Search NASA⌕ Search

SEARCH · Search NASA

Results for “Waste Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Interval-parameter semi-infinite fuzzy-stochastic mixed-integer programming approach for environmental management under multiple uncertainties

In this study, an interval-parameter semi-infinite fuzzy-chance-constrained mixed-integer linear programming (ISIFCIP) approach is developed for supporting long-term planning of waste-management systems under multiple uncertainties in the City of Regina, Canada. The method improves upon the existing interval-parameter semi-infinite programming (ISIP) and fuzzy-chance-constrained programming (FCCP) by incorporating uncertainties expressed as dual uncertainties of functional intervals and multiple uncertainties of distributions with fuzzy-interval admissible probability of violating constraint within a general optimization framework. The binary-variable solutions represent the decisions of waste-management-facility expansion, and the continuous ones are related to decisions of waste-flow allocation. The interval solutions can help decision-makers to obtain multiple decision alternatives, as well as provide bases for further analyses of tradeoffs between waste-management cost and system-failure risk. In the application to the City of Regina, Canada, two scenarios are considered. In Scenario 1, the City's waste-management practices would be based on the existing policy over the next 25 years. The total diversion rate for the residential waste would be approximately 14%. Scenario 2 is associated with a policy for waste minimization and diversion, where 35% diversion of residential waste should be achieved within 15 years, and 50% diversion over 25 years. In this scenario, not only landfill would be expanded, but also CF and MRF would be expanded. Through the scenario analyses, useful decision support for the City's solid-waste managers and decision-makers has been generated. Three special characteristics of the proposed method make it unique compared with other optimization techniques that deal with uncertainties. Firstly, it is useful for tackling multiple uncertainties expressed as intervals, functional intervals, probability distributions, fuzzy sets, and their combinations; secondly, it has capability in addressing the temporal variations of the functional intervals; thirdly, it can facilitate dynamic analysis for decisions of facility-expansion planning and waste-flow allocation within a multi-facility, multi-period and multi-option context.

54 ENVIRONMENTAL SCIENCES↗

Concrete Property and Radionuclide Migration Tests

The Waste Management Project provides safe, compliant, and cost-effective waste management services for the Hanford Site and the DOE Complex. Part of theses services includes safe disposal of LLW and MLLW at the Hanford Low-Level Waste Burial Grounds (LLBG) in accordance with the requirements listed in DOE Order 435.1, Radioactive Waste Management. To partially satisfy these requirements, a Performance Assessment (PA) analyses were completed and approved. DOE Order 435.1 also requires that continuing data collection be conducted to enhance confidence in the critical assumptions used in these analyses to characterize the operational features of the disposal facility that are relied upon to satisfy the performance objectives identified in the Order. One critical assumption is that concrete will frequently be used as waste form or container material to control and minimize the release of radionuclide constituents in waste into the surrounding environment. Data was collected to (1) quantify radionuclide migration through concrete materials similar to those used to encapsulate waste in the LLBG, (2) measure the properties of the concrete materials, especially those likely to influence radionuclide migration, and (3) quantify the stability of U-bearing solid phases of limited solubility in concrete.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Tools and Data for System-Level Dynamic Analyses

The only fuel cycle for which dynamic analyses and assessments are not needed is the null fuel cycle - no nuclear power. For every other concept, dynamic analyses are needed and can influence relative desirability of options. Dynamic analyses show how a fuel cycle might work during transitions from today's partial fuel cycle to something more complete, impact of technology deployments, location of choke points, the key time lags, when benefits can manifest, and how well parts of fuel cycles work together. This report summarizes the readiness of existing Fuel Cycle Technology (FCT) tools and data for conducting dynamic analyses on the range of options. VISION is the primary dynamic analysis tool. Not only does it model mass flows, as do other dynamic system analysis models, but it allows users to explore various potential constraints. The only fuel cycle for which constraints are not important are those in concept advocates PowerPoint presentations; in contrast, comparative analyses of fuel cycles must address what constraints exist and how they could impact performance. The most immediate tool need is extending VISION to the thorium/U233 fuel cycle. Depending on further clarification of waste management strategies in general and for specific fuel cycle candidates, waste management sub-models in VISION may need enhancement, e.g., more on 'co-flows' of non-fuel materials, constraints in waste streams, or automatic classification of waste streams on the basis of user-specified rules. VISION originally had an economic sub-model. The economic calculations were deemed unnecessary in later versions so it was retired. Eventually, the program will need to restore and improve the economics sub-model of VISION to at least the cash flow stage and possibly to incorporating cost constraints and feedbacks. There are multiple sources of data that dynamic analyses can draw on. In this report, 'data' means experimental data, data from more detailed theoretical or empirical calculations on technology performance, and assumptions such as the earliest date a technology can be deployed. The only fuel cycles for which we currently have adequate data are those we are sure we will never build, e.g., a PUREX plant in the U.S. For actual candidates, even for once through LWRs, there remain missing data such as how the fuel cycle would be completed with a geologic repository. The most immediate data needs are probably basic reactor physics data for new concepts and data associated with waste management for anything other than current technology. The readiness of tools and data is fluid and depends on what purposes are envisioned to drive upcoming analyses and further definition of the waste-related characteristics of fuel cycle candidates. Tools and data sets evolve as needs evolve. Thus, much of the document explains that if the FCT program wants a certain type of analysis, then the tools and data needs are as indicated. For example, functions can be treated as either commodities or facilities. Reactors, separation, fuel fabrication, repository are treated as facility types. Other functions such as uranium mining, conversion, enrichment, and waste packaging and non-repository disposal are treated as commodities and therefore not modeled as extensively. In summary, the tools are functional and can answer many fuel cycle questions but some analyses will require that the tools be modified to support those analyses.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

GNEP Material Transportation, Storage and Disposal Analysis FY-08 Summary Report

This report provides a summary for FY-2008 of activities, analyses and products from the Material Transportation, Storage and Disposal (M-TSD) sub-task of Systems Analysis within the Advanced Fuel Cycle Research & Development area of the Global Nuclear Energy Partnership. The objective of this work is to evaluate near-term material management requirements for initial GNEP facilities and activities, long-term requirements for large-scale GNEP technology deployment, and alternatives and paths forward to meet these needs. For FY-08, the work expanded to include the Integrated Waste Management Strategy as well as integration with the newly formed Waste Forms Campaign. The M-TSD team was expanded with the addition of support from Savannah River National Lab (SRNL) to the existing team of Lawrence Livermore National Lab (LLNL), Argonne National Lab (ANL), Idaho National Lab (INL), Sandia National Lab (SNL) and University of Nevada - Reno (UN-R). During the first half of the year, analysis was focused on providing supporting technical analysis and documentation to support anticipated high-level decisions on program direction. A number of analyses were conducted and reports prepared as program deliverables. This work is briefly summarized in this report. Analyses provided informally to other program efforts are included in this report to provide documentation. This year-end summary was planned primarily as a compilation of activities following the anticipated programmatic decisions. These decisions were deferred beyond the end of the year, and funds were reallocated in a number of areas, thus reducing the M-TSD activities. This report summarizes the miscellaneous 'ad-hoc' work conducted during the later part of the year, such as support to the draft Programmatic Environmental Impact Statement (PEIS), and support to other program studies. Major programmatic contributions from the M-TSD team during the year included: (1) Completion of the IWMS in March 2008 as the baseline for waste management calculations for the GNEP Programmatic Environmental Impact Statement (PEIS). The IWMS represents a collaborative effort between the Systems Analysis, Waste Forms, and Separations Campaigns with contributing authors from multiple laboratories. The IWMS reference is: 'Global Nuclear Energy Partnership Integrated Waste Management Strategy, D. Gombert, INL, et al, GNEP-WAST-WAST-AI-RT-2008-000214, March 2008'. (2) As input to the IWMS and support for program decisions, an evaluation of the current regulatory framework in the U.S. pertaining to the disposal of radioactive wastes under an advanced nuclear fuel cycle was completed by ANL. This evaluation also investigated potential disposal pathways for these wastes. The entire evaluation is provided in Appendix A of this report. (3) Support was provided to the development of the GNEP Programmatic Environmental Impact Statement from INL, SNL and ANL M-TSD staff. (4) M-TSD staff prepared input for DSARR (Dynamic Systems Analysis Report for Nuclear Fuel Recycle) report. The DSARR is an INL led report to examine the time-dependent dynamics for a transition from the current open fuel cycle to either a 1-tier or 2-tier closed fuel cycle. Section 5.3 Waste Management Impacts was provided to INL for incorporation into the DSARR. (5) SNL M-TSD staff prepared a M2 milestone report 'Material Transportation, Storage and Disposal Contribution for Secretarial Decision Package'. The report purpose was to comprehensively evaluate and discuss packaging, storage, and transportation for all potential nuclear and radioactive materials in the process and waste streams being considered by the GNEP program. In particular, a systems view was used to capture all packaging, storage, and transport operations needed to link the various functional aspects of the fuel cycle. (6) SRNL M-TSD staff developed a deliverable report 'Management of Decay Heat from Spent Nuclear Fuel'. This report evaluated a range of options for managing the near-term decay heat associated with Cs and Sr in spent nuclear fuel (SNF) reprocessing wastes. (7) M-TSD staff participated in a series of meetings of the US-Japan GNEP Working Group on Waste Management, developing the content for the first deliverable of the working group.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RCRA Summary Document for the David Witherspoon 1630 Site, Knoxville, Tennessee

The 48-acre David Witherspoon, Inc. (DWI) 1630 Site operated as an unregulated industrial landfill and scrap yard. The Tennessee Division of Superfund (TDSF) closed the landfill in 1974. During the period of operation, the site received solid and liquid wastes from salvage and industrial operations. The site consists of five separate tracts of land including a small portion located across the Norfolk Southern Railroad track. The landfill occupies approximately 5 acres of the site, and roughly 20 acres of the 48 acres contains surface and buried debris associated with the DWI dismantling business operation. Beginning in 1968, the state of Tennessee licensed DWI to receive scrap metal at the DWI 1630 Site, contaminated with natural uranium and enriched uranium (235U) not exceeding 0.1 percent by weight (TDSF 1990). The U.S. Department of Energy (DOE) has agreed to undertake remedial actions at the DWI 1630 Site as specified under a Consent Order with the Tennessee Department of Environment and Conservation (TDEC) (Consent Order No. 90-3443, April 4, 1991), and as further delineated by a Memorandum of Understanding (MOU) between DOE and the State of Tennessee (MOU Regarding Implementation of Consent Orders, October 6, 1994). The soil and debris removal at the DWI 1630 Site is being performed by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. Remediation consists of removing contaminated soil and debris from the DWI 1630 site except for the landfill area and repairing the landfill cap. The DWI 1630 remediation waste that is being disposed at the Environmental Management Waste Management Facility (EMWMF) as defined as waste lot (WL) 146.1 and consists primarily of soils and soil like material, incidental debris and secondary waste generated from the excavation of debris and soil from the DWI 1630 site. The WL 146.1 includes soil, soil like material (e.g., shredded or chipped vegetation, ash), discrete debris items (e.g., equipment, drums, large scrap metal, cylinders, and cable) and populations of debris type items (e.g., piles of bricks, small scrap metal, roofing material, scaffolding, and shelving) that are located throughout the DWI 1630 site. The project also generates an additional small volume of secondary waste [e.g., personal protective equipment (PPE), and miscellaneous construction waste] that is bagged and included in bulk soil shipments to the EMWMF. The Waste Acceptance Criteria (WAC) for the EMWMF does not allow for material that does not meet the Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDRs). The waste being excavated in certain areas of the DWI 1630 site contained soil that did not meet RCRA LDR criteria; therefore this waste had to be segregated for treatment or alternate disposal offsite. This document identifies the approach taken by the DWI 1630 project to further characterize the areas identified during the Phase II Remedial Investigation (RI) as potentially containing RCRA-characteristic waste. This document also describes the methodology used to determine excavation limits for areas determined to be RCRA waste, post excavation sampling, and the treatment and disposal of this material.

54 ENVIRONMENTAL SCIENCES↗

Collaborative Management for Complex Closure Teams - 19246

The closure documentation for government waste management sites requires a multidisciplinary approach to achieve success. This approach is necessary and similar to approaches utilized across remediation projects in the private and public sectors [1]. Closure documentation for government projects can range from tens of pages to upwards of thousands of pages. They normally take more than six months to put together - although, in many cases, it takes years - with multiple revisions. These documents, while all unique, share common themes with regards to communication and conflict with the other waste management projects. This paper explores the challenges in management and leadership approaches for generating technical documents, such as those found in the closure missions at government hazardous waste management sites. These matrixed teams are composed of many different members with varying expertise and experience, each with different stakeholder backgrounds. These teams experience challenges not only from using a matrixed approach - where the majority of the members are only partially engaged in the project - but also from integrating each of their respective stakeholder group's cultural individualities [2]. The Project Leads, who head up these highly matrixed projects, operate in environments comprised of virtual project teams- or more specifically in this context, intensive virtual project teams. Most of the participants are within the same city, but all of the document project teams operate with some level of organizational dispersion. Moreover, the larger a project becomes the more dispersed the team becomes. The frequent addition of sub-contracting resources by Project Leads further disperses the group and dilutes communication. The difficulties in communication derive from complications in the goal setting stages of a project and can manifest across the project team in the form of motivational issues, disengagement, quality expectations, and a loss of understanding. This puts a considerable amount of importance on a Project Lead to establish goals through the appropriate tools and methodology. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Municipal Pay-As-You-Throw (PAYT) Programs: Economic Benefits, Limitations, and Best Practices

Pay-as-you-throw (PAYT), also known as unit pricing or variable rate pricing, is a solid waste management system where customers pay for waste collection based on the volume or weight of waste they discard. By linking costs directly to waste generation, PAYT encourages customers to reduce waste through recycling, composting, and source reduction. This approach could support key waste management goals such as waste reduction, increased recycling, and controlling disposal costs. PAYT programs are flexible and can be customized to community needs. When implemented effectively, PAYT may also generate dedicated funding for waste services, enhancing program sustainability and stability.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

System Analysis Support of Consent-Based Siting Efforts - 23400

To better enable informed decision-making regarding the back end of the nuclear fuel cycle, the Integrated Waste Management (IWM) program within the U.S. Department of Energy, Office of Nuclear Energy (DOE-NE) has been sponsoring the development and application of system analysis tools capable of analyzing various system options for the management of spent nuclear fuel (SNF) and high-level radioactive waste. With these tools, integrated waste management system (IWMS) architecture analyses are being conducted to support the future deployment of a comprehensive nuclear waste management system that considers all major back-end aspects of the nuclear fuel cycle (i.e., transportation, storage, and disposal). System analyses and assessments typically use these modeling and simulation tools to investigate things like the implications of changes in various assumptions and parameters such as acceptance rates, receipt logic, facility capacities and capabilities, use of standardized canisters, and different assumed system operation start dates. Some example system analysis results have been published previously. With the passage of the consolidated appropriations acts for fiscal years 2021 and 2022, Congress provided funding and direction for the DOE to move forward with interim storage to support near-term action in managing the nation’s SNF as an important component of an IWMS. Consent-based siting is a phased, adaptive, and collaborative approach to siting facilities that focuses on the needs and concerns of people and communities. Communities participate in the siting process by working carefully through a series of phases and steps with the DOE (as the implementing organization). Each step and phase helps a community determine whether and how hosting a facility to manage SNF is aligned to the community’s goals. By its nature, a consent-based siting process must be transparent, flexible, adaptive, and responsive to community concerns. Thus, the phases and steps are intended to serve as a guide, not a prescriptive set of instructions. System analysis research analysts interface with DOE’s consent-based siting for a federal interim storage program and can perform preliminary system analyses as requested to support various aspects of the consent-based siting team’s work. This paper provides an overview of IWM program’s system analysis activities that support the ongoing consent-based siting process. The questions that decision-makers, planners, communities, and stakeholders might have during the consent-based siting process are similar to questions that have been explored by system analysts previously. Specifically, this paper discusses work that will inform consent-based siting efforts in the areas of community impacts, cost estimates, various SNF acceptance rates by potential facilities, potential consolidated interim storage facility (CISF) capacities and configurations, and the implications of a CISF on the overall waste management system. It is expected that system analysis will continue to be performed to support the consent-based siting process in the future.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Saltstone Waste Characterization Analysis - Salt Waste Processing Facility (SWPF) Waste Stream (Q4 CY2020)

The Saltstone Production and Disposal Facility is designed and permitted by the state of South Carolina Department of Health and Environmental Control (SCDHEC) to treat and dispose of low-level radioactive and hazardous liquid waste (salt solution) remaining from the processing of radioactive material at the Savannah River Site (SRS). Low-level waste (LEW) aqueous streams from the Effluent Treatment Project (ETP) and decontaminated solutions from the Tank Closure Cesium Removal Unit (TCCR) and the Salt Waste Processing Facility (SWPF) are stored in Tank 50 until the LEW can be transferred to the Saltstone Facility for treatment and disposal. In the past, decontaminated solution from the Modular Caustic Side Solvent Extraction Unit (MCU) was stored in Tank 50 until the LEW could be transferred to the Saltstone Facility for treatment and disposal. MCU is currently in a suspended operations state. LEW that meets the Waste Acceptance Criteria (WAC) can be transferred, stored, and treated in the Saltstone Production Facility (SPF) for subsequent disposal as saltstone grout in the Saltstone Disposal Facility (SDF). Sampling will be conducted as new waste streams are identified for treatment and disposal at the Saltstone Industrial Wastewater Treatment Facility (IWTF) and Z-Area Industrial Solid Waste Landfill (ISWLF), Facility ID# 025500-1603, General Condition B.9 or every six years in accordance with South Carolina (SC) Regulation 61-107.19 Parti C, “Solid Waste Management: Solid Waste Landfills and Structural Fill - General Requirements.”

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Consolidation and Centralization of Waste Operations Business Systems - 12319

This abstract provides a comprehensive plan supporting the continued development and integration of all waste operations and waste management business systems. These include existing systems such as ATMS (Automated Transportation Management System), RadCalc, RFITS (Radio Frequency Identification Transportation System) Programs as well as incorporating key components of existing government developed waste management systems and COTS (Computer Off The Shelf) applications in order to deliver a truly integrated waste tracking and management business system. Some of these existing systems to be integrated include IWTS at Idaho National Lab, WIMS at Sandia National Lab and others. The aggregation of data and consolidation into a single comprehensive business system delivers best practices in lifecycle waste management processes to be delivered across the Department of Energy facilities. This concept exists to reduce operational costs to the federal government by combining key business systems into a centralized enterprise application following the methodology that as contractors change, the tools they use to manage DOE's assets do not. IWITS is one efficient representation of a sound architecture currently supporting multiple DOE sites from a waste management solution. The integration of ATMS, RadCalc and RFITS and the concept like IWITS into a single solution for DOE contractors will result in significant savings and increased efficiencies for DOE. Building continuity and solving collective problems can only be achieved through mass collaboration, resulting in an online community that DOE contractors and subcontractors access common applications, allowing for the collection of business intelligence at an unprecedented level. This is a fundamental shift from a solely 'for profit' business model to a 'for purpose' business model. To the conventional-minded, putting values before profit is an unfamiliar and unnatural way for a contractor to operate - unless however; your objective is to build a strong, strategic alliance across the enterprise in order to execute an unprecedented change in waste management, transportation and logistical operations. The success of such an initiative can be achieved by creating a responsible framework by enabling key individuals to 'own' the sustainability of the program. This includes the strategic collaboration of responsible revolutionaries covering application developers, information owners and federal stakeholders to ensure compliance, security and risk management are 'baked' into the process and sustainability is fostered through continued innovation by both technology and application functionality. This ensures that working software can adapt to changing circumstances and is the principle measure of the success of the program. The consolidation of waste management business systems must be achieved in order to realize efficiencies in information technology portfolio management, data integrity, business intelligence and the lifecycle management of hazardous materials within the DOE enterprise architecture. By identifying best practices across the enterprise and aggregating computational and application development resources, you can provide a unified, holistic solution serviceable from a single location while being accessed from anywhere. The business impact of integrating and delivering a unified solution would reduce costs to the Department of Energy within the first year of deployment with increased savings annually. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Post Barnwell Class B/C Waste - Crisis Avoidance

The Barnwell Waste Management Facility (BWMF) is scheduled to restrict access to waste generators outside of the Atlantic Compact (SC, CT, NJ) on July 1, 2008. South Carolina, authorized under the Low-Level Waste Policy Act of 1980 and Amendments Act of 1985, and in agreement with the other Atlantic Compact states, will only accept Class A, B, and C low-level radioactive waste (LLRW) generated within compact. For many years, the BWMF has been the only LLRW disposal facility to accept Class B and C waste from LLRW generators throughout the country, except those that have access to the Northwest Compact Site. Many Class B/C waste generators consider this to be a national crisis situation requiring interim or possible permanent storage, changes in operation, significant cost impacts, and/or elimination of services, especially in the health care and non-power generation industries. With proper in-house waste management practices and utilization of commercial processor services, a national crisis can be avoided, although some generators with specific waste forms or radionuclides will remain without options. In summary: It is unknown what the future will bring for commercial LLRW disposal. Could the anticipated post Barnwell Class B/C crisis be avoided by any of the following? - Barnwell Site remains open for the nation's commercial Class B/C waste; - Richland Site opens back up to the nation for commercial Class B/C waste; - Texas Site opens up to the nation for commercial Class B/C waste; - Federal Government intervenes by keeping a commercial Class B/C site open for the nation's commercial Class B/C waste; - Federal Government makes a DOE site available for commercial Class B/C waste; - Federal Government revisits the LLRW Policy Act of 1980 and Amendments Act of 1985. Without a future LLRW site capable of accepting Class B/C currently on the horizon, commercial LLRW generators are faced with waste volume elimination, reduction, or storage. With proper in-house waste management practices, utilization of commercial processor services and regulatory relief, a national crisis can be avoided. Waste volumes for storage can be reduced to as little as 10% of the current Class B/C volume. Although a national LLRW crisis can be avoided, some generators with specific waste forms or radionuclides will have a significant financial and/or operational impact due to a lack of commercial LLRW management options. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Managing work flow and logistic at waste processing facilities using the waste compliance and tracking system - 15392

Work flow and logistics at a busy radioactive waste processing complex or permitted treatment, storage, and disposal facility (TSDF) can pose a monumental challenge. An efficient operation requires good communication between engineering, logistics, and waste operators. The Los Alamos National Laboratory (LANL) has implemented an application that facilitates seamless communication of work flow requirements, between engineering, logistics, and waste operations personnel in the field. The Waste Compliance and Tracking System (WCATS), a comprehensive waste management system designed at LANL, provides four key elements to support logistics: (a) the container work path, (b) directed unit operation requests, (c) notification of pending operations, and (d) real-time status tools for office and field workers. The combination of these elements allows everyone to function as a team, with a shared knowledge of what is needed to accomplish facility objectives. The first element is like a road map indicating which unit operations are needed and in what sequence they should be performed; this is referred to as a 'work path'. It automatically routes a waste item or container from operation to operation. For example, a given work path might indicate that waste items require radiological survey, radioassay, and a technical review, in that order. When the work path is assigned to a container, the system enforces the correct order of operations. Directed unit operation 'requests', the second element, fills a gap between pre-planned, formal 'work path' activities and the need for flexibility to direct preparatory operations or deal with unexpected issues, like staging or mining containers in preparation for a shipment or transferring containers from one storage unit to another to clear a path for building maintenance. Logistics engineers prepare these 'requests', and the system monitors the status and completion of the work. The third element, notifications, allows team members to subscribe to and receive notice that an operation is pending, initiated, or complete. This functionality supports a range of communication options, including e-mail, cell phone, pager, or application in-box messaging. Notifications allow waste operations personnel to multi-task, and remain in the loop on the status of facility-wide activities. Finally, the fourth element provides tools that communicate work path pending operations and directed requests to field workers on their mobile computer, allowing them to mine or pick containers from storage units, and leverage the capabilities of a bar-code scanner to avoid selection mistakes. Oversight and summary tools are provided, allowing logistics personnel to monitor work path and request task status, identify work-flow bottlenecks, and maximize the efficiency of waste operations. The Waste Compliance and Tracking System (WCATS) provides an innovative, comprehensive set of tools that allow large-scale radioactive waste processing facilities to manage logistics, maximize efficient use of the workforce, and create a team environment, where everyone from management to the waste handlers have an understanding of the work load and what needs to be accomplished. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Life cycle assessment of a packaging waste recycling system in Portugal

Highlights: • We modeled a real packaging waste recycling system. • The analysis was performed using the life cycle assessment methodology. • The 2010 situation was compared with scenarios where the materials were not recycled. • The “Baseline” scenario seems to be more beneficial to the environment. - Abstract: Life Cycle Assessment (LCA) has been used to assess the environmental impacts associated with an activity or product life cycle. It has also been applied to assess the environmental performance related to waste management activities. This study analyses the packaging waste management system of a local public authority in Portugal. The operations of selective and refuse collection, sorting, recycling, landfilling and incineration of packaging waste were considered. The packaging waste management system in operation in 2010, which we called “Baseline” scenario, was compared with two hypothetical scenarios where all the packaging waste that was selectively collected in 2010 would undergo the refuse collection system and would be sent directly to incineration (called “Incineration” scenario) or to landfill (“Landfill” scenario). Overall, the results show that the “Baseline” scenario is more environmentally sound than the hypothetical scenarios.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

German research and development for high level waste in light of the new site selection process - 15516

The German government decided 50 years ago, that radioactive waste is to be disposed of in Deep Geologic Repositories, preferably in a salt rock formation. Soon after, in 1967, research in the Asse salt mine was initiated. Since then substantial progress has been achieved in the development of the radioactive waste disposal programme in Germany. For a geologic repository for High Level Waste in salt a reference concept has been developed, which represented the radioactive waste management processes from transport of High Level Waste and Spent Nuclear Fuel to an interim storage site, waste conditioning and repackaging for disposal, to emplacement of the waste packages. The feasibility of the reference concept has been proven by demonstration tests for all relevant equipment: a pilot conditioning plant has been built as well as the main equipment for the entire transport chain including the shaft transport and emplacement technologies for heavy loads fulfilling strict requirements for nuclear and mining safety. Also the backfilling technology has been optimised for the purposes of a repository for radioactive waste. Finally, tests have been performed to verify thermo-mechanical models for the host rock. The demonstration tests have been performed to an extent which even would allow immediate licensing of the repository and the employed equipment. The Research and Development work was completed by further optimisation of the reference concept. Construction and operation of deep geologic repositories for low and intermediate level radioactive wastes in Germany benefited from the above mentioned but also stimulated the knowledge and experience build-up for the repositories for High Level Waste. Despite the well progressed work for a deep geologic repository in salt R and D work in Germany for already a long time also considered other host rock formations. While work for crystalline rock mainly consisted of relatively small contributions to international research projects due to the limited occurrence of suitable sites in Germany, projects and developments for repositories in clay formations have had an increasing contribution to the overall Research and Development work for radioactive waste repositories in Germany. In July 2013 a new site selection act was put into force, which set the initiating conditions for the German programme on radioactive waste management. Principally, a process was initiated to search for a site for a deep geologic repository for High Level Waste independent from earlier decisions. This means that a site shall be determined without predetermination by earlier decisions. Nevertheless, to enable a sound decision for a site selection it is necessary to be able draw back on the knowledge and experience from earlier activities. Otherwise, tedious learning processes would have to be experienced again. Since efforts to open up a site selection process again grew since the late 1990's projects had been implemented timely to capture existing knowledge. The paper at hand describes the achievements of R and D activities in Germany, the change of radioactive waste management policy and the endeavours to maintain the achievements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Safety Requirements for the Waste Storage Facilities May 2014

This document contains the Technical Safety Requirements (TSR) for the Radioactive and Hazardous Waste Management (RHWM) WASTE STORAGE FACILITIES, which include Area 625 (A625) and the Building 693 (B693) Yard Area of the Decontamination and Waste Treatment Facility (DWTF) at LLNL. The TSRs constitute requirements for safe operation of the WASTE STORAGE FACILITIES. These TSRs are derived from the Documented Safety Analyses for the Waste Storage Facilities (DSA) (LLNL 2011). The analysis presented therein concluded that the WASTE STORAGE FACILITIES are low-chemical hazard, Hazard Category 2 non-reactor nuclear facilities. The TSRs consist primarily of inventory limits and controls to preserve the underlying assumptions in the hazard and accident analyses. Further, appropriate commitments to safety programs are presented in the administrative controls sections of the TSRs. The WASTE STORAGE FACILITIES are used by RHWM to handle and store hazardous waste, TRANSURANIC (TRU) WASTE, LOW-LEVEL WASTE (LLW), mixed waste, California combined waste, nonhazardous industrial waste, and conditionally accepted waste generated at LLNL as well as small amounts of waste from other DOE facilities, as described in the DSA. In addition, several minor treatments (e.g., size reduction and decontamination) are carried out in these facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Optimized Integration of the Decontamination Plan and the Radwaste Management Plan into Decommissioning Plan to the VVR-S Research Reactor from Romania

The paper presents the progress of the Decontamination Plan and Radioactive Waste Management Plan which accompanies the Decommissioning Plan for research reactor VVR-S located in Magurele, Ilfov, near Bucharest, Romania. The new variant of the Decommissioning Plan was elaborated taking into account the IAEA recommendation concerning radioactive waste management. A new feasibility study for VVR-S decommissioning was also elaborated. The preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as rehabilitation of the existing Radioactive Waste Treatment Plant and the upgrade of the Radioactive Waste Disposal Facility at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and reusing of cleaned reactor building is envisaged. An inventory of each type of radioactive waste is presented. The proposed waste management strategy is selected in accordance with the IAEA assistance. Environmental concerns are a part of the radioactive waste management strategy. In conclusion: The current version 8 of the Draft Decommissioning Plan which include the Integrated concept of Decontamination and Decommissioning and Radwaste Management, reflects the substantial work that has been incorporated by IFIN-HH in collaboration with SITON, which has resulted in substantial improvement in document The decommissioning strategy must take into account costs for VVR-S Reactor decommissioning, as well as costs for much needed refurbishments to the radioactive waste treatment plant and the Baita-Bihor waste disposal repository. Several improvements to the Baita-Bihor repository and IFIN-HH waste treatment facility were proposed. The quantities and composition of the radioactive waste generated by VVR-S Reactor dismantling were again estimated by streams and the best demonstrated practicable processing solution was proposed. The estimated quantities of materials to be managed in the near future raise some issues that need to be solved swiftly, such as treatment of aluminum and lead and graphite management. It is envisaged that these materials to be treated to Subsidiary for Nuclear Research (SCN) Pitesti. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Generation Overview Refresher, Course 21464

This course, Waste Generation Overview Refresher (COURSE 21464), provides an overview of federal and state waste management regulations, as well as Los Alamos National Laboratory (LANL) policies and procedures for waste management operations. The course covers the activities involved in the cradle-to- grave waste management process and focuses on waste characterization, waste compatibility determinations and classification, and the storage requirements for temporary waste accumulation areas at LANL.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INL Reactor Technology Complex Out-of-Service Buried Piping Hazards

Idaho National Laboratory (INL) Reactor Technology Complex (RTC) buried piping and components are being characterized to determine if they should be managed as hazardous waste and subject to the Hazardous Waste Management Act /Resource Conservation and Recovery Act (RCRA). RTC buried piping and components involve both active piping and components from currently operating nuclear facilities, such as the Advanced Test Reactor (ATR), and inactive lines from facilities undergoing D&D activities. The issue exists as to the proper methods to analyze and control hazards associated with D&D activities on facilities collocated with existing operating nuclear facilities, or future collocated facilities being considered with the resurgent nuclear industry. During initial characterization activities, it was determined that residual radioactive material in several inactive RTC lines and components could potentially exceed hazard category (HC) 3 thresholds. In addition, concerns were raised as to how to properly isolate active nuclear facility piping and components from those inactive lines undergoing RCRA actions, and whether the operating facility safety basis could be impacted. Work was stopped, and a potential inadequacy in the safety analysis (PISA) was declared, even though no clear safety basis existed for the inactive, abandoned lines and equipment. An unreviewed safety question (USQ) and an occurrence report resulted. A HC 3 or greater Nuclear Facility/Activity for the buried piping and components was also declared in the occurrence report. A qualitative hazard assessment was developed to evaluate the potential hazards associated with characterization activities, and any potential effects on the safety basis of the collocated RTC operating nuclear facilities. The hazard assessment clearly demonstrated the low hazards associated with the activities based on form and dispersiblity of the radioactive material in the piping and components. The hazard assessment developed unique controls to isolate active RTC piping and components from inactive components, and demonstrated that existing safety management programs were adequate for protection of the worker.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗