Research (JUST-R) Offline Tool: A Tool for Guiding Researchers in Addressing Energy Justice Considerations in Early-Stage Research

The Justice Underpinning Science and Technology Research (JUST-R) Metrics Framework is a set of metrics for assessing the energy justice implications of technologies that are currently under research and development (R&D). The JUST-R Metrics Framework guides researchers through an analysis of the many facets of their research processes, from material inputs to knowledge sources, that may contribute to energy injustice both during the research period and when the technology is scaled. This JUST-R Offline Tool consists of an Excel file and PDF guide to aid researchers, engineers, and project managers in their application of the JUST-R Metrics Framework. This tool enables researchers to 1) evaluate the baseline energy justice implications of their research; 2) develop justice-oriented changes to the research process; and 3) track the implementation of proposed changes. The metrics included in the framework are sorted into five aspects of research: Team Dynamics, Sources & Inputs, Processes & Protocols, Waste & Hazards, and Results & Dissemination. The JUST-R Tool can be found here: https://www.nrel.gov/analysis/just-r.html.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Carbon Dioxide Removal Systems Analysis

This presentation was prepared for the 2024 Carbon Management Project Review Meeting. The slides summerize recent NETL systems analysis work examining carbon dioxide removal (CDR) technologies. Specifically, the slides present preliminary results from an update to NETL’s 2022 “Direct Air Capture Case Studies: Sorbent System” report and screening level techno-economic analyses (TEA) and life cycle assessments (LCA) of enhanced rock weathering and marine CDR technologies. Other completed, ongoing, and upcoming NETL TEA, LCA and markets analysis work are also highlighted.

Homsy, Sally↗

Cement Plant TEA/LCA

This presentation was prepared for the 2024 Carbon Management Project Review Meeting. The slides summerize recent NETL systems analysis work examining the application of carbon capture systems at cement plants. This includes a 2023 NETL report titled "Analysis of Carbon Capture Retrofits for Cement Plants" and a 2024 NETL authored journal article titled “The Impact of Cement Plant Air Ingress on Membrane-Based CO2 Capture Retrofit Cost”. The slide deck also highlights ongoing NETL techno-economic analysis and lifecycle assessment work on capture from cement plants & other industrial capture projects.

Homsy, Sally↗

Lessons Learned from MARVEL Initial Fabrication and Testing

The Microreactor Applications Research Validation and Evaluation (MARVEL) project is intended to be amongst the first U.S. advanced reactor demonstrations in four decades. By virtue of being sponsored directly by the U.S. Department of Energy, the reactor is intended to benefit the broader nuclear community by exercising design processes, safety reviews, and supply chains. This project is intent on publicly documenting key lessons learned along the way toward demonstration. Building on a 2024 report that focused on lessons learned from the design and project management phase, this 2025 edition focuses on findings from the MARVEL guard vessel fabrication and primary coolant apparatus test (PCAT) testing.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Procedure for the Computational Models created for the DOE/NRC Collaboration for Criticality Safety Support for Commercial-Scale HALEU Fuel Cycles Project (DNCSH)

This procedure outlines the application models developed as part of the US Department of Energy (DOE) and Nuclear Regulatory Commission (NRC) collaboration for criticality safety support for commercial scale HALEU fuel cycle and transportation (DNCSH) project, an effort authorized by the US Congress. The project is a joint effort among the DOE, NRC, numerous national laboratories, and private enterprises with project management from Oak Ridge National Laboratory.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Techno-Economic Analysis of Compressed Air Energy Storage and Hydrogen Production from Variable Renewable Energy

This study presents the techno-economic analysis (TEA) results of integrating electrolysis hydrogen (H 2 ) production, compressed air energy storage (CAES), and H 2 -fired combustion turbines in a high variable renewable energy (VRE) market environment. The inconsistent nature of VRE creates challenges for power producers in maintaining a stable electrical grid as it is increasingly utilized. The mission of the National Energy Technology Laboratory (NETL) is driving innovation and delivering energy solutions, and a multiangle approach involving H 2 production, energy storage, and next-level H 2 -fired combustion turbine generator (CTG) technologies could provide one solution for the nation’s growing electrical grid issues with increasing VRE sources. The H 2 production and CAES concept were investigated due to its ability to provide utility-scale H 2 -fueled power generation with large-scale energy storage capabilities. Two facilities with CAES and natural gas-fired CTGs (in McIntosh, Alabama, and Huntorf, Germany) have been operating for decades. In contrast, this study investigates the potential to replace the natural gas fuel with H 2 fuel. This concept has been publicly presented by both Siemens Energy and Bechtel Global Engineering, Construction & Project Management (Bechtel) at two different power generating levels. The CAES and air expansion/combustion turbine power generation in this study are primarily based on the Siemens Energy system (Bailie, Aug. 10-11, 2021) (Scheller, Feb. 21, 2023). The inclusion of a H 2 turboexpander generator is from Bechtel (Gülen, Sep. 6, 2022). A block flow diagram of the proposed process is illustrated in Exhibit ES-1.

08 HYDROGEN↗

Optimizing Alabama’s CO 2 Storage in Shelby County (Project OASIS) Milestone 3.4 Report: Complete Well Design and Drilling Plan

We are pleased to present the following materials, which serve as confirmation of the successful completion of Task 3.4 Complete Well Design and Drilling Plan Milestone, in accordance with the Project OASIS Project Management Plan. More specifically, the following provides confirmation of a team-wide call that was held on September 25, 2023, to discuss the CarbonSAFE Phase II drilling program, the well drilling prognosis, and an overview of risks associated with the program by category as well as probability and impact. A comprehensive Site-Specific Drilling Report will be provided to DOE-NETL 30 days after completion of drilling activities.

20 FOSSIL-FUELED POWER PLANTS↗