Search NASA⌕ Search

SEARCH · Search NASA

Results for “Configuration planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Activation of Air and Utilities in the National Ignition Facility

Detailed 3-D modeling of the NIF facility is developed to accurately simulate the radiation environment within the NIF. Neutrons streaming outside the NIF Target Chamber will activate the air present inside the Target Bay and the Ar gas inside the laser tubes. Smaller levels of activity are also generated in the Switchyard air and in the Ar portion of the SY laser beam path. The impact of neutron activation of utilities located inside the Target Bay is analyzed for variety of shot types. The impact of activating TB utilities on dose received by maintenance personnel post-shot is analyzed. The current NIF facility model includes all important features of the Target Chamber, shielding system, and building configuration. Flow of activated air from the Target Bay is controlled by the HVAC system. The amount of activated Target Bay air released through the stack is very small and does not pose significant hazard to personnel or the environment. Activation of Switchyard air is negligible. Activation of Target Bay utilities result in a manageable dose rate environment post high yield (20 MJ) shots. The levels of activation generated in air and utilities during D-D and THD shots are small and do not impact work planning post shots.

61 RADIATION PROTECTION AND DOSIMETRY↗

Bryan Mound SPR cavern 113 remedial leach stage 1 analysis.

The U.S. Strategic Petroleum Reserve implemented the first stage of a leach plan in 2011-2012 to expand storage volume in the existing Bryan Mound 113 cavern from a starting volume of 7.4 million barrels (MMB) to its design volume of 11.2 MMB. The first stage was terminated several months earlier than expected in August, 2012, as the upper section of the leach zone expanded outward more quickly than design. The oil-brine interface was then re-positioned with the intent to resume leaching in the second stage configuration. This report evaluates the as-built configuration of the cavern at the end of the first stage, and recommends changes to the second stage plan in order to accommodate for the variance between the first stage plan and the as-built cavern. SANSMIC leach code simulations are presented and compared with sonar surveys in order to aid in the analysis and offer projections of likely outcomes from the revised plan for the second stage leach.

Rudeen, David Keith↗

Habitat Demonstration Unit Project Leadership and Management Strategies

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Preliminary Criticality and Radiation Shielding Analysis for the Storage and Transfer of MARVEL Reactor Spent Nuclear Fuel

This report documents the results of preliminary nuclear criticality and radiation shielding assessments during transfer and dry storage of irradiated Microreactor Applications Research Validation and Evaluation (MARVEL) reactor fuel at Idaho National Laboratory (INL). The assessments focus on transfer casks and storage canisters that are currently in use at INL, which may be compatible with the irradiated MARVEL reactor fuel. The criticality assessments were performed using the radiation transport code MCNP6 with 37 MARVEL reactor fuel elements in various configurations and scenarios. All transfer and storage configurations under dry conditions were below the assumed criticality safety limit of 0.93. Some storage and transfer configurations under wet conditions exceeded the criticality safety limit. This suggests that the appropriate administrative and engineering controls, in addition to reducing the number of MARVEL reactor fuel elements per transfer cask or storage canister, can be expected to ensure criticality safety under all scenarios. The radiation shielding assessments were performed by generating conservative neutron and photon source terms using the ORIGEN module in the SCALE suite of codes. These source spectra were used to estimate the dose equivalent rates using the radiation transport code MCNP6, both on contact and 1 m away from the fuel and transfer casks. The maximum estimated dose equivalent rate of 37 unshielded MARVEL reactor fuel elements on contact is approximately 42000 R/hr. The maximum estimated dose equivalent rates on contact to the ATR transfer cask, HFEF-5 transfer cask, and high load charger were approximately 233 mR/hr, 171 mR/hr, and 201 mR/hr, respectively. This suggests that with the appropriate administrative and engineering controls, all three transfer casks analyzed can be expected to provide sufficient radiation shielding to workers during transfer of irradiated MARVEL reactor fuel. These calculations are performed to support the planning and strategy for the MARVEL project and will demonstrate the technical viability of the different configurations discussed and help identify where engineered or administrative controls may be necessary. A complete criticality safety analysis and radiation shielding analysis, including validation and contingency and accident analysis must be completed by licensed and authorized personnel before any transfer or storage of MARVEL reactor nuclear fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multiple-Purpose Subsonic Naval Aircraft (MPSNA): Multiple Application Propfan Study (MAPS)

Study requirements, assumptions and guidelines were identified regarding carrier suitability, aircraft missions, technology availability, and propulsion considerations. Conceptual designs were executed for two missions, a full multimission aircraft and a minimum mission aircraft using three different propulsion systems, the UnDucted Fan (UDF), the Propfan and an advanced Turbofan. Detailed aircraft optimization was completed on those configurations yielding gross weight performance and carrier spot factors. Propfan STOVL conceptual designs were exercised also to show the effects of STOVL on gross weight, spot factor and cost. An advanced technology research plan was generated to identify additional investigation opportunities from an airframe contractors standpoint. Life cycle cost analysis was accomplished yielding a comparison of the UDF and propfan configurations against each other as well as against a turbofan with equivalent state of the art turbo-machinery.

Engelbeck, R. M.↗

Hubble Space Telescope: Servicing Mission 3A. Media Reference Guide

Since its launch in April 1990, the Hubble Space Telescope (HST) has provided scientific data and images of unprecedented resolution from which many new and exciting discoveries have been made. The Telescope's purpose is to spend 20 years probing the farthest and faintest reaches of the cosmos. Crucial to fulfilling this objective is a series of on-orbit manned servicing missions. The First Servicing Mission (SM1) took place in December 1993 and the Second Servicing Mission (SM2) was flown in February 1997. During these missions, astronauts perform planned repairs and maintenance activities to restore and upgrade the observatory s capabilities. To facilitate this process, the Telescope s designers configured science instruments and several vital engineering subsystems as Orbital Replacement Units (ORU) -- modular packages with standardized fittings accessible to astronauts in pressurized suits. Hubble's Third Servicing Mission has been separated into two parts: Servicing Mission 3A (SM3A) will fly in Fall of 1999 and Servicing Mission 3B (SM3B) is planned for 2001. The principal objective of SM3A is to replace all six gyroscopes that compose the three Rate Sensor Units (RSU). In addition, space-walking astronauts will install a new Advanced Computer that will dramatically increase the computing power, speed, and storage capability of HST. They will change out one of the Fine Guidance Sensors (FGS) and replace a tape recorder with a new Solid State Recorder (SSR). The Extravehicular Activity (EVA) crew also will install a new S-band Single-Access Transmitter (SSAT), and Voltage/Temperature Improvement Kits (VIK) for the Telescope s nickel-hydrogen batteries. Finally, they will begin repair of the multilayer insulation on Hubble s outer surface. During SM3B astronauts will install a new science instrument, the Advanced Camera for Surveys (ACS), and an Aft Shroud Cooling System (ASCS) for the other axial science instruments. They will attach a new cryogenic cooler to the Near-Infrared Camera and Multi-Object Spectrometer (NICMOS). They also will replace the HST flexible Solar Arrays with new high-performance rigid arrays.

FROM↗

Outlook for artificial intelligence and machine learning at the NSLS-II

Abstract We describe the current and future plans for using artificial intelligence and machine learning (AI/ML) methods at the National Synchrotron Light Source II (NSLS-II), a scientific user facility at the Brookhaven National Laboratory. We discuss the opportunity for using the AI/ML tools and techniques developed in the data and computational science areas to greatly improve the scientific output of large scale experimental user facilities. We describe our current and future plans in areas including from detecting and recovering from faults, optimizing the source and instrument configurations, streamlining the pipeline from measurement to insight, through data acquisition, processing, analysis. The overall strategy and direction of the NSLS-II facility in relation to AI/ML is presented.

97 MATHEMATICS AND COMPUTING↗

Conceptual Design of a Tension Leg Platform With 22.3 MW Vertical Axis Turbine

Here, this paper presents the conceptual design of a tension leg platform (TLP) for the ARCUS “towerless” vertical-axis wind turbine (VAWT). VAWTs are ideal for floating offshore sites and have several advantages over horizontal-axis wind turbines (HAWT) including reduced top mass, lower center of gravity, increased energy capture, and in turn lower cost. The towerless ARCUS VAWT drives these advantages further through increased structural efficiency and by enabling more optimized TLP designs with simplified installation procedures. For hull sizing, we have studied three turbine sizes with corresponding power ratings of 5.1 MW, 10.4 MW and 22.3 MW. The largest turbine was identified as having the greatest potential to reduce the levelized cost of energy (LCOE) and is the reference size used for the further detailed design process. The conceptual design of the VAWT TLP has been awarded with an ABS Approval in Principle Certificate. This paper contains brief analysis results and design findings for a TLP designed to house a VAWT, including the following topics: • Applicable Design Codes • Metocean Conditions • ARCUS Turbine Loads • Design Load Cases and Requirements - Pre-service TLP Stability - In-place TLP Global Performance • Platform Configurations, Hull Structure Scantling Design, Weight and CG Estimation, and General Arrangement Drawings • Hull Ballast Plan for both Pre-service and In-place Conditions • Pre-service Quayside Integration, Transportation and Wet Tow Stability Analysis • Global Performance Analysis for Motions and Tendon tensions • Summary of cost components and system levelized cost of energy

17 WIND ENERGY↗

Effects of delta ray electrons on measurement uncertainties of harp system

A harp system, which is a multi-wire beam profile monitoring (MWPM) system, is planned upstream of the spallation target to make in situ calibration of beam current density configuration on the target along with beam imaging from luminescent coating on the beam entrance window at the Second Target Station (STS) of the Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL). This beam interception-based beam diagnostics system on the target will be used to ensure that the maximum beam loads on the target are within the design range during neutron production. Current design of the harp consists of three layers of measurement wires each of which is sandwiched between voltage biasing wire planes. The signal obtained from each measurement wire layer is disturbed by secondary electrons (SE) and delta rays produced by beam-matter interactions in neighboring wires and ionization of residual gases in accelerator vacuum. While the backgrounds from SE can be suppressed by voltage biasing, the delta-ray electrons with kinetic energies above keV ranges overcome the electric potential bias. In this paper, we study the effects of delta-rays on the measurement uncertainties of MWPM using the particle transport simulation code FLUKA. Furthermore, the cases where the harp system is installed in the proximity of a large delta ray sources such as proton beam window or in the core vessel filled with sub-atmospheric gas have been studied.

Lee, Yong Joong↗

On the Feasibility of Deep Geothermal Wells Using Numerical Reservoir Simulation

This study examines the geothermal energy extraction potential from the basement rock within the Denver–Julesburg Basin, focusing on the flow performance and heat extraction efficiency of different geothermal well configurations. It specifically compares U-shaped, V-shaped, inclined V-shaped, and pipe-in-pipe configurations against enhanced geothermal system setups. Through numerical modeling, we evaluated the thermal behavior of these systems under various operational scenarios and fracture conditions. The results suggest that while closed-loop systems offer moderate temperature increases, Enhanced geothermal system configurations show substantial potential for high-temperature extraction. This underscores the importance of evaluating well configurations in complex geological settings. The insights from this study aid in strategic geothermal energy planning and development, marking significant advancements in geothermal technology and setting a foundation for future explorations and optimizations.

15 GEOTHERMAL ENERGY↗

Delta-85 Orbiting Solar Observatory-H (OSO-H) Operations summary

The objectives of the Orbiting Solar Observatory (OSO-H) are discussed. Subjects considered are the: (1) mission objectives, (2) mission plan, (3) post launch operations, (4) communications, and (5) test operations. Illustrations of the satellite configuration and the Delta 85 launch vehicle are included.

Source record↗

Analysis and design of a capsule landing system and surface vehicle control system for Mars exploration

Investigation of problems related to the design and control of a mobile planetary vehicle to implement a systematic plan for the exploration of Mars has been undertaken. Problem areas receiving attention include: vehicle configuration, control, dynamics, systems and propulsion; systems analysis; terrain modeling and path selection; and chemical analysis of specimens. The following specific tasks have been under study: vehicle model design, mathematical modeling of a dynamic vehicle, experimental vehicle dynamics, obstacle negotiation, electromechanical controls, collapsibility and deployment, construction of a wheel tester, wheel analysis, payload design, system design optimization, effect of design assumptions, accessory optimal design, on-board computer sybsystem, laser range measurement, discrete obstacle detection, obstacle detection systems, terrain modeling, path selection system simulation and evaluation, gas chromatograph/mass spectrometer system concepts, chromatograph model evaluation and improvement.

Frederick, D. K.↗

Space processing in early Shuttle missions

The paper first reviews potential scientific and commercial benefits of space processing, and discusses roles of ground laboratory, sounding rocket, and Shuttle/Spacelab experimentation in carrying out space processing programs. Benefits which have been identified in such processes as containerless melting/solidification, electrophoresis, crystal growing, etc., and using such specific materials as tungsten, isoenzymes, single crystal silicon ribbon are utilized as specific examples in the above discussion. As a result, the paper identifies spectrum of specific objectives and implementation approaches for Shuttle/Spacelab experimentation. The paper then reviews currently planned Shuttle/Spacelab payload accommodations and traffic model. Finally, the paper matches experimentation approaches with Shuttle/Spacelab plans, and derives a possible schedule of missions in the 1979-1982 time frame using configurations with a high degree of automation where crew time for experiment involvement is limited.

Bloom, H. L.↗

PEP solar array definition study

The power extension package (PEP) is a solar array system that will be used on the space transportation system to augment the power of the Orbiter vehicle and to extend the time the vehicle may stay in orbit. The baseline configuration of the PEP is reviewed. The programmatic aspects of the design covering the development plan, the manufacturing facility plan and the estimated costs and risks are presented.

Source record↗

Nitrogen supply system based on hydrazine dissociation

Future long-duration manned space missions will require a method of generating N2 for cabin leakage makeup and repressurization. Life Systems, working with NASA, is developing a Nitrogen Supply Subsystem (NSS) based on the dissociation of N2H4 into a mixture of H2 and N2. The latter is separated to provide the makeup N2. Recent advances in specific hardware developments have resulted in the design and fabrication of a nominal 3.6 kg/day N2 generation module. The design integrates a N2H4 catalytic dissociator, three ammonia (NH3) dissociation stages and four H2 separation stages into a 33 kg, 14 cu dm module. A technique has been devised to alternate the NH3 dissociation and H2 separation stages to give high N2 purity in the product stream. Tests have shown the product stream to contain less than 0.5 percent H2 and 20 ppm NH3. This paper discusses the development and test activities of the NSS program. It reviews the design, configuration, operation and projected performance characteristics of a 4.4 kg/day NSS suitable for NASA's planned Space Operations Center.

Heppner, D. B.↗

Wing planform effects at supersonic speeds for an advanced fighter configuration

Four advanced fighter configurations, which differed in wing planform and airfoil shape, were investigated in the Langley Unitary Plan Wind Tunnel at Mach numbers of 1.60, 1.80, 2.00, and 2.16. Supersonic data were obtained on the four uncambered wings, which were each attached to a single fighter fuselage. The fuselage geometry varied in cross-sectional shape and had two side-mounted, flow-through, half-axisymmetric inlets. Twin vertical tails were attached to the fuselage. The four planforms tested were a 65 deg delta wing, a combination of a 20 deg trapezoidal wing and a 45 deg horizontal tail, a 70 deg/30 deg cranked wing, and a 70 deg/66 deg crank wing, where the angle values refer to the leading-edge sweep angle of the lifting-surface planform. Planform effects on a single fuselage representative of an advanced fighter aircraft were studied. Results show that the highly swept cranked wings exceeded the aerodynamic performance levels, at low lift coefficients, of the 65 deg delta wing and the 20 deg trapezoidal wing at trimmed and untrimmed conditions.

Wood, R. M.↗