Search NASA⌕ Search

SEARCH · Search NASA

Results for “Unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

RCT: Module 2.08, Radiological Source Control, Course 8774

radioactive source is material used for its emitted radiation. Sources are sealed or unsealed and are classified as accountable or exempt. Radioactive sources are used for response checks, functional checks, and the calibration of instruments and monitors to traceable standards. To ensure the safety and welfare of all personnel, it is important to maintain control of radioactive sources to minimize the potential for the spread of contamination, unnecessary exposure to personnel, loss or theft, and improper disposal. This course will prepare the student with the skills necessary for RCT qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and will provide in-the-field skills.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

RCT: Module 2.04, Dosimetry, Course 8769

This course will introduce the types of instruments used to measure external and internal radiation to people. Dosimetry is the quantitative assessment of radiation received by the human body. Several types of dosimeters are used worldwide. This information is valuable to all radiological control personnel because dosimeters are the only direct method to measure and document personnel radiation exposure and ensure regulatory compliance with applicable limits. This course will cover dosimetry terms, Department of Energy (DOE) limits, Los Alamos National Laboratory (LANL) administrative guidelines, thermoluminescent dosimeters (TLDs), LANL dosimetry, and bioassay assessment methods. This course will prepare the student with the skills necessary for radiological control technician (RCT) qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and providing in-thefield skills.

61 RADIATION PROTECTION AND DOSIMETRY↗

RCT: Module 2.10, Access Control and Work Area Setup, Course 8776

This course presents information on radiological work permits (RWPs), various types of postings used in radiological areas, radiological area setups, access controls, and releases of material from radiological areas. All of these are fundamental duties of RCTs. This course will prepare the student with the skills necessary for radiological control technician (RCT) qualification by passing quizzes, tests, and the RCT Comprehensive Phase 1, Unit 2 Examination (TEST 27566) and providing in-thefield skills.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Development of the Miniature Total Organic Carbon Analyzer

Monitoring the Total Organic Carbon (TOC) in spacecraft potable water will be of major importance in long-duration human space exploration. In-flight analysis of potable water produced from a regenerative water processor provides immediate feedback on the quality of reclaimed water for crew health as well as water processing system health monitoring. This paper updates the progress in development of the next generation Total Organic Carbon Analyzer (TOCA) designed for the unique requirements of an exploration-class mission. The current objective is to design, build, certify, deliver, and operate a TOCA technology demonstration on the International Space Station (ISS). The next generation analyzer system technology was previously developed and selected among a feasibility study of other options. The new system provides primary advantages of reduced mass and volume through reduced system complexity and reduced need for consumables; therefore, the flight project is named MiniTOCA. The project has recently completed design of the tech demo instrument and assembled and tested a flight-like engineering development unit. The engineering unit has undergone performance testing and environmental testing which provides confidence for the project to move forward with flight unit production and certification activities. Test results are summarized in this paper. The flight unit is targeted for delivery to ISS in late 2025.

TOC↗

Development of the Miniature Total Organic Carbon Analyzer

Monitoring the Total Organic Carbon (TOC) in spacecraft potable water will be of major importance in long-duration human space exploration. In-flight analysis of potable water produced from a regenerative water processor provides immediate feedback on the quality of reclaimed water for crew health as well as water processing system health monitoring. This paper updates the progress in development of the next generation Total Organic Carbon Analyzer (TOCA) designed for the unique requirements of an exploration-class mission. The current objective is to design, build, certify, deliver, and operate a TOCA technology demonstration on the International Space Station (ISS). The next generation analyzer system technology was previously developed and selected among a feasibility study of other options. The new system provides primary advantages of reduced mass and volume through reduced system complexity and reduced need for consumables; therefore, the flight project is named MiniTOCA. The project has recently completed design of the tech demo instrument and assembled and tested a flight-like engineering development unit. The engineering unit has undergone performance testing and environmental testing which provides confidence for the project to move forward with flight unit production and certification activities. Test results are summarized in this paper. The flight unit is targeted for delivery to ISS in late 2025.

TOC↗

Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

54 ENVIRONMENTAL SCIENCES↗

Hypersonic Laminar Boundary Layer Velocimetry with Discrete Roughness on a Flat Plate

Laminar boundary layer velocity measurements are made on a 10-degree half-angle wedge in a Mach 10 flow. Two types of discrete boundary layer trips were used to perturb the boundary layer gas. The first was a 2-mm tall, 4-mm diameter cylindrical trip. The second was a scaled version of the Orbiter Boundary Layer Transition (BLT) Detailed Test Objective (DTO) trip. Both 1-mm and 2.5-mm tall BLT DTO trips were tested. Additionally, side-view and plan-view axial boundary layer velocity measurements were made in the absence of these tripping devices. The free-stream unit Reynolds numbers tested for the cylindrical trips were 1.7x10(exp 6)/m and 3.3x10(exp 6)/m. The free-stream unit Reynolds number tested for the BLT DTO trips was 1.7x10(exp 6)/m. The angle of attack was kept at approximately 5-degrees for most of the tests resulting in a Mach number of approximately 8.3. These combinations of unit Reynolds numbers and angle of attack resulted in laminar flowfields. To study the precision of the measurement technique, the angle of attack was varied during one run. Nitric-oxide (NO) molecular tagging velocimetry (MTV) was used to obtain averaged axial velocity values and associated uncertainties. These uncertainties are as low as 20 m/s. An interline, progressive scan CCD camera was used to obtain separate images of the initial reference and shifted NO molecules that had been tagged by the laser. The CCD configuration allowed for sub-microsecond sequential acquisition of both images. The maximum planar spatial resolution achieved for the side-view velocity measurements was 0.07-mm in the wall-normal direction by 1.45-mm in the streamwise direction with a spatial depth of 0.5-mm. For the plan-view measurements, the maximum planar spatial resolution in the spanwise and streamwise directions was 0.69-mm by 1.28-mm, respectively, with a spatial depth of 0.5-mm. Temperature sensitive paint (TSP) measurements are provided to compliment the velocity data and to provide further insight into the behavior of the boundary layers. The experiments were performed at the NASA Langley Research Center 31-Inch Mach 10 Air tunnel.

Bathel, Brett↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada Test Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 114 comprises the following corrective action site (CAS) located in Area 25 of the Nevada Test Site: • 25-41-03, EMAD Facility This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 25-41-03. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for CAS 25-41-03. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place. This will be presented in a closure report that will be prepared and submitted to NDEP for review and approval. The CAS will be investigated based on the data quality objectives (DQOs) developed on April 30, 2009, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 25-41-03. The following text summarizes the SAFER activities that will support the closure of CAU 114: • Perform site preparation activities (e.g., utilities clearances, radiological surveys). • Collect samples of materials to determine whether potential source material (PSM) is present that may cause the future release of a contaminant of concern to environmental media. • If no PSMs are present at the CAS, establish no further action as the corrective action. • If a PSM is present at the CAS, either: - Establish clean closure as the corrective action. The material to be remediated will be removed and disposed of as waste, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the selected closure option is sufficient to protect human health and the environment.

54 ENVIRONMENTAL SCIENCES↗

Bench Scale Process for Low Cost CO 2 Capture Using a Phase-Changing Absorbent: Final Scientific/Technical Report

The objective of this project is to design and build a bench-scale process for a novel phase-changing aminosilicone-based CO 2 -capture solvent. The project will establish scalability and technical and economic feasibility of using a phase-changing CO 2 -capture absorbent for post-combustion capture of CO 2 from coal-fired power plants. The U.S. Department of Energy’s goal for Transformational Carbon Capture Technologies is the development of technologies available for demonstration by 2025 that can capture 90% of emitted CO 2 with at least 95% CO 2 purity for less than $40/tonne of CO 2 captured. In the first budget period of the project, the bench-scale phase-changing CO2 capture process was designed using data and operating experience generated under a previous project (ARPA-e project DE-AR0000084). Sizing and specification of all major unit operations was completed, including detailed process and instrumentation diagrams. The system was designed to operate over a wide range of operating conditions to allow for exploration of the effect of process variables on CO 2 capture performance. In the second budget period of the project, individual bench-scale unit operations were tested to determine the performance of each of each unit. Solids production was demonstrated in dry simulated flue gas across a wide range of absorber operating conditions, with single stage CO 2 conversion rates up to 75mol%. Desorber operation was demonstrated in batch mode, resulting in desorption performance consistent with the equilibrium isotherms for GAP-0/CO 2 reaction. Important risks associated with gas humidity impact on solids consistency and desorber temperature impact on thermal degradation were explored, and adjustments to the bench-scale process were made to address those effects. Corrosion experiments were conducted to support selection of suitable materials of construction for the major unit operations in the process. The bench scale unit operations were assembled into a continuous system to support steady state system testing. In the third budget period of the project, continuous system testing was conducted, including closed-loop operation of the absorber and desober systems. Slurries of GAP-0/GAP-0 carbamate/water mixtures produced in the absorber were pumped successfully to the desorber unit, and regenerated solvent was returned to the absorber. A techno-economic analysis, EH&S risk assessment, and solvent manufacturability study were completed.

20 FOSSIL-FUELED POWER PLANTS↗

TEDS Test Plan for Performance Characterization of Packed-bed Thermal Energy Storage Unit

This report proposes a set of test plans for performance measurement and characterization of the packed-bed thermal energy storage (TES) unit for TEDS. The main goals of this test plan are three-fold: (i) support the high-fidelity data measurement for TEDS, (ii) characterize thermal and structural performance of the TEDS TES unit, and (iii) produce high quality validation-oriented data. To achieve the goals, it is first suggested to revisit the instrument calibration and data sampling protocols applied during the startup and commissioning tests of TEDS, based on the observation from the recent CFD validation study using the TEDS TES operational data. The uncertainty quantification of the thermal and hydraulic measurements is also suggested. Lastly, test matrices are provided for charge, discharge, and standby modes of the packed-bed TES unit, respectively, to characterize the thermal and structural performances during the envisioned TEDS operations.

25 ENERGY STORAGE↗

Deducing Electronic Unit Internal Response During a Vibration Test Using a Lumped Parameter Modeling Approach

During random vibration testing of electronic boxes there is often a desire to know the dynamic response of certain internal printed wiring boards (PWBs) for the purpose of monitoring the response of sensitive hardware or for post-test forensic analysis in support of anomaly investigation. Due to restrictions on internally mounted accelerometers for most flight hardware there is usually no means to empirically observe the internal dynamics of the unit, so one must resort to crude and highly uncertain approximations. One common practice is to apply Miles Equation, which does not account for the coupled response of the board in the chassis, resulting in significant over- or under-prediction. This paper explores the application of simple multiple-degree-of-freedom lumped parameter modeling to predict the coupled random vibration response of the PWBs in their fundamental modes of vibration. A simple tool using this approach could be used during or following a random vibration test to interpret vibration test data from a single external chassis measurement to deduce internal board dynamics by means of a rapid correlation analysis. Such a tool might also be useful in early design stages as a supplemental analysis to a more detailed finite element analysis to quickly prototype and analyze the dynamics of various design iterations. After developing the theoretical basis, a lumped parameter modeling approach is applied to an electronic unit for which both external and internal test vibration response measurements are available for direct comparison. Reasonable correlation of the results demonstrates the potential viability of such an approach. Further development of the preliminary approach presented in this paper will involve correlation with detailed finite element models and additional relevant test data.

random vibration response↗

Closure Report for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Security Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Testing and Results of Vacuum Swing Adsorption Units for Spacesuit Carbon Dioxide and Humidity Control

A principal concern for extravehicular activity (EVA) space suits is the capability to control carbon dioxide (CO2) and humidity (H2O) for the crewmember. The release of CO2 in a confined or unventilated area is dangerous for human health and leads to asphyxiation; therefore, CO2 and H2O become leading factors in the design and development of the spacesuit. An amine-based CO2 and H2O vapor sorbent for use in pressure-swing re-generable beds has been developed by Hamilton Sundstrand. The application of solid-amine materials with vacuum swing adsorption technology has shown the capacity to concurrently manage CO2 and H2O levels through a fully regenerative cycle eliminating mission constraints imposed with non-regenerative technologies. Two prototype solid amine-based systems, known as rapid cycle amine (RCA), were designed to continuously remove CO2 and H2O vapor from a flowing ventilation stream through the use of a two-bed amine based, vacuum-swing adsorption system. The Engineering and Science Contract Group (ESCG) RCA is the first RCA unit implementing radial flow paths, whereas the Hamilton Sundstrand RCA was designed with linear flow paths. Testing was performed in a sea-level pressure environment and a reduced-pressure environment with simulated human metabolic loads in a closed-loop configuration. This paper presents the experimental results of laboratory testing for a full-size and a sub-scale test article. The testing described here characterized and evaluated the performance of each RCA unit at the required Portable Life Support Subsystem (PLSS) operating conditions. The test points simulated a range of crewmember metabolic rates. The experimental results demonstrate the ability of each RCA unit to sufficiently remove CO2 and H2O from a closed loop ambient or subambient atmosphere.

McMillin, Summer↗

Exploration Extravehicular Mobility Unit (xEMU) Hard Upper Torso (HUT) Chamber B Thermal Vacuum Testing Results

NASA’s Exploration Extravehicular Mobility Unit (xEMU) is the government reference next-generation spacesuit design and is engineered to protect astronauts from extreme lunar environmental temperatures. To evaluate the xEMU hardware thermal requirements, the xEMU Testing Team invented, designed, and executed a dual-suit, uncrewed thermal vacuum (TVAC) test at Johnson Space Center’s (JSC) Chamber B. This paper details the test methodology, hardware setup, and results from the xEMU hard upper torso (HUT). Two HUTs, one composite HUT and one aluminum HUT, were tested simultaneously in Chamber B, with different thermal environments. For the aluminum HUT on the Short xEMU (SxEMU) test article, five thermal profiles were tested during five simulated EVAs. For the composite HUT on the second xEMU, eleven unique thermal profiles were tested including both cold and hot environmental cases over the course of five continuous days of testing. The radiative thermal environment was controlled through exposure to liquid-nitrogen shrouds on the chamber walls and through two separate heater cages surrounding each respective test article. Seventy-two temperature sensors were used to collect data in critical locations in the xEMU HUT assembly. This paper will document the testing results and compare the test data against the xEMU HUT and system-level thermal models for model validation.

xEMU↗

Study of limitations and attributes of microprocessor testing techniques

All microprocessor units have a similar architecture from which a basic test philosophy can be adopted and used to develop an approach to test each module separately in order to verify the functionality of each module within the device using the input/output pins of the device and its instruction set; test for destructive interaction between functional modules; and verify all timing, status information, and interrupt operations of the device. Block and test flow diagrams are given for the 8080, 8008, 2901, 6800, and 1802 microprocessors. Manufacturers are listed and problems encountered in testing the modules are discussed. Test equipment and methods are described.

Mccaskill, R.↗

Analysis, design, fabrication and testing of the mini-Brayton rotating unit (Mini-BRU). Volume 1: Text and tables

A 500 to 2100 watt power output Mini-Brayton Rotating Unit (Mini-BRU)was analyzed, designed, fabricated and tested. Performance and test data for the various components is included. Components tested include the 2.12 in. diameter compressor, the 2.86 in. diameter turbine, the Rice alternator and the cantilevered foil-type journal and thrust bearings. Also included are results on the fabrication of a C-103 turbine plenum/nozzle assembly and on offgassing of the organic materials in the alternator stator.

Dobler, F. X.↗