Search NASA⌕ Search

SEARCH · Search NASA

Results for “SPACE COMMERCIALIZATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Center Planning and Development Student Engineer

This fall I was the Student Trainee (Engineering) Pathways Intern (co-op) at the Kennedy Space Center (KSC) in the Center Planning Development (CPD) Directorate. CPD works with commercial companies who are interested using KSCs unique capabilities in spaceflight, spacecraft processing, ground systems and Research Development (RD) projects that fall in line with NASAs mission and goals. CPD is divided into four (4) groups: (1) AD-A, which works on the Master Planning for center, (2) AD-B (where I am), which works on project management and integration, (3) AD-C, which works on partnership development, and (4) AD-T, which works on the RD aspects of partnerships. CPDs main goal is to one day make KSC the worlds largest spaceport and maintain the center as a leader in space exploration. CPD is a very diverse group with employees having a wide knowledge of not only the Space Shuttle, but also that of the Apollo era. Our director of CPD, Scott Colloredo, is on the advisory board for Commercial Space Operations (CSO) and has a degree at ERAU. I worked on a number of different tasks for AD-B, as well as CPD, that includes, but not limited to: reviewing and reissuing engineering drawings from the Apollo and Shuttle eras, to supporting NASA rocket launches (MAVEN), and working on actual agreementsproposals that will be used in the partnership process with multiple partners. Most of the work I have done is sensitive information and cannot be disclosed.

engineering↗

Space station needs, attributes and architectural options. Part 1: Summary

Candidate missions for the space station were subjected to an evaluation/filtering process which included the application of budgetary constraints and performance of benefits analysis. Results show that the initial space station should be manned, placed in a 28.5 deg orbit, and provide capabilities which include a space test facility, satellite service, a transport harbor, and an observatory. A space industrial park may be added once further development effort validates the cost and expanding commercial market for space-processed material. Using the space station as a national space test facility can enhance national security, as well as commercial and scientific interests alike. The potential accrued gross mission model benefit derived from these capabilities is $5.9B without the industrial park, and $9.3B with it. Other benefits include the lowering of acquisition costs for NASA and DoD space assets and a basis for broadening international participation.

Source record↗

Consortium for materials development in space

The status of the Consortium for Materials Development in Space (CMDS) is reviewed. Individual CMDS materials projects and flight opportunities on suborbital and orbital carriers are outlined. Projects include: surface coatings and catalyst production; non-linear optical organic materials; physical properties of immiscible polymers; nuclear track detectors; powdered metal sintering; iron-carbon solidification; high-temperature superconductors; physical vapor transport crystal growth; materials preparation and longevity in hyperthermal oxygen; foam formation; measurement of the microgravity environment; and commercial management of space fluids.

Source record↗

The Next Giant Leap: NASA's Ares Launch Vehicles Overview

The next chapter in NASA's history also promises to write the next chapter in America's history, as the Agency makes measurable strides toward developing new space transportation capabilities that wi!! put astronauts on course to explore the Moon as the next giant leap toward the first human footprint on Mars. This paper will present top-level plans and progress being made toward fielding the Ares I crew launch vehicle in the 2013 timeframe and the Ares V cargo launch vehicle in the 2018 timeframe. It also gives insight into the objectives for the first test flight, known as the Ares I-X, which is scheduled for April 2009. The U.S. strategy to scientifically explore space will fuel innovations such as solar power and water recycling, as well as yield new knowledge that directly benefits life on Earth. For the Ares launch vehicles, NASA is building on heritage hardware and unique capabilities; as well as almost 50 years of lessons learned from the Apollo Saturn, Space Shuttle, and commercial launch vehicle programs. In the Ares I Project's inaugural year, extensive trade studies and evaluations were conducted to improve upon the designs initially recommended by the Exploration Systems Architecture Study, resulting in significant reduction of near-term and long-range technical and programmatic risks; conceptual designs were analyzed for fitness against requirements; and the contractual framework was assembled to enable a development effort unparalleled in American space flight since the Space Shuttle. The Exploration Launch Projects team completed the Ares I System Requirements Review (SRR) at the end of 2006--the first such engineering milestone for a human-rated space transportation system in over 30 years.

Cook, Stephen A.↗

NASA Propulsion Investments for Exploration and Science

The National Aeronautics and Space Administration (NASA) invests in chemical and electric propulsion systems to achieve future mission objectives for both human exploration and robotic science. Propulsion system requirements for human missions are derived from the exploration architecture being implemented in the Constellation Program. The Constellation Program first develops a system consisting of the Ares I launch vehicle and Orion spacecraft to access the Space Station, then builds on this initial system with the heavy-lift Ares V launch vehicle, Earth departure stage, and lunar module to enable missions to the lunar surface. A variety of chemical engines for all mission phases including primary propulsion, reaction control, abort, lunar ascent, and lunar descent are under development or are in early risk reduction to meet the specific requirements of the Ares I and V launch vehicles, Orion crew and service modules, and Altair lunar module. Exploration propulsion systems draw from Apollo, space shuttle, and commercial heritage and are applied across the Constellation architecture vehicles. Selection of these launch systems and engines is driven by numerous factors including development cost, existing infrastructure, operations cost, and reliability. Incorporation of green systems for sustained operations and extensibility into future systems is an additional consideration for system design. Science missions will directly benefit from the development of Constellation launch systems, and are making advancements in electric and chemical propulsion systems for challenging deep space, rendezvous, and sample return missions. Both Hall effect and ion electric propulsion systems are in development or qualification to address the range of NASA s Heliophysics, Planetary Science, and Astrophysics mission requirements. These address the spectrum of potential requirements from cost-capped missions to enabling challenging high delta-v, long-life missions. Additionally, a high specific impulse chemical engine is in development that will add additional capability to performance-demanding space science missions. In summary, the paper provides a survey of current NASA development and risk reduction propulsion investments for exploration and science.

Smith, Bryan K.↗

NASA’s Interest in 3GPP Mobile Telecommunications Protocols for Near Earth Space and the Lunar Surface

In the next several years, NASA intends to return astronauts to the Moon through the Artemis Program. Under Artemis, NASA plans to collaborate with commercial and international partners to establish a long-term presence on the Moon. Near-term Artemis missions will be analogous but much more sophisticated versions of the last couple of Apollo missions. For example, the first area expected to be explored by an Artemis mission is near the south pole as opposed to the mid-latitudes visited by the Apollo astronauts, which makes direct communications with Earth more complicated. Lunar infrastructure will eventually be built over time by many organizations, public and private, to support sustained human exploration, science, and industrial activities on the Moon. A robust lunar communications and navigation infrastructure will be essential to realizing this long-term vision. Meanwhile, on Earth, major advances are being made as5G mobile telecommunications rollout across the globe. Furthermore, the 3rdGeneration Partnership Project (3GPP) is beginning to define future 6G capabilities. NASA envisions a lunar communications and navigation network with capabilities similar to those of communication networks we enjoy here on Earth. Building such a network will require participation by many organizations. NASA’s Tipping Point program seeks industry-developed space technologies that can both foster commercial space capabilities and benefit future NASA missions. This paper provides an overview of NASA’s interest in 3GPPanddescribescurrent work based on 3GPP standards within NASA or funded by NASA, such as Nokia’s upcoming Tipping Point demonstration of 4G/LTE on the lunar surface in early 2023.

Bernard L Edwards↗

Assessing Commercialization Strategies for Evolving Network Demand (ASCEND) in the NASA Space Communications and Navigation (SCaN) Program

What will NASA’s future communications demand and expenditure look like, in a paradigm where space policy encourages maximum private sector involvement? In this paper we consider this question, as NASA moves towards commercial procurement for Direct-To-Earth and Space Relay communication services. We develop a new quantitative Techno-Economic Assessment (TEA) model capable of evaluating the incremental cost over time to NASA of utilizing commercial communication services, for different mission and market scenarios. We find that current and future NASA demand could be viably procured from commercial services, with the potential to reduce cost using non-exclusive networks and the sharing of fixed costs. However, there is a key trade-off identified between maximizing economies of scale benefits and ensuring sufficient competition between communication providers to avoid collusion and excessive pricing. For example, procuring from 1-2 providers would maximize scale economies, whereas procuring from 5-6 providers would maximize competition. Given this context, it would be prudent to seek to award service contracts for 3-4 providers to optimize economies of scale benefits, while mitigating possible market collusion. These recommendations enable NASA to successfully achieve its scientific mission over the next decade, while managing limited financial and networking resources.

NSN↗

Development of a Ground Test and Analysis Protocol to Support NASA's NextSTEP Phase 2 Habitation Concepts

The NASA Next Space Technologies for Exploration Partnerships (NextSTEP) program is a public-private partnership model that seeks commercial development of deep space exploration capabilities to support extensive human spaceflight missions around and beyond cislunar space. NASA first issued the Phase 1 NextSTEP Broad Agency Announcement to U.S. industries in 2014, which called for innovative cislunar habitation concepts that leveraged commercialization plans for low Earth orbit. These habitats will be part of the Deep Space Gateway (DSG), the cislunar space station planned by NASA for construction in the 2020s. In 2016, Phase 2 of the NextSTEP program selected five commercial partners to develop ground prototypes. A team of NASA research engineers and subject matter experts have been tasked with developing the ground test protocol that will serve as the primary means by which these Phase 2 prototype habitats will be evaluated. Since 2008, this core test team has successfully conducted multiple spaceflight analog mission evaluations utilizing a consistent set of operational products, tools, methods, and metrics to enable the iterative development, testing, analysis, and validation of evolving exploration architectures, operations concepts, and vehicle designs. The purpose of implementing a similar evaluation process for the NextSTEP Phase 2 Habitation Concepts is to consistently evaluate the different commercial partner ground prototypes to provide data-driven, actionable recommendations for Phase 3.

Beaton, Kara H.↗

The Effects of Background Pressure on SPT-140 Thruster Performance at Multiple Power Levels

NASA's planned Psyche mission is scheduled to launch in 2022 and begin a 3.5-year cruise to the metallic asteroid Psyche, where it would examine this unique body. The baseline spacecraft design is a hybrid of JPL's deep-space heritage subsystems with commercial partner SSL's power, structure, and SPT-140 electric propulsion subsystems. Since the deep-space implementation of the SPT-140 differs from the commercial implementation, primarily in the need for deep power throttling, characterization of the system at lower powers is necessary. One specific area of interest is the sensitivity of thruster performance to background pressure in ground-based test facilities, which can have an impact on the prediction of in-space performance. Measurements of this pressure dependence were performed on a qualification-model SPT-140 thruster over the 0.9-4.5 kW range of interest for the Psyche mission. Thrust sensitivity to pressure, in an absolute sense, was largest at 4.5 kW and decreased with power until there was little-to-no measurable effect at 0.9 kW. In a relative sense, thrust sensitivity was similar at all powers above 0.9 kW with about 2-4% higher thrust measured at 10 μTorr than at the lowest operating pressure. Thruster stability margin, examined as a function of magnet current, did not have a strong dependence on facility pressure. Finally, an investigation of low-power operation at the lowest facility pressure showed that a combination of added cathode keeper current and additional cathode propellant flow significantly mitigated the larger negative cathode-to-ground voltages that were observed. These test results, combined with thruster life test results, inform the selection of proper low-power operating conditions for Psyche.

Snyder, John S.↗

Development of a Ground Test and Analysis Protocol for NASA's NextSTEP Phase 2 Habitation Concepts

The NASA Next Space Technologies for Exploration Partnerships (NextSTEP) program is a public-private partnership model that seeks commercial development of deep space exploration capabilities to support human spaceflight missions around and beyond cislunar space. NASA first issued the Phase 1 NextSTEP Broad Agency Announcement to U.S. industries in 2014, which called for innovative cislunar habitation concepts that leveraged commercialization plans for low-Earth orbit. These habitats will be part of the Deep Space Gateway (DSG), the cislunar space station planned by NASA for construction in the 2020s. In 2016, Phase 2 of the NextSTEP program selected five commercial partners to develop ground prototypes. A team of NASA research engineers and subject matter experts (SMEs) have been tasked with developing the ground-test protocol that will serve as the primary means by which these Phase 2 prototypes will be evaluated. Since 2008, this core test team has successfully conducted multiple spaceflight analog mission evaluations utilizing a consistent set of operational tools, methods, and metrics to enable the iterative development, testing, analysis, and validation of evolving exploration architectures, operations concepts, and vehicle designs. The purpose of implementing a similar evaluation process for the Phase 2 Habitation Concepts is to consistently evaluate different commercial partner ground prototypes to provide data-driven, actionable recommendations for Phase 3. This paper describes the process by which the ground test protocol was developed and the objectives, methods, and metrics by which the NextSTEP Phase 2 Habitation Concepts will be rigorously and systematically evaluated. The protocol has been developed using both a top-down and bottom-up approach. Top-down development began with the Human Exploration and Operations Mission Directorate (HEOMD) exploration objectives and ISS Exploration Capability Study Team (IECST) candidate flight objectives. Strategic questions and associated rationales, derived from these candidate architectural objectives, provide the framework by which the ground-test protocol will address the DSG stack elements and configurations, systems and subsystems, and habitation, science, and EVA functions. From these strategic questions, high-level functional requirements for the DSG were drafted and associated ground-test objectives and analysis protocols were established. Bottom-up development incorporated objectives from NASA SMEs in autonomy, avionics and software, communication, environmental control and life support systems, exercise, extravehicular activity, exploration medical operations, guidance navigation and control, human factors and behavioral performance, human factors and habitability, logistics, Mission Control Center operations, power, radiation, robotics, safety and mission assurance, science, simulation, structures, thermal, trash management, and vehicle health. Top-down and bottom-up objectives were integrated to form overall functional requirements - ground-test objectives and analysis mapping. From this mapping, ground-test objectives were organized into those that will be evaluated through inspection, demonstration, analysis, subsystem standalone testing, and human-in-the-loop (HITL) testing. For the HITL tests, mission-like timelines, procedures, and flight rules have been developed to directly meet ground test objectives and evaluate specific functional requirements. Data collected from these assessments will be analyzed to determine the acceptability of habitation element configurations and the combinations of capabilities that will result in the best habitation platform to be recommended by the test team for Phase 3.

Gernhardt, Michael L.↗

Using Mylar-Insulated Cryopumping Panels to Improve Vacuum Level During Warm Temperature Testing at JSC's Large Thermal Vacuum Facilities

Johnson Space Center’s Space Environment Simulation Lab (SESL) has both Chamber A, the world’s largest purpose-built thermal vacuum chamber capable of creating deep space conditions, and Chamber B, the largest human rated thermal vacuum chamber. A unique design feature of these chambers is the gaseous helium cryopumping panels within the liquid nitrogen shroud. This shroud is used to bring the chamber to cryogenic temperatures while the cryopumping panels trap gasses on its surface area to create a high vacuum environment of 5*10-6 Torr. In preparation for the James Webb Space Telescope (JWST) flight test, a series of functionals required the chamber to run at higher temperatures, and therefore did not need active cooling from the liquid nitrogen shroud. During testing, cryopumping panels were used to mitigate contamination during this main shroud warm-up. One of the cryopumping panels in Chamber A was covered with several layers of aluminized mylar to thermally protect the zone from the warmed shroud. This strategy was effective and became part of operations during JWST testing. Currently, Chamber B has requests for both commercial and NASA space suit tests at both high and low temperatures to validate thermal models. High temperature tests could benefit from reduced heater demand with an insulated shroud while still sustaining the high vacuum environment provided by the cryopumping panels. This paper will quantitatively define the thermal loads on the panels used in previous Chamber A warm up sequences. Additionally, this report will perform thermal analyses to assess the feasibility of adding layers of aluminized mylar to the cryopumping panels of Chamber B.

Cryogenics↗

Using Mylar-Insulated Cryopumping Panels to Improve Vacuum Level During Warm Temperature Testing at JSCs Large Thermal Vacuum Facilities

The Johnson Space Center’s Space Environment Simulation Lab (SESL) has both Chamber A, the world’s largest purpose-built thermal vacuum chamber capable of creating deep space conditions, and Chamber B, the largest human rated thermal vacuum chamber. A unique design feature of these chambers is the gaseous helium cryopumping panels within the liquid nitrogen shroud. This shroud is used to bring the chamber to cryogenic temperatures while the cryopumping panels trap gasses using their large surface area in order to create a high vacuum environment of 5*10^-6 Torr. In preparation for the James Webb Space Telescope (JWST) flight test, a series of functionals required the chamber to run at higher temperatures, and therefore did not need active cooling from the liquid nitrogen shroud. During testing, cryopumping panels were used to mitigate contamination during this main shroud warm-up. One of the cryopumping panels in Chamber A was covered with several layers of aluminized mylar in order to thermally protect the zone from the warmed shroud. This strategy was effective and became part of operations during JWST testing. Currently, Chamber B has requests for both commercial and NASA space suit tests at both high and low temperatures to accurately generate thermal models. High temperature tests would greatly benefit from simultaneous shroud warming and the high vacuum environment provided by the cryopumping panels. This paper will quantitatively define the thermal loads on the panels used in previous Chamber A warm up sequences. Additionally, this report will perform a thermal analysis to judge the feasibility of adding layers of aluminized mylar to the cryopumping panels of Chamber B.

Cryogenics↗

Using Mylar-Insulated Cryopumping Panels to Improve Vacuum Level During Warm Temperature Testing at JSC's Large Thermal Vacuum Facilities

The Johnson Space Center’s Space Environment Simulation Lab (SESL) has both Chamber A, the world’s largest purpose-built thermal vacuum chamber capable of creating deep space conditions, and Chamber B, the largest human rated thermal vacuum chamber. A unique design feature of these chambers is the gaseous helium cryopumping panels within the liquid nitrogen shroud. This shroud is used to bring the chamber to cryogenic temperatures while the cryopumping panels trap gasses using their large surface area in order to create a high vacuum environment of 5*10^-6 Torr. In preparation for the James Webb Space Telescope (JWST) flight test, a series of functionals required the chamber to run at higher temperatures, and therefore did not need active cooling from the liquid nitrogen shroud. During testing, cryopumping panels were used to mitigate contamination during this main shroud warm-up. One of the cryopumping panels in Chamber A was covered with several layers of aluminized mylar in order to thermally protect the zone from the warmed shroud. This strategy was effective and became part of operations during JWST testing. Currently, Chamber B has requests for both commercial and NASA space suit tests at both high and low temperatures to accurately generate thermal models. High temperature tests would greatly benefit from simultaneous shroud warming and the high vacuum environment provided by the cryopumping panels. This paper will quantitatively define the thermal loads on the panels used in previous Chamber A warm up sequences. Additionally, this report will perform a thermal analysis to judge the feasibility of adding layers of aluminized mylar to the cryopumping panels of Chamber B.

Cryogenics↗

Imagery Integration Team

The Human Exploration Science Office (KX) provides leadership for NASA's Imagery Integration (Integration 2) Team, an affiliation of experts in the use of engineering-class imagery intended to monitor the performance of launch vehicles and crewed spacecraft in flight. Typical engineering imagery assessments include studying and characterizing the liftoff and ascent debris environments; launch vehicle and propulsion element performance; in-flight activities; and entry, landing, and recovery operations. Integration 2 support has been provided not only for U.S. Government spaceflight (e.g., Space Shuttle, Ares I-X) but also for commercial launch providers, such as Space Exploration Technologies Corporation (SpaceX) and Orbital Sciences Corporation, servicing the International Space Station. The NASA Integration 2 Team is composed of imagery integration specialists from JSC, the Marshall Space Flight Center (MSFC), and the Kennedy Space Center (KSC), who have access to a vast pool of experience and capabilities related to program integration, deployment and management of imagery assets, imagery data management, and photogrammetric analysis. The Integration 2 team is currently providing integration services to commercial demonstration flights, Exploration Flight Test-1 (EFT-1), and the Space Launch System (SLS)-based Exploration Missions (EM)-1 and EM-2. EM-2 will be the first attempt to fly a piloted mission with the Orion spacecraft. The Integration 2 Team provides the customer (both commercial and Government) with access to a wide array of imagery options - ground-based, airborne, seaborne, or vehicle-based - that are available through the Government and commercial vendors. The team guides the customer in assembling the appropriate complement of imagery acquisition assets at the customer's facilities, minimizing costs associated with market research and the risk of purchasing inadequate assets. The NASA Integration 2 capability simplifies the process of securing one-of-a-kind imagery assets and skill sets, such as ground-based fixed and tracking cameras, crew-in the-loop imaging applications, and the integration of custom or commercial-off-the-shelf sensors onboard spacecraft. For spaceflight applications, the Integration 2 Team leverages modeling, analytical, and scientific resources along with decades of experience and lessons learned to assist the customer in optimizing engineering imagery acquisition and management schemes for any phase of flight - launch, ascent, on-orbit, descent, and landing. The Integration 2 Team guides the customer in using NASA's world-class imagery analysis teams, which specialize in overcoming inherent challenges associated with spaceflight imagery sets. Precision motion tracking, two-dimensional (2D) and three-dimensional (3D) photogrammetry, image stabilization, 3D modeling of imagery data, lighting assessment, and vehicle fiducial marking assessments are available. During a mission or test, the Integration 2 Team provides oversight of imagery operations to verify fulfillment of imagery requirements. The team oversees the collection, screening, and analysis of imagery to build a set of imagery findings. It integrates and corroborates the imagery findings with other mission data sets, generating executive summaries to support time-critical mission decisions.

Calhoun, Tracy↗

A study of space station needs, attributes and architectural options. Volume 2: Technical. Book 1: Mission requirements

The following types of space missions were evaluated to determine those that require, or will be benefited materially, by a manned space station: (1) science and applications, (2) commercial, (3) technology development, (4) space operations, and (5) national security. Integrated mission requirements for man-operated and man-tended free-flying missions were addressed. A manned space station will provide major performance and economic benefits to a wide range of missions planned for the 1990s.

Steinbronn, O.↗

Aeronautics and Space Report of the President: Fiscal Year 1996 Activities

Topics considered include: (1) Space launch activities: space shuttle missions; expendable launch vehicles. (2) Space science: astronomy and space physics; solar system exploration. (3) Space flight and technology: life and microgravity sciences; space shuttle technology; reuseable launch vehicles; international space station; energy; safety and mission assurance; commercial development and regulation of space; surveillance. (4) Space communications: communications satellites; space network; ground networks; mission control and data systems. (5) Aeronautical activities: technology developments; air traffic control and navigation; weather-related aeronautical activities; flight safety and security; aviation medicine and human factors. (6) Studies of the planet earth: terrestrial studies and applications: atmospheric studies: oceanographic studies; international aeronautical and space activities; and appendices.

Source record↗

Commercial Crew Launch America

This presentation is intended to discuss NASA's long term human exploration goals of our solar system. The emphasis will be on how our CCP (Commercial Crew Program) supports our space bound human exploration goals by encouraging commercial entities to perform missions to LEO (Low Earth Orbit), thus allowing NASA to focus on beyond LEO human exploration missions.

Thon, Jeffrey S.↗

Deep Space NanoSats - Positioned for Exponential Growth

We are poised at the beginning of a new era in solar system exploration, in which cubesats and nanosats can potentially play a big role. In 2012 a small group of like-minded enthusiasts at JPL predicted exponential growth in deep space cubesats with at least 10 exploring our solar system by 2020, and a 100 by 2030. Since then, JPL has built and flight-qualified the two INSPIRE spacecraft as pathfinders for future deep space cubesat missions, and the two MARCO spacecraft were assembled and tested in time to make the initial Insight launch opportunity in 2016 – now under consideration for the next available window. We have ongoing studies for lunar exploration and asteroid rendezvous missions, a Venus atmosphere sampler, and other concepts have been proposed to NASA. The Europa mission has 10 academic institutes under contract to study cubesats that would ride along with the main spacecraft to enable it to get closer to the surface of Jupiter’s most intriguing moon. Last year, ESA announced that its AIM asteroid probe will carry a small number of cubesats, when it launches in 2020. In the commercial world, Deep Space Industries are planning to host multiple cubesats in a mission to a Near Earth Asteroid. The prospects for near-term growth look reasonably healthy. This paper will provide an overview of deep space and LEO cubesat developments at JPL, and discuss the foundation they will provide for the growing community of interplanetary cubesat pioneers over the coming decade and a half.

Freeman, Anthony↗