Search NASA⌕ Search

SEARCH · Search NASA

Results for “location optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Persistent Acoustic Sensing for Monitoring A Reactor Facility - Oral Presentation

Measurements over the past few years, taking place within the Multi-Informatics for Nuclear Operations Scenarios (MINOS) project, show that infrasound and low-frequency acoustic monitoring can detect, and often quantify, activities that occur on-site at a large research reactor. Observable activities include: crane translation, lifting, and lowering; differentiation between loaded and unloaded crane operations; access door opening and closing; vehicle operations; and cooling tower fan operation. Advanced data analytic and spectral feature extraction methods can be used to interpret selected signatures to reach a deeper understanding of different reactor activities. These measurements are being conducted using a network of smartphones that continuously operate in conjunction with cloud-based architectures. A recent addition to the system is the development and deployment of a real-time, cloud-based analytic framework that supports near-real-time alarming which can facilitate tip-and-cue protocols. This paper will present recent research advances in this area including studies to explore the transferability of learned parameters from one smartphone to another, the detectability of events from multiple sensors at different locations simultaneously, and the feasibility of porting analytical tools directly to the smartphones to allow edge computing with optimized configurations.

42 ENGINEERING↗

Evidence Report: Risk of Injury and Compromised Performance due to EVA Operations

During future missions to the Moon and Mars, each crewmember will most likely perform up to 24 hours a week of extravehicular activity (EVA) in support of exploration, science, construction, and maintenance tasks. Achieving mission objectives will require EVA systems and operations concepts that maximize human performance and efficiency while minimizing health and safety risks for crewmembers. Currently, over 450 EVAs have been performed in microgravity using the Extravehicular Mobility Unit (EMU). The EMU space suit has enabled the successful assembly and maintenance of the International Space Station (ISS) for over 20 years, as well as deployment of payload experiments, solar arrays, satellite launches and repairs. This EVA work was accomplished at a slower cadence than is expected for Moon and Mars, with ISS crewmembers performing no more than 7 EVAs during a single mission and without any back-to-back EVAs. Despite their success, ISS EVAs have resulted in more injury to EVA crewmembers than may be acceptable for long-duration exploration missions. The Apollo astronauts completed EVA tasks in suits that were designed for their short-duration lunar missions, although suit mobility problems were evident. The more frequent EVAs and more varied EVA tasks that are anticipated during the future longer-duration exploration missions will require EVA suits and systems that are better oriented to human health and performance than those used during the Apollo Program. Many of the problems that were encountered with the Apollo EVA suits (e.g., limited mobility and dexterity, high and aft center of gravity, and other features requiring significant crew compensation) will need to be corrected or mitigated to optimize EVA objectives of exploration missions. It is critical that we understand how EVA system design variables such as suit pressure, weight/mass, center-of-gravity location, joint ranges of motion, and biomedical monitoring, affects the ability of astronauts to perform safe, efficient, and effective EVAs. To achieve this understanding, EVA researchers will need to develop and execute an integrated human testing program across multiple environments. The research will provide objective data that will enable informed design decisions and crewmember standards, thereby ensuring EVA systems that optimize crewmember health, safety, efficiency, and performance. This report describes the risks to crew health, safety, performance, and efficiency caused by EVA operations, and it provides the evidence base to substantiate the importance of the risk.

EVA↗

The Prospects for Pumped Storage Hydropower in Alaska

Key Takeaways: The resource mapping analysis confirmed that numerous locations in Alaska are suitable for the development of pumped storage hydropower (PSH) projects, both larger grid scale projects and smaller projects that could be suitable for remote communities; The resource assessment for larger, grid-scale projects showed the potential for more than 1,800 closed-loop systems in Alaska, with a total energy storage capacity of about 4 terawatt hours (TWh); Because of their small reservoir sizes and dam heights, many locations were identified as potentially suitable for small-scale PSH systems. Nearly 50% of the identified potentially suitable small-scale PSH sites are in Southeast Alaska; PSH candidate sites were part of the optimal capacity expansion solution in all scenarios analyzed for the Railbelt system. Depending on the scenario, the new PSH capacity that the model selected for the analysis period until 2046 ranged from 300 MW to 600 MW. The locations and timing of new PSH investments vary in different scenarios; Lithium-ion batteries were also selected a source of new generating capacity in all analyzed scenarios for the Railbelt system, indicating that the system will need a mix of short- and long-duration energy storage to support variable renewable energy sources and provide system reliability in the future; For rural communities, analysis results showed that PSH suitability is very site-specific; in addition to diesel fuel costs and PSH capital costs, suitability depends heavily on available renewable resources and existing infrastructure (e.g., reservoirs, transmission access and construction road access); The analysis for rural communities also showed that PSH projects with 10-hour energy storage are likely to be more economical for remote community applications in Alaska than those with larger reservoirs that could provide 10 days of energy storage; Lithium-ion batteries seem to be an economically more viable energy storage option for small, remote communities in Alaska.

13 HYDRO ENERGY↗

Parametric optimization of PCM-enhanced underground thermal energy storage for buildings in moderate cold climates

This study presents a novel underground thermal energy storage (UTES) system designed for space heating in buildings located in moderate cold climates. The proposed UTES features a borehole with a depth of 25 ft. (7.62 m) and a diameter of 3 ft. (0.91 m), containing two helical pipe loops-one for discharge fluid and another for recharge fluid-and a thermally enhanced phase change material (PCM) layer that provides high energy storage capacity. The system requires daily thermal recharging using a low-grade heat source for a few hours and delivers continuous heating at a nearly constant discharge rate without significant performance degradation over a 24-h period. This study demonstrates that the optimized UTES, when recharged with hot fluid at an inlet temperature of 40 degrees C for 6 h daily, can provide a continuous heat discharge rate of approximately 2.9 kW for 24 h or 3.4 kW if operated under a shorter discharge period of 15 h (17:00-08:00). With a round-trip efficiency of 72-97%, the proposed UTES offers an efficient and reliable solution for short- and long-duration thermal energy storage technology, making it a promising technology for cold climates.

15 GEOTHERMAL ENERGY↗

Computational Optimization of a Rotary Valved Pulse Combustor Concept

A resonant pulse combustor valve concept is introduced that utilizes two slotted, coaxial counterrotating discs for mechanical actuation at the combustor inlet. The intended test article for prototype demonstration is a small, 22 in. long, propane fueled laboratory combustor, flowing approximately 0.006 lbm/s of air. The objective is to develop an externally actuated (i.e., active) valve that yields better performance and longer life than the traditional internally actuated (i.e., passive), reed-type valve found on most pulse combustors. The rotary valve motion is optimized using an axisymmetric, two-dimensional computational fluid dynamic simulation with a domain that includes the valve as a moveable interior wall. Parameters such as slew rate, dwell period in the open position, and total closed period are varied using fuel specific impulse as the figure of merit. Variations in fuel injector location and air fuel ratio are also examined. Additionally, the performance impact of leakage from the rotary valve is quantified since leakage is endemic to the design. The optimized simulation results indicate that the rotary valve concept can deliver the desired performance attributes using disc rotational speeds and stresses that are well within the realm of modern materials. A preliminary mechanical valve design is included in the report.

pressure gain combustion↗

Computational Optimization of a Rotary Valved Pulse Combustor Concept

A resonant pulse combustor valve concept is introduced that utilizes two slotted, coaxial counterrotating discs for mechanical actuation at the combustor inlet. The intended test article for prototype demonstration is a small, 22 in. long, propane fueled laboratory combustor, flowing approximately 0.006 lbm/s of air. The objective is to develop an externally actuated (i.e., active) valve that yields better performance and longer life than the traditional internally actuated (i.e., passive), reed-type valve found on most pulse combustors. The rotary valve motion is optimized using an axisymmetric, two-dimensional computational fluid dynamic simulation with a domain that includes the valve as a moveable interior wall. Parameters such as slew rate, dwell period in the open position, and total closed period are varied using fuel specific impulse as the figure of merit. Variations in fuel injector location and air fuel ratio are also examined. Additionally, the performance impact of leakage from the rotary valve is quantified since leakage is endemic to the design. The optimized simulation results indicate that the rotary valve concept can deliver the desired performance attributes using disc rotational speeds and stresses that are well within the realm of modern materials. A preliminary mechanical valve design is included in the report.

pressure gain combustion↗

EVALUATION OF CONTROLLED END GAS AUTO IGNITION WITH EXHAUST GAS RECIRCULATION IN A STOICHIOMETRIC, SPARK IGNITED, NATURAL GAS ENGINE

Many stationary and heavy-duty on-road natural gas fueled engines today operate under stoichiometric conditions with a three-way catalyst. The disadvantage of stoichiometric natural gas engines compared to lean-burn natural gas and diesel engines is lower efficiency, resulting primarily from lower power density and compression ratio. Exhaust gas recirculation (EGR) coupled with advanced combustion controls can enable operation with higher compression ratio and power density, which yields higher efficiency. This also results in engine operation between the limits of knock and misfire. Operation between these limits has been named controlled end gas auto-ignition (C-EGAI) and can be used to improve the brake efficiency of the engine. Various methods of cylinder pressure-based knock quantification were explored to implement C-EGAI. The indicated quantification methods are used for the implementation of a control scheme for C-EGAI with a relation to the fractional heat release due to auto-ignition. A custom EGR system was built and the effect of EGR on the performance of a stochiometric, spark ignited, natural gas engine is evaluated. C-EGAI is implemented and the optimal parameters are determined for peak performance under EGR and C-EGAI conditions. In this study, knock detection is used for the recognition, magnitude, and location of the auto-ignition events. Cylinder pressure-based knock detection was the primary method for determining the occurrence and location of knock but was also used for implementing the ignition control scheme for controlled end gas auto-ignition. The combustion intensity metric (CIM) enabled parametric ignition timing control which allowed for the creation of a relationship between fractional heat release due to auto-ignition and CIM. Many stationary and heavy-duty on-road natural gas fueled engines today operate under stoichiometric conditions with a three-way catalyst. The disadvantage of stoichiometric natural gas engines compared to lean-burn natural gas and diesel engines is lower efficiency, resulting primarily from lower power density and compression ratio. Exhaust gas recirculation (EGR) coupled with advanced combustion controls can enable operation with higher compression ratio and power density, which yields higher efficiency. This also results in engine operation between the limits of knock and misfire. Operation between these limits has been named controlled end gas auto-ignition (C-EGAI) and can be used to improve the brake efficiency of the engine. Various methods of cylinder pressure-based knock quantification were explored to implement C-EGAI. The indicated quantification methods are used for the implementation of a control scheme for C-EGAI with a relation to the fractional heat release due to auto-ignition. A custom EGR system was built and the effect of EGR on the performance of a stochiometric, spark ignited, natural gas engine is evaluated. C-EGAI is implemented and the optimal parameters are determined for peak performance under EGR and C-EGAI conditions. In this study, knock detection is used for the recognition, magnitude, and location of the auto-ignition events. Cylinder pressure-based knock detection was the primary method for determining the occurrence and location of knock but was also used for implementing the ignition control scheme for controlled end gas auto-ignition. The combustion intensity metric (CIM) enabled parametric ignition timing control which allowed for the creation of a relationship between fractional heat release due to auto-ignition and CIM. Both exhaust gas recirculation and controlled end gas auto-ignition were analyzed with a cooperative fuel research (CFR) engine modified for boosted fuel/air intake. The data was interpreted to provide a proper evaluation of unique analytical methods to quantify the results of C_EGAI and characterize the live auto-ignition events. The control variables for this method of C-EGAI were optimized with EGR conditions to generate the point of peak performance on the CFR engine under stoichiometric, spark ignited, natural gas conditions.

Bayliff, Scott Michael↗

Optimization of structure and control system

The objective of this study is the simultaneous design of the structural and control system for space structures. This study is focused on considering the effect of the number and the location of the actuators on the minimum weight of the structure, and the total work done by the actuators for specified constraints and disturbance. The controls approach used is the linear quadratic regulator theory with constant feedback. At the beginning collocated actuators and sensors are provided in all the elements. The actuator doing the least work is removed one at a time, and the structure is optimized for the specified constraints on the closed-loop eigenvalues and the damping parameters. The procedure of eliminating an actuator is continued until an acceptable design satisfying the constraints is obtained. The study draws some conclusions on the trade between the total work done by the actuators, and the optimum weight and the number of actuators.

Khot, N. S.↗

First Solar Thermal Energy Planner (STEP 1) and Nationwide Industrial Heat and Power Analysis

The First Solar Thermal Energy Planner (STEP 1) and Nationwide Industrial Heat and Power Analysis (aka the STEP 1 Project or the Project) aimed to (1) developed a brand-new web tool that could provide decision support through free, rapid techno-economic analysis of behind-the-meter solar+storage systems for industrial process heat and (2) conduct high-level analyses of the cost-competitiveness of the same systems across the US in key sectors. The STEP 1 web tool collects key location, land availability, thermal load profile, proccess heat temperature and media, and other key parameters through an easy-to-use user interface (UI). The UI was designed to meet the user at their level of understanding by minimizing the number of required inputs as much as possible while including options for more nuanced inputs if the user desires. STEP 1 advises users on which solar thermal tehcnologies that could fit their needs based on the inputs provided (namely process media and temperature). The tool can model a wide range of solar thermal technologies including flat plate collectors, evacuated tubes, parabolic troughs, linear Fresnel, and molten salt towers all with corresponding thermal energy storage (TES) - solar PV with resistive heating and TES is also included. Once the parameters are collected, a nominal thermal energy production profile for the facility's location is generated using NREL's System Advisory Model (SAM) and then passed to a modified version of NREL's REopt platform to optimize the size (capacity) and dispatch of the solar+storage system to minimize lifecycle costs subject to energy balance, fuel and electricity rates, emission reductions goals, and other constraints. This entire process takes less than 20 minutes, is completely free, requires zero coding skills, and provides the user with a high-level assessment on the techno-economic feasability of deploying solar+storage systems for their energy needs. In addition to the development of the STEP 1 web tool, the project completed two complementary analyses focused on leveraging the backend code of STEP 1, public industrial facility locations and fuel consumption data, and key sector information to assess the economic opportunity of reducing fuel costs at various levels of capacity factor around the US. Both analyses found that there are key markets, locations, industrial sectors (namely food and beverage), and degrees of offset where solar thermal technologies could be cost-effectively deployed, highlighting a key market entry point for these technologies, and assessing deployment potential. In summary, the STEP 1 project improved the opportunities for solar+storage systems to expand into the industrial process heat market through breaking down barriers to assessing these technologies.

14 SOLAR ENERGY↗

End-to-End Performance Optimization of a Crewed Lunar Landing Mission Staged from a Near Rectilinear Halo Orbit

A crewed lunar landing mission staged from a Near Rectilinear Halo Orbit (NRHO) presents a unique set of challenges not considered before for the Apollo-type direct missions. The NRHO does not have a fixed orbital plane and its period also changes with time, due to which the mission performance is very sensitive to the timing and location of the NRHO departure and arrival burns for a near-polar surface landing site. For such type of mission staged from the NRHO, an end-to-end optimization approach for the entire mission, from the NRHO departure to surface landing and from surface lift-off to the NRHO insertion, is well-suited for extracting the maximum performance out of this design. In this paper, an integrated approach for performing end-to-end optimization of a NRHO-staged crewed lunar landing mission is proposed that optimizes the in-space and powered flight segments simultaneously using Copernicus trajectory optimization tool. Copernicus is augmented with analytical approximations for the in-space, powered descent, and powered ascent segments in this work to improve the convergence of its multiple-shooting based direct optimization method. New analytical solutions are derived for the different phases of the powered flight segments by solving associated guidance problems. These analytical solutions act as initial guesses for starting the numerical optimization of the integrated mission in Copernicus. An example lunar landing mission is simulated to validate the proposed end-to-end optimization approach and the results are compared with the conventional patched trajectory approach.

Bharat Mahajan↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

A. Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development for a PC-Fired Unit

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗