Search NASA⌕ Search

SEARCH · Search NASA

Results for “Test Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Simulating the Lunar Thermal Environment for the Surface-Deployed LEMS Artemis III TVAC Test

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.

Thermal↗

Simulating the Lunar Thermal Environment for the Surface-Deployed LEMS Artemis III TVAC Test

The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.

TVAC↗

Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification

This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generated during the US Integral Fast Reactor program between 1984-1994, where the data includes, but is not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs. It is recognized that managing the data generated by large research and development projects presents a significant challenge for retaining data integrity and availability. American Society of Mechanical Engineers Standard NQA-1 (NQA-1) 2008/2009a provides appropriate requirements for this plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification

This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generated during the US Integral Fast Reactor program between 1984-1994, where the data includes, but is not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs. It is recognized that managing the data generated by large research and development projects presents a significant challenge for retaining data integrity and availability. American Society of Mechanical Engineers Standard NQA-1 (NQA-1) 2008/2009a provides appropriate requirements for this plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification

This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generated during the US Integral Fast Reactor program between 1984-1994, where the data include, but are not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs. It is recognized that managing the data generated by large research and development projects presents a significant challenge for retaining data integrity and availability. American Society of Mechanical Engineers Standard NQA-1 (NQA-1) 2008/2009a provides appropriate requirements for this plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Quality Assurance Program Plan for SFR Metallic Fuel Data Qualification

This document contains an evaluation of the applicability of the current Quality Assurance Standards from the American Society of Mechanical Engineers Standard NQA-1 (NQA-1) criteria and identifies and describes the quality assurance process(es) by which attributes of historical, analytical, and other data associated with sodium-cooled fast reactor [SFR] metallic fuel will be evaluated. This process is being instituted to facilitate validation of data to the extent that such data may be used to support future licensing efforts associated with advanced reactor designs. The initial data to be evaluated under this program were generated during the US Integral Fast Reactor program between 1984-1994, where the data include, but are not limited to, research and development data and associated documents, test plans and associated protocols, operations and test data, technical reports, and information associated with past United States Nuclear Regulatory Commission reviews of SFR designs. It is recognized that managing the data generated by large research and development projects presents a significant challenge for retaining data integrity and availability. American Society of Mechanical Engineers Standard NQA-1 (NQA-1) 2008/2009a provides appropriate requirements for this plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Net Shape Fabricated Low Cost MHK Pass-Through the Hub Turbine Blades with Integrated Health Management Technology

The primary objective of this project is to develop a three-blade MHK rotor with low manufacturing and maintenance costs. The proposed program will design, fabricate and test a novel half-scale low cost, net shape fabricated single piece three-blade MHK rotor with integrated health management technology to demonstrate significant Capital Expenditures (CAPEX) and Operational Expenditures (OPEX) cost reductions due to the novel design and manufacturing process. The proposed project is divided into three major tasks: Task 1: Single Piece Three-blade Kinetic Hydropower System (KHPS) Rotor Full-Scale and Half-Scale Design; Task 2: Composite Manufacturing Trials and Half-Scale Prototype Rotor Fabrication; and Task 3: Material Characterization and Half-Scale Prototype Test and Evaluation. These three tasks include design and analysis of full-scale and half-scale three-blade rotor prototypes using computational fluid dynamics (CFD) and finite-element analysis (FEA), demonstration of a novel half-scale net shape fabrication process, determination of a fatigue threshold composite strain allowable, three-blade rotor mold design, manufacture of half-scale rotor clam shell mold, three-blade rotor test fixture design and fabrication, development of final manufacturing and test plans, manufacture of the half-scale net shape composite single blade and three-blade prototypes, and test and evaluation of the half-scale rotor.

16 TIDAL AND WAVE POWER↗

TP89 - SIRZ Decomposition Spectral Estimation

The primary objective of this test plan is to provide X-ray CT measurements of known materials for the purposes of generating and testing MicroCT and EDS spectral estimates. These estimates are to be used in subsequent Ze/RhoE decomposition analyses of acquired data.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Final Report for the Testing of the Y-12 Criticality Accident Alarm System Detectors at the Godiva IV Burst Reactor (IER-443)

This report documents the experimental conditions and final results for the performance testing of the Y-12 Criticality Accident Alarm System (CAAS) detectors at the Godiva IV Burst Reactor at the National Criticality Experimental Research Center (NCERC) at the Nevada National Security Site (NNSS). The testing followed a previously issued test plan and was conducted during the week of July 17, 2017, with completion on Thursday July 20. The test subjected CAAS detectors supplied by Y-12 to very intense and short duration mixed neutron and gamma radiation fields to establish compliance to maximum radiation and minimum pulse width requirements. ANSI/ANS- 8.3.1997 states that the “system shall be sufficiently robust as to actuate an alarm signal when exposed to the maximum radiation expected”, which has been defined at Y-12, in Documented Safety Analyses (DSAs), to be a dose rate of 10 Rad/s. ANSI/ANS-8.3.1997 further states that “alarm actuation shall occur as a result of a minimum duration transient” which may be assumed to be 1 msec. The pulse widths and dose rates provided by each burst during the test exceeded those requirements. The CAAS detectors all provided an immediate alarm signal and remained operable after the bursts establishing compliance to the requirements and fitness for re-deployment at Y-12.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Integrated sequence display device

Device integrates a planned test sequence with real-time changes indicated on a visual display which includes a record of both planned and unplanned events related to a time base. Motor driven paper chart can be advanced or reversed to display the time span of interest.

Rosine, D. R.↗

JT9D engine diagnostics. Task 2: Feasibility study of measuring in-service flight loads

The feasibility of measuring JT9D propulsion system flight inertia loads on a 747 airplane is studied. Flight loads background is discussed including the current status of 747/JT9D loads knowledge. An instrumentation and test plan is formulated for an airline-owned in-service airplane and the Boeing-owned RA001 test airplane. Technical and cost comparisons are made between these two options. An overall technical feasibility evaluation is made and a cost summary presented. Conclusions and recommendations are presented in regard to using existing inertia loads data versus conducting a flight test to measure inertia loads.

Kafka, P. G.↗

Support to NASA's Advanced Space Technology Program

During the period of May through September 2000, Lee & Associates, LLC completed the following tasks as specified in the purchase order SOW: Assessment of current processes and structure and recommended improvements; Reviewed and commented on restructure options; Participated in closure of the Fastrac Delta Critical Design Review actions; Participated in the Fastrac Test readiness review (TRR) process for test planned at SSC and Rocketdyne; and Participated in the investigation of any anomalies identified during the Fastrac engine test data reviews.

Goetz, Otto↗

System Accommodation of Propylene Loop Heat Pipes For The Geoscience Laser Altimeter System (GLAS) Instrument

Loop Heat Pipes (LHP) are used for precise temperature control for NASA Goddard Space Flight Center's Geoscience Laser Altimeter System (GLAS) Instrument in a widely varying LEO thermal environment. Two propylene LHPs are utilized to provide separate thermal control for the Nd:YAG Lasers and the remaining avionics/detector components suite. Despite a rigorous engineering development and test plan to demonstrate the performance in the restrictive GLAS design, the flight units failed initial thermal vacuum acceptance testing at GSFC. Subsequent investigation revealed that compromises in the mechanical packaging of these systems resulted in inadequate charge levels for a concentric wick LHP. The redesign effort included larger compensation chambers that provide more fluid to the wick for start-up scenarios and highlighted the need to fully understand the limitations and accommodation requirements of new technologies in a system design application. Once again, seemingly minor departures from heritage configurations and limited resources led to performance and operational issues. This paper provides details into the GLAS LHP engineering development program and acceptance testing of the flight units, including the redesign effort.

Grob, Eric W.↗

The Hyper-X Flight Systems Validation Program

For the Hyper-X/X-43A program, the development of a comprehensive validation test plan played an integral part in the success of the mission. The goal was to demonstrate hypersonic propulsion technologies by flight testing an airframe-integrated scramjet engine. Preparation for flight involved both verification and validation testing. By definition, verification is the process of assuring that the product meets design requirements; whereas validation is the process of assuring that the design meets mission requirements for the intended environment. This report presents an overview of the program with emphasis on the validation efforts. It includes topics such as hardware-in-the-loop, failure modes and effects, aircraft-in-the-loop, plugs-out, power characterization, antenna pattern, integration, combined systems, captive carry, and flight testing. Where applicable, test results are also discussed. The report provides a brief description of the flight systems onboard the X-43A research vehicle and an introduction to the ground support equipment required to execute the validation plan. The intent is to provide validation concepts that are applicable to current, follow-on, and next generation vehicles that share the hybrid spacecraft and aircraft characteristics of the Hyper-X vehicle.

Redifer, Matthew↗

The Intelligent Flight Control Program (IFCS)

Institute for Scientific Research, Inc. (ISR) is pleased to submit this closeout report for the Research Cooperative Agreement NCC4-00128 of accomplishments for the Intelligent Flight Control System (IFCS) Project. It has been a pleasure working with NASA and NASA partners as we strive to meet the goals of this research initiative. ISR was engaged in this Research Cooperative Agreement beginning March 3, 2001 and ending March 31, 2003. During this time, a great deal has been accomplished and plans have been solidified for the continued success of this program. Our primary areas of involvement include the following: 1) ARTS II Master Test Plan; 2) ARTS II Hardware Design and Development; 3) ARTS II Software Design and Development; 4) IFCS PID/BLNN/OLNN Development; 5) Performed Preliminary and Formal Testing; 6) Documentation and Reporting.

Source record↗

Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas

This document summarizes the activities of Cooperative Agreement DE-FE0026590, “Demonstration of Advanced CO 2 Capture Process Improvements for Coal-Fired Flue Gas” during the performance period of October 1, 2015 through May 31, 2017. This project was funded by the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime contractor and co-funder of the project. Mitsubishi Heavy Industries America (MHIA) and AECOM were project team members. The overall project objective was to improve costs, energy requirements, and performance of an existing amine-based CO 2 capture process. This will occur via improvements in three areas: 1. Reboiler design – The first objective of the program was to demonstrate performance of an integrated stripper/reboiler (termed Built-in Reboiler, or BIR) to reduce footprint, capital costs, and integration issues of the current technology. 2. Particulate management – The second objective was to carry out a Particulate Matter Management (PMM) test. This has the potential to reduce operating costs and capital costs due to the reduced or eliminated need for mechanical filtration. 3. Solvent – The third objective was to carry out a new solvent test plan (referred to as NSL) to demonstrate a new solvent (termed New Solvent A), which is expected to reduce regeneration steam. The bulk price is also expected to be lower than KS-1, which is the current solvent used in this process. NSL testing would include baseline testing, optimization, long term testing, solvent reclamation testing, and final inspection. These combine to form the Advanced Carbon Capture (ACC) technology. Much of this work will be applicable to generic solvent processes, especially in regards to improved reboiler design, and focused to meet or exceed the DOE’s overall carbon capture performance goals of 90% CO 2 capture rate with 95% CO 2 purity at a cost of $40/tonne of CO 2 by 2025 and at a cost of electricity (COE) 30% less than baseline CO 2 capture approaches by 2030. This project was divided into two phases. Phase 1 is the planning phase, and Phase 2 is the construction, operations, testing, and analysis phase. A down select occurred after Phase 1. Phase 1 activities were carried out during this reporting period, and therefore, Phase 1 activities are solely considered in this report. The project was not selected for Phase 2 funding.

01 COAL, LIGNITE, AND PEAT↗

Launch Abort System Flight Test Overview

This viewgraph presentation is an overview of the Launch Abort System (LAS) for the Constellation Program. The purpose of the paper is to review the planned tests for the LAS. The program will evaluate the performance of the crew escape functions of the Launch Abort System (LAS) specifically: the ability of the LAS to separate from the crew module, to gather flight test data for future design and implementation and to reduce system development risks.

Williams-Hayes, Peggy↗

OECD MCCI Project: Category 4 Integral Test to Validate Severe Accident Codes and Core-Concrete Interaction Test Six (CCI-6) (Rev. 2, Final Report)

Ex-vessel debris coolability is an important light water reactor (LWR) technical challenge. For existing plants, resolution of this challenge will confirm the technical basis for severe accident management guidelines (SAMGs). For new reactors, understanding this challenge will help confirm the effectiveness of the design and implementation of new accident mitigation features and severe accident management design alternatives (SAMDAs). The first OECD-MCCI program conducted reactor material experiments focused on achieving the following technical objectives: i) provide confirmatory evidence and data for various cooling mechanisms through separate effect tests for severe accident model development, and ii) provide long-term 2-D coreconcrete interaction data for code assessment and improvement. In addition to the experimental work, an analysis task was defined to develop and validate coolability models to form the basis for extrapolating the experiment findings to plant conditions. In response to the PRG mandate, a summary test plan for this sixth Core-Concrete Interaction (CCI-6) experiment was prepared, reviewed by the PRG, and subsequently approved for test conduct. The experiment approach was to incorporate an array of water nozzles into the core-concrete interaction test apparatus. The test section was enlarged to incorporate a 70 cm x 70 cm basemat. The initial melt depth was increased to 28 cm, which corresponds to a thermite charge mass of 900 kg. The melt depth is noted to be slightly less than the 30 cm level requested by the PRG. The thermite charge was redesigned to include a reduced amount of concrete decomposition products (i.e., 6 wt %) relative to the previously performed CCI tests. The concrete sidewalls allow for 24 cm of lateral erosion, and the sidewall design was modified to include refractory MgO with a UO 2 pellet and U 3 O 8 powder liner to stop the ablation if the 24 cm ablation depth was reached. The basemat and sidewalls also included an array of 45 concrete nozzles that were arranged on a 14 cm lateral pitch and were located at a uniform depth of 27.5 cm below the initial concrete basemat surface elevation. The nozzles were originally sealed at the top, and were fed with water from a common water supply tank that provided a static water head of nominally 10 kPa measured at the upper surface of the nozzles. The planned operating sequence was to ignite the thermite and then provide 210 kW Direct Electrical Heating (DEH) to simulate decay heat. The concrete would then heat up and begin erosion. At this point, the cavity would be flooded from the top. If the melt did not cool, then the core-concrete interaction would continue until the 27.5 cm axial ablation depth was reached. At this point, the nozzles would open by erosion and thus initiate cooling by bottom water injection. The test would continue to operate until the melt was quenched, or the maximum axial ablation depth of 32.5 cm was reached. The experiment would then be terminated. The CCI-6 experiment was carried out on 18 March 2010. The balance of this report documents the facility, actual test operating procedure, and results from this experiment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗