Search NASA⌕ Search

SEARCH · Search NASA

Results for “technical evaluation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

SRNL Report on Vendor Solicitation and Selective Ion-Electrode Testing

Effective operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) will require information collected from sampling and/or monitoring to maintain environmental compliance, product quality, and operating efficiency. The U.S. Department of Energy (DOE) – Office of River Protection (ORP) recognizes the potential long-term benefit of developing real-time, in-line monitoring (RTIM) at the WTP to improve the current strategy of collecting tens of thousands of samples and analyzing them. In-line monitoring can decrease processing time associated with waiting for sample analysis, reduce workers’ exposure to radiation and chemical hazards, decrease secondary waste volumes, potentially improve product quality, and provide production support and enhance overall operational control. The Assistant Manager, WTP chartered an Integrated Technical Team (ITT), which includes personnel from the Savannah River National Laboratory (SRNL), Bechtel National, Inc., and DOE-ORP, to evaluate the capability and potential benefits of replacing routine sample collection requirements with real-time, in-line monitoring. The initial focus of the ITT is the Direct Feed Low Activity Waste (DFLAW) Program. This work scope is being performed in multiple phases. Phase 1 is Requirements and Opportunities Analysis, Phase 2 is Applications and Benefits Determination, and Phase 3 is Qualification and Demonstration. Phase 1 included 6 tasks and was completed by SRNL in 2017. The tasks in Phase 1 were: (1) determining the functional requirements for determining analytes and properties of streams, (2) determining the technical basis for process control, (3) determining the sampling points within the Low Activity Waste (LAW) facility and Effluent Management Facility (EMF), (4) data quality and management, (5) process control challenges, and (6) preparing a Preliminary Analysis Plan. DOE-ORP was briefed on the findings from the Phase 1 tasks and requested that Phase 2 work focus on establishing a basis for a materials balance approach that minimized process sampling. The Phase 2 work scope contains tasks to evaluate a materials balance only approach as well as continuing scoping evaluations for instruments that could be used for RTIM. The Phase 2 work scope was completed by both SRNL and Pacific Northwest National Laboratory (PNNL). The tasks performed in Phase 2 were: 1. Overall program administration and technical oversight 2. Evaluation of a Material Balance Approach, a. Evaluation of uncertainty of this approach compared to uncertainty of current methods b. Evaluation of automating the material balance within the framework of existing control software, c. Development of the methodology to obtain and evaluate data during cold commissioning to support a material balance approach, and d. Development of a framework to utilize during presentation of the revised approach to stakeholders and regulators. 3. Screening Evaluations of Instruments to Supplement the Material Balance Approach, a. AP-105 melter condensate evaluations, and b. Screening testing with simulants. 4. Evaluation of the current DFLAW feed qualification program to identify analytes that could be eliminated, a. Inorganic analytes, b. Radionuclides, and c. Organic analytes. This report describes the results of Task 3b, Screening testing with simulants. The Savannah River National Laboratory requested demonstrations of commercially available analytical instruments by the vendors or laboratory demonstration. The techniques tested included: Raman spectroscopy, Infrared spectroscopy (IR), laser induced breakdown spectroscopy (LIBS), X-Ray Fluorescence Spectroscopy (XRF), and ion-selective electrochemical probes. Additionally, the instrumentation would need to be durable enough to withstand the environment of the plant, preferably with little to no maintenance. The insertion point of the instrument would be dependent upon the instrumentation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Approach for Validating Actinide and Fission Product Burnup Credit Criticality Safety Analyses: Criticality (k eff ) Predictions

One of the most important remaining challenges associated with expanded implementation of burnup credit in the United States is the validation of depletion and criticality calculations used in the safety evaluation—in particular, the availability and use of applicable measured data to support validation, especially for fission products (FPs). Applicants and regulatory reviewers have been constrained by both a scarcity of data and a lack of clear technical basis or approach for use of the data. In this study, this paper describes a validation approach for commercial spent nuclear fuel (SNF) criticality safety (k eff ) evaluations based on best-available data and methods and applies the approach for representative SNF storage and transport configurations/conditions to demonstrate its usage and applicability, as well as to provide reference bias results. The criticality validation approach utilizes not only available laboratory critical experiment (LCE) data from the International Handbook of Evaluated Criticality Safety Benchmark Experiments and the French Haut Taux de Combustion program to support validation of the principal actinides but also calculated sensitivities, nuclear data uncertainties, and limited available FP LCE data to predict and verify individual biases for relevant minor actinides and FPs. The results demonstrate that (a) sufficient critical experiment data exist to adequately validate k eff calculations via conventional validation approaches for the primary actinides, (b) sensitivity-based critical experiment selection is more appropriate for generating accurate application model bias and uncertainty, and (c) calculated sensitivities and nuclear data uncertainties can be used for generating conservative estimates of bias for minor actinides and FPs. Results based on the SCALE 6.1 and the ENDF/B-VII.0 cross-section libraries indicate that a conservative estimate of the bias for the minor actinides and FPs is 1.5% of their worth within the application model. Finally, this paper provides a detailed description of the approach and its technical bases, describes the application of the approach for representative pressurized water reactor and boiling water reactor safety analysis models, and provides reference bias results based on the prerelease SCALE 6.1 code package and ENDF/B-VII nuclear cross-section data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low Energy Photon Filter Box Optimization Study for the Gamma Irradiation Facility (GIF)

As a follow-up to results presented at the 16th International Symposium on Reactor Dosimetry, a new set of low energy photon filter box designs were evaluated for potential testing at the Gamma Irradiation Facility in Sandia National Laboratories' Technical Area V. The goal of this filter box design study is to produce the highest fidelity gamma ray test environment for electronic parts. Using Monte Carlo coupled photon/electron transport, approximately a dozen different designs were evaluated for the effectiveness in reducing the dose enhancement in a silicon sensor. The completion of this study provides the Radiation Metrology Laboratory staff with a starting point for experimental test plans that could lead to improvement in the gamma ray test environment at the Gamma Irradiation Facility.

61 RADIATION PROTECTION AND DOSIMETRY↗

MATERIALS AND COMPONENT DEVELOPMENT FOR ADVANCED TURBINE SYSTEMS

Future hydrogen-fired or oxy-fuel turbines will likely experience an enormous level of thermal and mechanical loading, as turbine inlet temperatures (TIT) approach 1425-1760ºC with pressures of 300-625 psig, respectively. Maintaining the structural integrity of future turbine components under these extreme conditions will require durable thermal barrier coatings (TBCs), high temperature creep resistant metal substrates, and effective cooling techniques. While advances in substrate materials have been limited for the past decades, thermal protection of turbine airfoils in future hydrogen-fired and oxy-fuel turbines will rely primarily on collective advances in TBCs and aerothermal cooling. To support the advanced turbine technology development, the National Energy Technology Laboratory (NETL) at the Office of Research and Development (ORD) has initiated a research project effort in collaboration with the University of Pittsburgh (UPitt), and West Virginia University (WVU), working in conjunction with commercial material and coating suppliers, to develop advanced materials, aerothermal configurations, as well as non-destructive evaluation techniques for use in advanced land-based gas turbine applications. This paper reviews technical accomplishments recently achieved in each of these areas.

36 MATERIALS SCIENCE↗

Sister Rod Destructive Examinations (FY22) Appendix F2: Evaluation of Fuel Rod Fatigue During Spent Fuel Transportation

This report documents work performed under the Spent Fuel and Waste Disposition’s Spent Fuel and Waste Science and Technology program for the US Department of Energy (DOE) Office of Nuclear Energy (NE). This work was performed to fulfill Level 2 Milestone M2SF-23OR010201024, “FY22 Report on ORNL Sibling Rod Testing Results,” within work package SF-23OR01020102 and is an update to the work reported in M2SF-22OR010201047, M2SF-21OR010201032, M2SF-19ORO010201026, and M2SF- 19OR010201028. As a part of DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin (LT) Zirc-4, ZIRLO, and M5. The DEs are being conducted to obtain a baseline of the HBU rods’ condition before dry storage and are focused on understanding overall SNF rod strength and durability. Composite fuel and defueled cladding will be tested to derive material properties. Although the data generated can be used for multiple purposes, one primary goal for obtaining the post-irradiation examination data and the associated measured mechanical properties is to support SNF dry storage licensing and relicensing activities by (1) addressing identified knowledge gaps and (2) enhancing the technical basis for post-storage transportation, handling, and subsequent disposition. This appendix documents an evaluation of the fatigue data to enhance the technical basis for post-storage transportation, handling, and subsequent disposition and to identify future testing needs for Phase 2 of the project.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

FEASIBILITY EVALUATION AND RETROFIT PLAN FOR COLD CRUCIBLE INDUCTION MELTER DEPLOYMENT IN THE DEFENSE WASTE PROCESSING FACILITY AT SAVANNAH RIVER SITE - 8118

Cold crucible induction melters (CCIM) have been proposed as an alternative technology for waste glass melting at the Defense Waste Processing Facility (DWPF) at Savannah River Site (SRS) as well as for other waste vitrification facilities. Proponents of this technology cite high temperature operation, high tolerance for noble metals and aluminum, high waste loading, high throughput capacity, and low equipment cost as the advantages over existing Joule Heated Melter (JHM) technology. This paper describes the CCIM technology and identifies technical challenges that must be addressed in order to implement CCIMs in the DWPF. The CCIM uses induction heating to maintain molten glass at high temperature. A water-cooled helical induction coil is connected to an AC current supply, typically operating at frequencies from 100 KHz to 5 MHz. The oscillating magnetic field generated by the oscillating current flow through the coil induces eddy currents in conductive materials within the coil. Those oscillating eddy currents, in turn, generate heat in the material. In the CCIM, the induction coil surrounds a 'Cold Crucible' which is formed by metal tubes, typically copper or stainless steel. The tubes are constructed such that the magnetic field does not couple with the crucible. Therefore, the field generated by the induction coil couples primarily with the conductive medium (hot glass) within. The crucible tubes are water cooled to maintain their temperature between 100 C to 200 C so that a protective layer of molten glass and/or batch material, referred to as a 'skull', forms between them and the hot, corrosive melt. Because the protective skull is the only material directly in contact with the molten glass, the CCIM doesn't have the temperature limitations of traditional refractory lined Joule heated melters. It can be operated at melt temperatures in excess of 2000 C, allowing processing of high waste loading batches and difficult-to-melt compounds. The CCIM is poured through a bottom drain, typically through a water-cooled slide valve that starts and stops the pour stream. To promote uniform temperature distribution and increase heat transfer to the slurry fed High Level Waste (HLW) sludge, the CCIM may be equipped with bubblers and/or water cooled mechanical agitators. The DWPF could benefit from use of CCIM technology, especially in light of our latest projections of waste volume to be vitrified. Increased waste loading and increased throughput could result in substantial life cycle cost reduction. In order to significantly surpass the waste throughput capability of the currently installed Joule Heated Melter, it may be necessary to install two 950 mm CCIMs in the DWPF Melt Cell. A cursory evaluation of system design requirements and modifications to the facility that may be required to support installation and operation of two 950 mm CCIMs was performed. Based on this evaluation, it appears technically feasible to position two CCIMs in the Melt Cell of the DWPF within the existing footprint of the current melter. Interfaces with support systems and controls including Melter Feed, Power, Melter Cooling Water, Melter Off-gas, and Canister Operations must be designed to support dual CCIM operations.

36 MATERIALS SCIENCE↗

Closed-Loop Pumped Storage Hydropower Resource Assessment for the United States. Final Report on HydroWIRES Project D1: Improving Hydropower and PSH Representations in Capacity Expansion Models

Pumped storage hydropower represents the bulk of the United States' current energy storage capacity: 23 gigawatts (GW) of the 24-GW national total (Denholm et al. 2021). This capacity was largely built between 1960 and 1990. PSH is a mature and proven method of energy storage with competitive round-trip efficiency and long life spans. These qualities make PSH a very attractive potential solution to energy storage needs, particularly for longer-duration storage (8 hours or more); such storage will be crucial to bridge gaps in electricity production as variable wind and solar production continue to comprise an ever-larger portion of the United States' energy portfolio (Cole et al. 2021; Frazier et al. 2021). However, it is unclear how much potential the United States has for the development of new PSH. No new large PSH has been constructed in the United States since the 1990s, and attempts to quantify technical potential capacity from PSH project applications to the Federal Energy Regulatory Commission (FERC) suffer from inconsistent site and cost evaluation methodologies and likely are not representative of all PSH opportunities. This study seeks to better under understand the technical potential for PSH development in the United States by developing a national-scale resource assessment for closed-loop PSH. Individual sites are not modeled in sufficient detail for project-level development, but they do provide valuable insights into potential resource areas across the United States, including the ability to provide estimates for a range of long-term development scenarios.

13 HYDRO ENERGY↗

Replacement of Clerestory Windows at TA-03-0039 Technical Shops Building

The U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) proposes an undertaking to replace 86 clerestory windows in Building 39 in Technical Area 3 (Technical Shops Building; TA-03-0039) at Los Alamos National Laboratory. TA-03-0039 was evaluated and determined eligible for listing in the National Register of Historic Places in a report titled ESA Division’s Five-Year Plan: Consolidation and Revitalization at Technical Areas 3, 8, 11, and 16. This determination was concurred on by the State Historic Preservation Office on June 22, 2003 (McGehee et al. 2003).

99 GENERAL AND MISCELLANEOUS↗

Performance and Techno-Economic Evaluation of a Three-Phase, 50-kW SiC-Based PV Inverter

The technical capabilities and benefits of silicon carbide (SiC) compared to silicon (Si) based power electronics converters as well as the premium associated with using SiC instead of Si are well understood. This work proves that the benefits provided by SiC, such as increased efficiency, would result in a lower levelized cost of energy (LCOE) compared to both commercially available, state-of-the-art inverters and the benchmark commercial system cost calculated for the U.S. Department of Energy Solar Energy Technologies Office's SunShot program. The LCOE is calculated to be same as the commercial benchmark despite the installed system cost being 8% more than the benchmark. The LCOE calculation is based on both experiential values obtained from testing the SiC photovoltaic (PV) inverter and on the bottoms-up modeled volume cost for the same 50-kW SiC-based inverter. The PV system used for the LCOE model is also explained, and the system cost breakout is presented in this paper. Furthermore, multiple scenarios with variations in the PV system are presented to show their effect on the system LCOE.

14 SOLAR ENERGY↗

Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned: Preprint

This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

15 GEOTHERMAL ENERGY↗

ISO 50001 for Commercial Buildings: Lessons Learned From U.S. DOE Pilot Project: Preprint

In the U.S., the ISO 50001 Standard, which establishes energy management systems (EnMSs) and processes, has shown uptake primarily in the industrial sector. The U.S. Department of Energy (DOE) undertook a pilot program to explore ISO 50001 implementation in commercial buildings. Eight organizations participated as pilots, with technical assistance provided by DOE, the National Renewable Energy Laboratory (NREL), the Lawrence Berkeley National Laboratory (LBNL), and the Georgia Institute of Technology (Georgia Tech). This paper shares important lessons learned from the pilot. Staff time was the most critical resource required to establish effective EnMSs in commercial buildings. The pilot also revealed that technical support and template/example materials were essential inputs. Crucial activities included evaluating performance, identifying goals, making connections, communicating operational controls, and tracking/reviewing progress. Benefits realized included enhanced intra-organizational connections, greater energy awareness, increased process efficiencies, and improved ability to make business cases. Incremental benefits for ISO 50001 certification were greater accountability, assurance of best practices, public relations opportunities, and potential to unlock verified savings credits or incentive money. Incremental certification costs included more staff/consultant time, money for certification, and a tendency to limit EnMS scope in order to ensure favorable audit results. Five best practices were identified - utilizing expert technical assistance, training, and other resources; focusing on implementation over documentation; keeping top management involved; considering organizational structure when selecting EnMS scope; and matching the implementation level to an EnMS's scope and scale. The last two practices are particularly relevant to the commercial buildings sector.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Moisture Monitoring at Area G, Technical Area 54, Los Alamos National Laboratory, 2016 Status Report

Hydrological characterization and moisture monitoring activities provide data required for evaluating the transport of subsurface contaminants in the unsaturated and saturated zones beneath Area G, and for the Area G Performance Assessment and Composite Analysis. These activities have been ongoing at Area G, Technical Area 54 of the Los Alamos National Laboratory since waste disposal operations began in 1957. This report summarizes the hydrological characterization and moisture monitoring activities conducted at Area G. It includes moisture monitoring data collected from 1986 through 2016 from numerous boreholes and access tubes with neutron moisture meters, as well as data collected by automated dataloggers for water content measurement sensors installed in a waste disposal pit cover, and buried beneath the floor of a waste disposal pit. This report is an update of a nearly identical report by Levitt et al., (2015) that summarized data collected through early 2015; this report includes additional moisture monitoring data collected at Pit 31 and the Pit 38 extension through December, 2016. It also includes information from the Jennings and French (2009) moisture monitoring report and includes all data from Jennings and French (2009) and the Draft 2010 Addendum moisture monitoring report (Jennings and French, 2010). For the 2015 version of this report, all neutron logging data, including neutron probe calibrations, were investigated for quality and pedigree. Some data were recalculated using more defensible calibration data. Therefore, some water content profiles are different from those in the Jennings and French (2009) report. All of that information is repeated in this report for completeness. Monitoring and characterization data generally indicate that some areas of the Area G vadose zone are consistent with undisturbed conditions, with water contents of less than five percent by volume in the top two layers of the Bandelier tuff at Area G. These data also indicate that other areas of the vadose zone are affected by waste disposal activities that have been ongoing at Area G since 1957, a period of nearly 60 years. In some areas, water content profiles indicate increases in water content to depths of tens of meters, especially in areas covered by asphalt and structures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of Technical Peer Review on the Risk Assessment Framework proposed in Report INL/RPT-22-68656 for Digital Instrumentation and Control Systems

This report summarizes the peer review activities initiated by Idaho National Laboratory (INL) during fiscal year (FY) 2023 for the evaluation and improvement of the methodology developed under the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective and secure DI&C technologies for digital upgrades/designs. A framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk-informed capability to quantitatively and accurately estimate the risk impact of plant modernization, considering the introduction of high safety-significant safety-related (HSSSR) DI&C systems, (2) support and supplement existing risk-informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of HSSSR DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. The R&D efforts of this project from FY 2019 through FY 2022 were focused on methodology improvement and demonstration of the proposed framework for the risk assessment and design optimization of safety-critical DI&C systems. Collaborations with the nuclear industry have been initiated to support the reliability and risk assessment of their DI&C systems by using the proposed framework. In FY 2023, the framework has reached to a point for a technical peer review and obtain stakeholder feedback. This peer review activity includes coordination of the reviews performed by a group of industry stakeholders, documentation of the peer review suggestions, providing resolutions and responses to the peer review comments. The objective of this technical peer review is to obtain representative feedback on the proposed framework to improve the technical qualities of its methodology and readiness for deployment to the industry. Feedback may identify potential areas for improvement and further development. The Subject Matter experts were invited to review the latest project report documenting the methodology developed in the project and provide evaluations of the technical qualities of the proposed framework and relevant methods. The reviewed project report is “An Integrated Framework for Risk Assessment of High Safety-significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology and Demonstration” INL/RPT-22-68656 (short as “INL/RPT-22-68656” in this report). This peer review report documents the technical questions provided for technical peer review and introduces the technical peer reviewers from the stakeholders including nuclear utilities, regulators, and universities. Comments from technical peer reviewers and the resolutions and responses to these comments are outlined. Insights and lessons learned from the technical peer review are summarized in conclusions and future work. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists.

99 GENERAL AND MISCELLANEOUS↗

Update to the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20124

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement (DAS) from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance. In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. In accordance with the guidance and recommendations in US DoE's technical standard for DAS, deterministic and probabilistic analyses were performed to demonstrate the SDF system, which includes the engineered cover system, the SDUs, the waste form, and the natural features of the site, provides a reasonable expectation that saltstone disposal will meet performance objectives. Post-closure doses to future members of the public (MOP) were evaluated; dose estimates from the air pathway were well below the 1.0 E-04 Sv/yr (10 mrem/yr) performance objective within 1,000 years, and the calculated doses to the MOP from all exposure pathways, including the groundwater and air pathways, were well below the 2.5 E-04 Sv/yr (25 mrem/yr) performance objective within 1,000 years. Doses following an assumed intrusion event within the facility boundaries were well below the IHI performance objectives, where the acute IHI dose was below the acute IHI dose performance objective of 5.0 E-03 Sv (500 mrem) and the chronic IHI dose was below the chronic IHI dose performance objective of 1.0 E-03 Sv/yr (100 mrem/yr) within 1,000 years. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experimental Evaluation of Interference in 2.4 GHz Wireless Network

To attain automation across different applications, nuclear power plants are beginning to leverage advancements in wireless communication technologies. A “one-size-fits-all” solution cannot be applied since wireless technologies are selected according to application needs, quality of service requirements, and economic restrictions. To balance the trade-off between technical and economic requirements, a multi-band heterogeneous wireless network architecture is needed. Numerous wireless technologies including Wi-Fi, Zigbee, and Bluetooth share the 2.4 GHz industrial, scientific, and medical band. However, due to different channel access mechanisms and transmit power levels, and very importantly, uncoordinated use, coexistence of these devices in the same vicinity can cause interference and degradation in performance. This report provides the technical basis for understanding the coexistence of these wireless technologies through an experimental evaluation of their performance. This report investigates interactions encompassing variables such as transmission power level, distance between the devices, data rates, and the utilization of co-channel or adjacent channels. The results show that the operation of both Zigbee and Bluetooth is severely compromised when coexisting with Wi-Fi within the same frequency spectrum. On the other hand, the performance of Bluetooth is not impaired by Zigbee and vice versa unless there exists any external interference from Wi-Fi.

2.4 GHz↗