Activation Calculation for the Dismantling and Decommissioning of a Light Water Reactor Using MCNP{sup TM} with ADVANTG and ORIGEN-S
The boiling water reactor (BWR) Philippsburg 1 (KKP1) and the pressurized water reactor (PWR) Neckarwestheim 1 (GKN I), with a thermal power of 2575 MW{sub th} resp. 2497 MW{sub th}, were shut down and entered directly the post-operational phase which is covered by the operating license held by the nuclear power plant owner. The decommissioning of a nuclear power plant (NPP) which is licensed under chap. 7 of the German Atomic Energy Act, following the post-operational phase requires a comprehensive licensing procedure including in particular radiation protection aspects and possible impacts to the environment. Decommissioning requires a decommissioning license. This will include essential changes in requirements for the systems and components and will mainly lead to the immediate dismantling of the nuclear power plant which is now the only permitted decommissioning strategy in Germany. In this context, neutron activation calculations for the structural components of KKP1 and GKN I have to be carried out to predict occurring activities and to estimate future costs for conditioning and packaging. To avoid an overestimation of the radioactive inventory and to calculate the expenses for decommissioning as accurate as possible, modern state-of-the-art Monte-Carlo-Techniques (MCNP6) combined with automated variance reduction tools (ADAVANTG) are used and are coupled with the activation and decay module ORIGEN-S. This paper presents the calculation procedure and the obtained results with a validation by measured activations and gamma dose rates.