Search NASA⌕ Search

SEARCH · Search NASA

Results for “surface contamination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Thermal Analysis for SRS Saltstone Disposal Unit Facility

Saltstone Disposal Units (SDU) are long term disposal units for low activity grout produced from the solidification of decontaminated non-hazardous salt waste at SRS. The unit is a cylindrical disposal vault of 150 ft. in diameter and 23 ft. in height. The total volume the SDU can hold is 3 million gallons of grout. The hydration process of the grout material produces heat from an exothermic chemical reaction. If the grout reaches temperatures higher than the maximum safety temperature of 95 deg. C, cracks can start forming leading to contamination of the environment. The purpose of this study is to develop the optimal baseline domain boundary conditions and to perform a sensitivity analysis with respect to the baseline modeling conditions. The following assumptions were made for the modeling calculations: - The system geometry is axisymmetric; - The system was at steady state; - Ambient temperature was set to 100 deg. F; - Air was assumed to be an incompressible ideal gas; - Radiation was neglected for a conservative estimation; - Natural convection for the SDU vapor space is assumed to be turbulent because Rayleigh number based on typical operating conditions is higher than 10{sup 8}; - Water tables were not taken into consideration. The following sensitivity analyses were performed to find the optimal domain boundary: - Mesh size sensitivity; - Soil depth sensitivity - Soil depth varied from 30 ft to 250 ft with a soil thickness of 90 ft; - Soil thickness sensitivity - Soil thickness varied from 30 ft to 270 ft with a soil depth of 180 ft; - Soil conductivity sensitivity - Soil thermal conductivity varied from 0.25 W/m-K to 1 W/m-K; - Ambient Temperature Sensitivity - Ambient temperature varied from 70 deg. F to 110 deg. F. For the thermal calculations, the temperature of the bottom of the soil was set to 17.4 deg. C. The heat flux on the roof of the building and surface of the earth is 163.2 W/m{sup 2}. The soil sides are set to be adiabatic. The sensitivity analysis shows that the mesh size has no effect on the numerical results. This is mainly due to a small convection zone and large conduction zones in the modeling domain. The optimal domain boundary was found to be a soil thickness of 90 ft and a soil depth of 150 ft. The different sensitivity analysis performed here shows the optimal boundary domain to be used for thermal calculations is a soil depth of 150 ft beneath the SDU and a soil thickness of 90 ft. Anything larger would produce similar solutions but at a longer computational time to solve. The maximum temperature was more sensitive to soil properties as shown here. While the ambient temperature affected the max temperature linearly. Most of the heat transfer takes place downward vertically between the SDU and the soil beneath it. Using the optimal domain boundary determined by the sensitivity analyses, the maximum thermal loading to keep the maximum grout temperature below 95 deg. C is 1.646 W/m{sup 3}.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laser Cleaning for Decontamination of a Nuclear Facility - 20609

This paper describes laser cleaning of contaminated tools in a nuclear power facility in Chalk River, Ontario Canada and also the same for EnergySolutions facility in Memphis facility. For the Chalk River facility, other methods of cleaning which included dry ice blasting, disassemble and wipe clean and steam cleaning, generated secondary waste and were time consuming. Laser cleaning of the tools in facility did not create secondary waste, was more efficient and safer for the operator. The laser cleaning method was compared with other methods. For the EnergySolutions facility in Memphis, laser cleaning was compared with hands on cleaning and laser removal by applying them to a rail car, a metal plate and a metal skate. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Methodology for the Impact Assessment of an Uranium Mill Contaminated Site - 19031

This work describes the development of mathematical models for radionuclides distribution and transport in the environment. The applicability of the models involves an integrated approach to assess the quantitative dispersion of the radionuclides in different environmental compartments when released from uranium tailings or from other low-activity mining wastes storages. For every compartment the important pathways of contamination and the radionuclides of major concern are identified and selected, based on their chemical, physical, radiological and toxic properties. Each compartment represents an environmental media: air, soil, water, vegetation and biota. Depending on the characteristics of the sources different types of possible releases are evaluated using phenomenological models. Models of environmental release, dispersion, transport and fate within each environmental compartment, as well as models of transfer between them, are applied to a specific site. The model outputs are the radionuclides activities for each one of the environmental compartments, where relevant exposure end-points are previously identified. The methodology was applied to a specific Uranium Mill Site, referred here as the 'Mill'. The site comprises approximately 3.2 km and includes two inactive mills, former ore stockpiles areas, a partially reclaimed tailings pond disposal area and a current tailings pond disposal area. The Mill site began operations in the late 1950's extracting uranium ore by alkaline leaching. Later on, a new facility using acid leaching for extracting uranium begun to operate in 1980. The mill operated first continuously and after intermittently until its closure, in March 2006. The data required for the model input was acquired from different sources: direct measurements from this particular site and available from multiple site investigation reports (in particular, environmental data for groundwater, soil, surface water, sediments and biota); other, were selected from published data. For the unknown data, assumptions were made. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3-D Radiological Data Acquisition, Visualization and Modeling - 20211

The U.S. Army Corps of Engineers (USACE) was tasked to investigate and remediate low activity radiological contamination from research and production of the nation's first nuclear weapons at the former DuPont Chambers Works Formerly Utilized Sites Remedial Action Program (FUSRAP) site (DuPont). The DuPont site had several buildings used for the Manhattan project that were demolished in the 1940's and 1950's apparently using heavy earthmoving equipment. Some of the contaminated rubble from the demolition appears to have been spread out by this equipment resulting in somewhat random scattering of radiologically contaminated soil and debris along with aqueous spills. Traditional investigative methods such as soil borings, test pits and 2-dimensional gamma walkovers were only partially successful in delineating the radiological contamination at the site. It was feared that even 'chasing' the contamination during remediation would miss contamination if the demolition resulted in discontinuous trails of radiologically contaminated soils. In evaluating the data generated over the interceding decades, the USACE determined that a better method to collect and process the remedial action radiological data was needed to enable the project team to optimize predictive planning and meet documentation expectations. The purpose of this paper is to provide an overview of the effort and progress to combine and organize radiological survey methods into a highly flexible sampling, modeling, and decision analysis approach that emphasizes the quality of decision-making during remediation. This innovative system blends multiple tools to develop a methodology that can extend MARRSIM [1] into the subsurface and provide tools that can be applied to other sites. (authors)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Experimental Study on the Transfer of Cs, Sr, Pu and Water in Concrete for the Estimation of Contamination - 20085

As part of the 'Nuclear Energy Science and Technology and Human Resources Development project- through concentrating wisdom-by MEXT' in Japan, the major results from the second year of a project on the analysis of radionuclide contamination mechanisms of concrete and the estimation of contamination distribution at the Fukushima Daiichi nuclear power station active during 2018-2020 are presented. The transfer of Cs, Sr, Pu, and water through concrete was studied experimentally. In a saturated condition, the clay did not affect the transfer and Cs penetrated much faster than Sr. In the dried condition, clay retarded Cs transfer. Carbonation of the concrete retarded the transfer of Cs and Sr. Pu was expected to be precipitated immediately in a high pH condition of concrete. Water suction depends on the temperature. Further, the detailed mechanism was analyzed by {sup 1}H-NMR. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dry Cask Shipments of ATR Spent Nuclear Fuel at INL - 19600

The High Load Charger (HLC) cask will be replacing the Advanced Test Reactor (ATR) spent fuel transfer cask that has been used at Idaho National Laboratory (INL) to wet-transfer spent ATR fuel elements from ATR to Idaho Nuclear Technology and Engineering Center (INTEC) in order to support future plans at both facilities. INTEC intends to discontinue use of the CPP-666 storage pools in compliance with the Idaho Settlement Agreement and the basins will no longer be available to store spent ATR fuel elements. In order to support the core-internals change out in 2021 for ATR, spent ATR fuel elements must be removed from the canal and shipped to INTEC. INL contractors will use the HLC cask for safe, dry transfer of spent Advanced Test Reactor (ATR) fuel elements between the ATR Complex managed by Battelle Energy Alliance, LLC and the Idaho Nuclear Technology and Engineering Center (INTEC) managed by Fluor Idaho, LLC. The HLC cask (also known as the High Load Charging Cask or High Load Charger) is a lead-shielded, stainless steel transfer container originally designed in 1954 by the Idaho Nuclear Corporation to meet the radiation and contamination controls requirements of the time for shipment of spent nuclear fuel. The cask has been modified over the years and is currently used for wet-to-dry transfers at INTEC. It is approved only for out-of-commerce transfers. The cask will arrive at the ATR where eight spent ATR fuel elements will be loaded into two, newly-designed buckets. Each bucket is a quarter section, right-cylinder shape that has four compartments. The cask will be lifted out of the ATR canal allowing most of the water to drain from the cask. Processing the 12,500 kg cask will be completed in ATR and then transported on a tractor trailer to INTEC where the loaded buckets will be removed from the cask. The loaded buckets will undergo a drying process before placing the four buckets into a canister for long-term storage in the Irradiated Fuel Storage Facility (IFSF) at INTEC. A new transportation plan that was submitted to, and approved by, the U.S. Department of Energy to provide the cask safety basis, which describes the hazard analysis and accident analysis for the cask during transport. Supporting accident analysis include criticality, thermal, dose, and drop analyses. Of particular interest for this cask was the drop analysis from which was derived the speed limit for the transport. The drop analysis addressed drops in air onto an unyielding surface and in water onto an energy-absorbing pad for the cask in the ATR facility. These analyses are typically applied as the bounding drop scenarios during transport; however, this resulted in a safety basis speed limit of 12.9 kph. In order to more accurately represent the in-transit accident scenario, LS-DYNA software was procured and the model was updated to more closely represent the potential drop heights and impact surfaces of asphalt and soil for the cask while in transit. This analysis resulted in a safety basis speed limit of 48 kph. This safety basis speed limit is more practical to implement and control. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost-effective Remediation of Legacy Uranium Mines in Canada - 19279

Canada's legacy uranium mines were developed and operated in the 1950's and the 1960's when environmental regulations applied to mining activities were not as stringent as they are today. Fortunately, the ore was very low grade and, most of these sites do not currently pose a significant risk. However, the mining practices used at the time would not be considered acceptable today and there is a need to ensure these sites are being managed properly, especially in the context of gaining public support for the development of new uranium mines. At the beginning of the Cold War nuclear arms race, uranium was in high demand. In 1948, bans on private uranium exploration and mining were lifted, resulting in extensive exploration activity across the country, with Canada's second uranium mine beginning production in 1953. By 1958, 19 uranium mills were operating and Canadian production peaked at 12,239 tonnes of uranium metal (tU). The uranium mining boom was short-lived as the United States, the major purchaser, soon had sufficient quantities of uranium to meet its needs and the Canadian contracts were not extended. Uranium mines began closing, and by 1965, only 4 remained in operation. Closure requirements were minimal at that time, and other than sealing shafts and other safety measures, the sites were abandoned by their owners and the wastes were not addressed. In many cases, the company that operated the mine, or its successor, still exists and is now addressing the wastes on its sites. However, sites for which a former operator cannot be found have become a government responsibility. It is not often practical or cost-effective to remediate legacy sites to the standards applied to modern uranium mines. Most of the sites pose a very low risk, due to the very low-grades of ore, their remote locations, and the fact that contamination has spread and dissipated over the last 50 years and the environment will continue to improve through natural attenuation. Owners of legacy uranium mine sites in Canada have developed and successfully carried out cost-effective remediation plans that meet regulatory requirements. Experience from the legacy sites that have been remediated to date in Canada has shown that costs for remediating legacy uranium mines need not be excessive, and should be similar to the cost of remediating other metal mines of comparable size. The main factor in the cost of remediating these sites is the amount of tailings that were generated. On a per unit cost basis (current U.S. dollars), costs of remediation, have ranged from US$0.83 to US$2.57 per tonne of tailings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 4 and 15: Japan Fukushima Daiichi D and D Update and Technological Challenges at Japan Fukushima Daiichi D and D and Update on Nuclear Overview and Development in Japan - Nuclear Fuel Cycle

Sessions 4 and 15 represent a two-part panel series that discusses progress and challenges associated with cleanup at Fukushima. Severe limitations on availability of original panelists from Japan due to strict restrictions put in place to alleviate the spread of coronavirus necessitated changes to both panels. The result was a significantly modified panel for Session 04 (shown above) and the elimination of all panelists for Session 15. The 4 and 15 Panel Sessions provide an overview of activities related to both the progress and challenges of cleanup and decommissioning of the Fukushima Daiichi Nuclear Power Station (NPS) in Japan. Five panelists discussed perspectives of the cleanup following a Tokyo Electric Power Company (TEPCO) video showing the progress on site since the devastating Great East Earthquake and tsunami that caused the explosions at three of the six reactors on the site. Three of the five panelists discussed on-going work being performed for the effort, while the other two provided expert perspectives of on strategic efforts at the site. The panel was attended by over 80 technologists and policy makers spanning the globe and was opened by Dr. Monica Regalbuto of Idaho National Laboratory and a short video provided by TEPCO. The video described changes at the site that spanned the cleanup efforts from stabilizing water intrusion into the contaminated reactor buildings to construction of new administrative facilities. The video explained the processes underway to retrieve spent fuel rods and challenges in retrieval of the compromised fuel debris. The video highlighted working condition improvements that included establishment of rest housing and a small convenience store on the site, and the rollback of protective equipment around the site due to decreases contamination. Panelists with presentations: Revision of 'the Mid-and-Long-Term Road-map towards the Decommissioning of TEPCO's Fukushima Daiichi Nuclear Power Station' (Paul Dickman); Sharing UK experience at Fukushima Daiichi (Adrian Simper); SRNL Japan (Andrew Fellinger); ABLE's Initiative to Dismantle the Exhaust Stack (Daniel Walter); JAEA R and D in Fukushima (Tokio Fukahori); TEPCO - Overview and Update of the Fukushima Decommissioning Process (Monica Regalbuto); Toshiba's Involvement in the Decommissioning of the Fukushima Daiichi Nuclear Power Plant (Yasuhiro Yuguchi); Remote Dismantling of the Exhaust Stack At Fukushima Dai-ichi NPS (Takashi Okutsu)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Spatiotemporal Distribution of {sup 241}Am in the Vicinity of the Waste Isolation Pilot Plant - 19543

Environmental monitoring around nuclear facilities is essential for characterizing the baseline conditions that are critical for identifying releases and quantifying their effects, should they occur, and for assessing post-closure performance. The spatiotemporal distribution and transport behavior of {sup 241}Am in the vicinity of a deep geologic repository for transuranic waste were assessed using data spanning the pre-operational phase to the present, including an accidental radionuclide release in 2014. The {sup 241}Am background values of 0.027±0.109 μBq/m{sup 3} (aerosols), and 0.061±0.065 Bq/kg (soil), as well as the {sup 241}Am/{sup 239+240}Pu ratios of 0.41±0.06 (aerosols) and 0.38±0.04 (soil), are similar to global fallout values. Pre-operations concentrations of {sup 241}Am show a strong seasonal dependence, attributed to resuspension of soils contaminated by global fallout, with no contribution from the upwind Project Gnome site ({sup 241}Am/{sup 239+240}Pu =0.24±0.08). During the 2014 accidental release, aerosol concentrations of {sup 241}Am briefly increased to 115.2 μBq/m{sup 3} at an onsite monitoring station, and 81.4 μBq/m{sup 3} at a station ∼1 km downwind of the exhaust shaft, changing the {sup 241}Am/{sup 239+240}Pu from ∼0.37 to ∼10. However, some four years later, conditions have returned to background. Almost 90% of the {sup 241}Am inventory is the 0-5 cm soil layer and there is no evidence of concentrations above regulatory standards, or that can be attributed to waste disposal operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US EPA Superfund Radiation Risk Assessment Update: Superfund Update: Revisions to Risk and Dose Assessment Tools - 18232

The U.S. Environmental Protection Agency (EPA) Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet based calculators for risk and dose assessment at Superfund sites are being revised to reflect better science, revisions to existing exposure scenarios and new scenarios, and changes to match up more closely with the EPA chemical regional screening level calculator. A comprehensive set of revisions to the PRG calculator was finished in November 2014. Additional revisions to the other 5 calculators were made in 2015. A set of further revisions are expected to be finalized prior to December 2016 and will be discussed in this abstract. There are several additional revisions that may be finished prior to WM 2017 and will be presented if finished or discussed in more general terms if still underway. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tersoff Benchmarking of Be-C-H Interatomic Potential

To demonstrate prolonged fusion power in ITERs (International Thermonuclear Experimental Reactors), the selection of appropriate plasma facing materials (PFMs) is a vital issue that requires the use of interatomic potentials to simulate the plasma interactions with the PFMs. So it is no surprise that the use of computer codes such as LAMMPS to perform studies in order to determine proper PFMs is necessary based on the complexity of such studies. In recent Tokamak advancements, beryllium was chosen as a first wall material due to its low Z (lower energy loss due to plasma contamination), its low tritium inventory and its oxygen gettering quality. With its high melting point and ability to withstand high heat fluxes, beryllium makes a fine choice for a PFM. In this work, Be-C-H (beryllium-carbon-hydrogen) bonds were investigated in a LAMMPS Tersoff simulation, where the interatomic potentials for Be-C-H were converted to LAMMPS Tersoff format, and were validated by calculating the cohesive energy (E{sub coh}), lattice constant (a), and atomic volume (V{sub 0}) for comparison to Density Functional Theory (DFT), Analytical Bond-Order Potentials (ABOP) and experiment potentials. This benchmark serves as the validation of performing Be-C-H bombardment simulations using LAMMPS.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Multi-Faceted Approach to Evaluate Discharge Locations at a FUSRAP Site - 18421

Following the completion of a Soil and Groundwater Remedial Investigation by USACE at a FUSRAP site located in Nassau County, New York, groundwater data indicated the presence of contaminant source(s) that had not been identified. As a result, a targeted investigation was undertaken to understand how materials were handled and disposed of at a site located in Nassau County, Long Island, New York. The FUSRAP site is a 4.3-hectare (10.5-acre) site encompassing three parcels which had historically been utilized as a nuclear materials manufacturing facility (e.g., cores, slug, and fuel elements) for reactors used in both research and electric power generation in early 1950's until late 1960's; however, the targeted investigation was on the southern-most parcel known as the '70 Property' (the Site). The 70 Property contained a building that was used for atomic fuel-element manufacturing from 1958 until 1966 under license to the Atomic Energy Commission (AEC), and involved the use of natural, enriched, and depleted uranium as well as lesser amounts of thorium. The major contaminants of concern are tetrachloroethene, nickel, uranium and thorium. During the RI, significant sources of contamination were not found in Site soils despite records indicating that chemicals and radionuclides had been disposed of on the property. In addition, downgradient groundwater data indicated a source(s) on the 70 Property that could not be identified by known sources on other the other FUSRAP parcels or from adjacent sites. This conclusion was further supported following development of groundwater contaminant transport and flow models. The main objective of the targeted investigation was to evaluate the potential discharge points on the 70 Property that may have been utilized for liquids waste disposal. However, several challenges existed including 1) lack of building construction details; 2) historical changes to Site building and property; 3) the use of the Site by various tenants; and 4) the commingling of Site contaminants with impacts from multiple sources. To overcome these challenges, historic documents/reports with information about the handling and disposal of liquid wastes were reviewed to evaluate quantities, contents and locations of waste disposal. Thereafter, an investigation was undertaken that included geophysical surveys; pipe tracing and video inspection; in-situ smoke and water testing; installation of test trenches and soil borings; and, sampling sludge residuals, soils and water within the various drainage structures that were located. This paper describes the multi-faceted investigation approach that was utilized to overcome the challenges faced during the investigation as well as insights into the waste disposal practices of the time period and the findings of the investigation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Ion Exchange Resin Performance - A Case Study at 200 West Pump and Treat - 18103

The 200 West Pump and Treat Facility (200W P and T), located on the U.S. Department of Energy's Hanford site, is a 2,500 gallon per minute (GPM) plant designed to capture and treat an eight square kilometer groundwater plume. The groundwater contamination is largely a result of process liquids disposed from operations involving the separation of nuclear materials and storage of spent nuclear fuel. This document will report on the performance of a full scale uranium ion exchange system used to treat contaminated groundwater and other waste streams. The uranium ion exchange system at 200W P and T was designed as a three vessel operation with a lead, lag and polish vessel, which contain 300 cubic feet of resin in each vessel. The ion exchange system treats a portion of the total plant flow with a maximum capacity of 400 GPM. Prior to start-up, one key issue was the potential to treat feed streams with a wide range of uranium concentrations (22 to 150,000 microgram per liter [μg/L]). The resin change-out frequency was a primary concern. A literature review was performed, resulting in resin capacity and change out frequency that varied by two orders of magnitude (1.2 milligram per gram [mg/g] to 104 mg/g capacity). Since startup in September 2015, the ion exchange system has experienced a dynamic feed stream as wells were brought online, which changed the contaminant concentrations. The plant also treats leachate liquid waste from on-site low-level waste site, known as the Environmental Restoration Disposal Facility (ERDF), which contains uranium as well as other competing anions, such as sulfate. The uranium breakthrough is closely monitored throughout the resin beds with weekly sampling events at the influent, effluent, and intermediate ports in the first vessel. In the influent to the ion exchange system, the uranium concentration fluctuated from 24 μg/L up to 910 μg/L. The information on influent and effluent was used to determine the change out frequency and the capacity of the resin for uranium under these operating conditions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Power flow in magnetically insulated transmission lines with ion backscatter effects

Ion backscattering off of surfaces in magnetically insulated transmission lines (MITLs) is often ignored in kinetic simulations of MITL power flow. Backscattering reduces ion current losses and the surface impact heating, which dictates the rate at which surface-adsorbed contaminants are liberated into the anode–cathode gap. Backscatter probabilities are difficult to implement in a kinetic code because there are limited data for incident ion energies less than a few keV. This paper presents an analytic model based on the Rutherford scattering formula that reproduces the measured backscatter probabilities at high incident energies and transitions to the highly reflective behavior expected at low incident energies. The backscatter model is implemented in power flow simulations, which are validated with current loss experiments conducted on the 0.4 TW Mykonos accelerator at Sandia National Laboratories. This simulation setup is then used in a high-current Z-machine shot. In conclusion, backscatter effects are found to be unimportant in the low-current Mykonos regime but significantly reduce current losses at the Z-machine scale.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The 'Site of Things': Remediation in the Information Age - 18088

More than just a payload, machines now haul data as well. Wood Environment and Infrastructure's maiden voyage into civil engineering automation at the Port Granby Project Long-Term Waste Management Facility demonstrated enormous potential for the remediation industry. The Port Granby Project will relocate approximately 450,000 cubic meters of historic low-level radioactive waste and marginally contaminated soils, located at an existing waste management facility on the shoreline of Lake Ontario, to a new, engineered aboveground mound to be built about a kilometer north of the current site. Sounds simple, right? Just move a bunch of dirt up the road? Hardly, this is marginally contaminated soil situated near Lake Ontario in a beautiful little village an hour east of Toronto. We must relocate safely, meaning limiting the number of staff in the field and efficiently to deliver according to our agreed upon budget and schedule. As if that wasn't enough we were asked to keep track of where each truckload of dirt was excavated from (with a high degree of accuracy), where it was placed in the new engineered disposal facility, how much it weighed and the amount of radioactivity in each load... a virtual chain of custody for each load. Presented is an overview of the Information Technology that supports the Port Granby Project and how the Data Management System (DMS) is being leveraged to make the project safer, more effective and efficient. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Concentration Ratios and Transfer Factors for Human and Ecological Probabilistic Performance Assessments - 19781

Human and ecological risk assessments utilize concentration ratios and transfer factors to calculate contaminant concentrations in plant and animal tissues in equilibrium with soil or water (concentration ratios) or based on an animal's contaminant intake from various media (transfer factors). These ratios and factors are used to evaluate human dose via food ingestion pathways and to evaluate ecological dose to an organism. In a probabilistic performance assessment, concentration ratio and transfer factor distributions are developed for every element, and these distributions are applied across the spatial and temporal domain of the assessment. As a result, it is necessary to scale the underlying data distributions by applying the central limit theorem to develop appropriate distributions of the mean for the temporal and spatial scale of the model. Herein we discuss the methodologies for identifying and ranking references, and how to develop statistical distributions of concentration ratios and transfer factors for probabilistic performance assessment models. We also discuss factors that could be pertinent to differences when selecting references and developing distributions for human versus ecological risk assessment scenarios. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 11: Featured Country Canada - Remediation of Contaminated Sites

Canada has several unique sites requiring environmental remediation of radiological contaminants. This panel was designed to outline the remediation of contaminated sites across Canada from several perspectives. Remote legacy uranium mining operations, small scale residential locations, and large impacted soil sites all pose different challenges, however there are some common solutions and keys to success. This panel addressed several of those challenges and provided lessons learned on how to successfully plan and execute large scale environmental remediation in both remote and residential locations. This panel focused on the cleaning up several contaminated sites in Canada and monitoring the long-term performance of sites that have already been remediated. Panelists addressed the technical and social challenges associated with various cleanup initiatives North of the 49. Parallel and the solutions that have been adopted to enable these projects to move forward. The panel offered the perspectives of owners, contractors and regulators on current projects and how they are leveraging past experience and learning from others to ensure future undertakings are successful. Presentations proposed include: 1 - Regulating Environmental Remediation in Canada (Michael Rinker, Canadian Nuclear Safety Commission (Canada)); 2 - Integration of Local Knowledge and Engagement/Capacity Building Legacy Uranium Mine Sites (Joe Muldoon, Saskatchewan Research Council (Canada)); 3 - The Path to Institutional Control - Safe, Secure and Stable (R. Liam Mooney, Cameco Corporation (Canada)); 4 - Port Hope Area Initiative: Project Challenges (Scott Parnell, Canadian Nuclear Laboratories (Canada))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Most Recent Chemical Decontamination for Decommissioning Projects - 19280

In 2017, Westinghouse performed a full system chemical decontamination of Units 1 and 2 of the Bohunice V1 Nuclear Power Plant. Bohunice V1 is a VVER 440 design with six loops. The application was performed two loops at a time, with the reactor core bypassed. The Pressurizer and Pressurizer Relief Tank (Bubble Tank) were decontaminated as well, in a separate application. This was a recovery decontamination that had been attempted by another company prior to Westinghouse. Several modifications to equipment and design of process were required to make the decontamination successful. The project was initiated to perform pre-dismantling chemical decontamination of primary circuits of both V1 units using Decontamination for Decommissioning (DfD) to meet the following objectives (see References 1 and 2 for process descriptions of DfD): - Remove activity from the primary circuit components; - Reduce dose rates around piping and components; - Simplify access to the installations, making it possible to use hands-on techniques for dismantling, rather than the more expensive use of robotics or manipulators; - Minimize the potential for spreading contamination during decommissioning activities - Reduce the activity of components that they may be disposed of at a lower classification, therefore more economical, waste disposal category. Several techniques were employed that were unique, or first of a kind, to aid in the decontamination, including resin regeneration and bypass of the reactor core, while still providing enough flow to to allow sufficient dispersal through all the steam generator tubes. Equipment that was already available on site was evaluated and, when possible, combined with Westinghouse equipment to minimize application cost and schedule. The lessons learned from the first unit (Unit 2) were applied to the second unit (Unit 1) application. The partial relocation of equipment allowed for the most efficient schedule to complete the second decontamination. The paper will describe in more detail the results and lessons learned from the full system chemical decontaminations performed, as well as updates on another recent decontamination project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗