Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Cost-Efficiency balanced polymer acceptors based on lowly fused Dithienopyrrolo[3, 2b]benzothiadiazole for 16.04% efficiency All-Polymer solar cells

All-polymer solar cells (All-PSCs) attracted increasing attention due to the outstanding thermal stability and mechanical properties. The current prevailing polymer acceptors for most efficient All-PSCs are polymerized high-performance small molecule acceptor of Y6, i.e. the dithienothiopheno[3,2-b]-pyrrolobenzothiadiazole (BTTP) based polymers. However, the BTTP-based polymers often show relatively shallow highest occupied molecular orbital (HOMO) energy level and high figure of merit (FOM), which limit the rational selection of paring donor polymers. Herein, we presented two low-cost polymer acceptors, namely as BTP-T2F and BTP-2T2F, based on lowly fused dithienopyrrolo[3,2b]benzothiadiazole (BTP, removing two thiophene cycles from BTTP). Here the BTP-based polymers exhibited deeper HOMO levels around –5.90 eV, which could match variable donor polymers with low-lying HOMO levels, such as low-cost PTQ10. Additionally, the synthesis was significantly simplified compared to BTTP-based polymers. A power conversion efficiency (PCE) of 14.32% was achieved in binary blend device containing PTQ10:BTP-2T2F. By adding a miscibility-enhancing PBDTCl-TPD as a third component, the top PCE of 16.04% was obtained in ternary blend All-PSCs. Combining the high device performance and low estimated cost, extraordinary cost-efficiency balance was realized within these BTP-based polymer acceptors.

36 MATERIALS SCIENCE↗

Update on Evaluation of Steam Cycle Upgrades to Improve the Competitiveness of U.S. Coal Power Plants

Under an award issued by the U.S. Department of Energy (DE-FE0031535), the Electric Power Research Institute (EPRI) is leading project to examine the technical and economic feasibility of a series of steam cycle upgrades to the two most prevalent types of U.S. coal power plants (including both subcritical and supercritical cycle configurations). The retrofit upgrade options are focused on evaluating increasing main steam and reheat steam temperatures from 1000°F (538°C) to hotter temperatures, ranging from ultra-supercritical (USC) (i.e., 1100°F or 593°C) to advanced USC (AUSC) conditions (≥1300° or 704°C) while maintaining steam pressures at their original values. By maintaining the original operating steam pressures as well as the original boiler and furnace enclosure envelopes, we aim to minimize the modifications required to the existing power plant, while still providing a significant improvement in heat rate. A unique aspect of this study is that the economic value of the heat rate improvement of each technically feasible option will be determined by detailed modeling of unit dispatch, over the remaining future plant life, in several regional power markets, using EPRI’s US-REGEN model. The capital cost estimates will be compared to the increased revenue estimated by the dispatch modeling to determine the overall economic attractiveness of each upgrade option. The results of this study have the potential to be applicable at up to 80% of the existing U.S. coal-fired power generation fleet. The project team, led by the Electric Power Research Institute, has completed the technical feasibility evaluation, and is currently executing the unit dispatch and capital cost evaluation portions of the work scope. This will describe the motivation for the project, explain the project’s structure and schedule, and provide details on the work scope and preliminary results of the technical feasibility evaluation.

01 COAL, LIGNITE, AND PEAT↗

Optimization of the Area 5 Radioactive Waste Management Site Closure Cover

The U.S. Department of Energy Manual DOE M 435.1-1, “Radioactive Waste Management Manual,” requires that performance assessments demonstrate that releases of radionuclides to the environment are as low as reasonably achievable (ALARA). Quantitative cost benefit analysis of radiation protection options is one component of the ALARA process. This report summarizes a quantitative cost benefit analysis of closure cover thickness for the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada Test Site. The optimum cover thickness that maintains doses ALARA is shown to be the thickness with the minimum total closure cost. Total closure cost is the sum of cover construction cost and the health detriment cost. Cover construction cost is estimated based on detailed cost estimates for closure of the 92-acre Low-Level Waste Management Unit (LLWMU). The health detriment cost is calculated as the product of collective dose and a constant monetary value of health detriment in units of dollars per unit collective dose. Collective dose is the sum of all individual doses in an exposed population and has units of person-sievert (Sv). Five discrete cover thickness options ranging from 2.5 to 4.5 meters (m) (8.2 to 15 feet [ft]) are evaluated. The optimization was subject to the constraints that (1) options must meet all applicable regulatory requirements and that (2) individual doses be a small fraction of background radiation dose. Total closure cost is found to be a monotonically increasing function of cover thickness for the 92-ac LLWMU, the Northern Expansion Area, and the entire Area 5 RWMS. The cover construction cost is orders of magnitude greater than the health detriment cost. Two-thousand Latin hypercube sampling realizations of the relationship between total closure cost and cover thickness are generated. In every realization, the optimum cover thickness is 2.5 m (8.2 ft) for the 92-ac Low-Level Waste Management Unit, the Northern Expansion Area, and the entire Area 5 RWMS. The conclusions of the optimization are found to be insensitive to all input parameters, the monetary value of the health detriment over a range of values from $200,000 to $15,000,000 per person-Sv, and the period of integration of collective dose. A 2.5 m (8.2 ft) closure cover at the Area 5 RWMS can meet all applicable regulatory requirements and maintain radionuclide releases ALARA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mental Models of Software Forecasting

The majority of software engineers resist the use of the currently available cost models. One problem is that the mathematical and statistical models that are currently available do not correspond with the mental models of the software engineers. In an earlier JPL funded study (Hihn and Habib-agahi, 1991) it was found that software engineers prefer to use analogical or analogy-like techniques to derive size and cost estimates, whereas curren CER's hide any analogy in the regression equations. In addition, the currently available models depend upon information which is not available during early planning when the most important forecasts must be made.

Cost Models↗

A NEW PROCESS DEVELOPED FOR SEPARATION OF LIGNIN FROM AMMONIUM HYDROXIDE PRETREATMENT SOLUTIONS

A method is described for separating lignin from liquid solutions resulting from the pretreatment of lignocellulosic materials such as switchgrass with ammonium hydroxide. The method involves a sequence of steps including acidification, evaporation, and precipitation or centrifugation that are performed under defined conditions, and results in a relatively pure, solid lignin product. The method is tested on ammonium hydroxide solutions containing lignin extracted from switchgrass. Experimental results show that the method is capable of recovering between 66-95% of dissolved lignin as a precipitated solid. Cost estimates of pilot-scale and industrial-scale expressions of the process indicate that breakeven lignin prices of $2.36/kg and $0.78/kg, respectively, may be obtainable with this recovery method.

09 BIOMASS FUELS↗

Windfarm Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT)

This report provides technical documentation and background on the newly-developed Wind Operations and Maintenance cost-Benefit Analysis Tool (WOMBAT) software. WOMBAT is an open-source model that can be used to obtain cost estimates for operations and maintenance of land-based or offshore wind power plants. The software was designed to be flexible and modular to allow for implementation of new strategies and technological innovations for wind plant maintenance. WOMBAT uses a process-based simulation approach to model day-to-day operations, repairs, and weather conditions. High-level outputs from WOMBAT, including time-based availability and annual operating costs, are found to agree with published results from other models.

17 WIND ENERGY↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Trends in Local Therapy Utilization and Cost for Early-Stage Breast Cancer in Older Women: Implications for Payment and Policy Reform

Purpose: Older women with early-stage disease constitute the most rapidly growing breast cancer demographic, yet it is not known which local therapy strategies are most favored by this population in the current era. Understanding utilization trends and cost of local therapy is important for informing the design of bundled payment models as payers migrate away from fee-for-service models. We therefore used the Surveillance, Epidemiology, and End Results Medicare database to determine patterns of care and costs for local therapy among older women with breast cancer. Methods and Materials: Treatment strategy and covariables were determined in 55,327 women age ≥66 with Tis-T2N0-1M0 breast cancer who underwent local therapy between 2000 and 2008. Trends in local therapy were characterized using Joinpoint. Polychotomous logistic regression determined predictors of local therapy. The median aggregate cost over the first 24 months after diagnosis was determined from Medicare claims through 2010 and reported in 2014 dollars. Results: The median age was 75. Local therapy distribution was as follows: 27,896 (50.3%) lumpectomy with external beam radiation, 18,356 (33.1%) mastectomy alone, 6159 (11.1%) lumpectomy alone, 1488 (2.7%) mastectomy with reconstruction, and 1455 (2.6%) lumpectomy with brachytherapy. Mastectomy alone declined from 39.0% in 2000 to 28.2% in 2008, and the use of breast conserving local therapies rose from 58.7% to 68.2%. Mastectomy with reconstruction was more common among the youngest, healthiest patients, whereas mastectomy alone was more common among patients living in rural low-income regions. By 2008, the costs were $36,749 for lumpectomy with brachytherapy, $35,030 for mastectomy with reconstruction, $31,388 for lumpectomy with external beam radiation, $21,993 for mastectomy alone, and $19,287 for lumpectomy alone. Conclusions: The use of mastectomy alone in older women declined in favor of breast conserving strategies between 2000 and 2008. Using these cost estimates, price points for local therapy bundles can be constructed to incentivize the treatment strategies that confer the highest value.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Disposal of Large Reactor Components - Rulemaking to Address Funding of Disposal Costs

The paper will explore the current challenges of financing the disposal costs for disposing of large reactor components such as reactor pressure vessel heads and steam generators and the resulting delays in disposal caused by the current regulatory requirements. The paper also will discuss a recent rulemaking petition submitted by EnergySolutions to the US Nuclear Regulatory Commission designed to improve the regulatory process by providing a process to permit funds from decommissioning trust funds to be used to fund disposal of large reactor components. If granted, the disposal of these large components could be expedited where reactor licensees have sufficient decommissioning trust funds available. Perspectives on the rulemaking will be addressed. In conclusion: NRC should provide serious consideration to this Petition. There is support in the industry for granting this Petition. As of the date this paper was submitted, there have been no negative comments. Granting this Petition is prudent and consistent with the underlying purpose of 10 C.F.R. 50.82(a)(8) and 10 CFR 20.1406. It provides flexibility without any adverse impact on the public health and safety. It should facilitate the decommissioning process by providing a regulatory framework to allow removing MRCs from sites, resulting in (1) the source term at the site being reduced, (2) the site workers being exposed to less radiation, (3) eliminating an unnecessary regulatory burden as the costs associated with maintaining the MRCs on-site and providing protection to the workers as a result of those components can be avoided, (4) the overall cost to decommission the site being reduced, and (5) more funds being made available to decommission the reactor at the time the reactor ceases operation. Finally, the framework would provide the demonstration by a site-specific decommissioning cost estimate and the associated funding program that adequate funds are available to dispose of these components as well as complete site decommissioning for unrestricted release consistent with the NRC requirements. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A comparison of economic evaluation models as applied to geothermal energy technology

Several cost estimation and financial cash flow models have been applied to a series of geothermal case studies. In order to draw conclusions about relative performance and applicability of these models to geothermal projects, the consistency of results was assessed. The model outputs of principal interest in this study were net present value, internal rate of return, or levelized breakeven price. The models used were VENVAL, a venture analysis model; the Geothermal Probabilistic Cost Model (GPC Model); the Alternative Power Systems Economic Analysis Model (APSEAM); the Geothermal Loan Guarantee Cash Flow Model (GCFM); and the GEOCOST and GEOCITY geothermal models. The case studies to which the models were applied include a geothermal reservoir at Heber, CA; a geothermal eletric power plant to be located at the Heber site; an alcohol fuels production facility to be built at Raft River, ID; and a direct-use, district heating system in Susanville, CA.

Ziman, G. M.↗

Wind turbine blade material in the United States: Quantities, costs, and end-of-life options

Wind energy has experienced enormous growth in the past few decades; as a result, there are thousands of wind turbines around the world that will reach the end of their design lifetimes in the coming years. Much of the material in those turbines can be recycled using conventional processes, but the composite material that is the main component of the blades is more challenging to recycle. In the United States, turbine blades may be disposed of in landfills, adding a new solid waste stream to the material already being landfilled. This paper presents a spatially resolved estimate of the mass and volume of wind turbine blade waste in each state by 2050 and compares these amounts to estimates of the remaining landfill capacity by state. In this work, we estimate costs for each stage of the disposal process to indicate cost levels for alternatives. Assuming a 20-year turbine lifetime, the cumulative blade waste in 2050 is approximately 2.2 million tons. This value represents approximately 1% of remaining landfill capacity by volume, or 0.2% by mass. We also find that the current cost of disposing of blades in large segments or through grinding is relatively low in comparison to the overall life-cycle cost of energy. Based on these findings, landfill space constraints and disposal costs appear unlikely to motivate a change in waste handling strategies under current policy conditions. Instead, more profound shifts in recycling technologies, blade materials, or policy may be needed to move towards a circular economy for wind turbine blades.

17 WIND ENERGY↗

Process Modeling and Techno-Economic Analysis of a CO 2 Capture Process Using Fixed Bed Reactors with a Microencapsulated Solvent

A detailed model of a capsule containing sodium carbonate solution is developed here to study the microencapsulated carbon capture solvents (MECS). A rigorous vapor–liquid equilibrium model is developed for the Na 2 CO 3 –CO 2 –H 2 O system, where liquid-phase nonideality is modeled by the electrolyte nonrandom two-liquid model. The data from the experiments conducted at the Lawrence Livermore National Laboratory is used to obtain a maximum likelihood estimate of the initial solvent concentration inside the capsules and the parameters for the capsule model. A nonisothermal, dynamic model of a fixed bed contactor filled with these capsules is then developed. In addition to direct steam injection, indirect heating using an embedded heat exchanger is modeled for desorption. Finally, the model is used to simulate temperature swing absorption and desorption cycles. The results of these studies indicate that there is an optimal residence time or superficial flue gas velocity to minimize the bed volume. However, the total energy requirement for desorption monotonically decreases with increased residence time as the proportion of the sensible heat to the total regeneration heat keeps decreasing. Furthermore, heat recovery from the bed is crucial to keep energy penalty for regeneration low. A techno-economic analysis is conducted, and the equivalent annual operating cost (EAOC) is analyzed for two different reactor materials (concrete and carbon-steel) and compared with a system using a conventional monoethanolamine (MEA) solvent. In this work, the minimum EAOC for the MECS fixed bed configuration is approximately 1.8–2.7 times higher than the EAOC for an MEA system with a similar amount of heat recovery (85%). The impact of ±50% uncertainty in the capital cost estimate is also evaluated, and the minimum EAOC is 1.5 times higher than the MEA technology for 85% heat recovery. These results using microencapsulated sodium carbonate solution are a starting point that sets an upper limit on the cost of the MECS carbon-capture system. Improvements to the MECS capsules (e.g., using a higher carbonate concentration and lowering the shell mass transfer resistance) and also exploring other contactor technologies are expected to decrease the system cost and make it more competitive.

20 FOSSIL-FUELED POWER PLANTS↗

Fission Surface Power System Initial Concept Definition

Under the NASA Exploration Technology Development Program (ETDP) and in partnership with the Department of Energy (DOE), NASA has embarked on a project to develop Fission Surface Power (FSP) technology. The primary goals of the project are to 1) develop FSP concepts that meet expected surface power requirements at reasonable cost with added benefits over other options, 2) establish a hardwarebased technical foundation for FSP design concepts and reduce overall development risk, 3) reduce the cost uncertainties for FSP and establish greater credibility for flight system cost estimates, and 4) generate the key products to allow NASA decision-makers to consider FSP as a preferred option for flight development. The FSP project was initiated in 2006 as the Prometheus Program and the Jupiter Icy Moons Orbiter (JIMO) mission were phased-out. As a first step, NASA Headquarters commissioned the Affordable Fission Surface Power System Study to evaluate the potential for an affordable FSP development approach. With a cost-effective FSP strategy identified, the FSP team evaluated design options and selected a Preliminary Reference Concept to guide technology development. Since then, the FSP Preliminary Reference Concept has served as a point-of-departure for several NASA mission architecture studies examining the use of nuclear power and has provided the foundation for a series of "Pathfinder" hardware tests. The long-term technology goal is a Technology Demonstration Unit (TDU) integrated system test using full-scale components and a non-nuclear reactor simulator. The FSP team consists of Glenn Research Center (GRC), Marshall Space Flight Center (MSFC) and the DOE National Laboratories at Los Alamos (LANL), Idaho (INL), Oak Ridge (ORNL), and Sandia (SNL). The project is organized into two main elements: Concept Definition and Risk Reduction. Under Concept Definition, the team performs trade studies, develops analytical tools, and formulates system concepts. Under Risk Reduction the team develops hardware prototypes and conducts laboratory-based testing.

Source record↗

Camp Lejeune Federal Fleet Tiger Team EVSE Site Assessment

The National Renewable Energy Laboratory (NREL) was contracted by the Department of Defense (DOD) Environmental Security Technology Certification Program (ESTCP) and the Department of Energy (DOE) Federal Energy Management Program (FEMP) to develop a web tool and complete pilot assessments for the installation of Electric Vehicle Supply Equipment (EVSE). NREL has deployed Tiger Teams comprising engineers and fleet experts to support DOD and DOE on several EVSE site assessments since 2015. However, the advancements developed in support of this report, including a cost-estimation tool and geospatial mapping tool, will enable a user-driven path to assess EVSE needs. This report details the site design recommendations for Camp Lejeune, North Carolina.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Multi-facility analysis using metered power data to quantify MRI energy use and utility bill costs across scanner operating modes

This study quantifies the energy consumption of magnetic resonance imaging (MRI) scanners across discrete operating modes during routine clinical workflows, based solely on electrical power measurements. Although previous studies have investigated MRI energy consumption within single hospitals or specific clinical settings, this research provides a broader and more systematic analysis. Researchers analyzed electrical power data and applied a previously developed semi-automatic method for identifying MRI operating modes using load duration curves for 20 MRI scanners across four different U.S. healthcare facilities, encompassing outpatient, inpatient, and mixed-use clinical settings. A key innovation is the inclusion of localized hourly utility rates to estimate costs, a parameter absent in prior literature. Key findings indicate significant variability in energy and cost profiles between weekdays and weekends. Scanner characteristics, including magnet strength, manufacturer, vintage, location, and clinical setting, influenced average daily energy consumption and power thresholds for operating modes. Notably, the clinical setting of a scanner predominantly determines its energy use. For example, the scanners in outpatient facilities consumed more energy. The breakdown of energy usage and costs by operating modes showed scanners spend between 61% and 93% of their time in nonproductive modes, with one outlier spending 34%. Average daily energy use for the scanners in the study ranged from 160 to 1069 kWh, with energy costs ranging from $\$$9 to $\$$149. This study uses an existing framework to quantify MRI energy behavior, leading to insights that can enable improved performance and cost savings across different healthcare environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assimilation of Wave Imaging Radar Observations for Real-time Wave-by-Wave Forecasting

This project addressed Topic 3: “Wave Measurement Instrumentation for Feed Forward Controls” under the FOA number DE-FOA-0000971. The overall goal of the program was to develop a phase-resolving wave forecasting technique for application to the active control of Wave Energy Conversion (WEC) devices. We have developed an approach that couples a wave imaging marine radar with a phase-resolving linear wave model for real-time wave field reconstruction and forward propagation of the wave field in space and time. The scope of the project was to develop and assess the performance of this novel forecasting system. Specific project goals were as follows: Develop and verify a fast, GPU-based (Graphical Processing Unit) wave propagation model suitable for phase-resolved computation of nearshore wave transformation over variable bathymetry; Compare the accuracy and speed of performance of the wave model against a deep water model in their ability to predict wave field transformation in the intermediate water depths (50 to 70 m) typical of planned WEC sites; Develop and implement a variational assimilation algorithm that can ingest wave imaging radar observations and estimate the time-varying wave conditions offshore of the domain of interest such that the observed wave field is best reconstructed throughout the domain and then use this to produce model forecasts for a given WEC location; Collect wave-resolving marine radar data, along with relevant in situ wave data, at a suitable wave energy test site, apply the algorithm to the field data, assess performance, and identify any necessary improvements; and Develop a production cost estimate that addresses the affordability of the wave forecasting technology and include in the Final Report. The developed forecasting algorithm (“Wavecast”) was evaluated for both speed and accuracy against a substantial synthetic dataset. Early in the project, performance tests definitively demonstrated that the system was capable of forecasting in real-time, as the GPU-based wave model backbone was very computationally efficient. The data assimilation algorithm was developed on a polar grid domain in order to match the sampling characteristics of the observation system (wave imaging marine radar). For verification purposes, a substantial set of synthetic wave data (i.e. forward runs of the wave model) were generated to be used as ground truth for comparison to the reconstructions and forecasts produced by Wavecast. For these synthetic cases, Wavecast demonstrated very good accuracy, for example, typical forecast correlation coefficients were between 0.84-0.95 when compared to the input data. Dependencies on shadowing, observational noise, and forecast horizon were also identified. During the second year of the project, a short field deployment was conducted in order to assess forecast accuracy under field conditions. For this, a radar was installed on a fishing vessel and observations were collected at the South Energy Test Site (SETS) off the coast of Newport, OR. At the SETS site, simultaneous in situ wave observations were also available owing to an ongoing field project funded separately. Unfortunately, the position and heading information that was available for the fishing vessel were not of sufficient accuracy in order to validate the forecast in a phase-resolving sense. Instead, a spectral comparison was made between the Wavecast forecast and the data from the in situ wave buoy. Although the wave and wind conditions during the field test were complex, the comparison showed a promising reconstruction of the wave spectral shape, where both peaks in the bimodal spectrum were represented. However, the total reconstructed spectral energy (across all directions and frequencies) was limited to 44% of the observed spectrum. Overall, wave-by-wave forecasting using a data assimilation approach based on wave imaging radar observations and a physics-based wave model shows promise for short-term phase-resolved predictions. Two recommendations for future work are as follows: first, we would recommend additional focused field campaigns for algorithm validation. The field campaign should be long enough to capture a range of wave conditions relevant to the target application and WEC site. In addition, it will be crucial to make sure the vessel of choice has high accuracy position and heading instrumentation (this instrumentation is commercially available but not standard on commercial fishing vessels). The second recommendation is to expand the model physics in the wave model backbone to include some nonlinear effects. Specifically, the third-order correction to the wave speed due to amplitude dispersion would be the next step in order to more accurately represent the phase speeds of large amplitude waves.

16 TIDAL AND WAVE POWER↗

Preliminary design of graphite composite wing panels for commercial transport aircraft

Subjectively assessed practical and producible graphite/epoxy designs were subjected to a multilevel screening procedure which considered structural functions, efficiency, manufacturing and producibility, costs, maintainability, and inspectability. As each progressive screening level was reviewed, more definitive information on the structural efficiency (weight), manufacturing, and inspection procedures was established to support the design selection. The configuration features that enhance producibility of the final selected design can be used as a generic base for application to other wing panel designs. The selected panel design showed a weight saving of 25 percent over a conventional aluminum design meeting the same design requirements. The estimated cost reduction in manufacturing was 20 percent, based on 200 aircraft and projected 1985 automated composites manufacturing capability. The panel design background information developed will be used in the follow-on tasks to ensure that future panel development represents practical and producible design approaches to graphite/epoxy wing surface panels.

Byers, B. A.↗

Options for a new Arizona observatory - Configurations, costs and site

The process of creating a major observatory, with emphasis on the configurations, costs, and site involved, is examined. The premise that cost optimization starts with a modestly priced building block, such as a 7.5-m telescope, is considered. The telescope unit and the configurations in which it is used, ranging from a single telescope or a set of separate telescopes, to an MMT in which the light of all of the telescopes can be phased when desired, are described. It is shown that options exist for using elements in a nonredundant linear array or Michelson interferometer. A means of estimating costs of different facilities, all on the same basis, is provided. The importance of placing the observatory on a site, such as Mt. Graham in Arizona, which maximizes the output per unit cost of the facility is discussed.

Woolf, N. J.↗