Search NASA⌕ Search

SEARCH · Search NASA

Results for “RADIOACTIVE WASTE DISPOSAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Nuclear Safety [Vol. 37, No. 1, January-March 1996]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 1 A Decision Support System for Maintenance Management of a Boiling-Water Reactor Power Plant, J. H. Shen, A. Ray, and S. Levine; ACCIDENT ANALYSIS: 12 On Prediction of the Ignition Potential of Uranium Metal and Hydride, M. Epstein, W. Luangdilok, M. G. Plys, and H. K. Fauske; 26 An Overview of the Primary Parameters and Methods for Determining Condensation Heat Transfer to Containment Structures, J. Green and K. Almenas; DESIGN FEATURES: 49 Modem Tornado Design of Nuclear and Other Potentially Hazardous Facilities, J. D. Stevenson and Y. Zaho; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 73 1994 Accident Sequence Precursor Program Results, R. J. Belles, J. W. Cletcher, D. A. Coplnger, B. W. Dolan, J. W. Minarick, and P. D. O'Reilly; ANNOUNCEMENTS: 93 American Institute of Chemical Engineers (AlChE) Spring 1997 National Meeting; 94 European Safety and Reliability Association International Conference on Safety and Reliability ESREL ’97; 95 Criticality Safety Challenges in the Next Decade; 96 21st International Symposium on the Scientific Basis for Nuclear Waste Management; 84 The Authors; 88 Letter to the Editor; 90 Indexes to Nuclear Safety, Volume 36.

05 NUCLEAR FUELS↗

Functionalized Magnetic Nanoparticles for Technetium Sequestration from Groundwater

Technetium 99 (Tc) is among the most common environmental contaminants at DOE sites and one of the most common risk drivers in low- and high-level waste disposal sites. The majority of Tc is generated from anthropogenic sources, such as nuclear power plants, global weapons, nuclear storage facilities and medical applications. Through these sources, Tc contamination has been unintentionally introduced in to the environment. The most common chemical form of Tc is Tc(VII)O{sub 4}{sup -}. Due to its high solubility and mobility, Tc can enter the food chain and cause adverse health effects to humans. Currently, ion exchange resins and reduction processes are the most common approaches for Tc immobilization. Although these techniques have shown to be effective, they also possess major drawbacks, such as high cost, low adsorption capacity, and complex creation and maintenance. Therefore, development of more efficient and simple technologies for the remediation of Tc-contaminated systems are needed. Functionalized magnetic nanoparticles have been used to remove organic and inorganic contaminants from water resources. These nanoparticles have attracted extensive attention as an adsorbent material due to their large surface area, high efficiency, low-cost, easy functionalization and separation with a magnet. This study seek to develop functionalized magnetic iron oxide nanoparticles for the efficient removal of Tc and other heavy metal contaminants from water resources under ambient conditions. Objectives: Synthesize magnetic iron oxide nanoparticles and functionalize their surface with Cetyltrimethylammonium Bromide (CTAB) and tetraethyl-orthosilicate (TEOS). Characterize the synthesized nanoparticles using scanning electron microscopy (SEM) coupled with energy dispersive X-ray spectroscopy (EDS), Dynamic Light Scattering (DLS) and Zeta PALS. Perform adsorption studies to evaluate their adsorption behavior and capacity for (a) Technetium using Rhenium (ReO{sub 4}{sup -}) as a surrogate and (b) heavy metals, e.g. Cu{sup 2+}. Conclusions: Magnetic iron oxide nanoparticles were successfully functionalized with CTAB and TEOS. The functionalization of the iron oxide nanoparticles affects their surface charge and their hydrodynamic diameter. The addition of CTAB or TEOS decreased the hydrodynamic diameter of the nanoparticles due to repulsive and steric forces. The SEM micrographs show spherical nanoparticles of different sizes. The EDX analysis shows the presence of iron and oxygen from the iron oxide crystalline structure, and the different constituents of the CTAB and TEOS molecules. Proof-of-concept shows the successful adsorption of rhenium (ReO{sub 4}{sup -}) and copper Cu{sup 2+}) onto CTAB-Fe{sub 2}O{sub 3} and TEOS-Fe{sub 2}O{sub 3} respectively.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Directional Drilling Technology for HLW Disposal - Long Term Monitoring in the Borehole - 16079

Central Research Institute of Electric Power Industry (CRIEPI) has been conducting a project for the directional drilling and measurement/logging technologies to survey hydro-geological condition at the stage of the preliminary investigation (PI) of site selection for the deep geological disposal of HLW. 1000 m length borehole which intersects the Omagari fault was drilled by directional drilling technology in order to verify the drilling technology in Hokkaido. Long term monitoring to clarify pore water pressure and water chemistry in the drilled borehole was also developed. We set measurement intervals on a hanging wall side of a main fracture and started the measurement of pore water pressure in February 2014. We assume that long term monitoring for several boreholes will be achieved in vast areas where power supply and/or communication networks are not available at the PI stage. Thus, we have been developing an automatic data acquisition system for long term monitoring, which enables us to access data remotely. The monitoring system, which was set in Horonobe-town in Hokkaido, is an automatic data acquisition system that performs long term monitoring of pore water pressure. This paper provides an overview of the development of monitoring technologies of pore water pressure measurement in the borehole as well as the automatic data acquisition system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges in Long-Term Records Preservation and Access - 19549

The US Department of Energy Office of Legacy Management (LM) mission includes preserving records and information about the nation's Cold War-era weapons projects and making that information available for years to come. As LM assumes responsibility for each project, records documenting operations and cleanup activities are absorbed into a central recordkeeping system. Each record category is governed by a federal retention requirement. Routine administrative records are kept just a few years, while the most important records have 'permanent' retention requirements and are transferred to the National Archives typically within 25 years of creation. It is relatively easy for LM to meet retention requirements for these routine and permanent records. LM's big preservation challenge is with records with tremendously long retention requirements. Records with 75-year retention requirements are common, and a small subset of LM records pertaining to waste disposal requires 150-year retention periods. LM must consider the best format for maintaining each of its records collections. Should physical records be boxed up for long-term storage, or should they be digitized? Each option has associated benefits, costs, and risks. Keeping records in paper format avoids digitizing expense and preserves the original media, but the paper must be maintained in a certified storage facility. A vermin infestation or sprinkler malfunction at a certified facility may be rare but could easily destroy records. Keeping the paper and making reference or backup electronic copies reduces the risk of loss but requires diligence and resources to keep the physical records and electronic versions synchronized. This becomes an overwhelming task in a database with millions of records. Entirely replacing paper records with digitized versions as electronic records introduces the risk that records could be lost due to a cybersecurity incident or made inaccessible by evolving technology. LM's early electronic records management efforts were limited to documents saved to PDF format. More recently, LM has embraced the benefits of maintaining records in native formats. (A spreadsheet includes formulas and other details lost when converted to a PDF file.) But whether the file is saved as a Microsoft Excel spreadsheet or PDF document, how do we ensure the file is readable in 75 or 150 years when these records meet their retention requirement? We have no way of knowing for sure from our 2019 vantage point-no more than we would expect to get good technology advice from someone 150 years ago. We cannot predict the technological future, but we can make sure our current electronic records environment is healthy and future ready. This includes making sure the electronic recordkeeping system is built on a modern platform and ensuring that each record in the system is saved in a current format. Quality standards are critical for electronic records to be future ready. Implementing quality involves an organization-wide approach to having consistently formatted file names and complete and descriptive metadata. Quality PDF documents are scanned to settings that ensure characters are machine-readable (with optical character recognition, or OCR). LM is currently replacing its electronic recordkeeping system and simultaneously modernizing its organizational approach to data management; it is replacing a traditional electronic records repository with a system that also manages records stored anywhere across the computer network. This new records management approach will require new thinking in how LM manages a dramatically increased volume of information across the network while not losing focus on its responsibility for long-term records preservation and access. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-term Performance of Engineered Barrier Systems (PEBS) - An International EURATOM Project on the Study and Testing of Engineered Barriers for the Final Disposal of HAW Using PEBS as an Example - 13299

The main aim of the PEBS project is to evaluate the sealing and barrier performance of the EBS over time, through development of a comprehensive approach involving experiments, model development, and consideration of the potential impacts on long-term safety functions. The experiments and models cover the full range of conditions, from initial emplacement of wastes (high heat generation and EBS re-saturation) through to later stage establishment of near steady state conditions, i.e. full re-saturation and thermal equilibrium with the host rock. These aspects will be integrated in a manner that will lead to greater certainty and thus greater confidence regarding the development from the initial transient state of the EBS to its long-term state, which provides the required isolation of the wastes. The work proposed within the project builds on existing knowledge and experience generated during recent years and supported by ongoing national and EC research programs. The project aims to provide a more complete description of the THM and THMC (thermo-hydro-mechanical- chemical) evolution of the EBS system, a more quantitative basis for relating the evolutionary behavior to the safety functions of the system, and a further clarification of the significance of residual uncertainties for long-term performance assessment. The importance of uncertainties arising from potential disagreement between the process models and the laboratory and in-situ experiments to be performed within PEBS, and their implications for an extrapolation of the results, will be reviewed, with particular emphasis on possible impacts on safety functions. In addition to the scientific-technical aims, the consortium will disseminate the basic findings to the broad scientific community within the EU, China and Japan, use expertise gained for public information purposes, and promote knowledge and technology transfer through training. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improbability of Post-Closure Criticality in Array of Transuranic Waste Containers after Compaction by Salt Creep at Waste Isolation Pilot Plant

Based on the rationale presented, post-closure nuclear criticality is improbable when room closure compacts containers disposing transuranic (TRU) waste emplaced at the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt in southeastern New Mexico. As described in the original WIPP certification, a qualitative estimate of the probability of post-closure criticality in TRU waste produced from atomic energy defense activities has been low either because remote-handled TRU waste canisters are neutronically isolated by the bedded salt or because the low fissile mass in an array of contact-handled TRU waste drums cannot be compacted sufficiently by room closure from salt creep. These situations are still valid for the majority of TRU waste that is disposed at WIPP without any disposal constraints, as updated herein. This report also qualitatively evaluates the probability of criticality after disposal of TRU waste in pipe overpack containers (POC) where every POC in a shipment may have the maximum 200 fissile gram equivalent of 239Pu content. The probability of criticality for a disposal room filled with POCs is estimated during four representative phases of repository evolution: (1) a large salt block falls onto POCs in the first 20 years, (2) salt creep closes a disposal room in the first 1000 years without brine seepage and subsequent gas generation, which permits maximum compaction, (3) some brine seepage occurs into the closed room, which initiates consumption of the fiberboard (cellulose) impact absorber in the POC in the second 1000 years, and (4) full brine inundation of a room and consumption of all fiberboard thereafter. Salt-block fall in the first phase does not greatly disrupt three tiers of POCs. The compacted spacing of POCs in the later three repository conditions is calculated through high-fidelity, geomechanical modeling. Criticality evaluation of compacted 200-g 239 Pu spheres at the compacted spacing shows that neither 12-inch nor 6-inch POCs are critical after the first 1000 years, the second 1000 years, or thereafter as the sea of reflector material changes to represent the three repository conditions. Specifically, fiberboard and iron isolates 239 Pu while dry, and brine reduces the reactivity when a room is partially and fully inundated. Because POC behavior bounds behavior of other standard TRU waste containers, post-closure criticality caused by room closure compacting containers is omitted in the performance assessments for the 2019 and 2026 WIPP compliance re-certification applications to the US Environmental Protection Agency.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Derivation of Monitoring Parameters based on the Long-term Safety Assessment - 19529

This paper discusses monitoring in the context of the Swiss geological disposal programme and presents a methodology to identify parameters that would be both useful from the point of view of demonstrating long-term safety and technically feasible to monitor. The methodology also serves as a contribution to the EC project on Development and Demonstration of monitoring strategies and technologies for geological disposal - Modern2020. The methodology consists of the following five steps: - STEP 1: Identify key, safety-relevant parameters, - STEP 2: Consider (without consideration of technical feasibility) whether monitoring of these parameters would be of interest, and set priorities, - STEP 3: Consider the technical practicability of monitoring those parameters identified as being of first and secondary priority, - STEP 4: Identify whether models exist for the evolution of those parameters that can be monitored and whether safety-relevant criteria exist that the parameters should meet, - STEP 5: Assess the overall rationale for monitoring those parameters identified in Steps 1 through 4. Key candidate parameters for monitoring, provisionally identified by applying the methodology and that have associated safety-relevant criteria include: - Temperature in the Opalinus Clay host rock and, - Fluid pressure, also in the Opalinus Clay host rock. A number of other high priority parameters not associated with safety-relevant criteria, as well as parameters with lower priority (with and without associated safety relevant criteria), have also been identified. The methodology, as well as its trial application, are to be considered as first iterations, and are likely to be refined over the forthcoming years as experience is gained. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ceramic Plugs for Deep Borehole Seals - 17316

In the deep borehole nuclear waste disposal concept, waste packages are emplaced deep in crystalline rock formations under conditions of high pressures, high mineral content water, and elevated temperatures. Well seals and plugs must perform for thousands of years. A novel ceramic plug system under development capitalizes on the thermal energy of thermite mixtures and engineered additives to react and form ceramic-like plugs in place with favorable structural, flow, and geochemical properties. Depending on the ingredients, the reaction can produce aluminosilicates, plagioclase feldspars, or other combinations in crystalline or amorphous forms. Normative mineralogy techniques were applied to predict product mineralogy and evaluate compatibility with host rocks, and showed they are comparable to igneous rock analogs. The results support a tentative geochemical compatibility between these formulations and granitic host rock. Because the reaction produces a significant amount of thermal energy, the thermal/structural/fluid response of the plug and surrounding media was evaluated with the FEHM code. Temperatures near the plug/rock interface are estimated to peak at less than 600 deg. C and cool to near ambient temperature within a day. Rock stresses resulting from the thermal pulse are predicted to be similar to the unconfined compressive strength of granites, and generally lower than triaxial test results. Entrained fluid expansion due to heating was shown to be lower than failure stresses. Little or no failure in the surrounding media would be expected due to the plug formation process. The present efforts are focused on refining the material formulations, evaluating the geochemical and mechanical interactions between the plug and host rock, and testing the plug formation process in scaled granite and basalt masses. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Cable Car Transfer System for the Cigeo Access Ramps - An Original Approach - 17035

Andra is currently implementing the detailed engineering phase of the step-wise design of Cigeo (the French HLW and IL-LLW Deep Geological Repository). Various technical issues are at stake, including the definition and development of a key component: a funicular ('cable-car') system dedicated to the transfer (down the access ramp and leading to the underground infrastructures) of the shielding casks housing the waste disposal containers (packages). The present paper starts with a brief description of the Cigeo architecture (i.e. the surface utilities, the service and nuclear ramps, the various shafts and finally the underground facilities). A focus is then made on the 'nuclear ramp' dedicated to the transfer of the waste containers lodged inside the casks (those latter weighing some 100 to 130 metric tons each) and its main geometrical characteristics (slope, length, diameter, structure). Then a discussion follows to detail the rationale having led to the choice of a somehow 'sophisticated' funicular transfer system, at the expense of what could be called 'more conventional' and more straightforward transport solutions (like a transfer system by trucks or by rack and pinion trains). A systematic comparison is finally made between the various solutions, explaining and rating the pros and cons of each concept, via a multi-criteria analysis. This technical choice (and the related justification approach) was submitted to an Experts review at the end of the Preliminary Design phase of Cigeo and comforted by their strong support before the design freeze of this solution was integrated in Cigeo. The following part of the paper is then focused on a description of the main technical components and the mechanical performance of the cable-car system, its current state of design and the set of qualification tests (of key safety components) to be implemented before its effective construction. This article concludes with a timeline of the qualification tests and developments to come. The positive outcomes of this future technical test campaign will also pave the way for the future instruction of the Cigeo licensing file, scheduled as of mid-2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Full Scale Seal Experiment - A Seal Industrial Prototype for Cigeo - 13106

The Full Scale Seal (FSS) Experiment is one of various experiments implemented by Andra, within the frame of the Cigeo (the French Deep Geological Repository) Project development, to demonstrate the technical construction feasibility and performance of seals to be constructed, at time of Repository components (shafts, ramps, drifts, disposal vaults) progressive closure. FSS is built inside a drift model fabricated on surface for the purpose. Prior to the scale 1:1 seal construction test, various design tasks are scheduled. They include the engineering work on the drift model to make it fit with the experimental needs, on the various work sequences anticipated for the swelling clay core emplacement and the concrete containment plugs construction, on the specialized handling tools (and installation equipment) manufactured and delivered for the purpose, and of course on the various swelling clay materials and low pH (below 11) concrete formulations developed for the application. The engineering of the 'seal-as-built' commissioning means (tools and methodology) must also be dealt with. The FSS construction experiment is a technological demonstrator, thus it is not focused on the phenomenological survey (and by consequence, on the performance and behaviour forecast). As such, no hydration (forced or natural) is planned. However, the FSS implementation (in particular via the construction and commissioning activities carried out) is a key milestone in view of comforting phenomenological extrapolation in time and scale. The FSS experiment also allows for qualifying the commissioning methods of a real sealing system in the Repository, as built, at time of industrial operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Systems-Based Approach for Reaching Acceptable End Points for Groundwater - 13629

The sheer mass and nature of contaminated materials at DOE and DoD sites, makes it impractical to completely restore these sites to pre-disposal conditions. DOE faces long-term challenges, particularly with developing monitoring and end state approaches for clean-up that are protective of the environment, technically based and documented, sustainable, and most importantly cost effective. Integrated systems-based monitoring approaches (e.g., tools for characterization and monitoring, multi-component strategies, geophysical modeling) could provide novel approaches and a framework to (a) define risk-informed endpoints and/or conditions that constitute completion of cleanup and (b) provide the understanding for implementation of advanced scientific approaches to meet cleanup goals. Multi-component strategies which combine site conceptual models, biological, chemical, and physical remediation strategies, as well as iterative review and optimization have proven successful at several DOE sites. Novel tools such as enzyme probes and quantitative PCR for DNA and RNA, and innovative modeling approaches for complex subsurface environments, have been successful at facilitating the reduced operation or shutdown of pump and treat facilities and transition of clean-up activities into monitored natural attenuation remedies. Integrating novel tools with site conceptual models and other lines of evidence to characterize, optimize, and monitor long term remedial approaches for complex contaminant plumes are critical for transitioning active remediation into cost effective, yet technically defensible endpoint strategies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental cleanup of the East Tennessee Technology Park - Year three - A status report - 15522

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began its five-year, $1.4 billion cleanup of the East Tennessee Technology Park (ETTP), the former Oak Ridge Gaseous Diffusion Plant, located on the U.S. Department of Energy's (DOE) Oak Ridge Reservation (Reservation) in Tennessee. Under the contract, the base period scope of work to be completed by 2016 includes demolition of both the K-25 and K-31 gaseous diffusion buildings and all demolition waste dispositioned, initiation of demolition on the remaining K-27 gaseous diffusion building, safe storage of transuranic (TRU) waste for eventual transfer to the Transuranic Waste Processing Center, previously designated -No-Path-To-Disposition Waste- dispositioned to the extent possible, and completion of design and engineering of a mercury treatment system to be installed at the Y-12 National Security Complex (Y-12). UCOR will have also managed DOE Oak Ridge Office of Environmental Management (OREM)-owned facilities at ETTP, Oak Ridge National Laboratory (ORNL), and Y-12 in a safe and cost-effective manner. Since assuming responsibilities as the ETTP and Oak Ridge Reservation cleanup contractor, UCOR has completed its life-cycle Performance Measurement Baseline; received its Earned Value Management System (EVMS) certification; completed the deactivation and demolition (D and D) of the 44-acre K-25 gaseous diffusion building; removed and disposed of a contaminated underground storage tank (Tank W-1A) at ORNL; dispositioned mercury-contaminated storage tanks at Y-12; completed closure of the Toxic Substances Control Act Incinerator; disposed of more than 158,000 cubic yards of cleanup waste while managing the on-site Environmental Management Waste Management Facility (EMWMF); and conducted operations, surveillance, and maintenance activities at 180 DOE EM facilities at ETTP, ORNL, and Y-12 in a safe and cost-effective manner. In 2014, UCOR completed the removal and disposal of all of the K-25 demolition debris; completed the removal of asbestos-laden transite siding on the K-31 gaseous diffusion building and began demolition of that 17-acre building; advanced the characterization and deactivation of the K-27 gaseous diffusion building, readying the building for the start of demolition in 2015; advanced the design and engineering of a Mercury Treatment Facility to be located at Y-12; continued the cost-effective and safe disposition of all cleanup wastes; and readied ETTP for Voluntary Protection Program Star Status Assessment in 2015. Project performance as of December 31, 2014, continued to be excellent: - Cost Performance Index - 1.12 - Schedule Performance Index - 1.02 At the same time, since safety is the foundation of all cleanup work, UCOR's safety record goes hand-in-hand with its excellent project performance. Through calendar year 2014, UCOR's recordable injury rate was 1.04 occurrences per 200,000 work hours, and the lost workday case rate was 0.52. This performance continues to be due, in large part, to the people and processes URS and CH2M HILL, the parent companies of UCOR, brought to the project. Key enablers included: - Selected and deployed experienced staff in key leadership positions throughout the organization, continually re-energizing the organization with new leaders - Implemented previously successful safety programs and initiatives from other DOE sites, such as DOE's Voluntary Protection Program - Brought fresh thinking and innovation to tackling tough project issues, such as the deactivation of the Technetium-99-contaminated areas of K-27, applying lessons learned from the D and D of K-25; and implementing a -waste factory- approach to cleanup - Maintained continuing alignment between UCOR's contract with DOE and its Performance Measurement Baseline - rapidly addressing contract changes when they arose - Maintained a readiness both from a process as well as experienced personnel perspective to support DOE OREM in performing other significant Oak Ridge Reservation cleanup activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determining Salinity Recharge Time for Deep Borehole Disposal - 17480

It is generally accepted that the borehole above the disposal zone of a deep borehole disposal must be sealed 'completely' and 'permanently'. By completely it is meant that the seal zone overall must not allow fluids to flow up through it more readily than they could through the surrounding geological barrier. By permanently it is meant that the seal(s) must maintain their function(s) for long enough to satisfy the safety case which could be in excess of 100,000 years. However, designing seals to meet these exacting requirements may be a case of over-engineering because the perturbations in the salinity gradients and density stratification of the groundwater created in and around the borehole during the drilling and operational phases of the borehole would be transient. Darcy flow of groundwater and diffusional flows will re-establish the salinity gradient which is one of the main barriers to the upward flow of fluid through the borehole and surrounding rock, restoring the natural barrier and making the engineered seals redundant. In this paper we address the question of the timescale over which this recharge can be expected to take place. Our methodology involves establishing a mathematical model whose solution gives the time taken for an initial pressure disturbance to reach a steady state and the migration rates of brines resulting from this pressure field. We discuss the model, its assumptions and the solutions, both analytical and numerical. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Criticality effect of long-term changes in material compositions and geometry in disposal canisters

For the Swedish final repository the basic requirement concerning margin to criticality is that k{sub eff} should be less than 0.95. This criterion is always fulfilled if the disposal canister is dry. If it is assumed that a canister is filled with water it is shown that the criticality criterion is fulfilled using burnup-credit for PWR fuel and credit for burnable poison for BWR fuel. If water is assumed to leak in, long term chemical processes will change the material compositions and geometries in the canister during the one million year analysis period. The main process expected to affect significantly the chemical composition of the materials in the canister is the corrosion of cast iron and carbon steel of the insert, the corrosion of the stainless steel, Inconel or Zircaloy in the fuel element structural material, the corrosion of Zircaloy cladding and finally the corrosion of spent fuel itself. During metal corrosion, various anoxic corrosion products are formed, usually with lower density than the metal itself, causing thus a volume increase in the canister, accompanied by geometrical changes. In this paper the reactivity effects of these changes are analysed and results presented. It is shown that the largest reactivity increase is due to the decrease of the water gap between the fuel and the fuel channel, due to the formation of Magnetite. Other process that possibly will increase the reactivity is if Siderite is produced besides from Magnetite, the production of Hydrogen, corrosion of the fuel and radial movements of fuel rods. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cementitious Barriers Partnership (CBP): Training and Release of CBP Toolbox Software, Version 1.0 - 13480

The Cementitious Barriers Partnership (CBP) Project is a multi-disciplinary, multi-institutional collaboration supported by the Office of Tank Waste Management within the Office of Environmental Management of U.S. Department of Energy (US DOE). The CBP program has developed a set of integrated tools (based on state-of-the-art models and leaching test methods) that improve understanding and predictions of the long-term hydraulic and chemical performance of cementitious barriers used in nuclear applications. Tools selected for and developed under this program are intended to evaluate and predict the behavior of cementitious barriers used in near-surface engineered waste disposal systems for periods of performance up to or longer than 100 years for operating facilities and longer than 1,000 years for waste management purposes. CBP software tools were made available to selected DOE Office of Environmental Management and field site users for training and evaluation based on a set of important degradation scenarios, including sulfate ingress/attack and carbonation of cementitious materials. The tools were presented at two-day training workshops held at U.S. National Institute of Standards and Technology (NIST), Savannah River, and Hanford included LeachXS{sup TM}/ORCHESTRA, STADIUM{sup R}, and a CBP-developed GoldSim Dashboard interface. Collectively, these components form the CBP Software Toolbox. The new U.S. Environmental Protection Agency leaching test methods based on the Leaching Environmental Assessment Framework (LEAF) were also presented. The CBP Dashboard uses a custom Dynamic-link library developed by CBP to couple to the LeachXS{sup TM}/ORCHESTRA and STADIUM{sup R} codes to simulate reactive transport and degradation in cementitious materials for selected performance assessment scenarios. The first day of the workshop introduced participants to the software components via presentation materials, and the second day included hands-on tutorial exercises followed by discussions of enhancements desired by participants. Tools were revised based on feedback obtained during the workshops held from April through June 2012. The resulting improved CBP Software Toolbox, including evaluation versions of and LeachXS{sup TM}/ORCHESTRA and STADIUM{sup R} has been made available to workshop and selected other participants for further assessment. Inquiries about future workshops and requests for access to the Toolbox software can be made via the CBP web site [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimation of SNF amount from various scenarios of power consumption prediction in South Korea - 15394

The Korean government is reviewing the methodology for every condition such as treatment, storage, disposal for the management of spent fuel. In order to establish the control policy of spent fuel, it is necessary to predict how much spent fuel is produced as the time changes. In this thesis the spent fuel production amount was predicted with the basis of the forecast number of the nuclear power plant. Until 2024 the construction plan was applied and until 2035 the number was predicted considering the ratio of nuclear power production. From 2035 to 2100, long term assessment was done assuming the energy consumption in different cases to calculate the necessary power production and then the amount was applied to the of the current power plant production rate to calculate the power production amount by nuclear power plant and the number of necessary nuclear power plants. As the estimated number of the operated power plants of each year and period is correlated with the nuclear power production amount, the main factors of the assessment were spent fuel production amount, the number of operated nuclear power plant, power consumption amount, power production amount, and the proportion of the nuclear power plant to assess. In long-term view the spent fuel production amount differed highly depending on the different conditions so it's thought to be necessary to establish policies after predicting the spent fuel production amount by every case for the management plan of spent fuel. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrolytically Assisted Surface Decontamination (EASD{sup TM}) for POCO Operations - 20282

NNL in collaboration with C-Tech Innovation Ltd and Sellafield Ltd has been exploring innovative technologies to enable a significant reduction of radiological hazards within facilities during the Post Operational Clean Out (POCO) phase of a nuclear plant's life cycle. Reducing the hazard by effectively decontaminating plants in-situ during POCO delivers huge cost reductions for future decommissioning operations. These cost reduction benefits are realized by reducing the number and complexity of remote operations as well as lowering the long-term waste disposal costs. Whilst chemical decontamination can achieve the desired level of decontamination, applying aggressive chemical reagents is hazardous, potentially difficult to control and requires there to be complimentary effluent treatment and waste routes. This work has aimed to develop flexible and controllable decontamination processes which could be operated without the additional complexity and issues associated with chemical decontamination. The processes needed to be relatively fast and effective to minimize the time operators would spend in an active area. In addition, there was a driver to produce decontamination methodologies which generated a secondary waste compatible with current routes and which takes advantage of current waste capacity. The strategy therefore was to come up with a solution that works with, rather than against, the science and engineering behind process plants at Sellafield. Electrolytically Assisted Surface Decontamination (EASD{sup TM}) is an innovative electrochemical decontamination process (developed by NNL and C-Tech Innovation Ltd) that can remove activity from contaminated metal in very short time periods. Application of the patented electric waveform to the surface when treating contaminated metal with nitric acid has been shown to significantly enhance the decontamination performance. When compared to proposed baseline washout procedures at Sellafield, the only change to the process is the applied electrical waveform which is temporary and controllable. The current causes dissolution of the metal surface being decontaminated which leads to activity transferring from the plant item into the nitric acid effluent stream. This innovation has the potential to transform the POCO process and allow a nitric acid based washout approach to deliver POCO quickly and cost effectively within the existing infrastructure. Several devices have now been designed that incorporate this EASD{sup TM} technology and enable the decontamination process to be applied to a range items commonly identified as being contaminated during nuclear decommissioning programmes such as pipework, tanks and hotspots of walls/floors. Inactive and active laboratory-scale testing has been completed using both simulated and 'real-life' contaminated (low level waste) metallic items retrieved from different nuclear sites. Active trials demonstrated that contaminated items could be treated to free release levels within minutes. Engineering scale tests are currently being performed, with guidance from Sellafield's system engineers and plant managers, to provide the necessary re-assurance the designed devices could be successfully deployed in an on-plant scenario. The final stage of this development work is to carry out an active demonstration of the decontamination technology on Thorp at Sellafield. This paper aims to highlight progress made to date with the EASD{sup TM} technology and, more specifically, the development of an in-situ decontamination device for deployment within radioactive pipework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗