Fiscal Year 2021 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada
Annual report prepared for DOE HQ
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Annual report prepared for DOE HQ
Report prepared for NDEP
Report for NDEP
Report for NDEP
Annual report submitted to DOE/HQ
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Report prepared for NDEP
Report prepared for NDEP
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Report for NDEP
Report prepared for NDEP
Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories (CRL) has been in operation for over 60 years. Radioactive, mixed, hazardous and non-hazardous wastes have been and continue to be generated at CRL as a result of research and development, radioisotope production, reactor operation and facility decommissioning activities. AECL has implemented several improvement initiatives at CRL to simplify the interface between waste generators and waste receivers: - Introduction of trained Waste Officers representing their facilities or activities at CRL; - Establishment of a Waste Management Customer Support Service as a Single-Point of Contact to provide guidance to waste generators for all waste management processes; and - Implementation of a streamlined approach for waste identification with emphasis on early identification of waste types and potential disposition paths. As a result of implementing these improvement initiatives, improvements in waste management and waste transfer efficiencies have been realized at CRL. These included: 1) waste generators contacting the Customer Support Service for information or guidance instead of various waste receivers; 2) more clear and consistent guidance provided to waste generators for waste management through the Customer Support Service; 3) more consistent and correct waste information provided to waste receivers through Waste Officers, resulting in reduced time and resources required for waste management (i.e., overall cost); 4) improved waste minimization and segregation approaches, as identified by in-house Waste Officers; and 5) enhanced communication between waste generators and waste management groups. (authors)
Repository performance confirmation links the technical bases of repository science and societal acceptance. Among the countless aspects of monitoring, performance confirmation holds a special place, involving distinct activities combining technical and social significance in radioactive waste management. Discussion is divided into four themes: 1. A distinction is drawn between performance confirmation monitoring and other testing and monitoring objectives, 2. A case study illustrates confirmation activities integrated within a long-term testing and monitoring strategy for Yucca Mountain, 3. A case study reviews compliance monitoring developed and implemented for the Waste Isolation Pilot Plant, and 4. An approach for developing, evaluating and implementing the next generation of performance confirmation monitoring is presented. International interest in repository monitoring is exhibited by the European Commission Seventh Framework Programme 'Monitoring Developments for Safe Repository Operation and Staged Closure' (MoDeRn) Project. The MoDeRn partners are considering the role of monitoring in a phased approach to the geological disposal of radioactive waste. As repository plans advance in different countries, the need to consider monitoring strategies within a controlled framework has become more apparent. The MoDeRn project pulls together technical and societal experts to assimilate a common understanding of a process that could be followed to develop a monitoring program. Experience from two repository programs in the United States sheds light on how performance confirmation has been executed. Lessons learned can help the next generation of performance confirmation. (author)
This paper identifies how a joint Sellafield Ltd/Nuclear Management Partners Tactical Review Team and main contractor, SA Robotics, developed and successfully deployed a solution to clean and coat the wall surface of an aging structure on the Sellafield Site. This involved removal of redundant pipework from the wall, cleaning and coating of the surface using a bespoke designed robotic manipulator with various end effectors. This system was able to safely and in a controlled manner remove the pipework, clean down the wall and prime and coat it within the required programme duration which was 5 months earlier than a previous shielding only option. This was done in a high radiation field and in the challenging conditions of winter in Northern England. (authors)
Report prepared for NDEP