Life cycle Management of 324 Project High-Activity, Mixed/Low-Level Radioactive Waste - 20506

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) manages the 324 Building and is preparing to remotely excavate and disposition the radioactive soil beneath the building to allow further deactivation of the building. The 324 Building is a non-reactor Category 2 Nuclear Facility located in the 300 Area of the Hanford Site. Records indicate that in October 1986, approximately 516 liters of a concentrated liquid waste stream containing cesium-137 ({sup 137}Cs) and strontium-90 ({sup 90}Sr) spilled onto the floor of a hot cell, B-Cell, in the 324 Building. The spill contained an estimated 1.3 million curies (Ci) of radioactivity. A breach in the sump of B-Cell was discovered in November 2009 during characterization of the soil under the building. Exposure rates in excess of 10,000 R/hr were detected through a system of access pipes installed under the hot cell, and an estimated 1.557 E+05 Ci of {sup 137}Cs and 6.842 E+04 Ci of {sup 90}Sr are in the soil beneath B-Cell. The magnitude of the soil contamination below B-Cell represents one of the most challenging remediation activities in the DOE complex. The objective of CHPRC's 324 Project is to remotely excavate and disposition the highly contaminated soil under the hot cell so building deactivation and stabilization activities can resume. Depending on the volume and radioactivity of contaminated soil under B-Cell, the material will be dispositioned either at the Hanford Site's Environmental Restoration Disposal Facility (ERDF) or in grout monoliths that will be created in the hot cells (A, C and D) next to B-Cell during future building demolition activities. The current project scope includes installing structural supports under the walls of B-Cell and using remotely operated equipment to remove debris from the hot cell, remove debris mixed with grout on the floor, saw through and remove the cell floor and liner, and excavate contaminated soil under B-Cell to a depth of up to 3.66 meters (12 feet). Addition or removal of debris in A-Cell may be required to support B-Cell cleanout and excavation activities. The base approach is to disposition debris and soil bins in the Radiochemical Engineering Cell (REC) monoliths, and subsequently disposition the monoliths during building demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization Challenges for Nanomaterials

Nanostructured materials are increasingly subject to nearly every type of chemical and physical analysis possible. Because of their small feature size there is a significant focus on tools with high spatial resolution. Because of their high surface area, it is also natural to characterize nanomaterials using tools designed to analyze surfaces. Regardless of the approach, nanostructured materials present a variety of obstacles to adequate, useful and needed analysis. This paper provides short overviews to some of the issues and complications including: particle stability, environmental effects, specimen handling, surface coating, contamination and time. Some specific examples are provided from a our work focused on ceria nanoparticles and iron metal-core/oxide-shell nanoparticles in which we use a combination of tools for routine analysis including XPS, TEM, and XRD and apply other methods as needed to obtain essential information.

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Preliminary Logistics Modeling of the Integrated Wash Aid Treatment Emergency Reuse System - 19495

We employed Analysis of Mobility Platform (AMP) and GoldSim software to model the logistics of deploying materials to implement the Integrated Wash Aid Treatment Emergency Reuse System (IWATERS) in a hypothetical cesium-contamination scenario covering a four-block strip of downtown Chicago, IL. In this deployment of IWATERS, buildings were washed down via fire-hosing and contaminated wash solution was collected in the city's waste/stormwater collection system. The contaminated wash water was treated to remove Cs via ad hoc sand/clay filtration beds, and the treated wash solution was recycled during continuing decontamination operations. A detailed task timeline for the IWATERS deployment and information (or assumptions) on the availability and location of required resources for operations provided input parameters, as well as a framework, to enable the AMP and GoldSim simulations. From the decision to deploy IWATERS to the end of operations, including the completion of processing all contaminated wash water, took 49 days with decontamination teams active for 35 days and treatment bed teams active for 37 days. The modeling results showed the availability of vermiculite clay (based on data supplied by its commercial vendors/distributors) as the limiting factor for deploying treatment bed teams and, consequentially, the recycling rate of wash water and the timeline for decontamination operations. These simulations represent the first attempt at understanding the material and personnel requirements for large-scale IWATERS operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Certifying the Performance of Fixative Technologies under Open Air Demolition Activities for D and D - 20096

Department of Energy (DOE) facilities undergoing deactivation and decommissioning (D and D) activities struggle with safety concerns of residual radioactive contamination leftover after gross decontamination efforts have concluded. The positive effects of implementing fixative technologies for decommissioning and maintenance is known across the DOE complex. However, there is no standardized metric in place that quantifies the performance of these technologies such as incombustible fixative platforms that immobilize the contamination in a solid polymer material under normal operating conditions or when exposed to stressors. The primary focus of this research is to provide the empirical data necessary to properly characterize the effects of implementing fixative technologies on mitigating the release of contamination. In addition, this effort has been used to identify and establish uniform testing protocols to quantify operational parameters of fixating platforms and properly credit such systems under a variety of operational conditions and stressors that can arise during open air demolition efforts (e.g. impact, water, thermal, etc.). The established protocols will be provided to the ASTM International E10.03 Subcommittee on Radiological Protection for Decontamination and Decommissioning of Nuclear Facilities and Components for the potential of formal standardization. Attributes to be addressed during testing are material compromise from impact stress, thermal stress for incombustible fixative materials, and immobilization factors (how well an immobilizing platform is capable of retaining fixated material during thermal and impact stressors). In developing these test methods, a greater understanding of the material's behavior under anticipated and unanticipated events, such as decommissioning activities and contingency events as outlined in the Basis of Interim Operations (BIO), can be successfully characterized. There are several key components of the experimental methodology that is essential in empirically certifying fixative technologies. A surrogate contaminant with a unique signature has been utilized with the implementation of a uniform contamination process of test coupons that is quantifiable and replicable for direct fixative comparisons. A modular test chamber has also been used to apply the various stressors of interest. Collection of released contamination that includes airborne and resettled contaminant particles and analyzed using mass spectrometry. This research directly supports DOE complex-wide concerns in terms of final disposition of nuclear facilities and the considerations made during their time between ceasing facility operation and final disposition. The results of this effort aims to provide a standardized road map and logical decision flow to better facilitate fixative technologies into D and D activities required to achieve the desired facility end state. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Aging of Concrete for the Evaluation of Repair Materials to Protect the Walls of the HCAEX Tunnel at Savannah River - 20301

H-Canyon, located in the Savannah River site, is a unique facility for chemical reprocessing of plutonium, highly-enriched uranium, and other radioactive materials. The exhaust gases of the H-Canyon are sent through the H-Canyon Exhaust (HCAEX) tunnel for contamination removal. Robotic inspections of the tunnel revealed significant degradation of the reinforced concrete structure that was associated with acid attack, and could compromise the structural stability of the tunnel. Thus, the identification and evaluation of potential repair materials that could be applied on the degraded walls to mitigate and prevent further degradation is of significant interest to the Department of Energy and the Savannah River representatives. This research effort has been divided into two phases: 1) Development and evaluation of aged concrete under accelerated aging conditions (which is the focus of this paper) and 2) Evaluation of potential repair materials applied on aged and non-aged concrete under simulated aggressive conditions. In order to develop and evaluate concrete samples exposed to accelerated aging conditions in simulated aggressive environments, a literature review of the HCAEX tunnel was conducted that included 1) characterization and extent of the concrete damage, 2) environmental conditions inside the tunnel and 3) primary deterioration mechanisms. In addition, potential coatings and/or repair materials for degraded concrete surfaces exposed to aggressive environments (primarily acidic) were selected from the literature review and the most common testing and measurements for evaluating acid attack phenomena, erosion, etc. were reviewed. From the literature review findings, a preliminary bench-scale test plan for the concrete aging was developed, including accelerated aging tests with aggressive conditions (acid fumes, humidity, etc.). Concrete samples were exposed to the aging accelerated conditions (e.g. immersion in acid solutions) and visual inspection, mass loss and pH change (acid solution) were recorded over time. Correlations between the visual inspection, mass loss and pH changes results and the aging time or the aging conditions were developed. Specimens submitted to the highest acid concentration showed the fastest and most intense degradation. The type of coarse aggregate (limestone) used for the concrete seemed to be the cause of the fastest aging observed, compared to the cement paste. The research findings created the foundation for the ongoing investigation, in which new concrete samples with a mix design similar to the HCAEX tunnel will be tested and will serve as the substrate for testing the selected coatings and /or repair materials. In this paper, the literature review and preliminary results from the aging tests are provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of FREMES to Characterize and Sort Soil During Site Remediation - 20182

During decommissioning of buildings and the related release of nuclear sites, large amounts of bulk materials such as soil must be measured for clearance. These measurements are required to demonstrate that for example potentially contaminated soil is below the respective radiological limits. Doing so also helps to minimize the amount of bulk material which has to be disposed of as nuclear waste. NUKEM Technologies Engineering Services GmbH (NUKEM) applies their FREMES technology in a project at the former fuel element factory of FBFC International at Dessel, Belgium. The purpose is to measure and check for potential contamination within the excavated soil. The project started in 2017 with design and procurement of the necessary equipment. In October 2017 the FREMES system was installed at the site. After installation and an extensive test program the FREMES facility went fully into operation in July 2018. Original foreseen to measure between 4.000 and 8.000 tons of material, it has currently (mid 2019) measured 23.600 tons. It is expected that another 5.000 tons still have to be measured before the project successfully ends. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing 5,000 Properties to Determine which Require Radiological Remediation - 19152

The Port Hope Area Initiative (PHAI) is a federal environmental clean-up program. Its mandate is the remediation and local, long-term, safe management of approximately 1.7 million cubic metres of historic low-level radioactive waste (hLLRW) in the adjacent communities of Port Hope and Port Granby in Southern Ontario, Canada. The PHAI is being undertaken by Canadian Nuclear Laboratories (CNL), on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. It is currently one of the largest environmental remediation projects in Canada. Conducting work safely, while delivering the PHAI on time and within budget, is CNL's number one priority. The PHAI is being carried out as two projects - the Port Hope Project and the Port Granby Project. The Port Hope Project is the larger of the two and includes the cleanup of approximately 1.7 million cubic metres of hLLRW from various locations within the community. The Port Hope Project includes a unique and important component - the Property Radiological Survey. This survey involves the interior and exterior investigation of approximately 4,800 small-scale sites (SSS) - primarily residential - in the Municipality of Port Hope for the presence or absence of hLLRW. This paper provides an overview of the characterization, delineation and design for remediation of historic LLRW for the SSS, a grouping of sites within the municipality comprised of residential properties, municipal properties including municipal road allowances, private road allowances and temporary storage sites. Comprising over 4,800 parcels of land, a robust remedial process was designed to identify, characterize, delineate and remediate interior and exterior hLLRW contamination found in soils and building materials. The process adheres to the framework of the Port Hope Project Waste Nuclear Substance Licence (License) and its associated governance frameworks and regulatory requirements [1]. The overall goal is for CNL to be able to issue the owner of each parcel of land a Compliance Letter stating that the site meets the PHAI Clean-up Criteria, either after completion of characterization (if no hLLRW is identified) or after completion of remediation and verification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overcoming Technical Challenges During Demolition of the West Valley Vitrification Facility - 19387

In February 2019, CH2M Hill BWXT West Valley, LLC will complete demolition and waste disposal of the first vitrification facility in the history of the United States. This project marked the largest and most complex radiological demolition project undertaken at the U.S. Department of Energy-led West Valley Demonstration Project (WVDP) to date. Provisions put in place during demolition monitored for and mitigated contamination migration during demolition. The work was carried out in a well-planned manner to address specific areas where higher levels of radiological activity were known to exist and where difficult and oversized equipment removal or sensitive items required special handling. Inaccessible contamination on ceiling mounted equipment, controlled removal of two massive steel shield doors, intact removal of lead glass shield windows and a confined demolition boundary area were some of the limiting factors that required special consideration during demolition. This paper contains a discussion of planning and implementation of special handling techniques utilized during some of the more difficult evolutions encountered during open-air demolition of the Vitrification Facility. The work techniques, provisions to mitigate inclement weather and lessons learned have been incorporated into the planning for follow-on radiological demolition work at the WVDP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contribution of climate and land cover changes to reduction in soil erosion rates within small cultivated catchments in the eastern part of the Russian Plain during the last 60 years

Highlights: • The soil erosion has decreased at least 2–3 times over the last 30 years at the RP. • The increase in winter air temperature is the key reason for the soil loss reduction. • The crop rotation changes is the factor of erosion rate reduction at the forest zone. The eastern part of the Russian Plain is an important agricultural region of European Russia with high proportion of cultivated lands in the steppe, forest-steppe and forest (southern part) landscape zones. Soil erosion is the main process of land degradation and surface water contamination there. Climate and land cover changes have been observed in this region during the last 30 years. However, field quantitative assessments of soil erosion rates are not available for the eastern part of European Russia due to the lack of monitoring data as well as the evaluation of erosion/deposition processes in cultivated catchments using other field methods. Three representative small cultivated catchments with high (> 80%) proportion of cultivated lands were selected in the forest (southern part), forest-steppe and steppe zones of the study region to evaluate sedimentation rates in dry valley bottoms of the catchments for two-time intervals (1963–1986 and 1987–2016) based on the application of the bomb-derived and Chernobyl-derived {sup 137}Cs isotope for sediment dating. The 3–4 depth {sup 137}Cs profiles were used to assess the sedimentation rates within the each investigated catchment. It was established that the sedimentation rates have considerably decreased (at least 2–3 times) over the last 30 years compared to 1963–1986 in all the investigated catchments. This is in agreement with results of erosion rate calculations using erosion models for the forest zone, however not consistent with erosion rates assessments for the forest-steppe and steppe zones. According to the model calculations, erosion rates show a slight decrease in the forest-steppe zone and increase in the steppe zone. The reduction in surface runoff during snowmelt period is one of the reasons for decrease in erosion rates within cultivated slopes for all the investigated catchments. The increase in proportion of perennial grasses in the regional crop rotation is another important reason for the decrease in erosion rates for the catchment located in the south of the forest zone. The importance of land cover changes in a major decrease of soil losses from the cultivated fields of the investigated catchments located in the forest-steppe and steppe zones cannot be identified due to the lack detailed information about crop rotation for those particular sites. However, available regional information about crop rotation changes for the two-time intervals (1960–1980 and 1996–2012) do not explain very high reduction in sedimentation rates in the dry valley bottoms after 1986.

54 ENVIRONMENTAL SCIENCES↗

Application of the PHDS Germanium Gamma-ray Imager (GeGI) in Facility Decontamination Assessment - 19471

As part of a site wide investigation, U.S. EPA Region 5 had to assess the nature and extent of contamination in a former radioactive source manufacturing facility. This work involved verification of the radioisotope expected, ensuring no other radioisotopes were present, and quantification of the activity and areal extent of contamination throughout the facility. The device used to support this assessment work was the Germanium Gamma-ray Imager (GeGI) manufactured by PHDS Co. of Knoxville, Tennessee. GeGI is a germanium-semiconductor imaging detector system that provides identification, location, and quantification of radioactive materials within its field of view. GeGI provides the highest fidelity radiological assay information including the best gamma-ray energy resolution and spatial localization of any existing technology, including gamma-ray energy resolution of ∼0.3% full-width half-max (FWHM) at 662 keV and angular location resolution ∼ +/-1 degree. The GeGI is a mechanically cooled, portable system well-suited to field operations. PHDS Co. also provided on-site support during assessment operations and performed subsequent data analysis. Gamma-ray spectral data and associated images were collected with GeGI in six primary areas of the facility having significant residual contamination. A total of 61 gamma-ray spectrum/image sets were collected over the course of three working days (22 Compton images and 39 Pinhole/Compton images). During data collection, Compton imaging was used as the means by which to identify and prioritize hotspots. After contaminated regions were identified via Compton imaging, short-distance Pinhole spectrum/image sets were collected for additional analysis. All of the spectrum/image sets were analyzed to determine the radioisotope distribution within the GeGI field of view, as well as to provide an estimate of the activity associated with each hotspot. It was determined that the nature of residual contamination present was distributed across specific areas of elevated activity, where in some areas there was significant accumulation of contaminated material. It was also determined that no discrete sources of high-activity were present, as would be expected in the case of radioactive material product intended for sealed source manufacture. Results included the activity of residual contamination for each of the areas assessed, and an estimate of the physical area over which that contamination was distributed. It was anticipated by EPA that if decontamination were to be performed that it would involve some type of concrete scabbling or other means of physical removal of contaminated material. The GeGI data could be used to estimate the areal extent (square footage) of concrete removal that would be required for decontamination. Using the activity estimate data from the GeGI along with an estimated depth of concrete removal, planning could be performed for decontamination work (equipment and personnel), waste collection, packaging, transportation, and disposal, along with an associated cost estimate. With regard to health and safety, use of the GeGI reduced the radiation dose to the EPA R5 staff performing the assessment work. The GeGI is a non-destructive device that supports assessment of radioactively contaminated areas and sources from a distance, reducing the need for close contact to radiation, and the time necessary for personnel to operate near such hazards. Use of the GeGI in this facility assessment was our first attempt to apply this technology in what proved to be a quick and efficient decontamination assessment method. The GeGI can assess the nature and extent of residual contamination in a facility, first by quickly identifying the areas of elevated activity, followed by refined measurement and assessment of those elevated areas. The GeGI data can then be used to develop planning and a cost estimate of required decontamination and waste management activities. Since it's a non-destructive gamma identification and imaging device, it can reduce the distance of workers from radioactive sources and the dose incurred from assessment work. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigation and Recovery Following the Drum Event at INL's ARP-V Facility - 19517

Contractors working under the Department of Energy's (DoE's) Idaho Field Office have been exhuming and processing buried legacy waste from early weapons development and productions operations since 1984. Since operations began, nearly 400,000 drums have passed through this process. On April 11, 2018, repackaged drums were staged in an airlock (radiological buffer area) awaiting transfer to another facility for characterization. Late in the evening after operations had ended, four of the drums over pressurized causing an energetic displacement of their lids. A significant fraction of drum contents was ejected and dispersed throughout the airlock. The event activated the fire detection system in the facility initiating an emergency response from the site fire department, radiological protection, and operations. Initial intervention by fire department personnel was unsuccessful at quenching the reaction, so the responders egressed to a safe distance and monitored the situation. After determining the event had terminated and it was safe to enter, the facility was assessed revealing significant contamination in the airlock from the ejected waste. The area surrounding the facility was surveyed and it was determined that no contamination was released outside the facility. The Fluor Idaho, LLC (Fluor Idaho) Program Manager commissioned an investigation and recovery effort, which focused on three aspects: (1) technical investigation, (2) event and causal analysis, and (3) facility recovery. A team of highly qualified individuals from around the DOE Complex was assembled to support the technical investigation. The team included representatives from several Fluor Idaho, Fluor Corporate, Battelle Energy Alliance, LLC (INL), LANL, SRNL, South West Research Institute, DOE Carlsbad Field Office, and Defense Nuclear Facility Safety Board, and DOE-Headquarters. This team addressed the reaction mechanism of the event by guiding the sampling activities and coordinating analysis and testing by the analytical laboratories. Independent and experienced investigators were brought in to conduct a rigorous event and cause analysis. The Causal Analysis Team pursued direct, root, and contributing causes. Interviews were conducted, and documents were reviewed to develop an event and causal analysis. The Accelerated Retrieval Project V Operations team mobilized to decontaminate and recover the facility. Significant progress has been made in this effort, area and airborne contamination levels have been significantly reduced allowing limited activities to resume. In addition, this group supported sample collection efforts as directed by the Technical Investigation Team. This paper reviews key findings and milestones from the technical investigation, the event and causal analysis, and facility recovery operations. From these elements of the investigation, lessons learned are identified that would benefit other organizations involved with legacy waste management and disposition. Waste management is common to all sites in the DOE Complex and the events and recovery efforts described in this paper may provide beneficial insights to these operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Electrochemical Property Determination of Fission Product Elements in Molten Fluoride Salt

The fluoride salt-cooled high temperature reactor (FHR) is a developing nuclear reactor concept that combines many attractive features of previous reactor designs. The FHR concept is also a technological bridge between today's light water reactors (LWRs) which use solid fuel and water coolant, to future technologies that utilize liquid salt coolant and dissolved liquid fuel. The FHR concept incorporates low-pressure liquid fluoride salt, tri-structural isotropic (TRISO) coated particle fuel, and an entirely passive decay heat removal system. FHRs operating at very high temperatures increase the thermal energy transfer and subsequently thermal efficiency. Similar to LWRs, the FHR will feature a cleanup system that performs online processing of the primary coolant in order to mitigate contamination from leaking fuel and moisture. Due to its ionic liquid properties, molten salts can be controlled with various applications of electrochemical properties. Oak Ridge National Laboratory (ORNL) studied these applications greatly during the Molten Salt Reactor Experiment (MSRE) and the Molten Salt Breeder Reactor (MSBR) concept during the 1960's and 70's; however, many technology gaps exist in terms of online salt processing for the FHR. The purpose of this research is to identify the electrochemical properties of leaking fission products as well as contamination from moisture in the system. These properties have been thoroughly studied for molten chloride salts but not as much data is reported for behavior in fluoride salts. Before a cleanup system can be proposed for the FHR concept, these properties will need to be extensively investigated to generate a reliable source of electrochemical data. These results are gathered through an electrochemical system which probes the molten salt at high temperatures (up to 750 deg. C). (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Natural Gas Drilling near the Underground Nuclear Test Site of Rulison, Colorado - 19571

In 1969, the Project Rulison test was conducted in western Colorado using a nuclear device to stimulate natural gas production by fracturing low-permeability, gas-bearing rock. The presence of radionuclides (specifically tritium) in the produced gas persisted above acceptable levels, and the test was abandoned. Advances in hydrofracturing technology over the past 10-15 years have revolutionized the extraction of hydrocarbons from low-permeability formations, leading to a significant increase of drilling in the Rulison area. Drilling activity nearing the Rulison site has raised concerns that remnant radioactivity might be encountered. The site, now under the care of the US Department of Energy (DOE), is protected by a 16-hectare (40 acre) institutional control boundary (Lot 11) that prohibits drilling or extraction of materials below 1830 meters (6000 feet) within the lot boundary. Drilling within 0.8 kilometer (0.5 mile) of the site requires a hearing before the Colorado Oil and Gas Conservation Commission. DOE recommends that gas developers adopt a conservative, staged drilling approach, allowing gas reserves near the Rulison site to be recovered in a manner that minimizes the likelihood of encountering contamination. The staged approach calls for collecting data from wells away from the site before drilling closer. For instance, the wells 1.2 kilometer (0.75 mile) west of the site did not encounter any unexpected geologic conditions and now have 8 years of production without encountering any detonation-related radionuclides. The next set of wells would be 0.8 kilometer (0.5 mile) west of the site. This sequential method drills first at locations with a low probability of encountering contamination and then moves closer. This process protects public safety while allowing the collection of additional data to confirm that contamination has not migrated beyond the 16-hectare (40-acre) institutional control boundary. The staged drilling approach was simulated with a modeling effort that estimates the current extent of contamination and the potential for production-induced contaminant migration to nearby wells. The model incorporates geologic data from nearby wells and was calibrated to production data from both the reentry well production testing (1970-1971) and the wells 1.2 kilometer (0.75 mile) from the site that began producing in 2010. The geologic data include both sand/shale distribution statistics as well as the tendency of hydrofractures to preferentially propagate east and west due to the regional stress field. The model results indicate that it is unlikely that wells near the site would ever encounter site-related radionuclides. (authors)

03 NATURAL GAS↗

Session 077 - Panel: Wednesday US DOE Featured Site: Lexington, KY Office (Portsmouth and Paducah Sites) (R1.14)

This panel featured the DoE's Portsmouth Paducah Project Office (PPPO), which is responsible for the management and cleanup of at the Portsmouth, Ohio and Paducah, Kentucky former Gaseous Diffusion Plant sites. Portsmouth is primed for the first major skyline change at the site the upcoming demolition of the X-326 process building and initial operations of the Onsite Waste Disposal Facility. The Paducah site is working on the C-400 city block initiative allowing DOE to tackle the main source of groundwater contamination at the site, in conjunction with deactivation and demolition of the C-400 Cleaning Building. PPPO's DUF6 conversion plants have 7 lines in continuous operation at both sites providing the opportunity to ramp up cylinder processing. Panelists with presentations: DOE PPO Update (Robert Edwards, Joel Bradburne); Portsmouth/Paducah Project Office (PPPO) (Joel Bradburne, Robert Edwards); PADUCAH (Jennifer Woodard, Myrna Espinosa Redfield); Depleted Uranium Hexafluoride Conversion Project (Reinhard Knerr, Zack Smith); Paducah Deactivation and Remediation Project (Myrna Espinosa Redfield); Mid-America Conversion Services - Seven Lines One Project (Zack Smith)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Adhesion Capabilities of Permanent Foaming Fixatives

DOE-EM have identified an operational requirement for a fixative that can immobilize and/or encapsulate residual contamination in 3D void volumes (pipes, gloveboxes, waste containers, etc.) during D and D activities. Failure to safely and effectively immobilize residual contamination can: Put workers at risk; Contaminate the public and environment; Drive up costs. Commercial-off-the-shelf (COTS) polyurethane (PU) foams is one possible solution and is currently being investigated by Savannah River National Lab (SRNL). Adhesion testing will dictate how well PU foams will adhere and immobilize residual contamination onto a substrate. Results can provide a performance criteria for Section 5 of ASTM E3191: Standard Specification for Permanent Foaming Fixatives Used to Mitigate Spread of Radioactive Contamination. Initial mechanical testing showed intumescent rigid PU foams were best in class (tensile, compression, TGA/DSC) Application of intumescent rigid PU foam in pipe scenario with 'contamination' showed excellent adhesion capabilities as long as foam had contact with pipe. The foam, however, was not able to penetrate 'contamination' but created pockets where the contamination interacted with the substrate. Pretreatment options of pipe were considered to produce better immobilization capabilities. Pretreatment options included COTS products like baking spray, rubber cement, and soap. Foam was still able to immobilize on a global sense, but not a local sense. Essentially acted as a mechanical plug. A tensile tester (MTS Criterion Series 43) was utilized to evaluate the tensile adhesion strength of 6 COTS PU foams. ASTM D1623: Tensile and Tensile Adhesion Properties of Rigid Cellular Plastics. Procedures: PU foams were cured between two smooth 2'' x 2'' 304 stainless steel coupons with hinges glued on plates for gripping support. Parameters Used: Pull rate of 0.1 in/min. Calculations: Tensile adhesion strength, elongation, and ImageJ analysis of how PU foam is left on substrate. Outcome: The PU foam with the best adhesion capabilities would be downselected for further evaluation to be used as a permanent foaming fixative. The rigid PU foams had the best adhesion capabilities with the R1 foam having a max load of 236 N. One of the I-R2 samples reached almost 450 N and another sample reached 2500 N before slipping. The other intumescent foam, I-F4, had the most coverage on the stainless steel coupon's surface from the ImageJ results (61.43% surface coverage). The intumescent foam, I-R2, will be the foam of choice for future testing due its fire retardant and adhesion capabilities. Future directions: Conduct the following experiment in a pipe scenario with the down-selected PU foam. Procedures: PU foam will be cured between in a 304 stainless steel pipe (ID: 4'', OD: 4.5'', Height: 4''). Parameters Used: Compression testing results will be referenced to determine if foam's adhesion strength would be greater its compression strength as its being compressed. Calculations: Compression strength, shear stress, total time elapsed. Conduct further adhesion testing with the down-selected PU foam (I-R2) to be treated as a permanent foaming fixative (PFF). Determine the minimum contact the PFF should have with the substrate for adequate results. Evaluate if PFF's adhesion capabilities is time dependent (3.1.5 of ASTM E3911). Subject PFF to seismic stressors addressed in Safety Basis of Interim Operation documents (SBIO) to further evaluate adhesion capabilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Technology to Retrieve Waste Below the 324 Building at the Hanford Site - 19622

The Waste Technology Engineering Laboratory (324 Building) is a Category 2 Nuclear Facility at Hanford. The 324 Building Disposition Project is responsible for the removal and remedial actions under CERCLA. Additionally, there are RCRA Dangerous Waste Management Units which the CERCLA actions are presumed to satisfy. The Radiochemical Engineering Complex (REC) is a group of four hot cells (A, B, C and D Cells) with an interconnecting airlock inside of the 324 Building. Underneath the REC B-Cell are contaminated soils that have an estimated 12,793 R/Hr dose rate and remediation is under CERCLA 300-FF-2 Operable Unit. The current action consists of debris removal from the floor of B-Cell, B-Cell floor removal, and excavation of the soils beneath the floor to a depth of up to twelve feet with four Remote Excavator Arms (REA). This paper provides insight into the preparation and performance of high tolerance core drilling into a hot cell complex. Installation of the REA Through Support (REA TS) mechanism through the 4'-6' concrete shield walls is a complex series of tasks with demanding tolerances at each of four locations around the perimeter of B-Cell. The use of training mock ups was included in the completion of this work. The REA TS is two 11 inch diameter high strength steel sleeves that have expandable collars at each end allowing the interstitial space between the outside of the sleeve and inside of the core drill to be grouted to form a substantial structural connection, and a 10 inch pipe with hydraulic hoses to power the REA. There are three cores required for each REA location. The REAs themselves are customized excavator arms, mounted on support columns to be used in the excavation and transfer of the contaminated soil into storage facilities. The tasks for the installation of the REA TSs are: 1) Characterization of B-Cell Cubicles. 2) Embedded Pipe Fill. 3) Interference Removal. a. Internal Walls, b. External Walls. 4) Core Drilling. 5) Go/No-Go gauge, and video inspection. 6) Installation of REA Through Support Assembly. The 324 Building REC Hot Cells have internal, external, and embedded utilities throughout the shield walls in conflict with the REA TS locations. Some of the embedded utilities have connection points inside of the B-Cell Cubicles. There were two separate issues at the conflicted locations. The first issue was the core drill cooling water would flow along the embedded utility potentially spreading legacy chemical and radiological contamination to areas of the facility that was unwanted. The second issue was that the REA TS required a substantial structural connection to the B-Cell wall, the cored diameter is larger than the REA TS and these interstitial areas required a full grouted connection. The embedded utilities posed a hazard that if unfilled, the interstitial grout would flow into the embedded utility and destabilize the required grouted structural connection. The B-Cell Cubicles had not been opened in over 10 years. A mockup was completed to install a glovebag over the cubicle opening and then to verify functionality and port requirements. The embedded utility pipe connections in the cubicles were then opened inside a glovebag to verify the correct connection points, connection method for future embedded pipe fill material delivery system, radiological characterization, and air flow to show that the embedded utility pipes were not blocked and would not pressurize. The embedded pipe fill material and grout system was mocked up and run several times to verify methodology and functionality. The B-Cell Cubicles were then reentered and the embedded utility pipe fill was completed using a hand pump. External interferences at the core drill locations were removed using standard interference removal techniques. Internal interferences at the core drill locations were removed using a remote cutting tool that was controlled through the use of the B-Cell crane, remote cameras and remote lighting. The core drilling was mocked up two separate times, the project's purpose built 'Mock Up Facility' was core drilled to verify tolerances and methodology prior to subcontract award, the core drill subcontractor built a 'dummy wall' to train and practice on achieving the demanding tolerances, coordinated alignments between the cores, short term and long term dose shielding techniques, and contamination control techniques. A core drill template, and additional anchoring techniques were used to maximize accuracy and precision of the REA TS core drills. A 'Go/No-Go' gauge was built and installed at each of the four REA TS locations to verify that the core drill met tolerances. The core drill locations were visually inspected using a boroscope. The REA TS installation was mocked up at the projects 'Mock Up Facility' beginning with basic hazard controls, then with intermediate hazard controls, and finally with full occupational safety, industrial hygiene, and radiological controls. The REA TSs were installed and grouted into place. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Soil Sorting Considerations and Applications - 19363

A number of methods are available for soil sorting, specifically sorting of radiological materials. These methods have been applied from the Feasibility Study stage of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) in pilot study operations to full scale operations in the post Record of Decision stages at Formerly Utilized Sites Remedial Action Program (FUSRAP) sites. This application of sorting at multiple sites and under many different conditions has provided the United States Army Corps of Engineers (USACE) with many challenges and lessons learned. Mechanical soil sorting has had varying degrees of success and many factors have been evaluated. Some factors include the type of material that is best suited for sorting, contaminant distribution, and pre-screening of materials. Community acceptance is another non-technical issue that can be key in applying sorting to a FUSRAP cleanup. This paper will discuss multiple types of radiological soil sorting to include reversing belt conveyor, segmented gate, and manual as well as technical considerations and the factors impacting each type. Additionally, how and when soil sorting is applied to FUSRAP operations is discussed. The FUSRAP is conducted in accordance with CERCLA and the impacts to how sorting is applied in terms of considering it treatment under CERCLA will also be discussed. This paper and presentation will be useful for any project considering using radiological soil sorting. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reducing Cost of Chlorinated Volatile Organic Compound Remediation by Transitioning from Active to Passive Soil Vapor Extraction - 20157

Areas of high chlorinated volatile organic compound (cVOC) contamination at the Savannah River Site (SRS) have been undergoing remediation via soil vapor extraction, sometimes coupled with thermal treatments to enhance extraction rates. These active systems are effective in removing large amounts of contaminant mass from the subsurface and mitigating the impacts to groundwater. However, as extraction rates decline, costs must be evaluated with respect to the benefit of continued active operation. A decision framework for identifying conditions when a transition to a more passive remediation is appropriate has been developed with state and federal regulatory agencies. Two remediation areas have recently been transitioned from active soil vapor extraction (ASVE) to passive soil vapor extraction (PSVE) at the SRS. Performance evaluation goals including plume stabilization, overall mass removal trends, environmental sustainability and costs were considered in transitioning from active remediation to passive technologies at both sites. At the Dynamic Underground Stripping (DUS) project at the M-Area Settling Basin, ASVE was combined with steam injection to extract cVOCs during active operations. Steam injection occurred from September 2005 to September 2009. DUS utilized 63 steam injection wells, 34 active vapor extraction wells, and 3 active soil vapor extraction units (SVEUs). Two active SVEUs had 60 horsepower blowers; the third had a 25-horsepower blower. Mass removal was closely tracked during DUS operations; over 181,437 kilograms (400,000 pounds) of cVOCs were removed while active steam injection occurred. After steaming was stopped, ASVE continued. The 34 active wells were evaluated in 2012. The ASVE wells were grouped into categories of high, medium, and low extraction rates. High producing wells remained connected to a single active SVEU. Low producing wells were abandoned, and the medium producing wells were transitioned to PSVE (Microblowers{sup TM}). Microblowers{sup TM} utilize a dedicated blower per well and are solar powered. This passive technology provides energy, maintenance, and operation costs savings while still providing an efficient reduction in cVOC migration to groundwater. In 2018, the remaining ASVE wells were evaluated again. The purpose of this testing was to identify which wells removed the most mass. An optimal well configuration was determined. The criteria to discontinue ASVE was removal of less than 18 kilograms (40 pounds) per week of cVOCs. After 3 months of shutdown (rebound conditions), 2.7 kilograms (5.9 pounds) of cVOCs per week were being removed. Data from the rebound test justified ending ASVE and transitioning wells with higher extraction rates to PSVE. Wells that had depleted the cVOC mass within their zone of influence were abandoned. Performance data from existing PSVE wells justified ending PSVE at wells with depleted extraction rates. Currently the system has 16 PSVE wells operating. Another ASVE system was being used to treat cVOC contaminated soil at the A-Area Miscellaneous Rubble Pile (AMRP) at SRS. System operation began in 2004, with 7 ASVE wells connected to a 60- horsepower blower. Mass removal rates and contaminant concentrations remained consistently low over the ASVE lifespan at AMRP. This indicated that mass removal was diffusion limited. With this data, the 7 ASVE wells were transitioned to PSVE in 2017. Twelve pressure monitoring points were also transitioned to PSVE wells. AMRP currently has 19 PSVE wells operating. Both transitions from active to passive remediation had concurrence from the United States Environmental Protection Agency and the South Carolina Department of Health and Environmental Control. These transitions ensure that only the necessary amount of energy is being exerted to remediate the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗