Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mars Mars exploration program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

National Aeronautics and Space Administration Budget Estimates, Fiscal Year 2011

The Budget includes three new robust exploration programs: (1) Technology demonstration program, $7.8 five years. Funds the development and demonstration of technologies that reduce the cost and expand the capabilities of future exploration activities, including in-orbit refueling and storage. (2) Heavy-Lift and Propulsion R&D, $3.1 billion over five years. Funds R&D for new launch systems, propellants, materials, and combustion processes. (3) Robotic precursor missions, $3.0 billion over five years. Funds cost-effective means to scout exploration targets and identify hazards and resources for human visitation and habitation. In addition, the Budget enhances the current Human Research Program by 42%; and supports the Participatory Exploration Program at 5 million per year for activities across many NASA programs.

Civil space programs↗

Development of an Adaptive Droop Control Method for Interconnected Lunar DC Microgrids Using Power Hardware-in-the-Loop

NASA’s Artemis Program outlines the need for a habitat capable of sustaining human life as well as mining and producing raw materials on the lunar surface. This mission is viewed as a means towards deeper space exploration, with plans for reaching Mars and beyond. Human presence on the moon is not possible without the ability to generate and distribute energy, namely electricity, through a network of energy sources, loads, and power converters called a microgrid. Multiple microgrids can be deployed on the moon based on location and need. Separate microgrids will require interconnection to increase resiliency and reliability given the mission’s high criticality. A method for adaptive control over power converters connecting two dc microgrids is proposed. A simulation is modeled after the lunar power system with two approaches to power converter droop control, allowing for a more flexible and adaptive microgrid architecture. Further experiments are conducted using the control methods in a power hardware-in-the-loop test environment to study the performance of hardware converter control used in this application.

dc microgrid↗

Reducing the risk to Mars: The gas core nuclear rocket

The next giant leap for mankind will be the human exploration of Mars. Almost certainly within the next thirty years, a human crew will brave the isolation, the radiation, and the lack of gravity to walk on and explore the Red planet. However, because the mission distances and duration will be hundreds of times greater than the lunar missions, a human crew will face much greater obstacles and a higher risk than those experienced during the Apollo program. A single solution to many of these obstacles is to dramatically decrease the mission duration by developing a high performance propulsion system. The gas-core nuclear rocket (GCNR) has the potential to be such a system. The authors have completed a comparative study of the potential impact that a GCNR could have on a manned Mars mission. The total IMLEO, transit times, and accumulated radiation dose to the crew will be compared with the NASA Design Reference Missions.

Howe, S. D.↗

SLS Ambassador Program

Overview of the agency’s plans for deep space exploration: (1) NASA has a phased approach to ensure our nation’s leadership in space exploration, beginning in Earth orbit, developing our skills in lunar space, and extending those skills and technologies to a human mission to Mars. (2) Currently, NASA is commercializing low-Earth orbit using commercial companies to transport supplies and scientific experiments to the ISS. NASA is working closely with them to launch American astronauts to the station from American soil soon. (3) ISS is our platform to better understand living and working in space. NASA paved the way for commercial companies to take over that work so that we could focus on human exploration of deep space. (4) NASA will establish a Lunar Orbiting Platform – Gateway to establish an outpost near the moon. It will enable us to get to Mars in a step-by-step fashion, with lessons learned in each phase of the process informing the next steps. SLS is the only launch vehicle with the power to get Orion and an in-space propulsion system to an orbit and a speed capable of enabling travel to the moon and beyond.

Lindstrom, Marcia↗

Solar System Exploration Division Strategic Plan, volume 1. Executive summary and overview

This first document is the first of a six-volume series presenting the Solar System Exploration Division's Strategic Plan for the 10-year period FY 1994 to FY 2003. The overall strategy is characterized by five fundamental precepts: (1) execute the current program; (2) improve the vitality of the program and the planetary science community; (3) initiate innovative, small, low-cost planetary missions; (4) initiate new major and moderate missions; and (5) prepare for the next generation of missions. This Strategic Plan describes in detail our proposed approach to accomplish these goals. Volume 1 provides first an Executive Summary of highlights of each of the six volumes, and then goes on to present an overview of the plan, including a discussion of the planning context and strategic approach. Volumes 2, 3, 4, and 5 describe in detail the initiatives proposed. An integral part of each of these volumes is a set of responses to the mission selection criteria questions developed by the Space and Earth Science Advisory Committee. Volume 2, Mission From Planet Earth, describes a strategy for exploring the Moon and Mars and sets forth proposed moderate missions--Lunar Observer and a Mars lander network. Volume 3, Pluto Flyby/Neptune Orbiter, discusses our proposed major new start candidate for the FY 1994 to FY 1998 time frame. Volume 4, Discovery, describes the Near-Earth Asteroid Rendezvous, as well as other candidates for this program of low-cost planetary missions. Volume 5, Toward Other Planetary Systems, describes a major research and analysis augmentation that focuses on extrasolar planet detection and the study of planetary system processes. Finally, Volume 6 summarizes the technology program that the division has structured around these four initiatives.

Source record↗

Teams in Space: Knowledge Gained, but More to Explore

NASA’s Human Research Program oversees the Team Risk (i.e., Risk of Performance and Behavioral Health Decrements due to Inadequate Cooperation, Coordination, Communication and Psychosocial Adaptation within a Team). Research in this area informs all aspects of an astronaut’s career, from hiring to training to mission support, and works to address new challenges related to lunar and Mars missions. NASA’s astronaut selection process creates an astronaut corps of highly qualified, team-oriented individuals, which allows mission planners much flexibility in composing small crews for specific missions. These crews are further developed and supported through extensive training, including team skills training, and countermeasures available to the crew throughout the mission. However, in the high consequence environment of long-duration missions, team composition is complex and is not a one-time concern to be addressed pre-mission. Team factors such as team cohesion, dyadic relationships, and shared team cognition are likely to change dynamically in response to each interaction and event experienced by the individuals and the team as a whole. Thus, monitoring and optimizing team composition at a more micro level (e.g., per task) is one way to support team functioning and performance. Spaceflight teams research also includes the multi-team system of Mission Control and coordination between space-to-ground, adding another avenue in which risk might be introduced, particularly under exploration missions that experience significant communication delays. Spaceflight teams research has recently experienced a concentrated flurry of analog research over the past decade, shedding light on the many unique challenges and potential solutions to mitigate the team risk in long-duration exploration missions. However, questions still remain about how to, for example, create unobtrusive operational measures and how to advance interdisciplinary teams research and countermeasure development. We present an overview of the challenges facing teams in space, our current knowledge, and the next steps for research and spaceflight operations.

Lauren Blackwell Landon↗

NASA's Space Launch System: Deep Space Access for CubeSats

NASA is embarking on a new generation of missions to the Moon, known as the Artemis program. The Agency’s new super heavy-lift launch vehicle, the Space Launch System (SLS), is a critical enabling capability for these efforts, which will serve as a proving ground for future crewed expeditions to Mars. SLS is designed to return astronauts to the Moon in the Orion spacecraft and to launch more mass and provide more volume for critical payloads than commercially available vehicles, giving NASA a unique asset for deep space exploration. When performance margin and volume is available, as it is on the first flight, Artemis I (previously Exploration Mission-1), SLS can offer CubeSats access to deep space, beyond Earth’s orbit. The Artemis I flight has 13 6U (14 kg) CubeSats manifested, and the Program is currently accepting proposals for 6U and 12U payloads for the Artemis II flight through the agency’s CubeSat Launch Initiative (CSLI) program. Proposals from U.S.-based payload developers to fly on Artemis II will be accepted through CSLI until November 4, 2019. When ridesharing on SLS deep space missions, CubeSats must demonstrate they will not interfere with primary mission objectives. The 13 Artemis I CubeSats that hail from industry, academia, NASA and its international partners represent an array of exciting deep space science investigations and technology demonstrations that may help inform future Artemis missions. The initial SLS Block 1 vehicle for the Artemis I flight is fully manufactured; several elements are complete and have been delivered to the Exploration Ground Systems (EGS) Program at Kennedy Space Center (KSC), which has responsibility for integrating and launching the SLS and Orion stack. Completed elements of the Artemis I vehicle include the Orion Stage Adapter (OSA), which houses the 13 Artemis I CubeSats. With the Artemis I flight hardware and software nearing completion, work is in progress for the second Block 1 launcher, designated for the crewed Artemis II flight. Hardware is being manufactured for every element of the Artemis II vehicle. In this paper, the author will review the status of the Artemis I vehicle and the payloads manifested for the initial flight. Information on the Secondary Payload Deployment System (SPDS) that the SLS Program provides to payload developers will also be included.

Creech, Stephen D.↗

The Affording Mars Workshop: Background and Recommendations

A human mission to Mars is the stated "ultimate" goal for NASA and is widely believed by the public to be the most compelling destination for America's space program. However, widely cited enormous costs - perhaps as much as a trillion dollars for a many-decade campaign - seem to be an impossible hurdle, although political and budget instability over many years may be equally challenging. More recently, a handful of increasingly detailed architectures for initial Mars missions have been developed by commercial companies that have estimated costs much less than widely believed and roughly comparable with previous major human space flight programs: the Apollo Program, the International Space Station, and the space shuttle. Several of these studies are listed in the bibliography to the workshop report. As a consequence of these new scenarios, beginning in spring, 2013 a multiinstitutional planning team began developing the content and invitee list for a winter workshop that would critically assess concepts, initiatives, technology priorities, and programmatic options to reduce significantly the costs of human exploration of Mars. The output of the workshop - findings and recommendations - would be presented in a number of forums and discussed with national leaders in human space flight. It would also be made available to potential international partners. This workshop was planned from the start to be the first in a series. Subsequent meetings, conferences, and symposia will concentrate on topics not able to be covered in December. In addition, to make progress in short meeting, a handful of ground rules were adopted by the planning team and agreed to by the participants. Perhaps the two most notable such ground rules were (1) the Space Launch System (SLS) and Orion would be available during the time frame considered by the participants and (2) the International Space Station (ISS) would remain the early linchpin in preparing for Mars exploration over the coming decade. The workshop was organized around three topical breakout sessions: 1. The ISS and the path to Mars: The critical coming decade 2. Affordability and sustainability: what does it mean and what are its implications within guidelines established at the start of the workshop? 3. Notional sequence(s) of cost-achievable missions for the 2020s to 2030s, including capability objectives at each stage and opportunities for coordinated robotic partnerships.

background↗

Mars aerobrake assembly demonstration

NASA has identified aerobraking as a potentially critical technology for the Space Exploration Initiative (SEI). The size of Mars aerobrakes may be beyond the capabilities of future launch vehicles to place them into orbit in one launch. On-orbit assembly using facilities and operations developed under the Space Station Freedom (SSF) Program represent one approach for realizing such large structures. the results of early testing in this subject can help influence the future evolution of the SSF. The objectives are to: (1) generate empirical data on operational procedures for on-orbit assembly of a large Mars aerobrake; (2) develop aerobrake design concepts; (3) identify critical issues and requirements associated with SSF utilization; and (4) to stimulate student participation in the SEI.

Garvey, John M.↗

Heavy Lift Launch Capability with a New Hydrocarbon Engine (NHE)

The Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center has analyzed over 2000 Ares V and other heavy lift concepts in the last 3 years. These concepts were analyzed for Lunar Exploration Missions, heavy lift capability to Low Earth Orbit (LEO) as well as exploratory missions to other near earth objects in our solar system. With the pending retirement of the Shuttle fleet, our nation will be without a civil heavy lift launch capability, so the future development of a new heavy lift capability is imperative for the exploration and large science missions our Agency has been tasked to deliver. The majority of the heavy lift concepts analyzed by ACO during the last 3 years have been based on liquid oxygen / liquid hydrogen (LOX/LH2) core stage and solids booster stage propulsion technologies (Ares V / Shuttle Derived and their variants). These concepts were driven by the decisions made from the results of the Exploration Systems Architecture Study (ESAS), which in turn, led to the Ares V launch vehicle that has been baselined in the Constellation Program. Now that the decision has been made at the Agency level to cancel Constellation, other propulsion options such as liquid hydrocarbon fuels are back in the exploration trade space. NASA is still planning exploration missions with the eventual destination of Mars and a new heavy lift launch vehicle is still required and will serve as the centerpiece of our nation s next exploration architecture s infrastructure. With an extensive launch vehicle database already developed on LOX/LH2 based heavy lift launch vehicles, ACO initiated a study to look at using a new high thrust (> 1.0 Mlb vacuum thrust) hydrocarbon engine as the primary main stage propulsion in such a launch vehicle.

Threet, Grady E., Jr.↗

NASA Lunar Surface Operations & Power Grid

The National Aeronautics and Space Administration (NASA) Artemis Program is developing, testing, and demonstrating new capabilities and technologies required to support a sustainable human presence on the lunar surface and a longer-term vision of sending astronauts to Mars. Artemis lunar surface operations will begin with robotically exploring the lunar south polar regions for locations suitable for harvesting lunar surface resources. Over time activities on the lunar surface will expand beyond robotic operations to human lunar surface operations with the delivery of a lunar habitat and in-situ resource utilization (ISRU) assets increasing the need for highly reliable and available electrical power. As operations move beyond the Artemis technology demonstrations and exploration activities towards full commercial lunar surface activities, the ability to expand the original envisioned Artemis power system and repurpose power system components to support commercial activities will be crucial. One technology that will be necessary to support commercial lunar operations is a power grid. A lunar surface power grid would offer the ability to integrate various power sources to maximize power availability, including fission surface power (nuclear), solar arrays, batteries, and regenerative fuel cells. Newly designed terrestrial microgrids are flexible and can be designed to allow for islanded operation, where power is utilized near the loads to minimize power distribution losses or in a power sharing mode where power is transmitted longer distances. This capability is crucial during failures where overall power availability is reduced, and load demand exceeds generation/storage capability. These terrestrial microgrids will also allow for the power system to grow and evolve over time, meeting the need to expand beyond initial lunar surface activities. This presentation will discuss the NASA Artemis plans, potential power system architectures, and power distribution options that will enable growth from initial technology demonstrations towards a lunar economy with a lunar surface power grid that offers many of the advantages of terrestrial microgrids.

Microgrids↗

Beagle 2 the Moon: An Experimental Package to Measure Polar Ice and Volatiles in Permanently Shadowed Areas or Beneath the Lunar Surface

NASA has announced the selection of several Lunar Science Sortie Concept Studies for potential scientific payloads with future Lunar Missions. The Beagle 2 scientific package was one of those chosen for study. Near the beginning of the next decade will see the launch of scientific payloads to the lunar surface to begin laying the foundations for the return to the moon in the Vision for Space Exploration. Shortly thereafter, astronauts will return to the lunar surface with the ability to place scientific packages on the surface that will provide information about lunar resources and compositions of materials in permanently shadowed regions of the moon (1). One of the important questions which must be answered early in the program is whether there are lunar resources which would facilitate "living off the land" and not require the transport of resources and consumables from Earth (2). The Beagle science package developed to seek the signatures of life on Mars is the ideal payload (3) to use on the lunar surface for determining the nature of hydrogen, water and lunar volatiles found in the polar regions which could support the Vision for Space Exploration.

Gibson, E. K.↗

Microbial Contamination in the Spacecraft

Spacecraft and space habitats supporting human exploration contain a diverse population of microorganisms. Microorganisms may threaten human habitation in many ways that directly or indirectly impact the health, safety, or performance of astronauts. The ability to produce and maintain spacecraft and space stations with environments suitable for human habitation has been established over 40 years of human spaceflight. An extensive database of environmental microbiological parameters has been provided for short-term (< 20 days) spaceflight by more than 100 missions aboard the Space Shuttle. The NASA Mir Program provided similar data for long-duration missions. Interestingly, the major bacterial and fungal species found in the Space Shuttle are similar to those encountered in the nearly 15-year-old Mir. Lessons learned from both the US and Russian space programs have been incorporated into the habitability plan for the International Space Station. The focus is on preventive measures developed for spacecraft, cargo, and crews. On-orbit regular housekeeping practices complete with visual inspections are essential, along with microbiological monitoring. Risks associated with extended stays on the Moon or a Mars exploration mission will be much greater than previous experiences because of additional unknown variables. The current knowledge base is insufficient for exploration missions, and research is essential to understand the effects of spaceflight on biological functions and population dynamics of microorganisms in spacecraft.

Pierson, Duane L.↗

Space Human Factors Engineering Gap Analysis Project Final Report

Humans perform critical functions throughout each phase of every space mission, beginning with the mission concept and continuing to post-mission analysis (Life Sciences Division, 1996). Space missions present humans with many challenges - the microgravity environment, relative isolation, and inherent dangers of the mission all present unique issues. As mission duration and distance from Earth increases, in-flight crew autonomy will increase along with increased complexity. As efforts for exploring the moon and Mars advance, there is a need for space human factors research and technology development to play a significant role in both on-orbit human-system interaction, as well as the development of mission requirements and needs before and after the mission. As part of the Space Human Factors Engineering (SHFE) Project within the Human Research Program (HRP), a six-month Gap Analysis Project (GAP) was funded to identify any human factors research gaps or knowledge needs. The overall aim of the project was to review the current state of human factors topic areas and requirements to determine what data, processes, or tools are needed to aid in the planning and development of future exploration missions, and also to prioritize proposals for future research and technology development.

Hudy, Cynthia↗

Microbial contamination of spacecraft

Spacecraft and space habitats supporting human exploration contain a diverse population of microorganisms. Microorganisms may threaten human habitation in many ways that directly or indirectly impact the health, safety, or performance of astronauts. The ability to produce and maintain spacecraft and space stations with environments suitable for human habitation has been established over 40 years of human space flight. An extensive database of environmental microbiological parameters has been provided for short-term (< 20 days) space flight by more than 100 missions aboard the Space Shuttle. The NASA Mir Program provided similar data for long-duration missions. Interestingly, the major bacterial and fungal species found in the Space Shuttle are similar to those encountered in the nearly 15-year-old Mir. Lessons learned from both the US and Russian space programs have been incorporated into the habitability plan for the International Space Station. The focus is on preventive measures developed for spacecraft, cargo, and crews. On-orbit regular housekeeping practices complete with visual inspections are essential, along with microbiological monitoring. Risks associated with extended stays on the Moon or a Mars exploration mission will be much greater than previous experiences because of additional unknown variables. The current knowledge base is insufficient for exploration missions, and research is essential to understand the effects of space flight on biological functions and population dynamics of microorganisms in spacecraft. Equally important is a better understanding of the immune response and of human-microorganism-environment interactions during long-term space habitation.

Mir Project↗

Building Operations Efficiencies into NASA's Ares I Crew Launch Vehicle Design

The U.S. Vision for Space Exploration guides the National Aeronautics and Space Administration's (NASA's) challenging missions that expand humanity's boundaries and open new routes to the space frontier. With the Agency's commitment to complete the International Space Station (ISS) and to retire the venerable Space Shuttle by 2010, the NASA Administrator commissioned the Exploration Systems Architecture Study (ESAS) in 2005 to analyze options for safe, simple, cost-efficient launch solutions that could deliver human-rated space transportation capabilities in a timely manner within fixed budget guidelines. The Exploration Launch Projects (ELP) Office, chartered by the Constellation Program in October 2005, has been conducting systems engineering studies and business planning to successively refine the design configurations and better align vehicle concepts with customer and stakeholder requirements, such as significantly reduced life-cycle costs. As the Agency begins the process of replacing the Shuttle with a new generation of spacecraft destined for missions beyond low-Earth orbit to the Moon and Mars, NASA is designing the follow-on crew and cargo launch systems for maximum operational efficiencies. To sustain the long-term exploration of space, it is imperative to reduce the $4 billion NASA typically spends on space transportation each year. This paper gives toplevel information about how the follow-on Ares I Crew Launch Vehicle (CLV) is being designed for improved safety and reliability, coupled with reduced operations costs. These methods include carefully developing operational requirements; conducting operability design and analysis; using the latest information technology tools to design and simulate the vehicle; and developing a learning culture across the workforce to ensure a smooth transition between Space Shuttle operations and Ares vehicle development.

Dumbacher, Daniel L.↗

A Capable and Temporary Test Facility on a Shoestring Budget: The MSL Touchdown Test Facility

The Mars Science Laboratory mission (MSL) has undertaken a developmental Touchdown Test Program that utilizes a full-scale rover vehicle and an overhead winch system to replicate the skycrane landing event. Landing surfaces consisting of flat and sloped granular media, planar, rigid surfaces, and various combinations of rocks and slopes were studied. Information gathered from these tests was vital for validating the rover analytical model, validating certain design or system behavior assumptions, and for exploring events and phenomenon that are either very difficult or too costly to model in a credible way. This paper describes this test program, with a focus on the creation of test facility, daily test operations, and some of the challenges faced and lessons learned along the way.

rover↗

A Distributed Simulation Framework Applied to Artemis Analysis, Studies, Integration, and Test

The National Aeronautics and Space Administration (NASA) established the Artemis Program, a series of missions to return humans to the Moon and explore further than before. To execute the Artemis missions, NASA is collaborating with commercial and international partners to create the necessary infrastructure and logistics plan that will establish a long term presence on the Moon ahead of exploring Mars. NASA and its partners are developing a collection of space and surface systems to support crewed missions to the lunar surface that will provide the mobility, habitation, logistics, and exploration support necessary for Artemis mission successes which includes robust scientific investigations. This paper details the design, capabilities, and uses of the Artemis Distributed Simulation (ADS) being developed by the NASA Exploration Systems Simulations (NExSyS) Team to support Artemis architecture studies. ADS utilizes international interoperability standards to connect a collection of independent vehicle and service simulations; these include but are not limited to elements such as rovers, landers, and habitation elements along with services like communications, environment, visualization, and data logging. ADS’s distributed nature allows for the complex aggregation of constituent Artemis elements; this includes efficient scenario modification with the addition or removal of individual simulations representing Artemis elements or services. This capability provides support for the rapid performance of various Artemis mission trade studies exploring alternate configurations. Currently, ADS uses NASA developed simulations for development and testing; however, through the use of international simulation interoperability standards, ADS provides an integration framework to incorporate dissimilar authoritative vendor simulations as Artemis systems mature and vendor simulations become available. Vendor simulations will be able to join ADS and interact with other Artemis elements and vehicles while limiting the exposure of proprietary data. This paper describes the expansion of an existing distributed simulation infrastructure to accommodate a collaborative and dynamic framework for the Artemis Program. This work includes updated federation designs, integration into existing NASA facilities, advancements in visualizations, and advancements in human driven inputs. This paper will also outline recently completed and ongoing support and collaboration with NASA studies and testing, namely results from energetics and Human-In-The-Loop (HITL) studies. The paper concludes with a plan for future developments and facility integration to enable enhanced studies in preparation for a return of humans to the lunar surface.

Artemis↗