Search NASA⌕ Search

SEARCH · Search NASA

Results for “WASTE PROCESSING PLANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

The Modeling of the Synfuel Production Process: Process models of Fischer-Tropsch production with electricity and hydrogen provided by various scales of nuclear plants

Synthetic fuels (synfuels), also known as electro-fuels (E-fuels), are hydrocarbon fuels produced from waste CO2 streams and water electrolysis, with electricity as the primary source of energy. To achieve substantial reductions in greenhouse gas (GHG) emissions, electricity sources must release zero carbon or near-zero carbon, as is the case with solar, wind, hydro, and nuclear power. Nuclear power is one of the largest and steadiest domestic sources of clean energy in the United States. Moreover, nuclear power has the potential to produce hydrogen economically for less than $2/kg, reaching the DOE near-term target price. Thus, using nuclear power to produce synfuels has the unique potential to significantly reduce the GHG emissions of hydrocarbon fuels production and end-use applications. Fisher-Tropsch or FT fuel (a mixture of naphtha, jet fuel, and diesel) is of great interest because it is a drop-in fuel that can be blended with conventional petroleum counterparts and is compatible with existing infrastructure. By using the ASPEN Plus model, this report develops FT fuel production models on three scales, corresponding to nuclear plants with capacities of 1000 MWe, 437 Mwe, and 100 MWe, respectively. The FT model case with energy from a 437-MWe nuclear plant is used as a baseline case. This report summarizes the baseline ASPEN Plus model results with a detailed mass and energy analysis. Our modeled facility produces 507 MT/day (185,000 gal/day) of FT fuel by converting 255 MT/day of hydrogen and 1,580 MT/day of CO2. The FT fuel production energy efficiency from hydrogen and electricity energy inputs is 70% (lowerheating-value or LHV-based). Including the high-temperature electrolyzer in the system boundary, the FT fuel production LHV efficiency from electricity and thermal energy inputs is 51%, considering 39.8 kWh/kg of electricity and 6.86 kWh/kg of thermal energy use from a nuclear plant for hydrogen production. The FT production efficiency can potentially be increased by further integrating the heat exchange between nuclear plant and FT process, and this study is underway. The carbon conversion ratio in the baseline case is 99%, with process CO2 capture and recirculation and oxy-combustion using the oxygen by-product from water electrolysis. The hydrogen consumption is 1.38 kg/gal-FT fuel and the CO2 consumption is 8.56 kg/gal-FT fuel in the baseline case. With different FT production scales determined by the nuclear plant capacity, the FT model was scaled using the same operating parameters, which led to the same conversion efficiency regardless of scale. However, the different FT plant scales will impact the economics of FT fuel production; this impact will be examined in the next phase of this study.

Zang, Guiyan↗

Waste management strategy for cost effective and environmentally friendly NPP decommissioning

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named ndcon to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimizing Long-term Monitoring of Radiation Air Dose Rates - 19169

Radiation air dose rates near the Fukushima Daiichi Nuclear Power Plant (NPP) have been steadily decreasing over the past seven years since the accident in March 2011. After seven years, the radiation monitoring program is expected to transition from short-term emergency responses to long-term monitoring. The objectives of long-term monitoring are often different from early emergency responses, since extensive data accumulation has led to an understanding of contaminant distributions and mobility. The main long-term monitoring objectives are (1) to confirm system stability and the continuing reduction of contaminant and hazard levels, (2) to provide assurance for the public, (3) to accumulate the basic datasets for scientific knowledge and future preparation, and (4) to detect changes or anomalies in contaminant mobility (if they occur), or any unexpected processes or events. In this work, we have developed a methodology for optimizing the sampling locations of radiation air dose-rate monitoring. Three steps are taken in order to determine sampling locations in a systematic manner: (1) prioritizing the critical locations, such as schools or regulatory requirement locations, (2) diversifying locations across the key environmental controls that are known to influence contaminant mobility and distributions, and (3) capturing the heterogeneity of radiation air dose rates across the domain. In the second step, we use a Gaussian mixture model to identify the representative locations in multiple environmental variables, such as elevation and land-cover types. In the third step, we use a Gaussian process model to capture and estimate the heterogeneity of air dose rates across the domain. We use the integrated dose-rate map from the Bayesian geostatistical method as the reference map and distribute the sampling in such a way as to capture the heterogeneity of the reference map. Although we assume hypothetical sets of measurement locations to evaluate the performance of the methodology and algorithms, we have demonstrated this approach using real, spatially extensive datasets, including the integrated air-dose-rate map of 2016. Our results have shown that this approach allows us to add sampling locations in a systematic manner. Increasing the number of sampling locations can better capture the heterogeneity of dose rates, although the estimation error does not decrease further after a certain number of samples. We have also found that when there are restrictions such as pre-existing monitoring locations or the ones along roads, the spatial estimation becomes poor even with the same number of monitoring locations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sulfur Iodine Process Summary for the Hydrogen Technology Down-Selection: Process Performance Package

This document describes the details of implementing a Sulfur-Iodine (S-I) hydrogen production plant to deploy with the Next General Nuclear Power Plant (NGNP). Technical requirements and specifications are included, and a conceptual plant design is presented. The following areas of interest are outlined in particular as a baseline for the various technology comparisons: (1) Performance Criteria - (a) Quantity of hydrogen produced, (b) Purity of hydrogen produced, (c) Flexibility to serve various applications, (d) Waste management; (2) Economic Considerations - (a) Cost of hydrogen, (b) Development costs; and (3) Risk - (a) Technical maturity of the S-I process, (b) Development risk, (c) Scale up options.

08 HYDROGEN↗

Evaluation of a New Remote Handling Design for High Throughput Annular Centrifugal Contactors

Advanced designs of nuclear fuel recycling plants are expected to include more ambitious goals for aqueous based separations including; higher separations efficiency, high-level waste minimization, and a greater focus on continuous processes to minimize cost and footprint. Therefore, Annular Centrifugal Contactors (ACCs) are destined to play a more important role for such future processing schemes. Previous efforts defined and characterized the performance of commercial 5 cm and 12.5 cm single-stage ACCs in a “cold” environment. The next logical step, the design and evaluation of remote capable pilot scale ACCs in a “hot” or radioactive environment was reported earlier. This report includes the development of remote designs for ACCs that can process the large throughput rates needed in future nuclear fuel recycling plants. Novel designs were developed for the remote interconnection of contactor units, clean-in-place and drain connections, and a new solids removal collection chamber. A three stage, 12.5 cm diameter rotor module has been constructed and evaluated for operational function and remote handling in highly radioactive environments. This design is scalable to commercial CINC ACC models from V-05 to V-20 with total throughput rates ranging from 20 to 650 liters per minute. The V-05R three stage prototype was manufactured by the commercial vendor for ACCs in the U.S., CINC mfg. It employs three standard V-05 clean-in-place (CIP) units modified for remote service and replacement via new methods of connection for solution inlets, outlets, drain and CIP. Hydraulic testing and functional checks were successfully conducted and then the prototype was evaluated for remote handling and maintenance suitability. Removal and replacement of the center position V-05R ACC unit in the three stage prototype was demonstrated using an overhead rail mounted PaR manipulator. This evaluation confirmed the efficacy of this innovative design for interconnecting and cleaning individual stages while retaining the benefits of commercially reliable ACC equipment for remote applications in the nuclear industry. Minor modifications and suggestions for improved manual remote servicing by the remote handling specialists were provided but successful removal and replacement was demonstrated in the first prototype.

99 GENERAL AND MISCELLANEOUS↗

Mitigation of Radioactive Waste By Sampling and Analyzing The Affected Area and Efficient Use of Different Detectors - 17400

The paper summarizes the way by which the mitigation of the radioactive waste during events like decommissioning of nuclear power plants, or during a nuclear disaster can be done so that the rehabilitation process for flora and fauna can begin in a natural manner. The paper describes the problems faced during ER operations in the developing countries and need of international committees in these areas. The paper suggests marking of the radioactive areas which can be used for controlled personnel access and which can be useful for monitoring purposes, while also focusing on the need of proper knowledge while handling detectors in ER operations for successful site characterization. It also highlights the importance of bio-indicators in these operations and also gives a description of various detectors used widely and their related significance for ER operations. The paper gives an overview of the planning and site characterization stages that follow in the environmental remediation. Planning stage should consider: 1. The impact on the ecosystem and human beings and the risk of spreading of the radionuclides. 2. The financial aid in hand for detectors, machinery and skilled labor. As the planning stages develop, the very first thing is the survey of the site. Site investigation should be carried out in all aspects including meteorology, geology, and hydrology, seismicity, geomorphology and the other aspects depending on site for a certain period of time. A site characterization should take: 1. The amount of damage occurred to the environment in the nearby region. 2. The distribution, character and the extent to which radioactivity has been dispersed. 3. The amount of risk that will be involved for personnel working in the field. 4. The precision of data collected that is to be used as input for further processes. In the developing countries, the central governmental bodies play a pivotal role in providing funds internally or from international bodies. The paper shows the effect how political issues effect the work progress of ER operations, that hamper the process and make people frustrated, who really work on the field. Paper provides the suggestion for the proper use of detectors in these countries where surveyors lack knowledge on what kind of detectors to be used while taking precision as a parameter. The table beside gives just a small picture of the large variety of detectors available today and tries to summarizes the main detectors with applications. There should also be a proper marking of the areas into different levels of radiation that will be helpful for work access control and monitoring personnel health. The paper also suggests of using bio-indicators in ER operation more often. The paper proposes to use site-specific bio-indicators which are very helpful in knowing the proper effect of the event in the environment. There is no single paved path for every situation that can lead to a successful ER. The planning should be done in such a way that the future work is not disturbed due to technical problems. In developing countries, political issues can hamper the progress of work and time remains a critical issue in such areas. The lack of proper knowledge for the use of detectors can affect the outcome of site characterization. Areas of the survey should be marked with different levels of activity for efficient monitoring of personnel's. The use of bio-indicators should be used more often and should be chosen as per the site. As they are a helpful tool in evaluating the work progress. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Glass Crystallization Constraints for WTP LAW Operations: Assessment of Isothermal Treatments on Crystal Formation

Much work has been done to expand the glass composition region available for operation of the Hanford Waste Treatment and Immobilization Plant. This includes the development of updated glass property-composition models as well as constraints. This report supports this effort by suggesting constraints for avoiding excessive, and likely detrimental, crystallization during melter operation while processing advanced low-activity glass waste forms. The constraints target SnO 2 and ZrO 2 crystals that can form when melter temperatures drop below 1100 °C. These types of crystals were found to be potentially detrimental during processing as they are denser than low-activity waste glass melts. SnO 2 , density of 6.95 g/cm3, and ZrO 2 , density of 5.68 g/cm3, have the potential to form during melter idling and settle to the bottom of the less dense glass melt (approximate density 2.65 g/cm3). If the crystals are present in appreciable amounts, they can result in blockages of the pour-spout riser, which impacts glass pouring and melter operation. Using previously acquired results and results from testing during this effort, constraints were determined and are suggested as options to reduce the risk of forming crystals of the types and concentrations that are likely detrimental to melter operation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Current Status of the Synroc Waste Treatment Facility - 20263

Construction of the Synroc Waste Treatment Facility is well underway at ANSTO. This plant has been designed to treat intermediate level liquid waste arising from the production of Mo-99 within the newly constructed ANSTO Nuclear Medicine (ANM) precinct [1]. The facility utilises ANSTO Synroc technology that has been tailored to the chemical, physical, and radiological properties of the waste. The result is a highly durable wasteform with a significant reduction in the final volume of the treated waste. This paper presents the construction status of the Synroc Waste Treatment Facility and the status of the associated technology maturation plan. Construction of the building is scheduled for completion in late 2020 followed by process installation and commissioning. A key component of the technology maturation plan has been the construction of an Inactive Engineering Demonstrator [2]. This has aided in the mitigation of risks with respect to technology selection, process integration, and process nuclearisation. Furthermore, the demonstration facility has provided an environment for the design and development of the instrumentation and control philosophy resulting in a seamlessly integrated plant control system. Successful demonstration of the technology by the inactive engineering demonstrator has significantly reduced the associated risks. Details of the Synroc Waste Treatment Facility project progress will also be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DECOVALEX-2023: Task E Final Report

This is the Task E final report for DECOVALEX-2023. Task E is focused on understanding thermal, two-phase hydrological, and mechanical (TH2M) processes, especially related to predicting brine migration in the excavation damaged zone around a heated excavation in salt. Salt is attractive as a disposal medium for radioactive waste because it is self-healing and is essentially impermeable and essentially non-porous in the far field (away from excavations). Investigation of the short-term (days to years) near-field (centimeters to tens of meters) behavior of salt is important for radioactive waste disposal because this early period strongly controls the amount of brine in a salt repository. Brine leads to corrosion of waste forms and waste packages, and possible dissolution of radionuclides with brine transport being a potential transport vector to the accessible environment. The main test case used in Task E is the ongoing Brine Availability Test in Salt (BATS) heater test located underground at the Waste Isolation Pilot Plant (WIPP) near Carlsbad, New Mexico, USA. The Task was divided into a series of Steps. Step 0 was an introduction to processes in salt, that included matching historical unheated brine inflow data from boreholes at WIPP and matching temperature observations during BATS heater test 1a. Step 1 included validation of models against a thermo-poroelastic analytical solution relevant to heated boreholes in salt, and two-phase flow around an excavation in salt. Step 2 required all the individual components covered in steps 0 and 1 to come together to match observed brine inflow behavior during the BATS 1a heater test. There were a range of approaches from the teams, from mechanistic to prescriptive. Given the uncertainties in the problem, some teams used one- or two-dimensional models of the processes, while other teams included more geometrical complexity in three-dimensional models. The key learning points from Task E have been: • Heat conduction through salt typically requires non-linear thermal conductivity (as a function of temperature), but most models do a good job matching observations, given appropriate adjustments to the applied power and some thermocouple locations. • Thermal pressurization requires coupled thermal-hydrological-mechanical (THM) responses that consider the thermal expansion of the fluid and solid phases. • Initialization of two-phase flow models around a borehole or excavation in salt are more realistically represented as “wetting up”, rather than “drying down” (i.e., the initial state after excavation is mostly dry, rather than mostly wet). • The BATS 1a heater test includes a significant release of brine after the end of heating, which requires a large increase in permeability to recreate. Task E has been a great learning experience for all the teams involved, and feedback from the modeling teams has led to changes in the design of follow-on BATS experiments, which are now ongoing underground at WIPP. There was a balance throughout the task between freedom to model phenomena how each team saw fit, and prescriptiveness in problem design to bring the modeling teams closer together to allow attribution of smaller differences between models to different modeling choices. The modeling approaches seem to go through two phases: an early phase of discovery or testing, and a later phase of refinement and improvement. In future modeling efforts, different field data could be used (e.g., BATS 2) and more time should be included in the processes for teams to make multiple model refinement or even significant changes to their conceptual model or setup, based on lessons learned from the modeling exercise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The New Generation of Uranium In Situ Recovery Facilities: Design Improvements Should Reduce Radiological Impacts Relative to First Generation Uranium Solution Mining Plants

In the last few years, there has been a significant increase in the demand for Uranium as historical inventories have been consumed and new reactor orders are being placed. Numerous mineralized properties around the world are being evaluated for Uranium recovery and new mining / milling projects are being evaluated and developed. Ore bodies which are considered uneconomical to mine by conventional methods such as tunneling or open pits, can be candidates for non-conventional recovery techniques, involving considerably less capital expenditure. Technologies such as Uranium In Situ Leaching / In Situ Recovery (ISL / ISR - also referred to as 'solution mining'), have enabled commercial scale mining and milling of relatively small ore pockets of lower grade, and are expected to make a significant contribution to overall world wide uranium supplies over the next ten years. Commercial size solution mining production facilities have operated in the US since the mid 1970's. However, current designs are expected to result in less radiological wastes and emissions relative to these 'first' generation plants (which were designed, constructed and operated through the 1980's). These early designs typically used alkaline leach chemistries in situ including use of ammonium carbonate which resulted in groundwater restoration challenges, open to air recovery vessels and high temperature calcining systems for final product drying vs the 'zero emissions' vacuum dryers as typically used today. Improved containment, automation and instrumentation control and use of vacuum dryers in the design of current generation plants are expected to reduce production of secondary waste byproduct material, reduce Radon emissions and reduce potential for employee exposure to uranium concentrate aerosols at the back end of the milling process. In Situ Recovery in the U.S. typically involves the circulation of groundwater, fortified with oxidizing (gaseous oxygen e.g) and complexing agents (carbon dioxide, e.g) into an ore body, solubilizing the uranium in situ, and then pumping the solutions to the surface where they are fed to a processing plant ( mill). Processing involves ion exchange and may also include precipitation, drying or calcining and packaging operations depending on facility specifics. This paper presents an overview of the ISR process and the health physics monitoring programs developed at a number of commercial scale ISL / ISR Uranium recovery and production facilities as a result of the radiological character of these processes. Although many radiological aspects of the process are similar to that of conventional mills, conventional-type tailings as such are not generated. However, liquid and solid byproduct materials may be generated and impounded. The quantity and radiological character of these by products are related to facility specifics. Some special monitoring considerations are presented which are required due to the manner in which radon gas is evolved in the process and the unique aspects of controlling solution flow patterns underground. The radiological character of these processes are described using empirical data collected from many operating facilities. Additionally, the major aspects of the health physics and radiation protection programs that were developed at these first generation facilities are discussed and contrasted to circumstances of the current generation and state of the art of uranium ISR technologies and facilities. In summary: This paper has presented an overview of in situ Uranium recovery processes and associated major radiological aspects and monitoring considerations. Admittedly, the purpose was to present an overview of those special health physics considerations dictated by the in situ Uranium recovery technology, to point out similarities and differences to conventional mill programs and to contrast these alkaline leach facilities to modern day ISR designs. As evidenced by the large number of ISR projects currently under development in the U.S. and worldwide, non conventional Uranium recovery techniques, such as ISL / ISR (solution mining), can play a significant role in complimenting Uranium supplies during the next decade. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Use of Brazilian sugarcane bagasse ash in concrete as sand replacement

Sugarcane today plays a major role in the worldwide economy, and Brazil is the leading producer of sugar and alcohol, which are important international commodities. The production process generates bagasse as a waste, which is used as fuel to stoke boilers that produce steam for electricity cogeneration. The final product of this burning is residual sugarcane bagasse ash (SBA), which is normally used as fertilizer in sugarcane plantations. Ash stands out among agroindustrial wastes because it results from energy generating processes. Many types of ash do not have hydraulic or pozzolanic reactivity, but can be used in civil construction as inert materials. The present study used ash collected from four sugar mills in the region of Sao Carlos, SP, Brazil, which is one of the world's largest producers of sugarcane. The ash samples were subjected to chemical characterization, sieve analysis, determination of specific gravity, X-ray diffraction, scanning electron microscopy, and solubilization and leaching tests. Mortars and concretes with SBA as sand replacement were produced and tests were carried out: compressive strength, tensile strength and elastic modulus. The results indicated that the SBA samples presented physical properties similar to those of natural sand. Several heavy metals were found in the SBA samples, indicating the need to restrict its use as a fertilizer. The mortars produced with SBA in place of sand showed better mechanical results than the reference samples. SBA can be used as a partial substitute of sand in concretes made with cement slag-modified Portland cement.

09 BIOMASS FUELS↗

World first in high level waste vitrification - A review of French vitrification industrial achievements

AREVA has more than 30 years experience in operating industrial HLW (High Level radioactive Waste) vitrification facilities (AVM - Marcoule Vitrification Facility, R7 and T7 facilities). This vitrification technology was based on borosilicate glasses and induction-heating. AVM was the world's first industrial HLW vitrification facility to operate in-line with a reprocessing plant. The glass formulation was adapted to commercial Light Water Reactor fission products solutions, including alkaline liquid waste concentrates as well as platinoid-rich clarification fines. The R7 and T7 facilities were designed on the basis of the industrial experience acquired in the AVM facility. The AVM vitrification process was implemented at a larger scale in order to operate the R7 and T7 facilities in-line with the UP2 and UP3 reprocessing plants. After more than 30 years of operation, outstanding record of operation has been established by the R7 and T7 facilities. The industrial startup of the CCIM (Cold Crucible Induction Melter) technology with enhanced glass formulation was possible thanks to the close cooperation between CEA and AREVA. CCIM is a water-cooled induction melter in which the glass frit and the waste are melted by direct high frequency induction. This technology allows the handling of highly corrosive solutions and high operating temperatures which permits new glass compositions and a higher glass production capacity. The CCIM technology has been implemented successfully at La Hague plant.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Distribution of Radioactive Materials in the Absheron Peninsula, Azerbaijan - 13567

The Absheron Peninsula forms the extreme Eastern part of Azerbaijan and juts into the Caspian Sea. The region has a long history of oil and gas exploration, transport, and processing and includes a number of abandoned chemical plants that were used in the separation of iodine from formation waters. As a result of lax environmental standards during the Soviet era, the industrial activity has led to serious contamination from oils residues, heavy metals and naturally occurring radioactive materials (NORM). Radiometric surveys performed over a wide range of the Absheron Peninsula showed generally low NORM concentrations. However, radiation levels two to three orders of magnitude above background levels were detected at two abandoned iodine separation plants near the capital city, Baku. These elevated radiation levels are mainly due to Ra-226 and U-238 with lower contributions from Ra-228 and U-235. (authors)

54 ENVIRONMENTAL SCIENCES↗

Repackaging of High Fissile TRU Waste at the Transuranic Waste Processing Center - 13240

Twenty-six drums of high fissile transuranic (TRU) waste from Oak Ridge National Laboratory (ORNL) operations were declared waste in the mid-1980's and placed in storage with the legacy TRU waste inventory for future treatment and disposal at the Waste Isolation Pilot Plant (WIPP). Repackaging and treatment of the waste at the TRU Waste Packaging Center (TWPC) will require the installation of additional equipment and capabilities to address the hazards for handling and repackaging the waste compared to typical Contact Handled (CH) TRU waste that is processed at the TWPC, including potential hydrogen accumulation in legacy 6M/2R packaging configurations, potential presence of reactive plutonium hydrides, and significant low energy gamma radiation dose rates. All of the waste is anticipated to be repackaged at the TWPC and certified for disposal at WIPP. The waste is currently packaged in multiple layers of containers which presents additional challenges for repackaging activities due to the potential for the accumulation of hydrogen gas in the container headspace in quantities than could exceed the Lower Flammability Limit (LFL). The outer container for each waste package is a stainless steel 0.21 m{sup 3} (55-gal) drum which contains either a 0.04 m{sup 3} or 0.06 m{sup 3} (10-gal or 15-gal) 6M drum. The inner 2R container in each 6M drum is ∼12 cm (5 in) outside diameter x 30-36 cm (12-14 in) long and is considered to be a > 4 liter sealed container relative to TRU waste packaging criteria. Inside the 2R containers are multiple configurations of food pack cans, pipe nipples, and welded capsules. The waste contains significant quantities of high burn-up plutonium oxides and metals with a heavy weight percentage of higher atomic mass isotopes and the subsequent in-growth of significant quantities of americium. Significant low energy gamma radiation is expected to be present due to the americium in-growth. Radiation dose rates on inner containers are estimated to be 1-3 mSv/hr (100-300 mrem/hr) with an unshielded dose rate on the waste itself of over 10 mSv/hr (1 rem/hr). Additional equipment to be installed at the TWPC will include a new perma-con enclosure and a shielded/inert glovebox in the process building to repackage and stabilize the waste. All of the waste will be repackaged into Standard Pipe Overpacks. Most of the waste (21 of the 26 drums) is expected to be repackaged at the food-pack can level (i.e. the food-pack cans will not be opened). Five of the incoming waste containers are expected to be repackaged at the primary waste level. Three of the containers exceed the 200 gram Pu-239 Fissile Gram Equivalent (FGE) limit for the Standard Pipe Overpack. These three containers will be repackaged down to the primary waste level and divided into eight Standard Pipe Overpacks for shipment to WIPP. Two containers must be stabilized to eliminate any reactive plutonium hydrides that may be present. These containers will be opened in the inert, shielded glovebox, and the remaining corroded plutonium metal converted to a stable oxide form by using a 600 deg. C tube furnace with controlled oxygen feed in a helium carrier gas. The stabilized waste will then be packaged into two Standard Pipe Overpacks. Design and build out activities for the additional repackaging capabilities at the TWPC are scheduled to begin in Fiscal Year 2013 with repackaging, stabilization, and certification activities scheduled to begin in Fiscal Year 2014. Following repackaging and stabilization activities, the Standard Pipe Overpacks will be certified for disposal at WIPP utilizing Non-Destructive Examination (NDE) to verify the absence of prohibited items and Non-Destructive Assay (NDA) to verify the isotopic content under the TWPC WIPP certification program implemented by the Central Characterization Project (CCP). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of Potential Eluants for Non-Acid Elution of Cesium From Resorcinol-Formaldehyde Resin

Small-column ion exchange (SCIX) units installed in high-level waste tanks to remove Cs-137 from highly alkaline salt solutions are among the waste treatment plans in the DOE-complex. Spherical Resorcinol-Formaldehyde (sRF) is the ion exchange resin selected for use in the Hanford Waste Treatment and Immobilization Plant (WTP). It is also the primary ion exchange material under consideration for SCIX at the Hanford site. The elution step of the multi-step ion exchange process is typically done with 0.5 M nitric acid. An acid eluant is a potential hazard in the event of a spill, leak, etc. because the high-level waste tanks are made of carbon steel. Corrosion and associated structural damage may ensue. A study has been conducted to explore non-acid elution as an alternative. Batch contact sorption equilibrium screening tests have been conducted with 36 potential non-acid eluants. The sorption tests involve equilibrating each cesium-containing eluant solution with the sRF resin for 48 hours at 25 C in a shaker oven. In the sorption tests, an eluant is deemed to have a high cesium elution potential if it minimizes cesium sorption onto the sRF resin. The top candidates (based on lowest cesium sorption distribution coefficients) include ammonium carbonate, ammonium carbonate/ammonium hydroxide, ammonium bicarbonate, rubidium carbonate, ammonium acetate, ammonium acetate/ammonium hydroxide, ammonium bicarbonate/ammonium hydroxide, calcium chloride, and magnesium chloride. A select few of the top candidate eluants from the screening tests were subjected to actual sorption (loading) and elution tests to confirm their elution ability. The actual sorption (loading) and elution tests mimicked the typical sRF-cesium ion exchange process (i.e., sorption or loading, caustic wash, water rinse, and elution) via batch contact sorption and quasi column caustic wash/water rinse/elution. The eluants tested included ammonium carbonate, ammonium acetate, calcium acetate, magnesium acetate, and nitric acid. Calcium acetate and magnesium acetate were substitutes for calcium chloride and magnesium chloride respectively due to corrosion concerns. Nitric acid was selected for benchmarking since it is the baseline cesium eluant for sRF resin. The cesium elution performance of ammonium carbonate and ammonium acetate was approximately the same as the benchmark eluant, nitric acid. Ninety-seven (97), 94, and 100% percent of the cesium sorbed or loaded were eluted by ammonium carbonate, ammonium acetate, and nitric acid was respectively. The performance of calcium acetate and magnesium acetate, on the other hand, was mediocre. Percent elution was 16 and 8 respectively.

36 MATERIALS SCIENCE↗