Search NASA⌕ Search

SEARCH · Search NASA

Results for “construction technologies”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

FGD Wastewater Treatment Testing Using a Saltworks Flex EDR Selective Technology

A 61-day, on-site pilot of Saltworks Technologies Inc.’s Flex EDR Selective (electrodialysis reversal system) technology was completed at the Water Research Center (located at Georgia Power’s Plant Bowen near Cartersville, Georgia) in collaboration with the Electric Power Research Institute, Southern Company, and U. S. Department of Energy. A unique characteristic of the Flex EDR technology is its ability to selectively remove chloride from a wastewater. In this project, flue gas desulfurization (FGD) wastewater was tested. Because FGD operators often establish limits on chloride concentration levels based on FGD material of construction to initiate purge/blowdown cycles, the Flex EDR technology has the potential to enable higher scrubber water recycling. The piloted treatment technology demonstrated over a 90% recovery in a system that required a less complex pretreatment often associated with other water treatment approaches. Instead, chloride removal allows for an internal process recycle, which significantly decreases wastewater volume. The resulting products are a low chloride and cleaner water that can be either reused or potentially discharged and a concentrated calcium-chloride-rich brine that is suitable for further volume reduction or direct wastewater encapsulation.

01 COAL, LIGNITE, AND PEAT↗

Gasoline Engine and Fuels Offering Reduced Fuel Consumption and Emissions: Vehicle Modeling Final Report

The Gasoline Engine and Fuels Offering Reduced Fuel Consumption and Emissions (GEFORCE) project was proposed in response to the U.S. Department of Energy’s Funding Opportunity Announcement 0991 by a team made up of the members of the Coordinating Research Council (CRC) and the research staff at Oak Ridge National Laboratory (ORNL.) The project focused on investigating the potential benefits that might be attained through synergistic use of specific engine technology together with fuels formulated to represent potential directions that high-octane fuels of the future might progress. A stated objective in the DOE FOA was to demonstrate a 25% reduction in petroleum consumption through optimization of the engine technologies together with a suitable fuel. An advanced engine was constructed and used with a matrix of research fuels to investigate potential avenues for efficiency improvement. The engine incorporated technologies expected to become mainstream for boosted engines in the next 10 to 20 years. These included increased compression ratio, a two-stage turbocharger, and cooled external exhaust gas recirculation (EGR). The fuel matrix was designed to investigate impacts from research octane number (RON), volumetric ethanol content, and the final boiling point of the fuel. The engine calibration was optimized for each fuel individually and data collected to enable vehicle system modelling that projected energy consumption, fuel economy, tailpipe CO₂ emissions, and impact on petroleum consumption for an industry-average mid-size sedan. The engine calibration and data collection were carried out at IAV in Michigan and is the subject of a separate report. IAV provided the engine data to Oak Ridge National Laboratory to support the vehicle modelling portion of the project. The vehicle modelling results show the following trends: Ethanol content does have a consistently strong influence on the fuel economy results for all cycles and all fuels. Among the fuels of a nominal RON level, increasing ethanol content consistently lowers fuel economy, with the 30% ethanol fuels always providing the lowest fuel economy for a given RON level. However, in some cases the energy consumption improvement allows the 30% ethanol fuels to match the fuel economy of the ethanol-free fuel P. These observations underscore the importance of both engine efficiency and fuel volumetric energy content on vehicle fuel economy.; There was no consistent trend in the projected energy consumption results for differences in fuel T90 for all fuels and cycles. Fuel economy projections did show a consistent trend, with the higher T90 fuel providing slightly greater fuel economy when compared to the low T90 fuel of the same ethanol content. The observed trends were consistent with differences in the heating value of the fuels.; The 102-RON fuels provided reduced energy consumption and greater fuel economy for the advanced engine on all drive cycles. The engine compression ratio of 11.5 was higher than would typically be used in a turbocharged engine when 92-RON fuel use is expected. Hence, the engine experiences more efficiency degradation from knock avoidance when using the 92-RON fuels. This degradation causes the fuel economy results for the 92-RON fuels to be lower than those for the 102-RON fuels.; Fuels E and F (92-RON, 30% ethanol) are projected to achieve 10% or greater reduction in petroleum consumption, with fuels K (102-RON, 30% ethanol) and O (97 RON, 30% ethanol) achieving greater than a 20% reduction. Fuel L (102-RON, 30% ethanol) achieves greater than 25% reduction, meeting the petroleum reduction target of the project. All of the fuels that achieve 10% or greater reduction in petroleum consumption are 30% ethanol blends.; Increasing final boiling point increased fuel economy at fixed ethanol content when the 102-RON fuels were used. This trend is a result of differences in the volumetric energy content of the fuels and the projected energy consumption values for the fuels. In the case of the 102-RON fuels, increasing final boiling point also resulted in an increase in the energy content of the fuel. There was not a consistent trend between the energy content and final boiling point for the 92-RON fuels at fixed ethanol content.

33 ADVANCED PROPULSION SYSTEMS↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

New portable instrument for the measurement of thermal conductivity in gas process conditions

The development of high temperature gas sensors for the monitoring and determination of thermophysical properties of complex process mixtures at high temperatures faces several problems, related with the materials compatibility, active sensing parts sensitivity, and lifetime. Ceramic/thin metal films based sensors, previously developed for the determination of thermal conductivity of molten materials up to 1200 °C, were redesigned, constructed, and applied for thermal conductivity measuring sensors. Platinum resistance thermometers were also developed using the same technology, to be used in the temperature measurement, which were also constructed and tested. A new data acquisition system for the thermal conductivity sensors, based on a linearization of the transient hot-strip model, including a portable electronic bridge for the measurement of the thermal conductivity in gas process conditions was also developed. The equipment is capable of measuring the thermal conductivity of gaseous phases with an accuracy of 2%-5% up to 840 °C (95% confidence level). The development of sensors up to 1200 °C, present at the core of the combustion chambers, will be done in a near future.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A path to in-space welding and to other in-space metal processing technologies using Space Shuttle small payloads

As we venture into space, it becomes necessary to assemble, expand, and repair space-based structures for our housing, research, and manufacturing. The zero gravity-vacuum of space challenges us to employ construction options which are commonplace on Earth. Rockwell International (RI) has begun to undertake the challenge of space-based construction via numerous options, of which one is welding. As of today, RI divisions have developed appropriate resources and technologies to bring space-based welding within our grasp. Further work, specifically in the area of developing space experiments to test RI technology, is required. RI Space Welding Project's achievements to date, from research and development (R&E) efforts in the areas of microgravity, vacuum, intra- / extra- vehicular activity and spinoff technologies, are reviewed. Special emphasis is given to results for G-169's (Get Away Special) microgravity flights aboard a NASA KC-135. Based on these achievements, a path to actual development of a space welding system is proposed with options to explore spinoff in-space metal processing technologies. This path is constructed by following a series of milestone experiments, of which several are to utilize NASA's Shuttle Small Payload Programs. Conceptual designs of the proposed shuttle payload experiments are discussed with application of lessons learned from G-169's design, development, integration, testing, safety approval process, and KC-135 flights.

Tamir, David↗

Scout: An Impact Analysis Tool for Building Energy-Efficiency Technologies

Evaluating the national impacts of candidate U.S. building energy-efficiency technologies has historically been difficult for organizations with large energy efficiency portfolios. In particular, normalizing results from technology-specific impact studies is time-consuming when those studies do not use comparable assumptions about the underlying building stock. To equitably evaluate its technology research, development, and deployment portfolio, the U.S. Department of Energy's Building Technologies Office has developed Scout, a software tool that quantitatively assesses the energy and CO2 impacts of building energy-efficiency measures on the national building stock. Scout efficiency measures improve upon the unit performance and/or lifetime operational costs of an equipment stock baseline that is determined from the U.S. Energy Information Administration Annual Energy Outlook (AEO). Scout measures are characterized by a market entry and exit year, unit performance level, cost, and lifetime. To evaluate measures on a consistent basis, Scout uses EnergyPlus simulation on prototype building models to translate measure performance specifications to whole-building energy savings; these savings impacts are then extended to a national scale using floor area weighting factors. Scout represents evolution in the building stock over time using AEO projections for new construction, retrofit, and equipment replacements, and competes technologies within market segments under multiple adoption scenarios. Scout and its efficiency measures are open-source, as is the EnergyPlus whole building simulation framework that is used to evaluate measure performance. The program is currently under active development and will be formally released once an initial set of measures has been analyzed and reviewed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Develop and test fuel cell powered on site integrated total energy sysems: Phase 3: Full-scale power plant development

A 25-cell stack of the 13 inch x 23 inch cell size (about 4kW) remains on test after 8300 hours, using simulated reformate fuel. A similar stack was previously shut down after 7000 hours on load. These tests have been carried out for the purpose of assessing the durability of fuel cell stack components developed through the end of 1983. A 25kW stack containing 175 cells of the same size and utilizing a technology base representative of the 25-cell stacks has been constructed and is undergoing initial testing. A third 4kW stack is being prepared, and this stack will incorporate several new technology features.

Kaufman, A.↗

Assessment and Management of the Risks of Debris Hits During Space Station EVAs

The risk of EVAs is critical to the decision of whether or not to automate a large part of the construction of the International Space Station (ISS). Furthermore, the choice of the technologies of the space suit and the life support system will determine (1) the immediate safety of these operations, and (2) the long-run costs and risks of human presence in space, not only in lower orbit (as is the case of the ISS) but also perhaps, outside these orbits, or on the surface of other planets. The problem is therefore both an immediate one and a long-term one. The fundamental question is how and when to shift from the existing EMU system (suit, helmet, gloves and life support system) to another type (e.g. a hard suit), given the potential trade-offs among life-cycle costs, risks to the astronauts, performance of tasks, and uncertainties about new systems' safety inherent to such a shift in technology. A more immediate issue is how to manage the risks of EVAs during the construction and operation of the ISS in order to make the astronauts (in the words of the NASA Administrator) "as safe outside as inside". For the moment (June 1997), the plan is to construct the Space Station using the low-pressure space suits that have been developed for the space shuttle. In the following, we will refer to this suit assembly as EMU (External Maneuvering Unit). It is the product of a long evolution, starting from the U.S. Air Force pilot suits through the various versions and changes that occurred for the purpose of NASA space exploration, in particular during the Gemini and the Apollo programs. The Shuttle EMU is composed of both soft fabrics and hard plates. As an alternative to the shuttle suit, at least two hard suits were developed by NASA: the AX5 and the MRKIII. The problem of producing hard suits for space exploration is very similar to that of producing deep-sea diving suits. There was thus an opportunity to develop a suit that could be manufactured for both purposes with the economies of scale that could be gained from a two-branch manufacturing line (space and deep sea). Of course, the space suit would need to be space qualified. Some of the problems in adopting one of the hard suits were first that the testing had to be completed, and second that it required additional storage space. The decision was made not to develop a hard suit in time for the construction and operation of the ISS. Instead, to improve the safety of the current suit, it was decided to reinforce the soft parts of the shuttle EMU with KEVLAR linings to strengthen it against debris impacts. Test results, however, show that this advanced suit design has little effect on the penetration characteristics.

Pate-Cornell, Elisabeth↗

Workshop on Using In Situ Resources for Construction of Planetary Outposts

The workshop examined the potential uses of indigenous materials on the Moon and Mars, other than those associated with the production of propellants for space transportation. The papers presented concerned the needs for construction, based on analysis of the current NASA Mars reference Mission and past studies studies of lunar outposts; the availability of materials on the Moon and Mars; construction techniques that make use of the natural environment; materials production and fabrication techniques based on indigenous materials; and new technologies that could promote the use of indigenous materials in construction.

M. B. Duke↗

The SIRAD irradiation facility at LNL

SIRAD is the irradiation facility at the Tandem XTU accelerator of the INFN National Laboratory of Legnaro (Padova, Italy) dedicated to study radiation effects, both comulative and Single Event, on silicon detectors and microelectronic devices and systems. SIRAD is routinely used by various research groups involved in the development of semiconductor detectors and electronics to be used in radiation hostile environments as experiments at high-energy/high luminosity accelerators or in space, or interested to study the basic radiation damage mechanisms. Single Events Effects (SEE) studies with micrometric resolution can be performed at SIRAD thanks to an Ion Electron Emission Microscope (IEEM) inserted at the end of the beam line. Here we describe the SIRAD facility including the available and future beam characteristics, and the IEEM performances as well as the scientific and technological solutions which have been implemented for its construction.

43 PARTICLE ACCELERATORS↗

Hydrogen Production Roadmap: Technology Pathways to the Future (January 2009)

This Hydrogen Production roadmap was constructed by the Hydrogen Production Technical Team (HPTT) of the FreedomCAR and Fuel Partnership to identify the key challenges and priority research and development (R&D) needs associated with various hydrogen fuel production technologies. The partnership is a collaborative effort by industry’s U.S. Council for Automotive Research (USCAR), energy companies, and the U.S. Department of Energy (DOE) to advance some of the most promising hydrogen fuel production technologies. The aim of the roadmap is to identify research pathways leading to hydrogen production technologies that produce near-zero net greenhouse gas (GHG) emissions1 and use renewable energy sources, nuclear energy, and coal (with carbon capture and storage).

08 HYDROGEN↗

Étude et simulation de la lumière de scintillation produite et se propageant dans une chambre à dérive double-phase à argon liquide, dans le contexte du projet DUNE

DUNE is a future long-baseline neutrino experiment designed to determine, among others, the neutrino mass hierarchy and to measure the CP violation phase that enters the neutrino oscillation process. This project is based on a 1300 km long high intensity neutrino beam and a massive detector containing more than 40 kilotons of liquid argon using the liquid argon time projection chamber technology (LArTPC). Two approaches of this technology are currently under development, leading to the construction of two prototypes to be in place at the end of 2018 at CERN. The work of this thesis is part of the ProtoDUNE-DP project, which aims at probing the capabilities of the so-called “dual-phase” technology, that uses both gaseous and liquid argon, for a large-scale detector. Two kind of signals, a charge signal and a scintillation light signal, are expected in a LArTPC. The light signal can be used as a trigger, for the identification and rejection of the cosmic background, and for precise calorimetric measurements. Prior simulations of this signal are needed in order to improve our understanding of the scintillation light signal and to develop the identification algorithms. This work addresses the development of this simulation and the study of the scintillation photon behavior in the liquid argon detector. The different scintillation light production mechanisms, the developed simulation and the different studies on the light propagation in ProtoDUNE-DP are presented. These simulations have also been compared with light data taken at CERN in 2017 with a first demonstrator, in order to validate and tune the simulation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

LLE 2007 Annual Report, October 2006 - September 2007

The laser-fusion research program at the University of Rochester’s Laboratory for Laser Energetics (LLE) is focused on the National Nuclear Security Administration’s (NNSA’s) Campaign-10 inertial confinement fusion (ICF) ignition and experimental support technology, operation of facilities (OMEGA), and the construction of OMEGA EP -- a high energy petawatt laser system. While LLE is the lead laboratory for research into the direct-drive approach to ICF ignition, it also takes a lead role in certain indirect-drive tasks within the National Ignition Campaign. During this past year progress in the laser-fusion research program was made in three principal areas: OMEGA direct drive and indirect-drive experiments and targets; development of diagnostics for experiments on OMEGA, OMEGA EP, and the National Ignition Facility (NIF); and theoretical analysis and design efforts aimed at improving direct-drive-ignition capsule designs and advanced ignition concepts such as fast ignition and shock ignition.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Citizen Explorer: An Earth Observer With New Small Satellite Technology - 1

Citizen Explorer-I (CX-I), designed and built by students at Colorado Space Grant Consortium in Boulder to provide global ozone monitoring, employs a unique mission architecture and several innovative technologies during its mission. The mission design allows K-12 schools around the world to be involved as ground stations available to receive science data and telemetry from CX-I. Another important technology allows the spacecraft to be less reliant on ground operators. Spacecraft Command Language (SCL) allows mission designers to set constraints on the satellite operations. The satellite then automatically adheres to the constraints when the satellite is out of contact with Mission Operations. In addition to SCL, a low level of artificial intelligence will be supplied to the spacecraft through the use of the Automated Scheduling and Planning ENvironment (ASPEN). ASPEN is used to maintain a spacecraft schedule in order to achieve the objectives a mission operator would normally have to complete. Within the communications system of CX-I, internet of CX-I, internet protocols are the main method for communicating with the satellite. As internet protocols have not been widely used in satellite communication, CX-I provides an opportunity to study the effectiveness of using internet protocols over radio links. The Attitude Determination and Control System (ADCS) on CX-I uses a gravity gradient boom as a means of orienting the satellite's science instruments toward nadir. The boom design is unique because it is constructed of tape measure material. These new technologies' effectiveness will be tested for use on future small satellite projects within the space satellite industry.

Allen, Zachary↗

Space and energy conservation housing prototype unit development

Construction plans are discussed for a house which will demonstrate the application of advanced technology to minimize energy requirements and to help direct further development in home construction by defining the interaction of integrated energy and water systems with building configuration and construction materials. Housing unit designs are provided and procedures for the analysis of a variety of housing strategies are developed.

Sunshine, D. R.↗

Repository planning for spent nuclear fuel and high-level radioactive waste: insights from U.S.. and international programs - 15638

For decades, the United States and other nations with nuclear programs have been planning for permanent disposition of spent nuclear fuel and high-level waste, to address the increasingly difficult problem of storing these materials for the long term. These plans are complicated by issues ranging from technological factors to regulatory approaches and public concerns about health and environmental protection. In its 2012 report, the Blue Ribbon Commission (BRC) on America's Nuclear Future identified a number of recommendations for creating a safe, long-term solution to the nation's problem of managing and disposing of its spent fuel and high-level radioactive waste. These include a recommendation that the U.S. Environmental Protection Agency (EPA) revise its standards for a high-level waste repository. The EPA is currently reviewing and synthesizing literature relevant to such standards, including: (1) existing national and international standards and guidelines for repositories; and (2) benefits and barriers to such standards, including limitations related to current technologies, as well as siting, licensing, and construction processes. This paper highlights findings of this literature review and synthesis. More than 90 countries, from Albania to Vietnam and Yemen, were identified as potential sources of relevant information based on existing nuclear programs or consideration of such programs to address future energy needs. Pursuant to the BRC recommendations, the U.S. Department of Energy (DOE) has compiled extensive information resources relevant to spent fuel and radioactive waste repositories in the Centralized Used Fuel Resource and Information Exchange (CURIE) database developed by Oak Ridge National Laboratory. Further valuable sources of information include annual proceedings of recent Waste Management Symposia, which provide insights into recent trends and progress across various national and international programs. Recent literature from a number of countries, including the United States and Canada, and the United Kingdom, Finland, Sweden, France, Germany, and other countries in Western Europe, as well as other regions including Australia, indicates that consent-based siting has emerged as a dominant theme. In addition to effective siting processes, key program needs identified in the literature include regulatory standards and performance context, as well as reliable technologies and engineered systems, such as for deep drilling and assured safe containment of these radioactive materials extending into the very long term. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Controlling and monitoring the space-station plasma interaction: A baseline for performing plasma experiments and using advanced technology

The size, complexity, and motion of space station through the Earth's environmental plasma means that there will be a large, complicated interaction region, involving a sheath, wake, charging of surfaces, induced electric fields, secondary emission, outgassing with ionization, etc. This interaction will necessarily be a factor in carrying out and interpreting plasma experiments and in the use of certain technologies. Attention should be given ahead of time to: (1) monitoring this interaction so that it is well described; (2) implifying the interaction by appropriate design and construction of the spacecraft and by appropriate planning of technology use; and (3) controlling the interaction by both active and passive means. Plasma emitters for modifying and controlling the spacecraft charge should be placed in several locations. Portable electrostatic shields could be deployed around noisy sections of the spacecraft in order to carry out sensitive experiments. A particle umbrella could be raised to deflect the ram ions and neutrals in order to provide a controlled environment. These interactions are briefly discussed.

Whipple, Elden C.↗

250 kWth Pilot Testing in Support of a 10 MWe Coal-Direct Chemical Looping Demonstration Feasibility Study

The Coal-Direct Chemical Looping (CDCL) process is emerging as a promising technology capable of high efficiency for producing electricity with low cost for carbon capture. In the CDCL process, coal is fully combusted to form carbon dioxide (CO2) and water via reaction with Fe2O3-based oxygen-carrier particles in a moving-bed reducer reactor. During reaction with coal, the Fe2O3 is reduced to form a mixture of Fe and FeO. The reduced particles are then transported to the combustor reactor where they are re-oxidized with air. The oxidation of the Fe and FeO mixture generates heat that can be used to produce steam for power generation. Once the particles are fully regenerated, they are pneumatically recycled to the reducer reactor where another reduction-oxidation (Redox) cycle begins. The Babcock & Wilcox Company (B&W) and The Ohio State University (OSU) have been developing the CDCL technology based on iron-based metal oxide particles circulating in a moving-bed reducer coupled with an entrained-flow combustor. As part of a Phase I effort of a DOE-sponsored project, B&W identified scale-up technology gaps for the coal-direct chemical looping reactor process, most of which fall under the moving-bed reactor design and operation. However, after the Phase I research, B&W concluded that the CDCL technology has the potential of generating electricity while meeting the DOE goals of greater than 90% CO2 capture and less than 35% increase in levelized cost of electricity (LCOE). B&W then moved to a Phase II project to design, build and demonstrate the CDCL technology at a 250 kWth capacity. B&W finished the construction and commissioning of the pilot test facility in 2017. The approach used to design a 250 kWth pilot-scale CDCL facility to investigate the technology gaps is presented. Important lessons from the commissioning activities that would transfer to commercial plant start-up are also shared. The findings from the test program are being incorporated into a Pre-FEED study for a 10 MWe large pilot demonstration. Under a separately-funded heat integration project, B&W and OSU are developing a multiphase computational fluid dynamic model (MFIX) of the combustor to quantify heat transfer to embedded steam generation surface, utilizing pinch analysis (ASPEN Energy Analyzer) to identify potential improvements of the heat integration scheme, and developing an integrated dynamic model (ProTRAX) of the steam turbine coupled with the chemical looping process to identify potential start-up and transient operation issues. Under an advanced control system for optimizing operation, B&W is supporting OSU to install a rules-based optimizer (B&W’s FocalPoint) on their 25 kWt bench-scale facility on the OSU West Campus. Finally, B&W and OSU were recently selected to perform a Phase I Feasibility study to evaluate installation of the 10 MWe pilot at the Dover Power & Light Municipal Power Plant in Dover, Ohio. The feasibility study includes compiling an Environmental Information Volume and generating a cost estimate for the design, construction and commissioning of the plant as well as lining up commitments from potential project participants and funding contributors. Updates on each project will be presented. The status of the technology development will be discussed. We focus on the progress made to date towards closing the technology gaps under each project.

20 FOSSIL-FUELED POWER PLANTS↗