Search NASA⌕ Search

SEARCH · Search NASA

Results for “FOCUS PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Measuring the neutrino-oxygen neutral current quasielastic cross section using the accelerator neutrino neutron interaction experiment

The Accelerator Neutrino Neutron Interaction Experiment (ANNIE) is a 26-ton gadolinium-doped water Cherenkov detector located on-axis to Fermilab’s Booster Neutrino Beam (BNB). ANNIE is uniquely positioned to perform high-statistics measurements of neutrino-nucleus interactions in water, benefiting from a large neutrino flux due to a short (100-meter) baseline. A central focus of ANNIE’s physics program is the measurement of both charged current (CC) and neutral current (NC) cross sections on water, including neutral current quasielastic (NCQE) and CC-inclusive channels. The NCQE measurement is particularly critical for constraining uncertainties in rare-event searches such as the Diffuse Supernova Neutrino Background (DSNB), where atmospheric $\nu$NCQE interactions constitute a significant and poorly constrained background. This dissertation presents a measurement of the flux-averaged neutrino-oxygen neutral current quasielastic ($\nu$NCQE) cross section using $2.573 \times 10^{20}$~POT of BNB exposure from the 2022 and 2023 beam years. The $\nu$NCQE interaction is identified through the primary $\gamma$-rays produced by nuclear de-excitation of the residual $^{15}$N$^*$ or $^{15}$O$^*$ nucleus following nucleon knockout from $^{16}$O. A dedicated Monte Carlo (MC) re-tuning campaign was conducted using an americium-beryllium (AmBe) calibration source, Michel electrons from stopped muons, and throughgoing dirt muons originating upstream of the detector. This multi-sample approach provided a wide-ranging $\mathcal{O}(\text{MeV})$--$\mathcal{O}(\text{GeV})$ dataset for tuning the simulated detector response, which was subsequently validated against AmBe neutron and Michel electron data for use in the $\nu$NCQE analysis. A dedicated laser calibration campaign was carried out to reduce timing uncertainties across the PMT system, enabling reconstruction of the BNB bunch substructure with sufficient resolution to serve as a background rejection tool. By selecting events in-time with individual neutrino bunches, beam-correlated $\nu$NCQE events are separated from diffuse and accelerator-induced backgrounds, notably skyshine neutrons and externally-originating events, that would otherwise dominate traditional charge-based selections within a small-scale, surface-level, short-baseline detector. A data-driven estimation of the skyshine neutron and external background rates was performed and incorporated into the systematic uncertainty budget. The flux-averaged $\nu$NCQE cross section on oxygen is measured to be $1.57 \pm 0.06\,(\text{stat.})$ $^{+0.91}_{-0.67}\,(\text{syst.})$ $\times 10^{-38}\ \text{cm}^{2}$. A full systematic budget is constructed by propagating uncertainties in the secondary hadronic interaction modeling, background cross section normalizations, detector response, neutrino flux, and the primary $\gamma$-ray emission probabilities from oxygen nuclear de-excitation. An idealized de-excitation model, constructed from existing measurements in the literature is developed to benchmark the predictions of the \textsc{GENIE} event generator. A comparison reveals that \textsc{GENIE} systematically overpredicts the primary $\gamma$-ray emission probability from oxygen de-excitation by a factor of $1.49\times$ for $E_\gamma > 6$~MeV and $3.07\times$ in the $3$--$6$~MeV band. This comparison motivates the dominant systematic uncertainty in this analysis, where a conservative uncertainty of $^{+39.9\%}_{-0\%}$ on the primary $\gamma$-ray signal prediction is assigned. The ANNIE result is consistent with and complementary to existing flux-averaged $\nu$NCQE cross section measurements from T2K and Super-Kamiokande, providing an independent measurement with a different detector, neutrino beam, and analysis methodology. Looking ahead, an upgrade to the ANNIE DAQ infrastructure enabling continuous extended readout will allow a complementary $\nu$NCQE neutron multiplicity measurement, directly relevant to constraining the NCQE background in DSNB searches, competitive with the recent T2K measurement at SK-Gd. The planned Super-SANDI upgrade, deploying a large Water-based Liquid Scintillator (WbLS) volume, will further extend ANNIE's reach to hadronic final states and exclusive NC channels, and enable joint measurements with liquid argon detectors sharing the BNB beamline ahead of DUNE and Hyper-Kamiokande.

Doran, Steven [Iowa State U.]↗

Scientific Process Automation Improves Data Interaction

This is an article written for the September 09 Scientific Computing magazine about the work of the Scientific Process Automation team of The U.S. Department of Energy (DOE) Scientific Discovery through Advanced Computing (SciDAC) program. The SPA team is focused on developing and deploying automated workflows for a variety of computational science domains. Scientific workflows are the formalization of a scientific process that is frequently and repetitively performed.

97 MATHEMATICS AND COMPUTING↗

Pacific Northwest National Laboratory (PNNL)/Hanford Site

This chapter provides a summary report on the major operational and research programs being conducted by PNNL's Atmospheric Sciences and Global Change Division (FCSD). From an operational perspective, the focus is on the Hanford meteorological monitoring program and the Hanford Meteorology Station. From a research perspective, a wide range of programs and capabilities are discussed.

atmospheric research↗

FY08 VPP Program Evaluation

The Voluntary Protection Program (VPP) is a recognized third-party certification of worker safety and health program excellence, based on industry best practices that focus on management leadership and employee involvement, as well as other safety and health program elements. This Pacific Northwest National Laboratory (PNNL) VPP Program Evaluation is the FY-2008 report of the PNNL VPP Steering Committee regarding the status of VPP at PNNL. It is an update of the previous annual report dated January, 2007 and was completed in January 2008. An annual evaluation of the status of VPP is required of all sites that participate in the DOE-VPP. This report provides a detailed summary of the PNNL VPP Steering Committee’s evaluation of program performance and documents both strengths and improvement opportunities related to the various aspects of the VPP model.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2012 Gordon Research Conference on Bioinspired Materials - Formal Schedule and Speaker/Poster Program

The emerging, interdisciplinary field of Bioinspired Materials focuses on developing a fundamental understanding of the synthesis, directed self-assembly and hierarchical organization of natural occurring materials, and uses this understanding to engineer new bioinspired artificial materials for diverse applications. The inaugural 2012 Gordon Conference on Bioinspired Materials seeks to capture the excitement of this burgeoning field by a cutting-edge scientific program and roster of distinguished invited speakers and discussion leaders who will address the key issues in the field. The Conference will feature a wide range of topics, such as materials and devices from DNA, reprogramming the genetic code for design of new materials, peptide, protein and carbohydrate based materials, biomimetic systems, complexity in self-assembly, and biomedical applications of bioinspired materials.

36 MATERIALS SCIENCE↗

FEMP Focus - August 2002

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus - December 2002

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus - January/February 2001

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus - January/February 2002

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus - July 2001

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus - May/June 2002

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus - March/April 2001

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus - November 2001

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus - November 2002

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus - September 2001

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus - Summer 2008

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

FEMP Focus March/April 2002

Features information about guidance for laboratories, Labs21, Philadelphia custom house, metering, data centers, ESPC, renewable energy projects, and more for federal agencies.

Federal Energy Management Program↗

The International Linear Collider. A Global Project

A large, world-wide community of physicists is working to realise an exceptional physics program of energy-frontier, electron-positron collisions with the International Linear Collider (ILC). This program will begin with a central focus on high-precision and model-independent measurements of the Higgs boson couplings. This method of searching for new physics beyond the Standard Model is orthogonal to and complements the LHC physics program. The ILC at 250 GeV will also search for direct new physics in exotic Higgs decays and in pair-production of weakly interacting particles. Polarised electron and positron beams add unique opportunities to the physics reach. The ILC can be upgraded to higher energy, enabling precision studies of the top quark and measurement of the top Yukawa coupling and the Higgs self-coupling. The key accelerator technology, superconducting radio-frequency cavities, has matured. Optimised collider and detector designs, and associated physics analyses, were presented in the ILC Technical Design Report, signed by 2400 scientists. There is a strong interest in Japan to host this international effort. A detailed review of the many aspects of the project is nearing a conclusion in Japan. Now the Japanese government is preparing for a decision on the next phase of international negotiations, that could lead to a project start within a few years. The potential timeline of the ILC project includes an initial phase of about 4 years to obtain international agreements, complete engineering design and prepare construction, and form the requisite international collaboration, followed by a construction phase of 9 years.

43 PARTICLE ACCELERATORS↗