Search NASA⌕ Search

SEARCH · Search NASA

Results for “SHUTDOWN”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

System Study: Residual Heat Removal 1998-2024

This report presents an unreliability evaluation of the residual heat removal (RHR) system in two modes of operation (low-pressure injection in response to a large loss-of-coolant accident and in response to post-trip shutdown cooling) at 93 U.S. commercial operating nuclear reactors. New Standardized Plant Analysis Risk (SPAR) models with the most recent SPAR parameter update results were used in this report. Demand, run hour, and failure data from 1998 to 2024 for selected components were obtained from the Institute of Nuclear Power Operations (INPO) Industry Reporting and Information System (IRIS), formerly the INPO Consolidated Events Database. The unreliability results are trended for the most recent 10 year period and yearly estimates for system unreliability are provided for the entire active period. Statistically significant and highly statistically significant decreasing trends were observed for RHR low-pressure injection mode start-only unreliability and RHR low-pressure injection model 24-hour unreliability.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Forge Internship at FAST-IOTA

Assisted FAST facility personal with various upgrades and system installation activities during the summer 2026 FAST-IOTA shutdown as a part of the FORGE internship program. Herein is a summary of my involvement in and the results of that experience.

DeCraene, Ryan [Unlisted, US, IL]↗

HTGR Multiphysics Application Drivers FY26 Updates

This report summarizes FY26 progress under the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program's high-temperature gas-cooled reactor (HTGR) application driver work, covering a wide range of activities such as code validation and multi-physics code assessment. 1) A detailed SAM model of the High-Temperature Engineering Test Reactor (HTTR) was developed using a unique-block grouping approach, with an extended parallel thermal network method to capture block-to-block conduction and radiation heat transfer, and applied to steady-state simulations of the HTTR 30~MW and 9~MW cases. 2) In another activity, SAM's newly implemented multi-component gas flow model was validated against the Natural convection Shutdown heat removal Test Facility (NSTF) argon ingress experiment, correctly capturing the density-driven suppression and thermal recovery of natural circulation observed when argon is introduced into the air-cooled Reactor Cavity Cooling System (RCCS) loop. 3) For the OECD/NEA High Temperature Test Facility (HTTF) benchmark, we co-led the international benchmark activities as well as the OECD/NEA final benchmark report to be released at the end of this year. 4) Finally, the coupled Griffin-SAM modeling capability for pebble-bed HTGRs was advanced by verifying the Griffin neutronics solution against Serpent Monte Carlo for a realistic non-uniform temperature distribution, resolving several deficiencies in the SAM-to-Griffin temperature transfer scheme, and enabling distinct fuel kernel, moderator, and coolant temperatures for cross section feedback. These new features were demonstrated in a PBR load-following transient.

Lee, Alvin↗

Nuclear Safety [Vol. 37, No. 2, April-June 1996]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 97 The Nuclear Community and the Public: Cognitive and Cultural Influences on Thinking About Nuclear Risk, M. A. Meyer; 109 Twenty-Third Water Reactor Safety Information Meeting, D. A. Copinger; ACCIDENT ANALYSIS: 126 Analysis of a PWR LBLOCA Without SCRAM, Trevor N. Tyler, Rafael Macian-Juan and John H. Mahaffy; DESIGN FEATURES: 139 Vulnerability of Multiple-Barrier Systems, N. C. Lind; ENVIRONMENTAL EFFECTS: 149 A Study of Wet Catalytic Oxidation of Radioactive Spent Ion Exchange Resin by Hydrogen Peroxide, Xingchao Jian, Tianbao Wu, and Guichun Yun; 157 A Comparison Study and Resolution of Differences Between Emergency Response and Safety Analysis Codes Used at the Savannah River Site, A. A. Simpkins; OPERATING EXPERIENCES: 164 Reactor Shutdown Experience, Compiled by J. W. Cletcher; RECENT DEVELOPMENTS: 167 Reports, Standards, and Safety Guides, D. S. Queener; 172 Proposed Rule Changes as of Dec. 31,1995; ANNOUNCEMENTS: 178 American Nuclear Society 1997 Annual Meeting; 178 American Nuclear Society Nuclear Criticality and Safety Division Topical Meeting; 176 The Authors.

05 NUCLEAR FUELS↗

Nuclear Safety [Vol. 33, No. 4, October-December 1992]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 499 Technical Note: Nuclear Regulatory Commission’s Examination Question Bank System, C. L Jensen and N. L. Skinner; 506 Report on the Specialists’ Meeting on Passive and Active Safety Features of Liquid-Metal Fast Breeder Reactors Organized by the International Atomic Energy Agency at Oarai Engineering Centre of Power Reactor and Nuclear Development Corporation, Japan, November 5-7,1991, S. R. Paranjpe; ACCIDENT ANALYSIS: 514 A Review of Hydrogen Production During Melt/Water Interaction in LWRs, D. F. Fletcher, B. D. Turland, and S. P. A. Lawrence; 535 A Review of the U 3 0 8 -Al Reaction as a Potential Heat Source in Research and Test Reactor Accidents, J. L. Snelgrove; CONTROL AND INSTRUMENTATION: 543 Multilevel Interfaces for Power Plant Control Rooms II: A Preliminary Design Space, K. J. Vicente; DESIGN FEATURES: 549 Twenty-Second DOE/NRC Nuclear Air Cleaning and Treatment Conference, R. R. Bellamy, D. W. Moeller, and M. W. First; 562 Book Review: Safety Assessment of Unit 5 (WWER-440/W-213) of the Greifswald Nuclear Power Station, M. H. Fontana; WASTE AND SPENT FUEL MANAGEMENT: 576 Activities Related to Waste and Spent Fuel Management, M. D. Muhlheim and E. G. Silver; OPERATING EXPERIENCES: 586 Analysis of Corrective Actions Applied to Nuclear Power Plant Operations, A. E. Cross; 593 Reactor Shutdown Experience, Compiled by J. W. Cletcher; 596 Operating U.S. Power Reactors, Compiled by M. D. Muhlheim and E. G. Silver; 609 Non-Commercial Power Operating Experience; 614 World Nuclear Performance, Compiled by M. D. Muhlheim; RECENT DEVELOPMENTS: 623 General Administrative Activities, Compiled by M. D. Muhlheim and E. G. Silver; 635 Reports, Standards, and Safety Guides, D. S. Queener; 639 Proposed Rule Changes as of June 30, 1992; ANNOUNCEMENTS: 513 Fourth International Conference on Nuclear Fuel Reprocessing and Waste Management RECOD '94; 585 International Topical Meeting on Advanced Reactors Safety; 622 International Workshop on Implementation of ALARA at Nuclear Power Plants; 648 Short Course on Nuclear Criticality Safety; 648 8th Topical Meeting on Problems in Reactor Physics MEPhi-VOLGA-93; 643 The Authors; 646 Reviewers of Nuclear Safety, Vol. 33

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multifunctional Metallic and Refractory Materials for Energy Efficient Handling of Molten Metals

The goal of the project was to extend the lifetime of hardware submerged in molten metal by an order of magnitude and to improve energy efficiency of molten metal handling process. Assuming broad implementation of project results, energy savings in 2020 were projected to be 10 trillion BTU/year, with cost savings of approximately $100 million/year. The project team was comprised of materials research groups from West Virginia University and the Missouri University of Science and Technology formerly University of Missouri – Rolla, Oak Ridge National Laboratory, International Lead and Zinc Research Organization, Secat and Energy Industries of Ohio. Industry partners included six suppliers to the hot dip galvanizing industry, four end-user steel companies with hot-dip Galvanize and/or Galvalume lines, eight refractory suppliers, and seven refractory end-user companies. The results of the project included the development of: (1) New families of materials more resistant to degradation in hot-dip galvanizing bath conditions were developed; (2) Alloy 2020 weld overlay material and process were developed and applied to GI rolls; (3) New Alloys and dross-cleaning procedures were developed for Galvalume processes; (4) Two new refractory compositions, including new anti-wetting agents, were identified for use with liquid aluminum alloys; (5) A new thermal conductivity measurement technique was developed and validated at ORNL; (6) The Galvanizing Energy Profiler Decision Support System (GEPDSS)at WVU; Newly Developed CCW Laser Cladding Shows Better Resistance to Dross Buildup than 316L Stainless Steel; and (7) A novel method of measuring the corrosion behavior of bath hardware materials. Project in-line trials were conducted at Southwire Kentucky Rod and Cable Mill, Nucor-Crawfordsville, Nucor-Arkansas, Nucor-South Carolina, Wheeling Nisshin, California Steel, Energy Industries of Ohio, and Pennex Aluminum. Cost, energy, and environmental benefits resulting from the project are due to: i) a reduced number of process shutdowns to change hardware or lining material, ii) reduced need to produce new hardware or lining material, iii) improved product quality leads to reduced need to remake product or manufacturing of new product, iv) reduction in contamination of melt from degradation of refractory and metallic components, v) elimination of worn hardware will increase efficiency of process, vi) reduced refractory lining deterioration or formation of a less insulating phase, would result in decreased heat loss through the walls. Projected 2015 benefits for the U.S. aluminum industry, assuming 21% market penetration of improved refractory materials, are energy savings of approximately 0.2 trillion BTU/year, cost savings of $2.3 billion/year and carbon reductions of approximately 1.4 billion tons/year. The carbon reduction benefit of the project for the hot-dip galvanize and aluminum industries combined is projected to be approximately 2.2 billion tons/year in 2015. Pathways from research to commercialization were based on structure of the project’s industrial partnerships. These partnerships included suppliers, industrial associations, and end users. All parties were involved in conducting the project including planning and critiquing the trials. Supplier companies such as Pyrotech Metaullics, Stoody, and Duraloy have commercialized products and processes developed on the project.

01 COAL, LIGNITE, AND PEAT↗

A Qualitative Investigation of Deposition Velocities of a Non-Newtonian Slurry in Complex Pipeline Geometries

The External Flowsheet Review Team (EFRT) has identified the issues relating to the Waste Treatment and Immobilization Plant (WTP) pipe plugging. Per the review’s executive summary, “Piping that transports slurries will plug unless it is properly designed to minimize this risk. This design approach has not been followed consistently, which will lead to frequent shutdowns due to line plugging.” To evaluate the potential for plugging, testing was performed to determine critical velocities for the complex WTP piping layout. Critical velocity is defined as the point at which a moving bed of particles begins to form on the pipe bottom during slurry-transport operations. Pressure drops across the fittings of the test pipeline were measured with differential pressure transducers, from which the critical velocities were determined. A WTP prototype flush system was installed and tested upon the completion of the pressure-drop measurements. We also provide the data for the overflow relief system represented by a WTP complex piping geometry with a non-Newtonian slurry. A waste simulant composed of alumina (nominally 50 μm in diameter) suspended in a kaolin clay slurry was used for this testing. The target composition of the simulant was 10 vol% alumina in a suspending medium with a yield stress of 3 Pa. No publications or reports are available to confirm the critical velocities for the complex geometry evaluated in this testing; therefore, for this assessment, the results were compared to those reported by Poloski et al. (2008) for which testing was performed for a straight horizontal pipe. The results of the flush test are compared to the WTP design guide 24590-WTP-GPG-M-0058, Rev. 0 (Hall 2006) in an effort to confirm flushing-velocity requirements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Audit Report "Department of Energy Efforts to Manage Information Technology Resources in an Energy-Efficient and Environmentally Responsible Manner"

The American Recovery and Reinvestment Act of 2009 emphasizes energy efficiency and conservation as critical to the Nation's economic vitality; its goal of reducing dependence on foreign energy sources; and, related efforts to improve the environment. The Act highlights the significant use of various forms of energy in the Federal sector and promotes efforts to improve the energy efficiency of Federal operations. One specific area of interest is the increasing demand for Federal sector computing resources and the corresponding increase in energy use, with both cost and environmental implications. The U.S. Environmental Protection Agency reported that, without aggressive conservation measures, data center energy consumption alone is expected to double over the next five years. In our report on Management of the Department's Data Centers at Contractor Sites (DOE/IG-0803, October 2008) we concluded that the Department of Energy had not always improved the efficiency of its contractor data centers even when such modifications were possible and practical. Despite its recognized energy conservation leadership role, the Department had not always taken advantage of opportunities to reduce energy consumption associated with its information technology resources. Nor, had it ensured that resources were managed in a way that minimized impact on the environment. In particular: (1) The seven Federal and contractor sites included in our review had not fully reduced energy consumption through implementation of power management settings on their desktop and laptop computers; and, as a consequence, spent $1.6 million more on energy costs than necessary in Fiscal Year 2008; (2) None of the sites reviewed had taken advantage of opportunities to reduce energy consumption, enhance cyber security, and reduce costs available through the use of techniques, such as 'thin-client computing' in their unclassified environments; and, (3) Sites had not always taken the necessary steps to reduce energy consumption and resource usage of their data centers, such as identifying and monitoring the amount of energy used at their facilities. We concluded that Headquarters programs offices (which are part of the Department of Energy's Common Operating Environment) as well as field sites had not developed and/or implemented policies and procedures necessary to ensure that information technology equipment and supporting infrastructure was operated in an energy-efficient manner and in a way that minimized impact on the environment. For example, although required by the Department, sites had not enabled computer equipment power management features designed to reduce energy consumption. In addition, officials within Headquarters programs and at the sites reviewed had not effectively monitored performance or taken steps to fully evaluate available reductions in energy usage at their facilities. Without improvements, the Department will not be able to take advantage of opportunities to reduce energy consumption and realize cost savings of nearly $23 million over the next five years at just the seven sites reviewed. We noted that the potential for reduced energy consumption at these sites alone was equivalent to the annual power requirements of over 2,400 homes or, alternatively, removing about 3,000 cars from the road each year. Many of the available energy reduction strategies, such as fully utilizing energy-efficient settings on the many computers used by the Department and its contractors, are 'low hanging fruit' in that they will provide immediate tangible energy savings at little or no cost. Others, such as a shift to thin-client computing, an environment that transfers the processing capabilities from an individual's desk to a shared server environment, will require some level of investment which can, based on available literature, be successfully recovered through reduced acquisition and support costs. In our judgment, given its highly visible leadership in energy issues, aggressive action should be taken to make the Department's information technology operations as energy efficient as possible so that it can serve as a role model for both the Federal and private sector. To its credit, the Department had increased the number of energy-efficient computers purchased in recent years. In addition, the Office of the Chief Information Officer implemented an automated computer shutdown program at Headquarters that was estimated to save up to nearly $400,000 per year. Furthermore, we found that certain sites had initiated actions to review a potential transition to unclassified thin-client computing; however, implementation had not yet been completed. These are positive steps, but additional action is required, and our report contains several recommendations to this end.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Cle Elum Supplementation and Research Facility : Monthly Progress Report : December 1, 2008 - December 31, 2008.

FISH PRODUCTION: Brood year 2008 production and experimental hatchery & supplemental crossed eggs continue to be incubated and chilled water at 380 Fahrenheit for the month. Temperature units are {approx}960 TU's at the end of the month. Hatching was observed at {approx}900 temperature units (TU's). The 2007 Brood year (BY) has approximately 773,477 juveniles on hand at the end of December, averaging 30.6 fish per pound. Fish tagging operations wrapped up on the 5th. Transportation of fish to acclimation sites is tentatively scheduled to begin January 12th. FISH CULTURE: Production pond cleaning continues on a weekly basis, and feeding continues to be performed two days per week due to the colder river water temperatures. Eggs in the incubation continue to be tempered in 38 degree water and temperature units recorded daily. On the 20th the river became too inclement for normal operations as the intake screens were covered with ice, at that time we shutdown two river pumps and turned on wells four and six to get 6,825 gallons of water. This was the operation at the facility for twenty-four hours at which point we were able to get back to normal operations. WATER PRODUCTION: The current combined well and river water supply to the complex is 14,756 gallons/min. The river pumps are supplying 13,571 gallons per minute. Well pumps No.2 and No.4 are operating and supplying 1,185 gallons/min. More on well pumps in the well field maintenance section of this report. ACCLIMATION SITES: Preparation of acclimation sites for fish transfer was the main focus for the month of December. Each week thermographs that record water temperature have the data disc changed at the acclimations sites. Ford Excavation with assistance from YKFP maintenance has started clearing snow out of the Easton acclimation site. VEHICLE MAINTENANCE: The snowmobiles were taken in to have annual maintenance performed. The full-size John Deere tractor needed and was taken to Barnet Implement in Yakima. The tractor needed a new clutch installed and was picked up on the 31st. SHOP BUILDING MAINTENANCE: On the 12th the facility domestic water hydro pneumatic tank and its system malfunctioned. The problem persisted and had to be dealt with multiple times; first it caused the tank to over flow and floods the shop. Wallace Electric was called and after extensive monitoring of the tank, compressor and electrical operations an electrical relay switch was replaced. Weekly cleaning and tool inventory continues to be a priority. The shop is home to our liberation truck along with fish transfer equipment, fish pump and seine nets. ELECTRICAL BUILDING MAINTENANCE: The large generator is located in the electrical building and is checked daily for routine inspections. HATCHERY BUILDING MAINTENANCE: The incubation building is being used to clean and repair isolation buckets, egg incubation baskets and troughs. An experiment involving remote site incubators (RSI's) continued through the month. Chad Stockton, WDFW, records flows and monitors emergence of fry on a daily basis. Chad is working with Steve S. and Curt K. on the RSI's research along with spawning channel fry emergence. RIVERWATER COOLING FACILITY: The one pump in operation in this building is checked daily during our routine inspections, the variable pump is supplying water to the artificial spawning channel. RIVER PUMP STATION MAINTENANCE: All four river pumps are in operation and pumping {approx}13,571 gallons/min to the facility. The building is cleaned monthly and the air burst system is cycled daily during the morning checks. The crew continued weekly changing of the graph paper on the river temperature thermograph throughout the month, continuing this activity as part of the daily checks routine. WELL FIELD MAINTENANCE: Wells No.1 and No.4 were in operation and supplying 1,185 gallons/minute to the facility and incubation building. Weekly test well readings are recorded and sent via fax to CH2MHILL. Also weekly well meter readings are recorded. Well No.5 had been determined to have a faulty drain valve while trying to operate the pump for emergency water usage. It was determined that water was not able to drain and began to flow out from the test hole (TH9). Charlie and Simon pumped out the remaining water from the test hole prior to replacing the valve. The valve was subsequently dug up, replaced and tested for operation. SAFETY AND TRAINING: The winter season has approached and conditions can be hazardous as Cle Elum staff stress safety while working and preparing acclimation sites for upcoming fish transfer. Some examples include wearing proper clothing, extra caution while driving and plowing snow. GROUNDS: Linda Lamebull of fisheries and personnel from Tribal Purchasing came to the hatchery to inventory two way radios.

13 HYDRO ENERGY↗

Deposition Velocities of Newtonian and Non-Newtonian Slurries in Pipelines

The WTP pipe plugging issue, as stated by the External Flowsheet Review Team (EFRT) Executive Summary, is as follows: “Piping that transports slurries will plug unless it is properly designed to minimize this risk. This design approach has not been followed consistently, which will lead to frequent shutdowns due to line plugging.” A strategy was employed to perform critical-velocity tests on several physical simulants. Critical velocity is defined as the point where a stationary bed of particles deposits on the bottom of a straight horizontal pipe during slurry transport operations. Results from the critical velocity testing provide an indication of slurry stability as a function of fluid rheological properties and transport conditions. The experimental results are compared to the WTP design guide on slurry transport velocity in an effort to confirm minimum waste velocity and flushing velocity requirements as established by calculations and critical line velocity correlations in the design guide. The major findings of this testing is discussed below. Experimental results indicate that the use of the Oroskar and Turian (1980) correlation in the design guide is conservative—Slurry viscosity has a greater affect on particles with a large surface area to mass ratio. The increased viscous forces on these particles result in a decrease in predicted critical velocities from this traditional industry derived equations that focus on particles large than 100 μm in size. Since the Hanford slurry particles generally have large surface area to mass ratios, the reliance on such equations in the Hall (2006) design guide is conservative. Additionally, the use of the 95% percentile particle size as an input to this equation is conservative. However, test results indicate that the use of an average particle density as an input to the equation is not conservative. Particle density has a large influence on the overall result returned by the correlation. Lastly, the viscosity correlation used in the WTP design guide has been shown to be inaccurate for Hanford waste feed materials. The use of the Thomas (1979) correlation in the design guide is not conservative—In cases where 100% of the particles are smaller than 74 μm or particles are considered to be homogeneous due to yield stress forces suspending the particles the homogeneous fraction of the slurry can be set to 100%. In such cases, the predicted critical velocity based on the conservative Oroskar and Turian (1980) correlation is reduced to zero and the design guide returns a value from the Thomas (1979) correlation. The measured data in this report show that the Thomas (1979) correlation predictions often fall below that measured experimental values. A non-Newtonian deposition velocity design guide should be developed for the WTP— Since the WTP design guide is limited to Newtonian fluids and the WTP expects to process large quantities of such materials, the existing design guide should be modified address such systems. A central experimental finding of this testing is that the flow velocity required to reach turbulent flow increases with slurry rheological properties due to viscous forces dampening the formation of turbulent eddies. The flow becomes dominated by viscous forces rather than turbulent eddies. Since the turbulent eddies necessary for particle transport are not present, the particles will settle when crossing this boundary called the transitional deposition boundary. This deposition mechanism should be expected and designed for in the WTP.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Search for the Standard Model Higgs boson in the decay mode H→ W + W - → ℓ + vℓ - v

The question of the nature and principles of the universe and our place in it is the driving force of science since Mesopotamian astronomers glanced for the first time at the starry sky and Greek atomism has been formulated. During the last hundred years modern science was able to extend its knowledge tremendously, answering many questions, opening entirely new fields but as well raising many new questions. Particularly Astronomy, Astroparticle Physics and Particle Physics lead the race to answer these fundamental and ancient questions experimentally. Today it is known that matter consists of fermions, the quarks and leptons. Four fundamental forces are acting between these particles, the electromagnetic, the strong, the weak and the gravitational force. These forces are mediated by particles called bosons. Our confirmed knowledge of particle physics is based on these particles and the theory describing their dynamics, the Standard Model of Particles. Many experimental measurements show an excellent agreement between observation and theory but the origin of the particle masses and therefore the electroweak symmetry breaking remains unexplained. The mechanism proposed to solve this issue involves the introduction of a complex doublet of scalar fields which generates the masses of elementary particles via their mutual interactions. This Higgs mechanism also gives rise to a single neutral scalar boson with an unpredicted mass, the Higgs boson. During the last twenty years several experiments have searched for the Higgs boson but so far it escaped direct observation. Nevertheless these studies allow to further constrain its mass range. The last experimental limits on the Higgs mass have been set in 2001 at the LEP collider, an electron positron machine close to Geneva, Switzerland. The lower limit set on the Higgs boson mass is m H > 114.4 GeV/c 2 and remained for many years the last experimental constraint on the Standard Model Higgs Boson due to the shutdown of the LEP collider and the experimental challenges at hadron machines as the Tevatron. This thesis was performed using data from the D0 detector located at the Fermi National Accelerator Laboratory in Batavia, IL. Final states containing two electrons or a muon and a tau in combination with missing transverse energy were studied to search for the Standard Model Higgs boson, utilizing up to 4.2 fb -1 of integrated luminosity. In 2008 the CDF and D0 experiments in a combined effort were able to reach for the first time at a hadron collider the sensitivity to further constrain the possible Standard Model Higgs boson mass range. The research conducted for this thesis played a pivotal role in this effort. Improved methods for lepton identification, background separation, assessment of systematic uncertainties and new decay channels have been studied, developed and utilized. Along with similar efforts at the CDF experiment these improvements led finally the important result of excluding the presence of a Standard Model Higgs boson in a mass range of m H = 160-170 GeV/c 2 at 95% Confidence Level. Many of the challenges and methods found in the present analysis will probably in a similar way be ingredients of a Higgs boson evidence or discovery in the near future, either at the Tevatron or more likely at the soon starting Large Hadron Collider (LHC). Continuing to pursue the Higgs boson we are looking forward to many exciting results at the Tevatron and soon at the LHC. In Chapter 2 an introduction to the Standard Model of particle physics and the Higgs mechanism is given, followed by a brief outline of existing theoretical and experimental constraints on the Higgs boson mass before summarizing the Higgs boson production modes. Chapter 3 gives an overview of the experimental setup. This is followed by a description of the reconstruction of the objects produced in proton-antiproton collisions in Chapter 4 and the necessary calorimeter calibrations in Chapter 5. Chapter 6 follows with an explanation of the phenomenology of the proton-antiproton collisions and the data samples used. In Chapter 7 the search for the Standard Model Higgs boson using a di-electron final state is discussed, followed by the analysis of the final states using muons and hadronic decaying taus in Chapter 8. Finally a short outlook for the prospects of Higgs boson searches is given in Chapter 9.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Estimation of Seismic Load Demand for a Wind Turbine in the Time Domain: Preprint

Turbines installed in seismically active regions such as the Pacific Rim or the Mediterranean must consider loads induced by base shaking from an earthquake. To account for this earthquake risk, current International Electrotechnical Commission (IEC) certification requirements provide a simplified method for calculating seismic loads which is intended to be conservative. Through the addition of capabilities, it is now possible to simulate earthquake loading of a wind turbine in conjunction other load sources such as wind and control system behavior using the FAST code. This paper presents a comparison of three earthquake loading scenarios of the National Renewable Energy Laboratory (NREL) offshore 5-MW baseline wind turbine: idling; continued operation through an earthquake; and an emergency shutdown initiated by an earthquake. Using a set of 22 earthquake records, simulations are conducted for each load case. A summary of the resulting tower moment demand is presented to assess the influence of operational state on the resulting structural demand.

17 WIND ENERGY↗

Evaluation of the Initial Isothermal Physics Measurements at the Fast Flux Test Facility, a Prototypic Liquid Metal Fast Breeder Reactor

The Fast Flux Test Facility (FFTF) was a 400-MWt, sodium-cooled, low-pressure, high-temperature, fast-neutron flux, nuclear fission reactor plant designed for the irradiation testing of nuclear reactor fuels and materials for the development of liquid metal fast breeder reactors (LMFBRs). The FFTF was fueled with plutonium-uranium mixed oxide (MOX) and reflected by Inconel-600. Westinghouse Hanford Company operated the FFTF as part of the Hanford Engineering Development Laboratory (HEDL) for the U.S. Department of Energy on the Hanford Site near Richland, Washington. Although the FFTF was a testing facility not specifically designed to breed fuel or produce electricity, it did provide valuable information for LMFBR projects and base technology programs in the areas of plant system and component design, component fabrication, prototype testing, and site construction. The major objectives of the FFTF were to provide a strong, disciplined engineering base for the LMFBR program, provide fast flux testing for other U.S. programs, and contribute to the development of a viable self-sustaining competitive U.S. LMFBR industry. During its ten years of operation, the FFTF acted as a national research facility to test advanced nuclear fuels, materials, components, systems, nuclear power plant operating and maintenance procedures, and active and passive reactor safety technologies; it also produced a large number of isotopes for medical and industrial users, generated tritium for the U.S. fusion research program, and participated in cooperative, international research work. Prior to the implementation of the reactor characterization program, a series of isothermal physics measurements were performed; this acceptance testing program consisted of a series of control rod worths, critical rod positions, subcriticality measurements, maximum reactivity addition rates, shutdown margins, excess reactivity, and isothermal temperature coefficient reactivity. The results of these experiments were of particular importance because they provide extensive information which can be directly applied to the design of large LMFBR’s. It should be recognized that the data presented in the initial report were evaluated only to the extent necessary to ensure that adequate data were obtained. Later reports provided further interpretation and detailed comparisons with prediction techniques. The conclusion of the isothermal physics measurements was that the FFTF nuclear characteristics were essentially as designed and all safety requirements were satisfied. From a nuclear point of view, the FFTF was qualified to proceed into power operation mode. The FFTF was completed in 1978 and first achieved criticality on February 9, 1980. Upon completion of the isothermal physics and reactor characterization programs, the FFTF operated for ten years from April 1982 to April 1992. Reactor operations of the FFTF were terminated and the reactor facility was then defueled, deactivated, and placed into cold standby condition. Deactivation of the reactor was put on hold from 1996 to 2000 while the U.S. Department of Energy examined alternative uses for the FFTF but then announced the permanent deactivation of the FFTF in December 2001. Its core support basket was later drilled in May 2005, so as to remove all remaining sodium coolant. On April 17, 2006, the American Nuclear Society designated the FFTF as a “National Nuclear Historic Landmark”.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deposition Velocities of Non-Newtonian Slurries in Pipelines: Complex Simulant Testing

One of the concerns expressed by the External Flowsheet Review Team (EFRT) is about the potential for pipe plugging at the Waste Treatment and Immobilization Plant (WTP). Per the review’s executive summary, “Piping that transports slurries will plug unless it is properly designed to minimize this risk. This design approach has not been followed consistently, which will lead to frequent shutdowns due to line plugging.” To evaluate the potential for plugging, deposition-velocity tests were performed on several physical simulants to determine whether the design approach is conservative. Deposition velocity is defined as the velocity below which particles begin to deposit to form a moving bed of particles on the bottom of a straight horizontal pipe during slurry-transport operations. The deposition velocity depends on the system geometry and the physical properties of the particles and fluid. An experimental program was implemented to test the stability-map concepts presented in WTP-RPT-175 Rev. 01. Two types of simulant were tested. The first type of simulant was similar to the glass-bead simulants discussed in WTP-RPT-175 Rev. 0 ; it consists of glass beads with a nominal particle size of 150 µm in a kaolin/water slurry. The initial simulant was prepared at a target yield stress of approximately 30 Pa. The yield stress was then reduced, stepwise, via dilution or rheological modifiers, ultimately to a level of <1 Pa. At each yield-stress step, deposition-velocity testing was performed. Testing over this range of yield-stress bounds the expected rheological operating window of the WTP and allows the results to be compared to stability-map predictions for this system. The second simulant was a precipitated hydroxide that simulates HLW pretreated sludge from Hanford waste tank AZ-101. Testing was performed in a manner similar to that for the first simulant over a wide range of yield stresses; however, an additional test of net-positive suction-head required (NPSHR) was performed at each yield stress condition. Unlike the previous simulant, the sizes and densities of the particles that can deposit in the piping are a result of the simulant precipitation process; there is expected to be a complex mixture of particles of various sizes and densities that make it difficult to predict a stability map. The objective of the testing is to observe whether behavior consistent with the stability-map concept occurs in complex simulants with mixtures of different sizes and densities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗