Search NASA⌕ Search

SEARCH · Search NASA

Results for “LUNAR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Feasibility Study of a Multi Tilt-rotor Aircraft as the Artemis Lunar Training Vehicle

The Lunar Landing Research Vehicles (LLRVs) and the Lunar Landing Training Vehicles (LLTVs) provided astronaut candidates for the Apollo program with essential experience and confidence required to complete the missions, and contributed to six successful manned landings on the moon. The primary challenge in terrestrial training was being able to replicate the ratio of bank angle to linear acceleration that a pilot would experience in lunar gravity. Presently, as the Artemis program seeks to return humans to the Moon by 2025, engineers are evaluating suitable platforms to serve as an In-Flight Trainer (IFT) or Artemis Lunar Training Vehicle (ALTV) for astronauts training in the task of manual landing. The program is investigating the viability of current technology in the field of electric vertical takeoff and landing (eVTOL) vehicles and is evaluating using a multi tilt-rotor aircraft platform as a candidate platform for a preliminary ALTV. The tilt-rotor capability enables the vehicle attitude to be decoupled from its flight path, which is a crucial requirement in realistically simulating lunar gravity on Earth. Other key considerations include compensating for a lack of aerodynamic forces while flying through the atmosphere of Earth, as well as the ability to simulate the dynamics of multiple different lander designs for the Human Landing System (HLS) program. This paper details the feasibility study and presents a preliminary flight control architecture for an IFT based on a notional multi tilt-rotor platform. The modeling-following control law, based on nonlinear dynamic inversion (NDI), removes the need for gain scheduling because the vehicle operates across a wide range of flight conditions. The inner-loop dynamic control allocation strategy consists of a static portion that is optimized offline for trim while compensating for the difference in gravity and a dynamic portion that is computed in real time. The reference model consists of the full closed-loop dynamics of a generic HLS design. The modularity of the flight control architecture enables evaluation of multiple HLS concepts with minimal modifications to the control law. Simulation results of the multi tilt-rotor configuration following the final portion of the Apollo 11 descent trajectory are shown.

Jing Pei↗

Visibility of the lunar crescent

A model designed to predict whether or not the moon will be visible under any set of observing conditions is presented. It explicitly includes atmospheric clarity, which is calculated from the site's altitude, latitude, temperature, relative humidity, aerosol content, and time of the year. This mathematical model is combined with a lunar and solar ephemeris to yield a computer program which will predict the date of the first crescent sighting from any location. A list of 201 observations of lunar visibility was collected to test this model and other models. It is found that criteria involving the moonset lagtime and the moon's age have zones of uncertainty which typically cover the entire earth.

Schaefer, Bradley E.↗

A Protoflight Lightweight Surface Manipulation System to Enable High-Load, Long-Reach Lunar Surface Operations

There is a current critical need under the Artemis program for a versatile, high-load, long reach manipulation system that can provide payload offloading and handling for lunar landers. The Lightweight Surface Manipulation System (LSMS) is a highly structurally efficient, long-reach robotic arm that can be sized for a wide range of missions and payload ranges. The LSMS has more than a decade of heritage and testing at NASA Langley Research Center (LaRC), including laboratory and field testing of multiple end-effector tools and operational scenarios. With the need for rapid development of a flight-proven offloading capability and the desire to have that device be reusable for future missions and services, a 4-year program was initiated this year under NASA’s Space Technology Mission Directorate, to develop and build a protoflight unit of the LSMS, capable of lifting 1,000 kg on the Moon at an 8-meter reach. The target mission is to fly on a large cargo lander as a technology demonstrator to validate self-leveling, deployment, and payload handling operations, with future flights adding additional tools and capabilities. This paper provides a summary of the prior decade of work on the LSMS, the current mission drivers and goals, and details the first year of development of the LSMS toward a protoflight unit.

LSMS↗

Nuclear thermal propulsion program overview

Nuclear thermal propulsion program is described. The following subject areas are covered: lunar and Mars missions; national space policy; international cooperation in space exploration; propulsion technology; nuclear rocket program; and budgeting.

Bennett, Gary L.↗

Attitude Control and Orbit Determination of a Crewed Spacecraft with Lunar Lander in near Rectilinear Halo Orbit

NASA's Gateway program plans to place a crew-tended spacecraft in cislunar Near Rectilinear Halo Orbit (NRHO). The craft will support arrivals of crews in Orion and the undocking and return of a crewed lunar lander. The impact to at-titude control of a Gateway with the addition of a lunar lander is investigated. Perturbations from Orion and a lander's docking and undocking from the Gate-way are considered. Deep Space Network (DSN) tracking is supplemented with optical measurements to lunar north pole craters to analyze the possible benefit in solution accuracy and/or DSN scheduling relief.

Newman, Clark P.↗

Lunar motion analysis and laser data management

Work completed in lunar motion analysis and laser data management during the period July 1, 1971 - September 30, 1975 was reported. In this context, analysis refers to theoretical or numerical studies involving real or potential applications of such observations to improvement of the physical model, and data management refers to the process by which observed photon events are turned into observations and are made available to potential users. The data analysis work included: (1) bringing to operational status of computer programs for the numerical integration of the lunar orbit motion and for the application of lunar laser time delays for the improvement of the parameters of the physical model, (2) program improvement and program integrity, (3) three-dimensional ephemeris, and (4) miscellaneous independent studies. The data management work included: (1) data identification, (2) observatory interfaces, and (3) data distribution.

Mulholland, J. D.↗

Lunar RFC Reliability Testing for Assured Mission Success

NASA's Constellation program has selected the closed cycle hydrogen oxygen Polymer Electrolyte Membrane (PEM) regenerative Fuel Cell (RFC) as its baseline solar energy storage system for the lunar outpost and manned rover vehicles. Since the outpost and manned rovers are "human-rated", these energy storage systems will have to be of proven reliability exceeding 99 percent over the length of the mission. Because of the low (TRL=5) development state of the closed cycle hydrogen oxygen PEM RFC at present, and because there is no equivalent technology base in the commercial sector from which to draw or infer reliability information from, NASA will have to spend significant resources developing this technology from TRL 5 to TRL 9, and will have to embark upon an ambitious reliability development program to make this technology ready for a manned mission. Because NASA would be the first user of this new technology, NASA will likely have to bear all the costs associated with its development. When well-known reliability estimation techniques are applied to the hydrogen oxygen RFC to determine the amount of testing that will be required to assure RFC unit reliability over life of the mission, the analysis indicates the reliability testing phase by itself will take at least 2 yr, and could take up to 6 yr depending on the number of QA units that are built and tested and the individual unit reliability that is desired. The cost and schedule impacts of reliability development need to be considered in NASA's Exploration Technology Development Program (ETDP) plans, since life cycle testing to build meaningful reliability data is the only way to assure "return to the moon, this time to stay, then on to Mars" mission success.

Bents, David J.↗

Petrology of lunar rocks and implication to lunar evolution

Recent advances in lunar petrology, based on studies of lunar rock samples available through the Apollo program, are reviewed. Samples of bedrock from both maria and terra have been collected where micrometeorite impact penetrated the regolith and brought bedrock to the surface, but no in situ cores have been taken. Lunar petrogenesis and lunar thermal history supported by studies of the rock sample are discussed and a tentative evolutionary scenario is constructed. Mare basalts, terra assemblages of breccias, soils, rocks, and regolith are subjected to elemental analysis, mineralogical analysis, trace content analysis, with studies of texture, ages and isotopic composition. Probable sources of mare basalts are indicated.

Ridley, W. I.↗

Structural Concepts and Materials for Lunar Exploration Habitats

A new project within the Exploration Systems Mission Directorate s Technology Development Program at NASA involves development of lightweight structures and low temperature mechanisms for Lunar and Mars missions. The Structures and Mechanisms project is to develop advanced structure technology for the primary structure of various pressurized elements needed to implement the Vision for Space Exploration. The goals are to significantly enhance structural systems for man-rated pressurized structures by 1) lowering mass and/or improving efficient volume for reduced launch costs, 2) improving performance to reduce risk and extend life, and 3) improving manufacturing and processing to reduce costs. The targeted application of the technology is to provide for the primary structure of the pressurized elements of the lunar lander for both sortie and outpost missions, and surface habitats for the outpost missions. The paper presents concepts for habitats that support six month (and longer) lunar outpost missions. Both rigid and flexible habitat wall systems are discussed. The challenges of achieving a multi-functional habitat that provides micro-meteoroid, radiation, and thermal protection for explorers are identified.

Belvin, W. Keith↗

A high-fidelity N-body ephemeris generator for satellites in Earth orbit

A program is currently used for mission planning called the Analytic Satellite Ephemeris Program (ASEP), which produces projected data for orbits that remain fairly close to Earth. Lunar and solar perturbations are taken into account in another program called GRAVE. This project is a revision of GRAVE which incorporates more flexible means of input for initial data, provides additional kinds of output information, and makes use of structured programming techniques to make the program more understandable and reliable. The computer program ORBIT was tested against tracking data for the first 313 days of operation of the CRRES satellite. A sample graph is given comparing the semi-major axis calculated by the program with the values supplied by NORAD. When calculated for points at which CRRES passes through the ascending node, the argument of perigee, the right ascension of the ascending node, and the mean anomaly all stay within about a degree of the corresponding values from NORAD; the inclination of the orbital plane is much closer. The program value of the eccentricity is in error by no more than 0.0002.

Simmons, David R.↗

Lunar base - A stepping stone to Mars

Basic elements of technology and programmatic development are identified that appear relevant to the Case for Mars, starting from a base on the moon. The moon is a logical stepping stone toward human exploration of Mars because a lunar base can provide the first test of human ability to use the resources of another planetary body to provide basic materials for life support. A lunar base can provide the first long-term test of human capability to work and live in a reduced (but not zero) gravity field. A lunar base requires creation of the elements of a space transportation system that will be necessary to deliver large payloads to Mars and the space operations capability and experience necessary to carry out a Mars habitation program efficiently and with high reliability. A lunar base is feasible for the first decade of the 21st Century. Scenarios have been studied that provide advanced capability by 2015 within budget levels that are less than historical U.S. space expenditures (Apollo). Early return on the investment in terms of knowledge, practical experience and lunar products are important in gaining momentum for an expanded human exploration of the solar system and the eventual colonization of Mars.

Duke, M. B.↗

Earth-to-orbit transportation for advanced space facilities

Stages in the development of lift vehicles and related facilities for near-earth space transportation, starting with the Space Shuttle, are reviewed. Data and expected missions for the Lunar Lander, Heavy Lift Vehicle, Orbital Transport Vehicle, Lunar Transport Vehicle, Shuttle plus Intermediate Upper Stage or Shuttle plus FCT are tabulated. Objectives and summary data are tabulated for some programs (low earth orbit space stations, geosynchronous operations, lunar surface sorties, planetary exploration, nuclear waste disposal, satellite energy systems).

Davis, H. P.↗

Orders of Magnitude: A History of NACA and NASA, 1915 - 1980

The history of NACA and NASA from 1915 to 1980 is narrated. The impact of two world wars on aeronautics is reviewed. Research activity before and during World War II is presented. Postwar exploitation of new technologies is summarized. The creation of NASA and a comprehensive space program is discussed. Long range planning for a lunar mission is described. The Gemini project is reviewed. The Apollo project and side effects includng NASA's university and technology transfer programs are presented. Numerous scientific and application satellite projects are reviewed. The impact of budget reductions is explained. The value of space exploration is emphasized. Development of the Space Shuttle is reported.

Anderson, F. W., Jr.↗

Lunar Browser trajectory tool

The Lunar Browser is a tool developed at NASA Ames Research Center for building, processing, and analyzing a database of lunar transfer trajectory solutions. Examples of intended uses include design trades for lunar missions and preliminary assessments of key parameters such as launch opportunities, delta-v and propulsion budgets, communication windows, eclipse durations, and lunar landing windows. The Lunar Browser tool is in the development phase and it is already producing results in its current form to address various NASA program requirements, proposals, and mission trajectories. The tool has also been used for research analysis in trajectory design, including a first publication regarding its application to the CLPS and Artemis programs. In particular, the results included transfers to lunar frozen orbits. Future work include the generation of more trajectories to expand the existing database and the optimization of the results.

Lunar Browser trajectory tool↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning, and actual results of the the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

Lunar Prospector Extended Mission

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission is NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control focused on the use of innovative and proven trajectory analysis programs. As part of this effort, the Ames Research Center and the Goddard Space Flight Center have become partners in the Lunar Prospector trajectory team to provide the trajectory analysis, maneuver planning, orbit determination support, and product generation. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100 km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered the extended mission phase. Initially the mission orbit was lowered from 100 km to a mean altitude of 40 km. The altitude of Lunar Prospector varied between 25 and 55 km above the mean lunar geode due to lunar potential effects. After one month, the lunar potential model was updated based upon the new tracking data at 40 km. On January 29, 1999, the altitude was lowered again to a mean altitude of 30 km. This altitude varies between 12 and 48 km above the mean lunar geode. Since the minimum altitude is very close to the mean geode, various approaches were employed to get accurate lunar surface elevation including Clementine altimetry and line of sight analysis. Based upon the best available terrain maps, Lunar Prospector will reach altitudes of 8 km above lunar mountains in the southern polar and far side regions. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector extended mission including maneuver design, eccentricity & argument of perigee evolution, and lunar potential modeling.

Folta, David↗

The Lunar Prospector Mission: Final Results of Trajectory Design, Quasi-Frozen Orbits, Extended Mission Targeting, and Lunar Topography and Potential Models

The National Aeronautics and Space Administration (NASA) selected Lunar Prospector (LP) as one of the discovery missions to conduct solar system exploration science investigations. The mission was NASA's first lunar voyage to investigate key science objectives since Apollo and was launched in January 1998. In keeping with discovery program requirements to reduce total mission cost and utilize new technology, Lunar Prospector's mission design and control will focus on the use of innovative and proven trajectory analysis programs. As part of this effort, the Goddard Space Flight Center and the Ames Research Center became partners in the Lunar Prospector trajectory team to provide the trajectory analysis and orbit determination support. At the end of 1998, Lunar Prospector completed its one-year primary mission at 100-km altitude above the lunar surface. On December 19, 1998, Lunar Prospector entered its extended mission phase. The mission orbit was lowered from 100 km to a mean altitude of 40 km. Due to lunar potential effects, the altitude of Lunar Prospector varied from 25 to 55 km above the mean lunar geoid. After one month at 40 km, the lunar potential model was updated based upon the new tracking data at 40 km. On January 15, 1999, the altitude was lowered again to a mean altitude of 30 km. The spherical altitude varied between 15 km and 45 km above the mean lunar geoid while the topographical altitude varied between 10 km and 50 km. Various means were employed to get accurate lunar surface elevation including Clementine altimetry and LOS analysis. Based upon the best available terrain maps, Lunar Prospector reached actual altitudes of 8 km above lunar mountains in the southern polar region. This extended mission phase of six months will enable LP to obtain science data up to 3 orders of magnitude better than at the mission orbit. At the end of the operations mission, LP was targeted for impact at a chosen location that allowed optical observation of the lunar ejecta as LP ended its mission at 1.6 km/sec. This paper details the trajectory design and orbit determination planning and actual results of the Lunar Prospector nominal and extended mission including maneuver design, eccentricity vs. argument of perigee evolution, topographical altitude estimation, and lunar potential modeling. This paper provides understanding of the quasi-frozen orbit design of the LP mission, the optimization process of lunar orbit targets, the impacts that the selected lunar potential models play, and discusses the feasibility of meeting the mission goals. Observed evolution of the Keplerian orbit elements are compared to the theoretical predictions using the latest lunar potential model available which incorporates the Lunar Prospector Doppler data. Mapping orbit maintenance maneuver design along with results of the actual maneuvers to maintain the orbital requirements are also presented.

Folta, David↗