India 2030 Wind and Solar Integration Study (Interim Report)

India has established several targets for renewable energy capacity growth in the coming years, most notably the target of deploying 175 gigawatts (GW) of generation capacity from wind, solar, biomass, and small hydropower by 2022, and furthering that vision with India's Nationally Determined Contribution target of 40% renewable electricity capacity (including hydro) by 2030 (GOI 2015). Given the rapid and significant changes to India's power system to help meet these targets, the objective of this interim report is to understand the operational challenges for India's power grid in 2030. The primary contribution of this report is to establish a 2030 unit commitment and dispatch model of India's grid, with hourly temporal resolution, high spatial resolution of renewable energy resources, interstate transmission constraints, and unit-level generator characteristics. Annual simulations of 2030 operations demonstrate that a 22% annual penetration of wind and solar is manageable by India's grid. Most days in the year do not show signs of stress, and 99.97% of energy is served with the plans as presented. Average coal plant load factors are 70% for the year, up from relatively low plant load factors in recent years (Patel 2018). However, the results highlight specific challenges the grid may face during a small number of high-demand periods, resulting in unserved energy. The drivers behind the unserved energy suggest that this could be avoided with better coordination in scheduling. This report is part of a broader set of analyses under the Energy Transitions Commission (ETC), which includes collaborations with The Energy and Resources Institute (TERI), Climate Policy Initiative (CPI), and a broad stakeholder community.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Low Probability Tail Event Analysis and Mitigation in BPA Control Area: Task One Report

This is a report for task one of the tail event analysis project for BPA. Tail event refers to the situation in a power system when unfavorable forecast errors of load and wind are superposed onto fast load and wind ramps, or non-wind generators falling short of scheduled output, the imbalance between generation and load becomes very significant. This type of events occurs infrequently and appears on the tails of the distribution of system power imbalance; therefore, is referred to as tail events. This report analyzes what happened during the Electric Reliability Council of Texas (ERCOT) reliability event on February 26, 2008, which was widely reported because of the involvement of wind generation. The objective is to identify sources of the problem, solutions to it and potential improvements that can be made to the system. Lessons learned from the analysis include the following: (1) Large mismatch between generation and load can be caused by load forecast error, wind forecast error and generation scheduling control error on traditional generators, or a combination of all of the above; (2) The capability of system balancing resources should be evaluated both in capacity (MW) and in ramp rate (MW/min), and be procured accordingly to meet both requirements. The resources need to be able to cover a range corresponding to the variability of load and wind in the system, additional to other uncertainties; (3) Unexpected ramps caused by load and wind can both become the cause leading to serious issues; (4) A look-ahead tool evaluating system balancing requirement during real-time operations and comparing that with available system resources should be very helpful to system operators in predicting the forthcoming of similar events and planning ahead; and (5) Demand response (only load reduction in ERCOT event) can effectively reduce load-generation mismatch and terminate frequency deviation in an emergency situation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

National Energy Audit Tool for Multifamily Buildings — Development Plan

The U.S. Department of Energy's (DOE's) Weatherization Assistance Program (WAP) enables low-income families to reduce their energy costs by providing funds to make their homes more energy efficient. In addition, the program funds Weatherization Training and Technical Assistance (T and TA) activities to support a range of program operations. These activities include measuring and documenting performance, monitoring programs, promoting advanced techniques and collaborations to further improve program effectiveness, and training, including developing tools and information resources. The T and TA plan outlines the tasks, activities, and milestones to support the weatherization network with the program implementation ramp up efforts. Weatherization of multifamily buildings has been recognized as an effective way to ramp up weatherization efforts. To support this effort, the 2009 National Weatherization T and TA plan includes the task of expanding the functionality of the Weatherization Assistant, a DOE-sponsored family of energy audit computer programs, to perform audits for large and small multifamily buildings This report describes the planning effort for a new multifamily energy audit tool for DOE's WAP. The functionality of the Weatherization Assistant is being expanded to also perform energy audits of small multifamily and large multifamily buildings. The process covers an assessment of needs that includes input from national experts during two national Web conferences. The assessment of needs is then translated into capability and performance descriptions for the proposed new multifamily energy audit, with some description of what might or should be provided in the new tool. The assessment of needs is combined with our best judgment to lay out a strategy for development of the multifamily tool that proceeds in stages, with features of an initial tool (version 1) and a more capable version 2 handled with currently available resources. Additional development in the future is expected to be needed if more capabilities are to be added. A rough schedule for development of the version 1 tool is presented. The components and capabilities described in this plan will serve as the starting point for development of the proposed new multifamily energy audit tool for WAP.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ExaWorks software development kit: a robust and scalable collection of interoperable workflows technologies

Scientific discovery increasingly requires executing heterogeneous scientific workflows on high-performance computing (HPC) platforms. Heterogeneous workflows contain different types of tasks (e.g., simulation, analysis, and learning) that need to be mapped, scheduled, and launched on different computing. That requires a software stack that enables users to code their workflows and automate resource management and workflow execution. Currently, there are many workflow technologies with diverse levels of robustness and capabilities, and users face difficult choices of software that can effectively and efficiently support their use cases on HPC machines, especially when considering the latest exascale platforms. We contributed to addressing this issue by developing the ExaWorks Software Development Kit (SDK). The SDK is a curated collection of workflow technologies engineered following current best practices and specifically designed to work on HPC platforms. We present our experience with (1) curating those technologies, (2) integrating them to provide users with new capabilities, (3) developing a continuous integration platform to test the SDK on DOE HPC platforms, (4) designing a dashboard to publish the results of those tests, and (5) devising an innovative documentation platform to help users to use those technologies. Our experience details the requirements and the best practices needed to curate workflow technologies, and it also serves as a blueprint for the capabilities and services that DOE will have to offer to support a variety of scientific heterogeneous workflows on the newly available exascale HPC platforms.

97 MATHEMATICS AND COMPUTING↗

Computational unsteady aerodynamics for aeroelastic analysis

This report summarizes the status of computational unsteady aerodynamics methods for aeroelastic analysis and makes recommendations for future research activities. The flight conditions for which various types of flows exist are described and the aeroelastic phenomena that can occur in those flight regimes are discussed. Some important aeroelastic problems of current interest are described, and the aerodynamic methods needed to analyze them are presented. The capabilities and limitations of existing unsteady aerodynamics methods are discussed. Computer resources required to perform aeroelastic analysis of various flight vehicle configurations are presented. Recommendations for future research are made, and schedules for completion of proposed research tasks are presented.

Whitlow, Woodrow, Jr.↗

Space transportation nodes assumptions and requirements: Lunar base systems study task 2.1

The Space Transportation Nodes Assumptions and Requirements task was performed as part of the Advanced Space Transportation Support Contract, a NASA Johnson Space Center (JSC) study intended to provide planning for a Lunar Base near the year 2000. The original task statement has been revised to satisfy the following queries: (1) What vehicles are to be processed at the transportation node; (2) What is the flow of activities involved in a vehicle passing through the node; and (3) What node support resources are necessary to support a lunar scenario traffic model composed of a mix of vehicles in an active flight schedule. The Lunar Base Systems Study is concentrating on the initial years of the Phase 2 Lunar Base Scenario. The study will develop the first five years of that phase in order to define the transportation and surface systems (including mass, volumes, power requirements, and designs).

Kahn, Taher Ali↗

Using Grid Benchmarks for Dynamic Scheduling of Grid Applications

Navigation or dynamic scheduling of applications on computational grids can be improved through the use of an application-specific characterization of grid resources. Current grid information systems provide a description of the resources, but do not contain any application-specific information. We define a GridScape as dynamic state of the grid resources. We measure the dynamic performance of these resources using the grid benchmarks. Then we use the GridScape for automatic assignment of the tasks of a grid application to grid resources. The scalability of the system is achieved by limiting the navigation overhead to a few percent of the application resource requirements. Our task submission and assignment protocol guarantees that the navigation system does not cause grid congestion. On a synthetic data mining application we demonstrate that Gridscape-based task assignment reduces the application tunaround time.

Frumkin, Michael↗

Optimal Integration of Departure and Arrivals in Terminal Airspace

Coordination of operations with spatially and temporally shared resources such as route segments, fixes, and runways improves the efficiency of terminal airspace management. Problems in this category include scheduling and routing, thus they are normally difficult to solve compared with pure scheduling problems. In order to reduce the computational time, a fast time algorithm formulation using a non-dominated sorting genetic algorithm (NSGA) was introduced in this work and applied to a test case based on existing literature. The experiment showed that new method can solve the whole problem in fast time instead of solving sub-problems sequentially with a window technique. The results showed a 60% or 406 second delay reduction was achieved by sharing departure fixes (more details on the comparison with MILP results will be presented in the final paper). Furthermore, the NSGA algorithm was applied to a problem in LAX terminal airspace, where interactions between 28% of LAX arrivals and 10% of LAX departures are resolved by spatial segregation, which may introduce unnecessary delays. In this work, spatial segregation, temporal segregation, and hybrid segregation were formulated using the new algorithm. Results showed that spatial and temporal segregation approaches achieved similar delay. Hybrid segregation introduced much less delay than the other two approaches. For a total of 9 interacting departures and arrivals, delay reduction varied from 4 minutes to 6.4 minutes corresponding flight time uncertainty from 0 to 60 seconds. Considering the amount of flights that could be affected, total annual savings with hybrid segregation would be significant.

high density terminal↗

INFORMATION: Special Report on "Selected Department of Energy Program Efforts to Implement the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on February 17, 2009, to jumpstart the economy by creating or saving millions of jobs, spurring technological advances in health and science, and investing in the Nation's energy future. The Department of Energy received over $32.7 billion in Recovery Act funding for various science, energy, and environmental programs and initiatives. As of November 2009, the Department had obligated $18.3 billion of the Recovery Act funding, but only $1.4 billion had been spent. The Department's Offices of Energy Efficiency and Renewable Energy, Fossil Energy, Environmental Management, Science, and Electricity Delivery and Energy Reliability received the majority of funding allocated to the Department, about $32.3 billion. Obligating these funds by the end of Fiscal Year 2010, as required by the Recovery Act, and overseeing their effective use in succeeding years, represents a massive workload increase for the Department's programs. The effort to date has strained existing resources. As has been widely acknowledged, any effort to disburse massive additional funding and to expeditiously initiate and complete projects increases the risk of fraud, waste and abuse. It is, therefore, important for the Department's program offices to assess and mitigate these risks to the maximum extent practicable. In this light, we initiated this review as an initial step in the Office of Inspector General's charge to determine whether the Department's major program offices had developed an effective approach for identifying and mitigating risks related to achieving the goals and objectives of the Recovery Act. The Department's program offices included in our review identified risks and planned mitigation strategies that, if successfully implemented and executed, should help achieve the goals and objectives of the Recovery Act. While each office identified risks unique to its respective areas of responsibility, there were a number of risks shared in common. These included the mechanical and substantive requirements related to the award and distribution of funds; program and project performance monitoring; and, program and project execution activities. In particular, the offices self-identified common risks such as: (1) The inability to award and distribute funds in a timely manner to achieve the goals of the Recovery Act; (2) The sufficiency of monitoring procedures and resources to, among other things, prevent and detect fraud, waste and abuse throughout the performance period of financial assistance awards and contracts; and (3) The inherent cost, schedule and performance risks associated with first-of-a-kind, innovative research and demonstration projects. Our review confirmed that the Department had begun to implement a number of strategies designed to mitigate these and other program-specific risks. Our testing, however, identified challenges to the effective implementation of these mitigation strategies that need to be addressed if the Department is to meet the goals and objectives established by the Recovery Act. At the time of our review: (1) Program staffing resources, critical to the success of all other mitigation strategies, remained inadequate both in numbers and qualifications (certifications and training) for positions in procurement and acquisition, project management, and monitoring and oversight functions; (2) Performance measures for achieving Recovery Act goals such as distributing funds in an expeditious manner had not always been established and included in performance plans, and, in financial assistance and contract documents; and (3) Programs had not consistently demonstrated that previously reported deficiencies, identified through audits, inspections, investigations and other oversight activities, had been considered in designing mitigation strategies for the Recovery Act related risks. As we noted in our Special Report on the American Recovery and Reinvestment Act at the Department of Energy (OAS-RA-09-01, March 2009) these sorts of deficiencies, which were described in the March 2009 report, had adversely impacted the success of earlier Departmental projects. We concluded that consideration of these previously encountered internal control weaknesses was essential if the Department was to avoid the same or similar problems in executing the Recovery Act programs/projects. During the course of our audit we identified other internal control weakness indicators. When brought to their attention by the Office of Inspector General audit staff, program officials acted promptly to address these problems by modifying or improving their risk mitigation strategies. For instance, we found that the Office of Energy Efficiency and Renewable Energy, responsible for $16.8 billion in Recovery Act program activities, took steps to strengthen its merit review process to avoid potential conflict of interest concerns.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Handbook of Industrial Engineering Equations, Formulas, and Calculations

The first handbook to focus exclusively on industrial engineering calculations with a correlation to applications, Handbook of Industrial Engineering Equations, Formulas, and Calculations contains a general collection of the mathematical equations often used in the practice of industrial engineering. Many books cover individual areas of engineering and some cover all areas, but none covers industrial engineering specifically, nor do they highlight topics such as project management, materials, and systems engineering from an integrated viewpoint. Written by acclaimed researchers and authors, this concise reference marries theory and practice, making it a versatile and flexible resource. Succinctly formatted for functionality, the book presents: Basic Math Calculations; Engineering Math Calculations; Production Engineering Calculations; Engineering Economics Calculations; Ergonomics Calculations; Facility Layout Calculations; Production Sequencing and Scheduling Calculations; Systems Engineering Calculations; Data Engineering Calculations; Project Engineering Calculations; and Simulation and Statistical Equations. It has been said that engineers make things while industrial engineers make things better. To make something better requires an understanding of its basic characteristics and the underlying equations and calculations that facilitate that understanding. To do this, however, you do not have to be computational experts; you just have to know where to get the computational resources that are needed. This book elucidates the underlying equations that facilitate the understanding required to improve design processes, continuously improving the answer to the age-old question: What is the best way to do a job?

42 ENGINEERING↗

Enabling Autonomous Rover Science through Dynamic Planning and Scheduling

This paper describes how dynamic planning and scheduling techniques can be used onboard a rover to autonomously adjust rover activities in support of science goals. These goals could be identified by scientists on the ground or could be identified by onboard data-analysis software. Several different types of dynamic decisions are described, including the handling of opportunistic science goals identified during rover traverses, preserving high priority science targets when resources, such as power, are unexpectedly over-subscribed, and dynamically adding additional, ground-specified science targets when rover actions are executed more quickly than expected. After describing our specific system approach, we discuss some of the particular challenges we have examined to support autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations.

planning↗

Accelerating the Whiteshell Laboratories Decommissioning Through the Implementation of a Projectized and Delivery-Focused Organization - 13074

Whiteshell Laboratories (WL) is a nuclear research site in Canada that was commissioned in 1964 by Atomic Energy of Canada Limited. It covers a total area of approximately 4,375 hectares (10,800 acres) and includes the main campus site, the Waste Management Area (WMA) and outer areas of land identified as not used for or impacted by nuclear development or operations. The WL site employed up to 1100 staff. Site activities included the successful operation of a 60 MW organic liquid-cooled research reactor from 1965 to 1985, and various research programs including reactor safety research, small reactor development, fuel development, biophysics and radiation applications, as well as work under the Canadian Nuclear Fuel Waste Management Program. In 1997, AECL made a business decision to discontinue research programs and operations at WL, and obtained government concurrence in 1998. The Nuclear Legacy Liabilities Program (NLLP) was established in 2006 by the Canadian Government to remediate nuclear legacy liabilities in a safe and cost effective manner, including the WL site. The NLLP is being implemented by AECL under the governance of a Natural Resources Canada (NRCan)/AECL Joint Oversight Committee (JOC). Significant progress has since been made, and the WL site currently holds the only Canadian Nuclear Safety Commission (CNSC) nuclear research site decommissioning license in Canada. The current decommissioning license is in place until the end of 2018. The present schedule planned for main campus decommissioning is 30 years (to 2037), followed by institutional control of the WMA until a National plan is implemented for the long-term management of nuclear waste. There is an impetus to advance work and complete decommissioning sooner. To accomplish this, AECL has added significant resources, reorganized and moved to a projectized environment. This presentation outlines changes made to the organization, the tools implemented to foster projectization, and the benefits and positive impacts on schedule and delivery. A revised organizational structure was implemented in two phases, starting 2011 April 1, to align WL staff with the common goal of decommissioning the site through the direction of the WL Decommissioning Project General Manager. On 2011 September 1, the second phase of the reorganization was implemented and WL Decommissioning staff was organized under five Divisions: Programs and Regulatory Compliance, General Site Services, Decommissioning Strategic Planning, Nuclear Facilities and Project Delivery. A new Mission, Vision and Objectives were developed for the project, and several productivity enhancements are being implemented. These include the use of an integrated and fully re-sourced Site Wide Schedule that is updated and reviewed at Plan-of-the-Week meetings, improved work distribution throughout the year, eliminating scheduling 'push' mentality, project scoreboards, work planning implementation, lean practices and various process improvement initiatives. A revised Strategic Plan is under development that reflects the improved project delivery capabilities. As a result of these initiatives, and a culture change towards a projectized approach, the decommissioning schedule will be advanced by approximately 10 years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analyzing the Impacts of Variable Renewable Resources on California Net-Load Ramp Events: Preprint

This paper characterizes the ramping features of multiple renewable resources, load and net-load in California using 2016 measured data. The goal of this analysis is to understand the interactions between variable renewable resource ramps and net-load ramps, and delineate the positive and negative impacts. The findings indicated that although the frequency and uncertainty in the system level net-load ramp occurrences increased due to variable renewable integration, there was also a decrease in the average ramp up and down magnitudes by about 20% and 30% respectively, along with decreases in their respective standard deviations by 40% and 20%. At the zonal level, the analyses also indicated a 4-5% decrease in the net-load standard deviations due to wind integration alone at various market scheduling periods. The paper finally concludes with future research needs to better integrate variable renewable ramp forecasts into system operations and planning for economic utilization of resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Comparison of a Brain-Based Adaptive System and a Manual Adaptable System for Invoking Automation

Two experiments are presented that examine alternative methods for invoking automation. In each experiment, participants were asked to perform simultaneously a monitoring task and a resource management task as well as a tracking task that changed between automatic and manual modes. The monitoring task required participants to detect failures of an automated system to correct aberrant conditions under either high or low system reliability. Performance on each task was assessed as well as situation awareness and subjective workload. In the first experiment, half of the participants worked with a brain-based system that used their EEG signals to switch the tracking task between automatic and manual modes. The remaining participants were yoked to participants from the adaptive condition and received the same schedule of mode switches, but their EEG had no effect on the automation. Within each group, half of the participants were assigned to either the low or high reliability monitoring task. In addition, within each combination of automation invocation and system reliability, participants were separated into high and low complacency potential groups. The results revealed no significant effects of automation invocation on the performance measures; however, the high complacency individuals demonstrated better situation awareness when working with the adaptive automation system. The second experiment was the same as the first with one important exception. Automation was invoked manually. Thus, half of the participants pressed a button to invoke automation for 10 s. The remaining participants were yoked to participants from the adaptable condition and received the same schedule of mode switches, but they had no control over the automation. The results showed that participants who could invoke automation performed more poorly on the resource management task and reported higher levels of subjective workload. Further, those who invoked automation more frequently performed more poorly on the tracking task and reported higher levels of subjective workload. and the adaptable condition in the second experiment revealed only one significant difference: the subjective workload was higher in the adaptable condition. Overall, the results show that a brain-based, adaptive automation system may facilitate situation awareness for those individuals who are more complacent toward automation. By contrast, requiring operators to invoke automation manually may have some detrimental impact on performance but does appear to increases subjective workload relative to an adaptive system.

Bailey, Nathan R.↗

A microeconomic scheduler for parallel computers

We describe a scheduler based on the microeconomic paradigm for scheduling on-line a set of parallel jobs in a multiprocessor system. In addition to the classical objectives of increasing the system throughput and reducing the response time, we consider fairness in allocating system resources among the users, and providing the user with control over the relative performances of his jobs. We associate with every user a savings account in which he receives money at a constant rate. When a user wants to run a job, he creates an expense account for that job to which he transfers money from his savings account. The job uses the funds in its expense account to obtain the system resources it needs for execution. The share of the system resources allocated to the user is directly related to the rate at which the user receives money; the rate at which the user transfers money into a job expense account controls the job's performance. We prove that starvation is not possible in our model. Simulation results show that our scheduler improves both system and user performances in comparison with two different variable partitioning policies. It is also shown to be effective in guaranteeing fairness and providing control over the performance of jobs.

Stoica, Ion↗

NASA Electronic Parts and Packaging (NEPP) Program: Resources for SmallSats on EEE Parts

From the outside looking in, the NEPP program supports NASA's traditional approach to providing electrical, electronic, and electromechanical (EEE) assurance for space missions. Standards (military and commercial) for EEE parts are based on risk averse methodologies, drive higher costs and schedules, and, in general, provide devices that significantly lag behind commercial devices in performance aspects (speed, power efficiency, etc...). This is NOT the model most small missions realistically can use. However, when you look behind the curtain, NEPP has been considering the risk trade space for small missions for over five years and has consistently provided resources that the small mission regime would find useful. In this paper, we provide a brief overview of these resources as well as NEPP's current research/development efforts that are relevant. While we'll primarily discuss radiation assurance related issues such as data availability and usage, assurances processes for not only the radiation effects side, but also the EEE parts reliability will be touched upon.

Electrical↗

NASA Electronic Parts and Packaging (NEPP) Program - Resources for SmallSats on EEE Parts

From the outside looking in, the NEPP program supports NASA's traditional approach to providing electrical, electronic, and electromechanical (EEE) assurance for space missions. Standards (military and commercial) for EEE parts are based on risk averse methodologies, drive higher costs and schedules, and, in general, provide devices that significantly lag behind commercial devices in performance aspects (speed, power efficiency, etc...). This is NOT the model most small missions realistically can use. However, when you look behind the curtain, NEPP has been considering the risk trade space for small missions for over five years and has consistently provided resources that the small mission regime would find useful. In this paper, we provide a brief overview of these resources as well as NEPP's current research/development efforts that are relevant. While we'll primarily discuss radiation assurance related issues such as data availability and usage, assurances processes for not only the radiation effects side, but also the EEE parts reliability will be touched upon.

Parts assurance↗