Search NASA⌕ Search

SEARCH · Search NASA

Results for “Active Flow Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Cardiovascular and Interventional Radiological Society of Europe Commentary on the Treatment of Chronic Cerebrospinal Venous Insufficiency

Chronic cerebrospinal venous insufficiency (CCSVI) is a putative new theory that has been suggested by some to have a direct causative relation with the symptomatology associated with multiple sclerosis (MS). The core foundation of this theory is that there is abnormal venous drainage from the brain due to outflow obstruction in the draining jugular vein and/or azygos veins. This abnormal venous drainage, which is characterised by special ultrasound criteria, called the 'venous hemodynamic insufficiency severity score' (VHISS), is said to cause intracerebral flow disturbance or outflow problems that lead to periventricular deposits. In the CCSVI theory, these deposits have a great similarity to the iron deposits seen around the veins in the legs in patients with chronic deep vein thrombosis. Zamboni, who first described this new theory, has promoted balloon dilatation to treat the outflow problems, thereby curing CCSVI and by the same token alleviating MS complaints. However, this theory does not fit into the existing bulk of scientific data concerning the pathophysiology of MS. In contrast, there is increasing worldwide acceptance of CCSVI and the associated balloon dilatation treatment, even though there is no supporting scientific evidence. Furthermore, most of the information we have comes from one source only. The treatment is called 'liberation treatment,' and the results of the treatment can be watched on YouTube. There are well-documented testimonies by MS patients who have gained improvement in their personal quality of life (QOL) after treatment. However, there are no data available from patients who underwent unsuccessful treatments with which to obtain a more balanced view. The current forum for the reporting of success in treating CCSVI and thus MS seems to be the Internet. At the CIRCE office and the MS Centre in Amsterdam, we receive approximately 10 to 20 inquiries a month about this treatment. In addition, many interventional radiologists, who are directly approached by MS patients, contact the Cardiovascular and Interventional Radiological Society of Europe (CIRSE) for advice. Worldwide, several centres are actively promoting and performing balloon dilatation, with or without stenting, for CCSVI. Thus far, no trial data are available, and there is currently no randomized controlled trial (RCT) in progress Therefore, the basis for this new treatment rests on anecdotal evidence and successful testimonies by patients on the Internet. CIRSE believes that this is not a sound basis on which to offer a new treatment, which could have possible procedure-related complications, to an often desperate patient population.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Hydropower Geotechnical Foundations: Current Practice and Innovation Opportunities for Low-Head Applications

Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to Hydropower is a renewable energy resource that produces electricity from flowing water under pressure. Engineered hydropower structures, such as dams, are used to create a hydraulic head, enabling a turbinegenerator unit to convert pressurized flow into electricity. While hydropower has been a source of renewable energy since antiquity, new development in the United States has slowed in recent decades. Based on recent resource assessments, the largest opportunity to expand hydropower in the United States is from new stream-reach development (i.e., new hydropower development along stream-reaches that do not currently have hydroelectric facilities or other forms of infrastructure, such as dams). Roughly 75% of identified new stream-reach development potential is from low-head sites (less than 30 ft of head), which typically suffer from smaller power densities and higher normalized costs, given economies of scale. Hydropower developers and other stakeholders are thus interested in strategies to reduce initial capital costs while practicing sustainable development to maximize environmental compatibility with minimal disruption to natural aquatic life, sediment, and water flows. Historically, civil works have represented a significant cost driver for new hydropower development, with the foundation system representing a major cost component and source of uncertainty. The foundation system is the collection of engineered structural features (e.g. cutoff trenches, walls, grouting, anchors) constructed at or below the preconstruction ground surface that interfaces between the overlying structures (superstructures) and the bed material below (subsurface). Development of a hydropower foundation system must consider the various characteristics of the surrounding stream environment and subsurface while adhering to the engineering requirements of the superstructure that it supports. The care of water, excavation, and other construction activities are important features of foundation design and construction. The design and construction cost of the foundation system is largely dependent on the site geology and riverbed composition and is influenced by the level of geotechnical assessment required and conducted. Thus, a hydropower facility’s geotechnical foundation is often highly site-specific, with proper site selection and assessment being important to project success. The foundation system is designed to provide structural stability (of the foundation and dam), limit seepage, ensure public safety, and maintain functionality for the project life, during both construction and facility operations. Inadequate foundation or dam design can result in dam failure and the uncontrolled release of significant volumes of water, which could cause a high number of casualties and extensive property damage downstream of the failure. According to the Association of State Dam Safety Officials, approximately 30% of all historical dam failures in the United States are attributed to foundation or abutment defects, and another 20% are attributed to piping or seepage through the embankment, foundation, or abutment. To ameliorate these safety considerations, foundations often require massive amounts of construction material (e.g., grout, concrete, engineered dam fill) and long construction times. Foundation design also requires significant analysis prior to construction because the initial in-stream and abutment subsurface conditions are site-specific, and sufficient data for them often are lacking. Current practice requires on-site assessment, using expensive drilling and invasive and non-invasive investigation methods, to determine the expected cost of foundation material and treatment. Additionally, foundation construction often requires site dewatering (and other care of water activities), which involves constructing temporary diversion structures upstream and often downstream, called cofferdams, and water diversion systems that route water around the construction site. Cofferdams and water diversion systems can drastically increase construction costs and contribute to environmental disruption, including modification of flow patterns and benthic habitats. Given the technical, economic, and environmental challenges associated with hydropower foundations, opportunities exist to improve the current state of practice and to develop new and innovative solutions to challenges frequently encountered with traditional approaches. With this understanding, it is critically important to understand and document the current state of practice for hydropower geotechnical foundations, identify key challenges, and define opportunities for innovative solutions. To this end, this report documents the current state of practice across the three main phases of geotechnical foundation development: (1) geotechnical site assessment, (2) design, and (3) construction for hydropower systems. It also describes the major challenges with conventional approaches and identifies opportunities for innovation to reduce hydropower foundations costs, timelines, and risks. Key takeaways from this report include the following: Approximately 80% of available low-head sites are expected to have foundations on soil beds rather than rock beds, suggesting that rockfill and earthfill dams may be the most cost-effective conventional dam type for new projects.; Geotechnical and geologic investigation activities are time-consuming and expensive but are essential to define the parameters and criteria needed for foundation design.; Certain riverbed soil and bedrock types present significant technical challenges or require expensive foundation construction, which can prove financially prohibitive for low-head project development.; Modular hydropower design and prefabricated modular foundations represent a promising but unproven paradigm for new hydropower development. Design and construction approaches using optimized and highly repeatable, reliable components would benefit project cost, time, and risk but require additional research and development.; Temporary construction features for foundations, including cofferdams, water diversion, and water control systems, can prove costly and have inherent construction risk.; For economically viable development, hydropower geotechnical foundations should be limited to 4 to 15% of the project’s total initial capital costs. Many proposed projects have experienced cost overruns attributable to foundation difficulties or surprises during construction. These overruns may have been due to inadequate investigations, lack of adequate engineering effort to tailor the structures to site geology and topography, and/or contractual terms, among other considerations.; Challenges for hydropower foundations and opportunities for innovative technology solutions are identified in the following areas (consistent with the three main phases of foundation development): Geotechnical site assessment, Foundation design and materials, Construction methods and technology. Ultimately, this report aims to provide information about geotechnical foundations for low-head hydropower and to motivate transformative technologies to support hydropower growth.

13 HYDRO ENERGY↗

Progress Report on Performance of A709 and G91 Steels in Sodium

Specimens in six different processing and heat treatment conditions of A709 H58776 were exposed to sodium at 550, 600, and 650°C, respectively for various exposure times. G91 base metal was tested in sodium at 550, 600, and 650°C, and G91 weldment at 550 and 600°C, respectively. Parallel thermal aging experiments were conducted on G91 and A709 to obtain thermal aging data for comparison with sodium exposure results to separate the thermal and sodium effects. The corrosion data obtained on A709 steel continue to show low corrosion rates, which indicate good compatibility of A709 with sodium when oxygen content is controlled. G91 has also shown acceptable corrosion rates over the temperature range of 550-650°C in sodium. Thermal aging or sodium exposures reduced the tensile strength, uniform elongation, and total elongation for A709 ESR, AOD specimens. These specimens consistently showed higher yield stress and tensile strength and lower uniform and total elongations after sodium exposure than after thermal aging under comparable testing conditions. It implies that there was an additional effect of sodium exposure that gave rise to an increase in tensile strength of A709. Dynamic strain aginginduced flow serrations were completely removed by either thermal aging or sodium exposure at 650°C, which imply that carbon or nitrogen in solution was removed from the solution and formed precipitates during aging or sodium exposures. The tensile data ruled out the possibility of decarburization under the sodium exposure conditions. The HOMO specimens behaved somewhat differently from the ESR and AOD specimens in sodium. While thermal aging and sodium exposures at 550 and 600°C decreased the yield stress and the ultimate tensile strength of G91, there was virtually no additional effect resulting from sodium exposures at these two temperatures. In contrast, sodium exposures at 650°C had a drastic effect on the yield stress and the ultimate tensile strength of G91. It is suggested that G91 experienced decarburization in the 650°C sodium environments. Carbon concentrations in sodium in the SMT-1 and SMT-2 loops were determined by a foil equilibration method. The estimated carbon concentration was in the range of 0.8-1.2 ppm in the SMT-1 loop and 0.3-0.7 ppm in the SMT-2 loop. The carbon activity in sodium in the SMT-2 loop was estimated to be 0.03-0.08 at 600°C, and 0.08-0.2 at 550°C. The carbon activity in sodium at 650°C in the SMT-1 loop was 0.04-0.07. Equilibrium simulation of the carburization – decarburization processes was conducted for A709 and G91 steels exposed in sodium environments at temperatures of 550-700°C. The carbon activity-concentration relationship for G91 was re-evaluated by considering four phases in G91, i.e. bcc ferrite, M 23 C 6 , NbC and VC carbides. It was found that the carburization-decarburization process in G91 steel was dictated by M 23 C 6 carbides at high carbon activities, while NbC carbides dominated the process at low carbon activities. Formation of NbC increases the decarburization resistance of G91 steel. It remains to be understood whether the decarburization resistance provided by MC carbides in G91 can be maintained during long-term operations of SFRs. The carbon concentration-activity relationship for A709 was calculated based on the equilibrium of fcc-austenite and M 23 C 6 carbide phase. The calculations showed that A709 decarburizes at 650°C in the SMT-1 loop environments, which is different from the experimental findings. The carbon concentration-activity relationship in A709 was further evaluated by considering four phases, including fcc-austenite, M 23 C 6 , NbC, and TiC carbide phases. TiC is the most stable carbides among the three carbide phases. The carburization-decarburization process in A709 is dictated by M 23 C 6 carbides at high carbon activities and by TiC at low carbon activities. Formation of TiC increases the decarburization resistance of A709 steel. Because of the complexity of the precipitation process in A709 during sodium exposures, detailed characterization of precipitates in sodium-exposed specimens and improved thermodynamic models are needed to understand the carburization-decarburization behavior of A709. Kinetic analysis of carbon transfer will be investigated for G91 and A709 in future work.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Solid Oxide Fuel Cell Systems PVL Line

In July 2010, Stark State College (SSC), received Grant DE-EE0003229 from the U.S. Department of Energy (DOE), Golden Field Office, for the development of the electrical and control systems, and mechanical commissioning of a unique 20kW scale high-pressure, high temperature, natural gas fueled Stack Block Test System (SBTS). SSC worked closely with subcontractor, Rolls-Royce Fuel Cell Systems (US) Inc. (RRFCS) over a 13 month period to successfully complete the project activities. This system will be utilized by RRFCS for pre-commercial technology development and training of SSC student interns. In the longer term, when RRFCS is producing commercial products, SSC will utilize the equipment for workforce training. In addition to DOE Hydrogen, Fuel Cells, and Infrastructure Technologies program funding, RRFCS internal funds, funds from the state of Ohio, and funding from the DOE Solid State Energy Conversion Alliance (SECA) program have been utilized to design, develop and commission this equipment. Construction of the SBTS (mechanical components) was performed under a Grant from the State of Ohio through Ohio's Third Frontier program (Grant TECH 08-053). This Ohio program supported development of a system that uses natural gas as a fuel. Funding was provided under the Department of Energy (DOE) Solid-state Energy Conversion Alliance (SECA) program for modifications required to test on coal synthesis gas. The subject DOE program provided funding for the electrical build, control system development and mechanical commissioning. Performance testing, which includes electrical commissioning, was subsequently performed under the DOE SECA program. Rolls-Royce Fuel Cell Systems is developing a megawatt-scale solid oxide fuel cell (SOFC) stationary power generation system. This system, based on RRFCS proprietary technology, is fueled with natural gas, and operates at elevated pressure. A critical success factor for development of the full scale system is the capability to test fuel cell components at a scale and under conditions that can be accurately extrapolated to full system performance. This requires specially designed equipment that replicates the pressure (up to 6.5 bara), temperature (about 910 C), anode and cathode gas compositions, flows and power generation density of the full scale design. The SBTS fuel cell anode gas is produced through the reaction of pipeline natural gas with a mixture of steam, CO2, and O2 in a catalytic partial oxidation (CPOX) reactor. Production of the fuel cell anode gas in this manner provides the capability to test a fuel cell with varying anode gas compositions ranging from traditional reformed natural gas to a coal-syngas surrogate fuel. Stark State College and RRFCS have a history of collaboration. This is based upon SSCAs commitment to provide students with skills for advanced energy industries, and RRFCS need for a workforce that is skilled in high temperature fuel cell development and testing. A key to this approach is the access of students to unique SOFC test and evaluation equipment. This equipment is designed and developed by RRFCS, with the participation of SSC interns. In the near-term, the equipment will be used by RRFCS for technology development. When this stage is completed, and RRFCS has moved to commercial products, SSC will utilize this equipment for workforce training. The RRFCS fuel cell design is based upon a unique ceramic substrate architecture in which a porous, flat substrate (tube) provides the support structure for a network of solid oxide fuel cells that are electrically connected in series. These tubes are grouped into a {approx}350-tube repeat configuration, called a stack/block. Stack/block testing, performed at system conditions, provides data that can be confidently scaled to full scale performance. This is the basis for the specially designed and developed test equipment that is required for advancing and accelerating the RRFCS SOFC power system development program. All contract DE-EE0003229 objectives were achieved and deliverables completed during the period from March 1, 2010 through March 31, 2011. As a result of program completion, the Stack Block Test System was ready to support installation and electrical operation of a RRFCS solid oxide fuel cell (SOFC) stack block in the second quarter of 2011.

01 COAL, LIGNITE, AND PEAT↗

A hybrid architecture for volt-var control in active distribution grids

Modern active distribution grids are characterized by the increasing penetration of distributed energy resources (DERs). The proper coordination and scheduling of a large numbers of these small-scale and spatially distributed DERs is necessary, and warrants the use of novel distributed approaches. In this paper, we propose a hybrid volt-var control architecture for the distribution grid, which leverages existing centralized and local approaches to planning, decision making, and control, and augments it with distributed optimization and distributed control for DER management. First, we propose a convex model to describe the power physics of distribution grids of meshed topology and unbalanced structure, based on current injection and McCormick Envelopes. Second, we employ the distributed proximal atomic coordination (PAC) algorithm to coordinate DERs to provide voltage support. We implement volt-var optimization by optimally coordinating DERs including PV smart inverters and demand response. We present results using the IEEE-34 bus network, using real data from a distribution feeder in Hawaii, to model load and PV generation. Different levels of DER penetration and objective functions are simulated. Finally, our results show the need for the coordination of DERs to improve voltage profiles, even in networks with existing voltage control devices. Further, we show the need for flexible reactive power capabilities to achieve desired grid performance.

24 POWER TRANSMISSION AND DISTRIBUTION↗

TECTONIC VERSUS VOLCANIC ORIGIN OF THE SUMMIT DEPRESSION AT MEDICINE LAKE VOLCANO, CALIFORNIA

Medicine Lake Volcano is a Quaternary shield volcano located in a tectonically complex and active zone at the transition between the Basin and Range Province and the Cascade Range of the Pacific Province. The volcano is topped by a 7x12 km elliptical depression surrounded by a discontinuous constructional ring of basaltic to rhyolitic lava flows. This thesis explores the possibility that the depression may have formed due to regional extension (rift basin) or dextral shear (pull-apart basin) rather than through caldera collapse and examines the relationship between regional tectonics and localized volcanism. Existing data consisting of temperature and magnetotelluric surveys, alteration mineral studies, and core logging were compiled and supplemented with additional core logging, field observations, and fault striae studies in paleomagnetically oriented core samples. These results were then synthesized with regional fault data from existing maps and databases. Faulting patterns near the caldera, extension directions derived from fault striae P and T axes, and three-dimensional temperature and alteration mineral models are consistent with slip across arcuate ring faults related to magma chamber deflation during flank eruptions and/or a pyroclastic eruption at about 180 ka. These results are not consistent with a rift or pull-apart basin. Limited subsidence can be attributed to the relatively small volume of ash-flow tuff released by the only known major pyroclastic eruption and is inconsistent with the observed topographic relief. The additional relief can be explained by constructional volcanism. Striae from unoriented and oriented core, augmented by striae measurements in outcrop suggest that Walker Lane dextral shear, which can be reasonably projected from the southeast, has probably propagated into the Medicine Lake area. Most volcanic vents across Medicine Lake Volcano strike north-south, suggesting they are controlled by crustal weakness related to Basin and Range extension. Interaction of dextral shear, Basin and Range extension, and the zone of crustal weakness expressed as the Mount Shasta-Medicine Lake volcanic highland controlled the location and initiation of Medicine Lake Volcano at about 500 ka.

15 GEOTHERMAL ENERGY↗

CY2019 Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada (January 2019–December 2019), Revision 1

Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2019. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. Tritium concentrations in both of these wells, RNM-2S and UE-5n, remain above the Safe Drinking Water Act maximum contaminant level of 20,000 picocuries per liter but declined in 2019 as compared to measurements in 2018. All other contaminants of concern are below the minimum detection level plus analytical error. The water-level monitoring network includes 16 wells. Depth to water measured in 2019 is generally consistent with recent measurements for all wells. Many wells continue to exhibit a long-term downward trend in water level, though changes from 2018 to 2019 are minimal. The sharp 2016 decline in water level in Well ER-5-3-2 remains unexplained, with the lower level persisting through 2019. Rising water-level trends continue to be observed in Well ER-5-3 deep piezometer and former water supply Well WW-5A. Water supply Well WW-5B experienced a rise in water level as a result of an absence of pumping in the first part of the year (due to a mechanical problem), whereas water levels declined in WW-4 and WW-4A in response to greater pumping in 2019. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

54 ENVIRONMENTAL SCIENCES↗

Tectonic versus volcanic origin of the summit depression at Medicine Lake Volcano, California

Medicine Lake Volcano is a Quaternary shield volcano located in a tectonically complex and active zone at the transition between the Basin and Range Province and the Cascade Range of the Pacific Province. The volcano is topped by a 7x12 km elliptical depression surrounded by a discontinuous constructional ring of basaltic to rhyolitic lava flows. This thesis explores the possibility that the depression may have formed due to regional extension (rift basin) or dextral shear (pull-apart basin) rather than through caldera collapse and examines the relationship between regional tectonics and localized volcanism. Existing data consisting of temperature and magnetotelluric surveys, alteration mineral studies, and core logging were compiled and supplemented with additional core logging, field observations, and fault striae studies in paleomagnetically oriented core samples. These results were then synthesized with regional fault data from existing maps and databases. Faulting patterns near the caldera, extension directions derived from fault striae P and T axes, and three-dimensional temperature and alteration mineral models are consistent with slip across arcuate ring faults related to magma chamber deflation during flank eruptions and/or a pyroclastic eruption at about 180 ka. These results are not consistent with a rift or pull-apart basin. Limited subsidence can be attributed to the relatively small volume of ash-flow tuff released by the only known major pyroclastic eruption and is inconsistent with the observed topographic relief. The additional relief can be explained by constructional volcanism. Striae from unoriented and oriented core, augmented by striae measurements in outcrop suggest that Walker Lane dextral shear, which can be reasonably projected from the southeast, has probably propagated into the Medicine Lake area. Most volcanic vents across Medicine Lake Volcano strike north-south, suggesting they are controlled by crustal weakness related to Basin and Range extension. Interaction of dextral shear, Basin and Range extension, and the zone of crustal weakness expressed as the Mount Shasta-Medicine Lake volcanic highland controlled the location and initiation of Medicine Lake Volcano at about 500 ka.

15 GEOTHERMAL ENERGY↗

Use of a Heat Flow Meter to Determine Active PCM Content in an Insulation

Residential and commercial roofs and walls are currently designed and tested using steady-state criteria. The resulting R-values, based on the apparent thermal conductivity, are used by building standards as an important measure of energy performance. Building envelope components, however, are subject to dynamic environmental conditions. This mismatch between the steady-state principles used in design and code requirements and their dynamic operation results in relatively low thermal efficiencies. Although several research centers have developed experimental methods for transient analysis of building envelopes, there are no standardized testing procedures available for screening materials and systems for which performance depends on dynamic response. For example, a full-scale dynamic evaluation of phase change materials (PCMs) is needed to assess their energy saving benefits. A nationally accepted small-scale (one to two foot size specimens) testing procedure is not available for the analysis of dynamic thermal characteristics of conventional thermal mass systems or PCM-enhanced materials. At the same time, data on these characteristics are necessary for whole-building simulations, energy analysis, and energy code work. The transient characteristics of PCM-enhanced products depend on the PCM content and quality. The only readily available method of thermal evaluation uses the differential scanning calorimeter. Unfortunately, this method requires small, relatively uniform test specimens. This requirement is unrealistic in the case of PCM-enhanced building envelope products such as PCM-cellulose, PCM-glass fiber, or PCM-gypsum blends. Small specimens are not representative of PCM-based blends, since these materials are not homogeneous. Jan Kosny and David Yarbrough, Oak Ridge National Laboratory, P.O. Box 2008, MS 6070, Oak Ridge, TN 37831-6070. Elizabeth Kossecka, Polish Academy of Sciences, Institute of Fundamental Technological Research, Pawinskiego 5 B, 02-106, Warsaw, Poland. A procedure for making dynamic heat-flow measurements using existing instrumentation has been developed to analyze the benefits of thermal storage. This small-scale testing method is useful for thermal analysis and as a potential quality control method for producers of PCM-enhanced building materials. The research may provide the basis for consensus standard development. This paper uses as an example a dynamic testing process for PCM-enhanced cellulose insulation.

25 ENERGY STORAGE↗

Energy efficiency of a dynamic glazing system

The reduction of air-conditioning energy consumptions is one of the main indicators to act on when improving the energy efficiency in buildings. In the case of advanced technological buildings, a meaningful contribution to the thermal loads and the energy consumptions reduction could depend on the correct configuration and management of the envelope systems. In recent years, the architectural trend toward highly transparent all-glass buildings presents a unique challenge and opportunity to advance the market for emerging, smart, dynamic window and dimmable daylighting control technologies (). A prototype dynamic glazing system was developed and tested at ITC-CNR; it is aimed at actively responding to the external environmental loads. Both an experimental campaign and analyses by theoretical models were carried out, aimed at evaluating the possible configurations depending on different weather conditions in several possible places. Therefore, the analytical models of the building-plant system were defined by using a dynamic energy simulation software (EnergyPlus). The variables that determine the system performance, also influenced by the boundary conditions, were analysed, such as U- and g-value; they concern both the morphology of the envelope system, such as dimensions, shading and glazing type, gap airflow thickness, in-gap airflow rate, and management, in terms of control algorithm parameters tuning fan and shading systems, as a function of the weather conditions. The configuration able to provide the best performances was finally identified by also assessing such performances, integrating the dynamic system in several building types and under different weather conditions. The dynamic envelope system prototype has become a commercial product with some applications in facade systems, curtain walls and windows. The paper describes the methodological approach to prototype development and the main results obtained, including simulations of possible applications on real buildings. (author)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

High-Throughput RNA FISH Analysis by Imaging Flow Cytometry Reveals That Pioneer Factor Foxa1 Reduces Transcriptional Stochasticity

Genes are regulated at the single-cell level. Here, we performed RNA FISH of thousands of cells by flow cytometry (flow-RNA FISH) to gain insight into transcriptional variability between individual cells. These experiments utilized the murine adenocarcinoma 3134 cell line with 200 copies of the MMTV-Ras reporter integrated at a single genomic locus. The MMTV array contains approximately 800–1200 binding sites for the glucocorticoid receptor (GR) and 600 binding sites for the pioneer factor Foxa1. Hormone activation of endogenous GR by dexamethasone treatment resulted in highly variable changes in the RNA FISH intensity (25–300 pixel intensity units) and size (1.25–15 mm), indicative of probabilistic or stochastic mechanisms governing GR and cofactor activation of the MMTV promoter. Exogenous expression of the pioneer factor Foxa1 increased the FISH signal intensity and size as expected for a chromatin remodeler that enhances transcriptional competence through increased chromatin accessibility. In addition, specific analysis of Foxa1-enriched cell sub-populations showed that low and high Foxa1 levels substantially lowered the cell-to-cell variability in the FISH intensity as determined by a noise calculation termed the % coefficient of variation. These results suggest that an additional function of the pioneer factor Foxa1 may be to decrease transcriptional noise.

54 ENVIRONMENTAL SCIENCES↗

Kinetics of scrap tyre pyrolysis under vacuum conditions

Scrap tyre pyrolysis under vacuum is attractive because it allows easier product condensation and control of composition (gas, liquid and solid). With the aim of determining the effect of vacuum on the pyrolysis kinetics, a study has been carried out in thermobalance. Two data analysis methods have been used in the kinetic study: (i) the treatment of experimental data of weight loss and (ii) the deconvolution of DTG (differential thermogravimetry) curve. The former allows for distinguishing the pyrolysis of the three main components (volatile components, natural rubber and styrene-butadiene rubber) according to three successive steps. The latter method identifies the kinetics for the pyrolysis of individual components by means of DTG curve deconvolution. The effect of vacuum in the process is significant. The values of activation energy for the pyrolysis of individual components of easier devolatilization (volatiles and NR) are lower for pyrolysis under vacuum with a reduction of 12 K in the reaction starting temperature. The kinetic constant at 503 K for devolatilization of volatile additives at 0.25 atm is 1.7 times higher than that at 1 atm, and that corresponding to styrene-butadiene rubber at 723 K is 2.8 times higher. Vacuum enhances the volatilization and internal diffusion of products in the pyrolysis process, which contributes to attenuating the secondary reactions of the repolymerization and carbonization of these products on the surface of the char (carbon black). The higher quality of carbon black is interesting for process viability. The large-scale implementation of this process in continuous mode requires a comparison to be made between the economic advantages of using a vacuum and the energy costs, which will be lower when the technologies used for pyrolysis require a lower ratio between reactor volume and scrap tyre flow rate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Report – Cooperative Research and Development Agreement between National Energy Technology Laboratory and Solar Turbines Incorporated

The National Energy Technology Laboratory is developing the Raman Gas Analyzer (RGA) to be a fast, non-destructive instrument for on-line measurement of gas composition. The RGA prototype has been demonstrated to have an extremely fast response (<1 second) multi-gas analysis capability. All but the noble gases are Raman active, but Raman interaction is weak with gas phase substances. The RGA uses a reflectively lined capillary as the optical cell in a patented configuration, providing both a small sample volume for fast gas exchange, and a much greater Raman signal collection than traditional instrument configurations. This allows very fast measurement of fuel gases (hydrogen, methane, ethane, propane) as well as other common industrial gases (including CO, CO2, N2, O2, H2O). The RGA provides a new enabling technology for faster, smarter process control based on the chemical composition of the gases in the process, such as improving fuel flexibility and efficiency for power generation systems. NETL has constructed a field prototype of the RGA to test the instrument performance in various applications in fossil energy. Through this CRADA, the RGA prototype operation was tested using hydrocarbon mixtures and hydrogen on a combustor test rig for potential use in gas turbine engine testing. The testing was performed at the Solar Turbines Incorporated Harbor Drive facility in downtown San Diego, CA on December 3-7, 2018. The RGA was installed outside a combustor test bay, with a ¼" sample line connected from a point shortly upstream of the test combustor. The combustion test building online gas chromatograph reported analysis of a sample every 6 minutes. During testing, seven test conditions of pure gas or gas mixtures were supplied to a pressurized combustion test rig. A sample of the fuel gas was continuously analyzed using the RGA with a 1 second measurement and reporting time. For each test condition, once the steady condition was reached, the composition of the gas from the RGA measurements is reported, along with the expected composition from the flow meters, and the composition reported by the online gas chromatograph (GC). During this testing, the real-time measurement capability of the RGA was readily apparent. The composition changes occurring in real-time could be followed and observed to correspond to combustion behavior changes on the video monitor at the operator station. The largest concentration species were tracked well through the tests; however, from comparison of the RGA one-second data with the GC steady-state points, it appears the RGA had some difficulty with quantifying hydrocarbon mixtures, especially when some of the hydrocarbons were at low concentration. The difficulty was particularly noted for ethane and butane in these tests. The NETL team intends to address this in 2019. Moderate concentrations of nitrogen, carbon dioxide, and hydrogen (>10%) were readily observed in the spectral data and quantified closely to the GC measurements. While calibration data for propylene was collected in preparation for this testing, it was not observed during the testing, even when the test conditions had high concentrations of propane.

Source record↗

Immediate Dismantling of a Large Fleet of LWR NPPs: Consequences for Spent Fuel and Waste Management - 16027

The experience feedback shows that the complete dismantling of one Light Water Reactor (LWR) unit is an activity now globally well under control (reactor pressure vessel and its internals removal and cutting included). However some specific industrial difficulties may arise in view of the dismantling of numerous LWR units simultaneously. Indeed more than 300 LWR units are currently operated worldwide, which have been commissioned these last 50 years. So in some countries, many units may be permanently shut down over a period of few years in the next decades. Such a situation addresses the issue of the overall management of large quantities of spent nuclear fuel (SNF) and decommissioning waste for the concerned units. For example, in France, the legislative and regulatory framework for the nuclear facilities favors their dismantling 'as soon as possible' after their permanent shutdown which implies as well to limit the duration of the transition period from operation to decommissioning. Furthermore 58 LWR units have been commissioned between 1977 and 1999 in France - on average more than 2 units per year. In this context, the operator (Electricite de France - EDF) plans to remove quickly the SNF then to perform dismantling actions immediately after the permanent shutdown of the LWR units. One issue is to remove the SNF from all the relevant units, even if this removal is simultaneous in many units (permanently shut down or still under operation). Similar issue has to be taken into account regarding the management of the radioactive waste (RW) produced by the dismantling and clean-up actions, notably the RW that cannot be disposed of in a near surface repository. One method followed by the French technical support organization (Institut de Radioprotection et de Surete Nucleaire - IRSN) to analyze these issues is the use of estimates of flows of SNF and RW. These estimates are based notably on a phasing-scenario and a planning template defined for the decommissioning of the units of one nuclear power plant (NPP) and coupled to an overall schedule for phase out all the units of the fleet. The estimates relative to the next decades can be compared to the current experience feedback of flows of SNF and RW for units under operation, in order to identify risks when facing decommissioning. The risks highlighted are driven by key parameters (as duration of the main dismantling actions) of the estimates which can be adapted to minimize their impact. On this basis, it is possible to identify the key-factors to dismantle each unit of NPPs and phase out the fleet regarding SNF and RW management. It is noteworthy that this work needs to be done in any case upstream the studies and the implementation of dismantling actions. Finally it can be underlined that another issue is the human resources (staff, skills and knowledge) necessary to perform all the decommissioning actions, but this aspect is not addressed in the present paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PEP Run Report for Simulant Shakedown/Functional Testing

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Waste Treatment Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, "Undemonstrated Leaching Processes." The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP; and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to leach solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct injection of steam to accelerate the leach process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP-1, the 19-M NaOH is added to un-concentrated waste slurry (3-8 wt% solids), while for leaching in UFP-2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. In both scenarios, following the caustic leach, the slurry was then concentrated to 17 wt% and washed with inhibited water to remove NaOH and other soluble salts. Next, the slurry was oxidatively leached using sodium permanganate to solubilize chrome. The slurry was then washed to remove the dissolved chrome and concentrated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Stakeholder Engagement is Evolving at the Caldas Uranium Mining Site in Minas Gerais, Brazil - 13223

The Caldas site is located in the Federal State of Minas Gerais in Brazil about 25 km from the city of Pocos de Caldas. While the city itself has 150,000 inhabitants there is a total population of around 0.5 million people living in an area that could potentially be influenced by the site. Uranium ore was mined and milled here between the years of 1982 and 1995, with ore extraction taking place from an open pit. Of the material removed, aside from that extracted for uranium, some was used on-site for road construction and building embankments while the remainder was disposed of onto two major rock piles. There are a number of potential historical and current environmental impacts to groundwater as a consequence of discharges into streams which then flow off site. The site is now undergoing a phase of decommissioning which includes the formulation and substantiation of a site remediation strategy. As part of a wider International Atomic Energy Agency (IAEA) Technical Cooperation Project aimed at providing practical guidance for implementing a decommissioning and remediation plan at the site, WSP E and E were invited to lead a mission in order to provide advice on the importance and merits of stakeholder engagement and how to ultimately build an engagement program. In November 2011, WSP E and E met with personnel from the site operators, the Brazilian regulatory bodies and representatives from the local stakeholder community and explained the principles of stakeholder engagement and how the process had internationally evolved principally from a decide-announce-defend approach to a more formal two way mechanism of engagement. Historically there had been insufficient liaison between the site operator, the nuclear regulator and the environmental regulator. All parties had recognized that greater interaction was necessary. There had also been very little engagement with local stakeholders about the various activities on the site and the potential implications of these activities on human health and the environment. The main concerns of the local stakeholders were in relation to potential environmental impacts on groundwater and surface water as well as their lack of knowledge about the site's activities and how it might evolve over time. There was a feeling that the site brought no real benefit to the local community as local labor was rarely utilized when work was being undertaken. WSP E and E were asked many questions about stakeholder engagement processes and had to address a number of concerns relating to being able to construct and control an engagement program. Advice was provided on how to construct a phased program in a manner that would allow the site operator to demonstrate increased transparency and allow as wide a range of stakeholders as possible the opportunity to become engaged. We provided an important message in that engagement often had to be culture and project specific and that what might work in one country could not necessarily purely be transposed to another. Since the WSP E and E mission there has been evidence of a number of positive steps in many of the areas of stakeholder engagement related to the Caldas site. The nuclear and environmental regulators work in a more open and transparent manner and continue to undertake joint inspections of the Caldas site. They have agreed to develop a written agreement that will enable them to jointly assess and discuss the issues on the site. Both regulatory bodies had previously accompanied the site operator on a visit to the Wismut uranium mining area in Germany and as well as providing useful learning had also allowed the regulators to discuss some common issues, thus bringing them closer together. A local stakeholder group under the auspices of the Water Commission had previously been set up but now they are starting to have more regular meetings with the site operator and nuclear regulator. They are now additionally considering the formation of a site specific advisory board (based on similar lines to those at US legacy sites) in order to gain some further technical focus within the stakeholder community. The site operator has started to present and explain the proposed environmental remediation plans to various towns and cities potentially influenced by the Caldas site. The successes to date can be attributed primarily to the willingness of the site operator to engage more openly with local community representatives in addition to the enthusiasm of the Water Commission itself. Providing stakeholder engagement advice to all the relevant parties in a manner which recognized their concerns, aspirations and country specific culture was extremely important for this positive progress to have been established. The process established and the subsequent successes could provide useful learning to those countries that face similar cultural engagement challenges. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Adsorption of Iodine and Tritium from UNF Reprocessing Off-Gas Streams

The need to control emissions of the gaseous radionuclides to the air during nuclear fuel recycling is widely recognized. Gaseous radionuclides can partition to off-gas streams emanating from the various individual processes used in the recycle plant, such as from the mechanical head end (shear), tritium pretreatment, fuel dissolver, vessel vents, cell ventilation, and conversion operations. In traditional recycle plants, the bulk of the four primary volatile fission products (i.e., {sup 3}H, {sup 14}C, {sup 85}Kr, and {sup 129}I) is released in the head-end processes, for example, the dissolution process. The usual off-gas treatment sequence of operations targets removal of tritium (as {sup 3}HHO), iodine, carbon (as {sup 14}CO{sub 2}), and the noble gases, in that order. Water and iodine are captured first because the other species are relatively unimpeded by the sorbents used for water and iodine, so they flow downstream to additional treatment processes. Water and iodine do react with one another, and many techniques used to collect one of these species also collect some fraction of the other. It is quite desirable to sequester the iodine and water separately because the tritiated water may be disposed of as a low level waste. If not cleanly separated, contamination of the low-level waste by iodine may elevate its classification to high-level waste and result in greater costs for disposal. The proposed sorption sequence was tested in the laboratory. Use of a second column of AgZ permits the detection of breakthrough from the primary AgZ column while protecting the downstream 3AMS column from collecting iodine. (This arrangement is equivalent to enabling intra-column sampling of the primary column.) Neutron activation analysis of the 3AMS revealed that iodine was below, or at, the level of detection. The results successfully demonstrated that iodine can be sequestered in the AgZ while the water is collected free of iodine in the 3AMS column. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

EFRT M12 Issue Resolution: Comparison of PEP and Bench-Scale Oxidative Leaching Results

Pacific Northwest National Laboratory (PNNL) has been tasked by Bechtel National Inc. (BNI) on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility (PTF). The Pretreatment Engineering Platform (PEP) was designed and constructed and is to be operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. The PEP also includes non-prototypic ancillary equipment to support the core processing. Two operating scenarios are currently being evaluated for the ultrafiltration process (UFP) and leaching operations. The first scenario has caustic leaching performed in the UFP-2 ultrafiltration feed vessels (i.e., vessel UFP-VSL-T02A in the PEP; and vessels UFP-VSL-00002A and B in the WTP PTF). The second scenario has caustic leaching conducted in the UFP-1 ultrafiltration feed preparation vessels (i.e., vessels UFP-VSL-T01A and B in the PEP; vessels UFP-VSL-00001A and B in the WTP PTF). In both scenarios, 19-M sodium hydroxide solution (NaOH, caustic) is added to the waste slurry in the vessels to dissolve solid aluminum compounds (e.g., gibbsite, boehmite). Caustic addition is followed by a heating step that uses direct steam injection to accelerate the leaching process. Following the caustic leach, the vessel contents are cooled using vessel cooling jackets and/or external heat exchangers. The main difference between the two scenarios is that for leaching in UFP1, the 19-M NaOH is added to un-concentrated waste slurry (3 to 8 wt% solids), while for leaching in UFP2, the slurry is concentrated to nominally 20 wt% solids using cross-flow ultrafiltration before the addition of caustic. For wastes that have significantly high chromium content, the caustic leaching and slurry dewatering is followed by adding sodium permanganate to UFP-VSL-T02A, and the slurry is subjected to oxidative leaching at nominally ambient temperature. The purpose of the oxidative leaching is to selectively oxidize the poorly alkaline-soluble Cr(III) believed to be the insoluble form in Hanford tank sludge to the much more alkaline-soluble Cr(VI), e.g., chromate. The work described in this report provides the test results that are related to the efficiency of the oxidative leaching process to support process modeling based on tests performed with a Hanford waste simulant. The tests were completed both at the lab-bench scale and in the PEP. The purpose of this report is to summarize the results from both scales that are related to oxidative leaching chemistry to support a scale factor for the submodels to be used in the G2 model, which predicts WTP operating performance. Owing to schedule constraints, the PEP test data to be included in this report are limited to those from Integrated Tests A (T01 A/B caustic leaching) and B (T02A caustic leaching).

02 PETROLEUM↗