Search NASA⌕ Search

SEARCH · Search NASA

Results for “ROADS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Thermal Management for Planar Package Power Electronics (CRADA Final Report)

The National Renewable Energy Laboratory (NREL) and John Deere Electronic Solutions (JDES) collaborated to develop and evaluate computer models and simulations related to the thermal performance of semiconductor device packaging for an inverter of an off-road vehicle ("Semiconductor Packaging"). The objective of the research was for NREL and JDES to develop a two or three-dimensional computer-aided design model of the Semiconductor Packaging ("Computer Model") for thermal performance evaluation in a simulation. The project developed computer models of a Semiconductor Package of silicon-carbide semiconductor devices with appropriate thermal dissipation via one or more of the following thermal features: a double-sided planar cooling configuration, an air-cooled configuration, a liquid-cooled configuration for off-road inverter applications in a relevant simulated operating environment. It is noted that surface area and prototype product embodiment consisting of air-cooled and liquid-cooled configurations may and may not be in direct contact with power semiconductor chips. The idea was to explore and develop packaging and thermal management technology for power semiconductors that was most effective in the performance yet had least burden in overall product cost for a given application.

33 ADVANCED PROPULSION SYSTEMS↗

Electric Vehicle Charging for Residential and Commercial Energy Codes: Technical Brief

Numerous studies show that sales of electric vehicles (EVs) have grown consistently over recent years in the U.S. The U.S. Energy Information Administration (EIA) estimated 3 million EVs were on the road in 2022, and the Edison Electric Institute (EEI) forecasts a total of 26.4 million EVs on the road by 2030. Based on this forecast, EEI projects the need for an additional 12.9 million EV charge ports by 2030. If EV charging infrastructure fails to keep pace with sales of EVs it could result in consumers stranded without options to power their vehicles. EVs are capable of providing substantial benefits to the consumers. EVs are less expensive to operate than conventional internal combustion engine vehicles, have lower maintenance costs, and have the convenience of fueling (charging) at home or work. Studies conducted in California show that costs associated with installing EV charging infrastructure can be substantially more expensive for retrofit scenarios compared to new construction, making inclusion of EV infrastructure in new construction codes a cost-effective policy option to increase infrastructure to meet growing demands. PNNL tracks adoption of mandatory EV provisions across the U.S. As of December 20, 2024, 12 states (California, Oregon, Washington, Colorado, New Mexico, Illinois, Maryland, Delaware, New Jersey, Rhode Island, Massachusetts and Vermont) and 53 local governments have added EV provisions to their building codes, local ordinances and zoning requirements. Originally published in 2022, this tech brief has been revised to align with recent model energy code committee discussions and published EV infrastructure code language. This technical brief summarizes market trends, costs and benefits, and provides sample code language for EV charging infrastructure for consideration to be included in model codes, such as the International Energy Conservation Code (IECC) and ANSI/ASHRAE/IES Standard 90.1, as well as directly by states and local governments in their building codes. The technical brief summarizes related efforts undertaken by states and local governments, and builds upon language considered during the 2021 and 2024 IECC development cycles.

2021 IECC↗

Enhanced Lighting Signals for Safety and Efficiency - Experiments With Addressable LEDs

For enhanced roadway safety, clear and immediate visual cues are essential for preventing accidents between drivers and pedestrians. At intersections, however, the line of sight to other roadway users may be obstructed by vehicles and infrastructure. Additionally, adverse conditions, including low visibility, poor weather, or inadequate lighting can increase the potential for collisions. Distracted drivers and pedestrians can further exacerbate the risk of accidents, particularly when using a smartphone, rather than focusing on roadway surroundings. These issues demonstrate the need for infrastructure upgrades that enhance visibility and awareness at crosswalks. A potential solution is through enhanced lighting signals integrated into the roadway infrastructure. One such example is the use of addressable LEDs, individually controllable lights that can change color and brightness instantaneously through programmable microcontrollers. They can be installed and integrated into crosswalks to maintain visibility in conditions where pedestrians may be difficult to see, while also offering peripheral cues to pedestrians who may be distracted by their phones or other objects rather than the road. Such a system (as one example) that is integrated into a traffic intersection digital twin that tracks all roadway users accurately, has the potential to enhance visibility of vulnerable road users, and thus enhance safety. This paper examines the potential implementation and feasibility of this technology, as well as the safety benefits it could provide. Laboratory experiments with addressable LEDs reveal the capabilities and challenges of this technology for roadway infrastructure safety. These findings could pave the way for more integrated lighting in infrastructure for vehicles and pedestrians at intersections, merge and diverge locations, and other areas where complex interactions present safety hazards. Such lighting solutions, enabled by modern computation and communications, could enhance safety and efficiency in our transportation system and improve overall mobility.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Accelerating computing for the future electric grid (CRADA Final Report)

As a participant in the Cyclotron Road Lab-Embedded Entrepreneurship Program (LEEP), Vellex Computing, Inc. has successfully validated the "Vellex Computing Stack," a breakthrough Analog Neural Computer (ANC) specifically designed for high-performance edge optimization. This project achieved critical milestones in mixed-signal circuit stability and software-hardware co-design, directly addressing national priorities in semiconductor resiliency. The success of this work is deeply rooted in the support from the Cyclotron Road LEEP, which provided the essential "hard tech" runway—funding, mentorship, and access to Lawrence Berkeley National Laboratory’s world-class characterization facilities—allowing Vellex to overcome the "Valley of Death" often faced by deep-tech hardware startups. By leveraging LBNL’s advanced testing infrastructure, Vellex was able to rigorously benchmark the ANC architecture against state-of-the-art digital solutions, a feat that would have been resource-prohibitive independently. This collaboration has not only advanced American leadership in analog computing but has also matured Vellex’s technology to a stage ripe for private sector commercialization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Computational Modeling of Water Infiltration From Ditches Into Roadway Embankments

Ditches are built along roadways to convey the stormwater runoff. They collect the runoff from the pavement and adjacent drainage areas. Water can move freely in a ditch away from the road surface, thus making it safer for the vehicular traffic. South Carolina DOT expressed interest in studying infiltration of water from ditches into roadway embankments. As part of the current design criteria, it is recommended that the road subgrades be 1.0 foot above the design event water surface elevation in the ditch. The distance between the water surface and bottom of the subbase is referred to as “freeboard”. The purpose of this requirement is to lower the risk of pavement damage by moving the flow away from the pavement, containing the captured flow, and conveying flow received from adjacent properties to outfalls. With changes in roadway design standards, larger shoulders and flatter cross-slopes have moved ditches further away from the pavement and the subbase. These changes could allow for a lower freeboard standard without reducing safety margins due to the increased lateral distance from the subbase to the ditch. The objective of this study is to evaluate whether the current SCDOT criterion requiring the roadway subgrade to be 1 ft above the design-event ditch water surface can be relaxed under selected geometric and soil conditions, particularly where larger shoulder widths and flatter side slopes increase horizontal separation between ditch water and pavement structure.

42 ENGINEERING↗

Hydrogeology and tritium transport in Chicken Creek Canyon,Lawrence Berkeley National Laboratory, Berkeley, California

This study of the hydrogeology of Chicken Creek Canyon wasconducted by the Environmental Restoration Program (ERP) at LawrenceBerkeley National Laboratory (LBNL). This canyon extends downhill fromBuilding 31 at LBNL to Centennial Road below. The leading edge of agroundwater tritium plume at LBNL is located at the top of the canyon.Tritium activities measured in this portion of the plume during thisstudy were approximately 3,000 picocuries/liter (pCi/L), which issignificantly less than the maximum contaminant level (MCL) for drinkingwaterof 20,000 pCi/L established by the Environmental ProtectionAgency.There are three main pathways for tritium migration beyond theLaboratory s boundary: air, surface water and groundwater flow. Thepurpose of this report is to evaluate the groundwater pathway.Hydrogeologic investigation commenced with review of historicalgeotechnical reports including 35 bore logs and 27 test pit/trench logsas well as existing ERP information from 9 bore logs. This was followedby field mapping of bedrock outcrops along Chicken Creek as well asbedrock exposures in road cuts on the north and east walls of the canyon.Water levels and tritium activities from 6 wells were also considered.Electrical-resistivity profiles and cone penetration test (CPT) data werecollected to investigate the extent of an interpreted alluvial sandencountered in one of the wells drilled in this area. Subsequent loggingof 7 additional borings indicated that this sand was actually anunusually well-sorted and typically deeply weathered sandstone of theOrinda Formation. Wells were installed in 6 of the new borings to allowwater level measurement and analysis of groundwater tritium activity. Aslug test and pumping tests were also performed in the wellfield.

54 ENVIRONMENTAL SCIENCES↗

Advanced Electric Systems and Aerodynamics for Efficiency Improvements in Heavy Duty Trucks

The Advanced Electric Systems and Aerodynamics for Efficiency Improvements in Heavy Duty Trucks program (DE-FC26-04NT42189), commonly referred to as the AES program, focused on areas that will primarily benefit fuel economy and improve heat rejection while driving over the road. The AES program objectives were to: (1) Analyze, design, build, and test a cooling system that provided a minimum of 10 percent greater heat rejection in the same frontal area with no increase in parasitic fan load. (2) Realize fuel savings with advanced power management and acceleration assist by utilizing an integrated starter/generator (ISG) and energy storage devices. (3) Quantify the effect of aerodynamic drag due to the frontal shape mandated by the area required for the cooling system. The program effort consisted of modeling and designing components for optimum fuel efficiency, completing fabrication of necessary components, integrating these components into the chassis test bed, completing controls programming, and performance testing the system both on a chassis dynamometer and on the road. Emission control measures for heavy-duty engines have resulted in increased engine heat loads, thus introducing added parasitic engine cooling loads. Truck electrification, in the form of thermal management, offers technological solutions to mitigate or even neutralize the effects of this trend. Thermal control offers opportunities to avoid increases in cooling system frontal area and forestall reduced fuel economy brought about by additional aerodynamic vehicle drag. This project explored such thermal concepts by installing a 2007 engine that is compliant with current regulations and bears additional heat rejection associated with meeting these regulations. This newer engine replaced the 2002 engine from a previous project that generated less heat rejection. Advanced power management, utilizing a continuously optimized and controlled power flow between electric components, can offer additional fuel economy benefits to the heavy-duty trucking industry. Control software for power management brings added value to the power distribution and energy storage architecture on board a truck with electric accessories and an ISG. The research team has built upon a previous truck electrification project, formally, 'Parasitic Energy Loss Reduction and Enabling Technologies for Class 7/8 Trucks', DE-FC04-2000AL6701, where the fundamental concept of electrically-driven accessories replacing belt/gear-driven accessories was demonstrated on a Kenworth T2000 truck chassis. The electrical accessories, shown in Figure 1, were controlled to provide 'flow on demand' variable-speed operation and reduced parasitic engine loads for increased fuel economy. These accessories also provided solutions for main engine idle reduction in long haul trucks. The components and systems of the current project have been integrated into the same Kenworth T2000 truck platform. Reducing parasitic engine loading by decoupling accessory loads from the engine and driving them electrically has been a central concept of this project. Belt or gear-driven engine accessories, such as water pump, air conditioning compressor, or air compressor, are necessarily tied to the engine speed dictated by the current vehicle operating conditions. These conventional accessory pumps are sized to provide adequate flow or pressure at low idle or peak torque speeds, resulting in excess flow or pressure at cruising or rated speeds. The excess flow is diverted through a pressure-minimizing device such as a relief valve thereby expending energy to drive unnecessary and inefficient pump operation. This inefficiency causes an increased parasitic load to the engine, which leads to a loss of usable output power and decreased fuel economy. Controlling variable-speed electric motors to provide only the required flow or pressure of a particular accessory system can yield significant increases in fuel economy for a commercial vehicle. Motor loads at relatively high power levels (1-5 kW, or higher) can be efficiently provided current from high-efficiency generators or batteries with system voltages in the range of 250 to 360 volts DC (VDC). In the previous project, the electric accessories could be powered from one of three sources: an AC voltage source ('shore power'), an on-board diesel generator (auxiliary power unit), or an ISG located in the flywheel housing and driven by the main engine. The electric accessories and power sources, including the ISG, have remained in place for the current upgrade of the research platform vehicle. In this project, more emphasis has been placed on determining the best way to use the ISG to power the vehicle and accessories, thereby yielding additional value from existing hardware.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Spatial Disaggregation of CO2 Emissions for the State of California

This report allocates California's 2004 statewide carbon dioxide (CO2) emissions from fuel combustion to the 58 counties in the state. The total emissions are allocated to counties using several different methods, based on the availability of data for each sector. Data on natural gas use in all sectors are available by county. Fuel consumption by power and combined heat and power generation plants is available for individual plants. Bottom-up models were used to distribute statewide fuel sales-based CO2 emissions by county for on-road vehicles, aircraft, and watercraft. All other sources of CO2 emissions were allocated to counties based on surrogates for activity. CO2 emissions by sector were estimated for each county, as well as for the South Coast Air Basin. It is important to note that emissions from some sources, notably electricity generation, were allocated to counties based on where the emissions were generated, rather than where the electricity was actually consumed. In addition, several sources of CO2 emissions, such as electricity generated in and imported from other states and international marine bunker fuels, were not included in the analysis. California Air Resource Board (CARB) does not include CO2 emissions from interstate and international air travel, in the official California greenhouse gas (GHG) inventory, so those emissions were allocated to counties for informational purposes only. Los Angeles County is responsible for by far the largest CO2 emissions from combustion in the state: 83 Million metric tonnes (Mt), or 24percent of total CO2 emissions in California, more than twice that of the next county (Kern, with 38 Mt, or 11percent of statewide emissions). The South Coast Air Basin accounts for 122 MtCO2, or 35percent of all emissions from fuel combustion in the state. The distribution of emissions by sector varies considerably by county, with on-road motor vehicles dominating most counties, but large stationary sources and rail travel dominating in other counties.The CO2 emissions data by county and source are available upon request.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The John Deere E diesel Test & Research Project

Three non-road Tier II emissions compliant diesel engines manufactured by John Deere were placed on a durability test plan of 2000 hours each at full load, rated speed (FLRS). The fuel was a blend of 10% fuel ethanol and 90% low sulfur #2 diesel fuel. Seven operational failures involving twenty seven fuel system components occurred prior to completion of the intended test plan. Regulated emissions measured prior to component failure indicated compliance to Tier II certification goals for the observed test experience. The program plan included operating three non-road Tier II diesel engines for 2000 hours each monitoring the regulated emissions at 500 hour intervals for changes/deterioration. The program was stopped prematurely due to number and frequency of injection system failures. The failures and weaknesses observed involved injector seat and valve wear, control solenoid material incompatibility, injector valve deposits and injector high pressure seal cavitation erosion. Future work should target an E diesel fuel standard that emphasizes minimum water content, stability, lubricity, cetane neutrality and oxidation resistance. Standards for fuel ethanol need to require water content no greater than the base diesel fuel standard. Lubricity bench test standards may need new development for E diesel.

09 BIOMASS FUELS↗

Cleanup Summary Report for the Defense Threat Reduction Agency Fiscal Year 2007, Task 6.7, U12u-Tunnel (Legacy Site), Nevada Test Site, Nevada

This letter serves as notice of completion for cleanup of the U12u-Tunnel (Legacy Site) as specified in the Defense Threat Reduction Agency (DTRA) Fiscal Year 2007 Statement of Work, Task 6.7. The U12u-Tunnel Legacy Site is located near the intersection of the U12u-Tunnel access road and the U12n-Tunnel access road in Area 12 of the Nevada Test Site (see Figure 1). The site encompasses 1.2 acres and was used to store miscellaneous mining equipment and materials that were used to support DTRA testing in Area 12. Field activities commenced February 11, 2008, and were completed February 20, 2008. Radiological surveys were performed on a drill jumbo and all material stored at the site. The drill jumbo was relocated to U12p-Tunnel portal and consolidated with other critical mining equipment for future use or storage. Ten truck loads of solid waste (53 tons) were shipped to the Nevada Test Site, Area 9 U10c Sanitary Landfill for disposal. No hazardous or radiological waste was generated at this site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Safety Requirements for the Waste Storage Facilities

This document contains Technical Safety Requirements (TSR) for the Radioactive and Hazardous Waste Management (RHWM) WASTE STORAGE FACILITIES, which include Area 625 (A625) and the Decontamination and Waste Treatment Facility (DWTF) Storage Area at Lawrence Livermore National Laboratory (LLNL). The TSRs constitute requirements regarding the safe operation of the WASTE STORAGE FACILITIES. These TSRs are derived from the 'Documented Safety Analysis for the Waste Storage Facilities' (DSA) (LLNL 2008). The analysis presented therein determined that the WASTE STORAGE FACILITIES are low-chemical hazard, Hazard Category 2 non-reactor nuclear facilities. The TSRs consist primarily of inventory limits and controls to preserve the underlying assumptions in the hazard and accident analyses. Further, appropriate commitments to safety programs are presented in the administrative controls sections of the TSRs. The WASTE STORAGE FACILITIES are used by RHWM to handle and store hazardous waste, TRANSURANIC (TRU) WASTE, LOW-LEVEL WASTE (LLW), mixed waste, California combined waste, nonhazardous industrial waste, and conditionally accepted waste generated at LLNL as well as small amounts from other U.S. Department of Energy (DOE) facilities, as described in the DSA. In addition, several minor treatments (e.g., size reduction and decontamination) are carried out in these facilities. The WASTE STORAGE FACILITIES are located in two portions of the LLNL main site. A625 is located in the southeast quadrant of LLNL. The A625 fenceline is approximately 225 m west of Greenville Road. The DWTF Storage Area, which includes Building 693 (B693), Building 696 Radioactive Waste Storage Area (B696R), and associated yard areas and storage areas within the yard, is located in the northeast quadrant of LLNL in the DWTF complex. The DWTF Storage Area fenceline is approximately 90 m west of Greenville Road. A625 and the DWTF Storage Area are subdivided into various facilities and storage areas, consisting of buildings, tents, other structures, and open areas as described in Chapter 2 of the DSA. Section 2.4 of the DSA provides an overview of the buildings, structures, and areas in the WASTE STORAGE FACILITIES, including construction details such as basic floor plans, equipment layout, construction materials, controlling dimensions, and dimensions significant to the hazard and accident analysis. Chapter 5 of the DSA documents the derivation of the TSRs and develops the operational limits that protect the safety envelope defined for the WASTE STORAGE FACILITIES. This TSR document is applicable to the handling, storage, and treatment of hazardous waste, TRU WASTE, LLW, mixed waste, California combined waste, nonhazardous industrial waste, and conditionally accepted waste received or generated in the WASTE STORAGE FACILITIES. Section 5, Administrative Controls, contains those Administrative Controls necessary to ensure safe operation of the WASTE STORAGE FACILITIES. Programmatic Administrative Controls are in Section 5.6.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Surveys for Special Status Reptiles at the Site 300 Facilities of Lawrence Livermore National Laboratory

The purpose of this report is to present the results of a live-trapping and visual surveys for special status reptiles at the Site 300 Facilities of Lawrence Livermore National Laboratory (LLNL). The survey was conducted under the authority of the Federal recovery permit of Swaim Biological Consulting (PRT-815537) and a Memorandum of Understanding issued from the California Department of Fish and Game. Site 300 is located between Livermore and Tracy just north of Tesla road (Alameda County) and Corral Hollow Road (San Joaquin County) and straddles the Alameda and San Joaquin County line (Figures 1 and 2). It encompasses portions of the USGS 7.5 minute Midway and Tracy quadrangles (Figure 2). Focused surveys were conducted for four special status reptiles including the Alameda whipsnake (Masticophis lateralis euryxanthus), the San Joaquin Whipsnake (Masticophis Hagellum ruddock), the silvery legless lizard (Anniella pulchra pulchra), and the California horned lizard (Phrynosoma coronanum frontale).

54 ENVIRONMENTAL SCIENCES↗

Equipment Operational Requirements

The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

42 ENGINEERING↗

Rehabilitate Newsome Creek Watershed, 2007-2008 Annual Report.

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridgetop approach. The Nez Perce Tribe (NPT) and the Nez Perce National Forest (NPNF) have formed a partnership in completing watershed restoration activities, and through this partnership more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Newsome Creek watershed of the South Fork Clearwater River in 1997. Progress has been made in restoring the watershed through road decommissioning and culvert replacement. Starting in FY 2001 and continuing into the present, a major stream restoration effort on the mainstem of Newsome Creek has been pursued. From completing a watershed assessment to a feasibility study of 4 miles of mainstem rehabilitation to carrying that forward into NEPA and a final design, we will begin the effort of restoring the mainstem channel of Newsome Creek to provide spawning and rearing habitat for anadromous and resident fish species. Roads have been surveyed and prioritized for removal or improvement as well as culverts being prioritized for replacement to accommodate fish passage throughout the watershed.

13 HYDRO ENERGY↗

Protect and Restore Red River Watershed, 2007-2008 Annual Report.

The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. The Nez Perce Tribe (NPT) and the Nez Perce National Forest (NPNF) have formed a partnership in completing watershed restoration activities, and through this partnership more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Red River Watershed of the South Fork Clearwater River in 2001. Progress has been made in restoring the watershed through road decommissioning and culvert replacement. From completing a watershed assessment to two NEPA efforts and a final stream restoration design, we will begin the effort of restoring the mainstem channel of Red River to provide spawning and rearing habitat for anadromous and resident fish species. Roads have been surveyed and prioritized for removal or improvement as well as culverts being prioritized for replacement to accommodate fish passage throughout the watershed. Another major, and extremely, important component of this project is the Red River Meadow Conservation Easement. We have begun the process of pursuing a conservation easement on approximately 270 acres of prime meadow habitat (Red River runs through this meadow and is prime spawning and rearing habitat).

13 HYDRO ENERGY↗

Analysis of Actual Operating Conditions of an Off-grid Solid Oxide Fuel Cell

Fuel cells have been proposed as ideal replacements for other technologies in remote locations such as Rural Alaska. A number of suppliers have developed systems that might be applicable in these locations, but there are several requirements that must be met before they can be deployed: they must be able to operate on portable fuels, and be able to operate with little operator assistance for long periods of time. This project was intended to demonstrate the operation of a 5 kW fuel cell on propane at a remote site (defined as one without access to grid power, internet, or cell phone, but on the road system). A fuel cell was purchased by the National Park Service for installation in their newly constructed visitor center at Exit Glacier in the Kenai Fjords National Park. The DOE participation in this project as initially scoped was for independent verification of the operation of this demonstration. This project met with mixed success. The fuel cell has operated over 6 seasons at the facility with varying degrees of success, with one very good run of about 1049 hours late in the summer of 2006, but in general the operation has been below expectations. There have been numerous stack failures, the efficiency of electrical generation has been lower than expected, and the field support effort required has been far higher than expected. Based on the results to date, it appears that this technology has not developed to the point where demonstrations in off road sites are justified.

30 DIRECT ENERGY CONVERSION↗

INL Wind Farm Project Description Document

The INL Wind Farm project proposes to install a 20 MW to 40 MW wind farm on government property, consisting of approximately ten to twenty full-sized (80-meter hub height) towers with 2 MW turbines, and access roads. This includes identifying the optimal turbine locations, building access roads, and pouring the tower foundations in preparation for turbine installation. The project successfully identified a location on INL lands with commercially viable wind resources (i.e., greater than 11 mph sustained winds) for a 20 to 40 MW wind farm. Additionally, the proposed Wind Farm was evaluated against other General Plant Projects, General Purpose Capital Equipment projects, and Line Item Construction Projects at the INL to show the relative importance of the proposed Wind Farm project.

17 WIND ENERGY↗

The Effect of Driving Intensity and Incomplete Charging on the Fuel Economy of a Hymotion Prius PHEV

On-road testing was conducted on a Hymotion Prius plug-in hybrid electric vehicle (PHEV) at the Electric Transportation Engineering Corporation in Phoenix, Arizona. The tests were comprised of on-road urban and highway driving during charge-depleting and charge-sustaining operation. Determining real-world effectiveness of PHEVs at reducing petroleum consumption in real world driving was the main focus of the study. Throughout testing, several factors that affect fuel consumption of PHEVs were identified. This report discusses two of these factors: driving intensity (i.e., driving aggressiveness) and battery charging completeness. These two factors are unrelated, yet both significantly impact the vehicle’s fuel economy. Driving intensity was shown to decrease fuel economy by up to half. Charging completeness, which was affected by human factors and ambient temperature conditions, also showed to have great impact on fuel economy for the Hymotion Prius. These tests were performed for the U.S. Department of Energy’s Advanced Vehicle Testing Activity. The Advanced Vehicle Testing Activity, part of the U.S. Department of Energy’s Vehicle Technology Program, is conducted by the Idaho National Laboratory and the Electric Transportation Engineering Corporation.

33 ADVANCED PROPULSION SYSTEMS↗