Verification of severe accident management guideline (SAMG) entry condition for OPR1000 - 367
The current severe accident prevention and mitigation strategies for OPR 1000 have emergency operating procedures (EOPs) and severe accident management guidelines (SAMGs), respectively. The main objective of SAMG is to prevent a release of radioactive materials from releasing into environment and mitigate severe accident phenomena during severe accident. The current SAMG entry condition is met when the core exit temperature (CET) reaches 650 deg. C in OPR 1000. Peak cladding temperature (PCT), which represents core integrity more precisely than CET does, cannot be used since it is not measurable in the main control room (MCR). Current SAMG entry condition for every kind of accident scenarios is not reasonable, since entry condition is determined without considering operator action time. Therefore, SAMG entry condition need to be verified with consider operator action time. Thus, an analysis methodology for SAMG entry condition was developed to verify the SAMG entry condition. A severe accident DB were also developed in order to analyze the SAMG entry condition. The analysis results of DB show that available operator action time from the SAMG entrance to RV fail is shorter than the required time in most cases. As a result, the proper SAMG entry condition was suggested through the results of DB analysis. When the SAMG entry condition is changed from CET to suggested condition, the available action time is increased about 350 to 4300 sec. Also, the suggested entry condition was verified through the simulation which considered operation action time and reflecting the suggested entry condition. (authors)