Search NASA⌕ Search

SEARCH · Search NASA

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Building 23 Remedial Action-Challenges and Successes - 12247

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) from mid-May 1956 through the spring of 1957 under license to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a ca. 100 year old, five-story, building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibited residual radiological activity remaining from the monazite sand processing. U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) and feasibility study (FS) and prepared a Record of Decision (ROD) to address residual radioactivity on building components and equipment in the southwest quadrant of Building 23. The remedy selected for the southwest quadrant of Building 23, which was documented in the ROD (dated May 2005), was identified as 'Alternative 2: Decontamination With Removal to Industrial Use Levels'. The selected remedy provided for either decontaminating or removing areas of radioactivity to meet the RGs. Demonstration of compliance with the selected ARAR was performed using the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM) and other appropriate guidance, as well as appropriate dose modeling codes where necessary. USACE-Baltimore District along with its private industry partner worked together under the terms of a 2008 Settlement Agreement to implement the remedial action (RA) for the southwest quadrant of Building 23. The RA was conducted in two phases: Phase 1 was completed to improve the building condition for support of subsequent remedial action and decrease scope uncertainty of the remedial action, and Phase 2 included decontamination and removal activities to meet the RGs and demonstration of compliance with the selected ARAR. Challenges encountered during the RA include: coordination with stakeholders, coordination between multiple RA contractors, addressing unique structural challenges for Building 23, nonradiological hazards associated with the RA, weather issues, and complex final status survey (FSS) coordination. The challenges during the Phase 1 RA were handled successfully. The challenges for the Phase 2 RA, which is anticipated to be complete by late-summer of 2012, have been handled successfully so far. By fall of 2012, USACE is expecting to finalize a robust RA Closure Report, including the Final Status Survey Report, which summarizes the RA activities and documents compliance with the ROD. During the ongoing RA at Building 23, there have been and still are many challenges both technically and from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity within an active processing building), dual oversight by the property owner and USACE, and site-specific challenges associated with a complex RA and multiple contractors. Currently, USACE and its industry partner are overseeing the completion of RA field activities. RA closure documentation for the remediation of Building 23 to address residual contamination in building materials will be reviewed/approved by USACE and its industry partner upon completion of the field activities. USACE and its industry partner are working well together, through the Settlement Agreement, to conduct a cost-efficient and effective remedial action to address the legacy issues at Building 23. This cooperative effort has set a firm foundation for achieving a successful RA at the RWDA using a 'forward think' approach, and it is a case study for other sites where an industry partner is involved. The collaborative effort led to implementation of an RA which is acceptable to the site owner, the regulators, and the public, thus allowing USACE to move this project forward successfully in the FUSRAP program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AmeriFlux FLUXNET-1F US-xAE NEON Klemme Range Research Station (OAES)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xAE NEON Klemme Range Research Station (OAES). This is the FLUXNET version of the carbon flux data for the site US-xAE NEON Klemme Range Research Station (OAES) produced by applying the standard ONEFlux (1F) software. Site Description - The 1,560-acre Klemme Range Research Station is a grassland site managed for livestock grazing and pasture, located in the middle of the Rolling Red Plains Resource Area. The Rolling Red Plains extends from south of the Red River to north of the Oklahoma/Kansas border consisting of approximately 9.4 million acres, which occupies a significant portion of Western Oklahoma excluding the Oklahoma Panhandle.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F US-WPT Winous Point North Marsh

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-WPT Winous Point North Marsh. This is the FLUXNET version of the carbon flux data for the site US-WPT Winous Point North Marsh produced by applying the standard ONEFlux (1F) software. Site Description - The marsh site has been owned by the Winous Point Shooting Club since 1856 and has been managed by wildlife biologists since 1946. The hydrology of the marsh is relatively isolated by the surrounding dikes and drainages and only receives drainage from nearby croplands through three connecting ditches. Since 2001, the marsh has been managed to maintain year-round inundation with the lowest water levels in September. Within the 0–250 m fetch of the tower, the marsh comprises 42.9% of floating-leaved vegetation, 52.7% of emergent vegetation, and 4.4% of dike and upland during the growing season. Dominant emergent plants include narrow-leaved cattail (Typha angustifolia), rose mallow (Hibiscus moscheutos), and bur reed (Sparganium americanum). Common floating-leaved species are water lily (Nymphaea odorata) and American lotus (Nelumbo lutea) with foliage usually covering the water surface from late May to early October.

Chen, Jiquan↗

AmeriFlux FLUXNET-1F US-MN3 Morris: Corn-Soybean, Conventional Tillage

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-MN3 Morris: Corn-Soybean, Conventional Tillage. This is the FLUXNET version of the carbon flux data for the site US-MN3 Morris: Corn-Soybean, Conventional Tillage produced by applying the standard ONEFlux (1F) software. Site Description - Cropland, 2-year rotation (corn-soybean), conventional (deep rip) tillage, uniform nutrient management, uniform pest management, tile drainage

Helseth, Christina [USDA-ARS LTAR]↗

Model-Based Extracted Water Desalination System for Carbon Sequestration

Over the last 1.5 years, GE Global Research and Pennsylvania State University defined a model-based, scalable, and multi-stage extracted water desalination system that yields clean water, concentrated brine, and, optionally, salt. The team explored saline brines that ranged across the expected range for extracted water for carbon sequestration reservoirs (40,000 up to 220,000 ppm total dissolved solids, TDS). In addition, the validated the system performance at pilot scale with field-sourced water using GE’s pre-pilot and lab facilities. This project encompassed four principal tasks, in addition to Project Management and Planning: 1) identify a deep saline formation carbon sequestration site and a partner that are suitable for supplying extracted water; 2) conduct a techno-economic assessment and down-selection of pre-treatment and desalination technologies to identify a cost-effective system for extracted water recovery; 3) validate the downselected processes at the lab/pre-pilot scale; and 4) define the scope of the pilot desalination project. Highlights from each task are described below: Deep saline formation characterization The deep saline formations associated with the five DOE NETL 1260 Phase 1 projects were characterized with respect to their mineralogy and formation water composition. Sources of high TDS feed water other than extracted water were explored for high TDS desalination applications, including unconventional oil and gas and seawater reverse osmosis concentrate. Technoeconomic analysis of desalination technologies Techno-economic evaluations of alternate brine concentration technologies, including humidification-dehumidification (HDH), membrane distillation (MD), forward osmosis (FO), turboexpander-freeze, solvent extraction and high pressure reverse osmosis (HPRO), were conducted. These technologies were evaluated against conventional falling film-mechanical vapor recompression (FF-MVR) as a baseline desalination process. Furthermore, a quality function deployment (QFD) method was used to compare alternate high TDS desalination technologies to FF-MVR. High pressure reverse osmosis was found to a be a promising alternative desalination technology. A deep-dive technoeconomic analysis of HPRO was performed, including Capex and Opex estimates, for seawater RO (SWRO). Additionally, two additional cases were explored: 1) a comparison of a SWRO plus HPRO system to the option of doubling the size of a standard seawater RO system to achieve the same total pure water recovery rate; and 2) a flue gas desulfurization wastewater treatment zero-liquid discharge (ZLD) application, where preconcentration with RO (SWRO or SWRO + HPRO) before evaporation and crystallization was compared to FF-MVR and crystallization technologies without RO preconcentration. Pre-pilot process validation Pre-pilot-scale tests were conducted using field production water to validate key process steps for extracted water pretreatment. Approximately 5,000 gallons of field produced water was processed through, microfiltration, ultrafiltration, and steam regenerable sorbent operations. Smaller quantities were processed through microclarification. In addition, analytical methods (purge-and-trap gas chromatography and Hach TOC analytical methods) were validated. Lab-scale HPRO elements were constructed and tested at high pressures, to identify and mitigate technical risks of the technology. Lastly, improvements in RO membrane materials were identified as the necessary next step to achieve further improvement in element performance at high pressure. Scope of Field Pilot A field pilot for extracted water pretreatment was designed.

20 FOSSIL-FUELED POWER PLANTS↗

XTE Science Briefing from KSCNF

The X-ray Timing Explorer (XTE), launched on Dec. 30, 1995, is a Satellite that observes the fast-moving, high-energy worlds of black holes, neutron stars, x-ray pulsars and bursts of X-rays that light up the sky and then disappear forever. This videotape presents a pre-launch science briefing to the press by a few of the scientist and managers associated with the XTE satellite. The moderator for the press briefing is Jim Sahli, from the Public Affairs Office at Goddard Space Flight Center (GSFC). He introduces Alan Bunner, of the High Energy Astrophysics at NASA Headquarters; Fred Lamb, from the University of Illinois; Richard Mashotzky, X Ray Scientist at GSFC; Rick Rothschild, Principal Investigator from the University of California at San Diego; and Dale Schultz, the XTE project manager at GSFC. Dr. Bunner explains the electromagnetic spectrum, the placement of x-rays and the importance of the XTE observations to a better understanding of the Universe. Dr. Lamb, explains the difference between white dwarfs, neutron stars and black holes, and the type of observations that the XTE will give to a further understanding of these phenomena. Dr. Mashotzky expands the viewpoint to beyond the galaxy, and explains the interests of scientists who hope to use XTE to further study Quasars and Active Galactic Nuclei. Dr. Rothschild reviews some of the features of XTE, using a diagram to show the features of interest, such as the X ray Telescopes, and the collecting Proportional Counter Array (PCA.) Mr. Schultz presents a videotape tour of the XTE, in which he shows the scientific instruments and the other features of the satellite. In this tour, the source of each of the instruments is noted. Questions from the members of the press are then fielded. Many of the questions are about the cost of the XTE and any problems that are anticipated in regards to the launch.

Source record↗

AmeriFlux FLUXNET-1F US-xTL NEON Toolik (TOOL)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-xTL NEON Toolik (TOOL). This is the FLUXNET version of the carbon flux data for the site US-xTL NEON Toolik (TOOL) produced by applying the standard ONEFlux (1F) software. Site Description - The Toolik field site is located in a remote wilderness area at the Toolik Field Station which is on land managed by the Bureau of Land Management. The area is underlain by continuous permafrost, which exerts a major influence on hydrology and the distribution, structure, and function of terrestrial and aquatic ecosystems. Because of its location between the Brooks Range and the coastal plain, the vegetation and soils at TOOL are representative of much of the Alaskan foothills tundra. This terrestrial field site is collocated with NEON’s Toolik Lake aquatic site. The closest city, Fairbanks, Alaska is 400 miles away. The Dalton Highway (also known as the Haul Road or Pipeline Road), which traverses the middle of the state from Fairbanks to Prudhoe Bay, provides access to the area.

Network), NEON (National Ecological Observatory↗

AmeriFlux FLUXNET-1F US-HB4 Minim Creek Brackish Impoundment

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-HB4 Minim Creek Brackish Impoundment. This is the FLUXNET version of the carbon flux data for the site US-HB4 Minim Creek Brackish Impoundment produced by applying the standard ONEFlux (1F) software. Site Description - An impounded, brackish wetland that is a historic rice field and adjacent to a tidal creek that is managed for water level and vegetation for waterfowl habitat.

O'Halloran, Tom [Clemson University]↗

AmeriFlux FLUXNET-1F US-VT2 Vermillion Tributary Paired Cropland – Site 2 (Corn/Soy; Cover Crops)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-VT2 Vermillion Tributary Paired Cropland – Site 2 (Corn/Soy; Cover Crops). This is the FLUXNET version of the carbon flux data for the site US-VT2 Vermillion Tributary Paired Cropland – Site 2 (Corn/Soy; Cover Crops) produced by applying the standard ONEFlux (1F) software. Site Description - US-VT2 is located on flat, actively managed farmland operated by working farmers, following a conventional no-till corn–soybean rotation in the U.S. Midwest that uses cover crops. US-VT2 is one of two paired working farm sites on the same property; both are managed using similar conventional practices, with the key difference being that the paired site (US-VT1) does not incorporate cover crops into its rotation. This paired design enables direct site-to-site comparisons to assess the impacts of cover cropping on carbon, water, and energy fluxes.

Key, Kesondra [Indiana University - Bloomington]↗

Engineering the System and Technical Integration

Approximately 80% of the problems encountered in aerospace systems have been due to a breakdown in technical integration and/or systems engineering. One of the major challenges we face in designing, building, and operating space systems is: how is adequate integration achieved for the systems various functions, parts, and infrastructure? This Contractor Report (CR) deals with part of the problem of how we engineer the total system in order to achieve the best balanced design. We will discuss a key aspect of this question - the principle of Technical Integration and its components, along with management and decision making. The CR will first provide an introduction with a discussion of the Challenges in Space System Design and meeting the challenges. Next is an overview of Engineering the System including Technical Integration. Engineering the System is expanded to include key aspects of the Design Process, Lifecycle Considerations, etc. The basic information and figures used in this CR were presented in a NASA training program for Program and Project Managers Development (PPMD) in classes at Georgia Tech and at Marshall Space Flight Center (MSFC). Many of the principles and illustrations are extracted from the courses we teach for MSFC.

Blair, J. C.↗

AmeriFlux FLUXNET-1F US-Rls RCEW Low Sagebrush

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Rls RCEW Low Sagebrush. This is the FLUXNET version of the carbon flux data for the site US-Rls RCEW Low Sagebrush produced by applying the standard ONEFlux (1F) software. Site Description - The site is located on the USDA-ARS's Reynolds Creek Experimental Watershed. It is dominated by low sagebrush on land managed by USDI Bureau of Land Management.

Flerchinger, Gerald↗

AmeriFlux FLUXNET-1F US-VT1 Vermillion Tributary Paired Cropland – Site 1 (Corn/Soy; No Cover Crops)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-VT1 Vermillion Tributary Paired Cropland – Site 1 (Corn/Soy; No Cover Crops). This is the FLUXNET version of the carbon flux data for the site US-VT1 Vermillion Tributary Paired Cropland – Site 1 (Corn/Soy; No Cover Crops) produced by applying the standard ONEFlux (1F) software. Site Description - US-VT1 is located on flat, actively managed farmland operated by working farmers, following a conventional no-till corn–soybean rotation in the U.S. Midwest. US-VT1 is one of two paired working farm sites on the same property; both are managed using similar conventional practices, with the key difference being that the paired site (US-VT2) incorporates cover crops into its rotation. This paired design enables direct site-to-site comparisons to assess the impacts of cover cropping on carbon, water, and energy fluxes.

Key, Kesondra [Indiana University - Bloomington]↗

Management and Systems Engineering of the Kepler Mission

Kepler is the National Aeronautics and Space Administration's (NASA's) first mission capable of detecting Earth-size planets orbiting in the habitable zones around stars other than the sun. Selected for implementation in 2001 and launched in 2009, Kepler seeks to determine whether Earth-like planets are common or rare in the galaxy. The investigation requires a large, space-based photometer capable of simultaneously measuring the brightnesses of 100,000 stars at part-per-million level of precision. This paper traces the development of the mission from the perspective of project management and systems engineering and describes various methodologies and tools that were found to be effective. The experience of the Kepler development is used to illuminate lessons that can be applied to future missions.

systems engineering↗

AmeriFlux FLUXNET-1F US-SD2 Shatto Ditch Paired Cropland - Site 2 (Corn/Soy; Cover Crops)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-SD2 Shatto Ditch Paired Cropland - Site 2 (Corn/Soy; Cover Crops). This is the FLUXNET version of the carbon flux data for the site US-SD2 Shatto Ditch Paired Cropland - Site 2 (Corn/Soy; Cover Crops) produced by applying the standard ONEFlux (1F) software. Site Description - US-SD2, located on gently sloped terrain, is an actively managed farmland operated by working farmers following a conventional no-till corn–soybean rotation in the U.S. Midwest. US-SD2 is one of two paired working farm sites which are relatively close by; both are managed using similar conventional practices with the key difference being that the paired site (US-SD1) incorporates cover crops into its rotation, along with minor differentiating terrain and soil type, where US-SD1 is located on mostly flat terrain with some gentle hills. This paired design enables direct site-to-site comparisons to assess the impacts of cover cropping on carbon, water, and energy fluxes.

Key, Kesondra [Indiana University - Bloomington]↗

NASA Lewis Wind Tunnel Model Systems Criteria

This report describes criteria for the design, analysis, quality assurance, and documentation of models or test articles that are to be tested in the aeropropulsion facilities at the NASA Lewis Research Center. The report presents three methods for computing model allowable stresses on the basis of the yield stress or ultimate stress, and it gives quality assurance criteria for models tested in Lewis' aeropropulsion facilities. Both customer-furnished model systems and in-house model systems are discussed. The functions of the facility manager, project engineer, operations engineer, research engineer, and facility electrical engineer are defined. The format for pretest meetings, prerun safety meetings, and the model criteria review are outlined Then, the format for the model systems report (a requirement for each model that is to be tested at NASA Lewis) is described, the engineers that are responsible for developing the model systems report are listed, and the time table for its delivery to the facility manager is given.

Soeder, Ronald H.↗

Panel Session 99: Commercial LLW Management: Global Perspective

This panel focused on opportunities and challenges in providing commercial nuclear waste management services in a global context. The panelists commented on their approach to establishing new businesses, overcoming communication barriers acquiring / maintaining skills and capabilities and delivering commercial nuclear waste management projects in a range of regulatory and socio-economic environments. The panel discussion was followed by a Q and A session with audience participation. Panelist with presentations: BGE Technology (Thilo von Berlepsch)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AmeriFlux FLUXNET-1F US-Rwe RCEW Reynolds Mountain East

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Rwe RCEW Reynolds Mountain East. This is the FLUXNET version of the carbon flux data for the site US-Rwe RCEW Reynolds Mountain East produced by applying the standard ONEFlux (1F) software. Site Description - The site is located on the USDA-ARS's Reynolds Creek Experimental Watershed. It is a mixed sagebrush site on land managed by USDI Bureau of Land Management.

Flerchinger, Gerald↗

AmeriFlux FLUXNET-1F US-Mo3 LTAR CMRB Field 3 (CMRB BAU)

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Mo3 LTAR CMRB Field 3 (CMRB BAU). This is the FLUXNET version of the carbon flux data for the site US-Mo3 LTAR CMRB Field 3 (CMRB BAU) produced by applying the standard ONEFlux (1F) software. Site Description - Site is in a 20 ha agricultural field near Centralia, MO on a broad, slightly sloped landscape. Currently managed in a corn-soybean rotation for commercial crop production

Schreiner-McGraw, Adam↗