IMOG 2018 Spring Meeting May 8th & 9th Scan/Reverse Engineering [Slides]
Slides for presentation on designing and building a Dome Mandrel using Creo CAD/CAM system.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Slides for presentation on designing and building a Dome Mandrel using Creo CAD/CAM system.
The Carbon Dioxide (CO 2 ) Enhanced Oil Recovery (EOR) Life Cycle (CELiC) Model calculates life cycle greenhouse gas (GHG) emissions for a CO 2 -EOR system, where the user can select one of three sources of the injected CO 2 : (1) extracted from a natural dome, (2) captured from a coal-fired power plant, or (3) captured from a natural gas power plant. The model has several parameters and options to allow the assessment of the system for a wide-array of products—electricity, pipeline CO 2 , crude oil, and refined fuels. The model is also capable of deterministic (i.e., point estimate) and stochastic (i.e., probabilistic) analyses and finally a deterministic time-series analysis that shows the changing GHG emissions for the CO 2 -EOR system over time.
This analysis evaluated integrated CCS costs (i.e., capture, transport, and storage) from the perspective of a CO 2 source. Capture costs for sources with annual CO 2 capture rates from 0.65 to 3.90 Mt were based on two NETL reports. Transportation costs from source to storage reservoir were modeled for two pipelines systems (dedicated and trunkline) using the FE/NETL CO 2 Transport Cost Model. Storage costs were modeled in dome and regional dip structural settings for two reservoirs in the Rose Run Formation, three within the Mt. Simon, one in the Lower Tuscaloosa, and one in the Frio using the FE/NETL CO 2 Saline Storage Cost Model. A paper with the same name and information as well as additional details on this analysis was published in The International Journal of Greenhouse Gas Control along with a supplementary document that provides additional material (i.e., key parameters used in the models for obtaining transport and storage costs and CCS cost and pipeline results).
Kerith Stender and Kimberly Monroe conducted an ergonomic assessment of the drum handling tasks performed at several sites at LANL. Drum handling tasks at TA-50 Building 69 were reviewed on May 26th, 2011 with Fred Moya. A meeting was held with Joe Abeyta, Jose Chavez, and Don Thorp on July 13th, 2011 to discuss drum handling issues and manual material handling equipment specifications. A second meeting was held on August 9th, 2011 with Stephanie Jacquez, Juan Garcia and Alfred Vallo to review issues associated with drum handling at TA-54. Alfred Vallo toured the domes at TA-54 with Kimberly Monroe on August 11th, 2011. At that time, employee feedback was solicited from multiple employees handling drums throughout the area. A final review meeting was held on September 28th with Kimberly Monroe, Kerith Stender, and Juan Garcia to finalize this report.
We investigated how the plasmoid instability affects the evolution of topological features of a magnetic field and the process of magnetic reconnection with three sub-projects. (i) We extensively studied the criterion for plasmoid-mediated current sheet disruption and the onset of fast reconnection. Scaling relations with respect to plasma parameters have been established, using both direct numerical simulations and analytic theories, for the disruption time, the current sheet width, the instability linear growth rate, and the dominant mode wavenumber. (ii) We applied the theories of plasmoid-mediated current sheet disruption to magnetohydrodynamic turbulence and predicted a steepening of the turbulence energy spectrum. This steepening has been confirmed by direct numerical simulations. (iii) We performed numerical simulations of ultraviolet burst events in the solar atmosphere with a spine-dome magnetic topology. The plasmoid instability leads to unsteady reconnection, which is consistent with solar observations.
Advanced reactor concepts currently under development in the United States [e.g., the High-Temperature Gas Reactor (HTGR) of X-Energy and the Molten Chloride Fast Reactor (MCFR) of TerraPower] are striving to improve the economics of nuclear power primarily by using passively and ‘walk-away’ safe technologies in the reactor. The recently published report, ‘Future of Nuclear Energy in a Carbon-Constrained World’ by the Massachusetts Institute of Technology Energy Institute (MIT EI) has shown that a significant contributor to the capital cost of NPPs is the ‘civil works’ i.e., the construction of the balance of plant (BoP: all SSCs except those involved in power generation, e.g., reactor vessel) such as the buildings, containment dome, foundation, etc., which amount to almost half of the overnight capital cost. The report suggests that using advanced construction technologies such as seismic isolation and high-performance concrete to significantly reduce the capital costs of advanced reactors. This report demonstrates the application of two cost-cutting solutions on advanced reactor designs that are currently under development. These solutions include, (1) seismic base isolation, and (2) risk- and cost-based seismic design optimization including seismic isolation of individual components.
The U.S. Strategic Petroleum Reserve (SPR) is a stockpile of emergency crude oil to be tapped into if a disruption in the nation's oil supply occurs. The SPR comprises of four underground salt dome sites. Subsidence surveys have been conducted either annually or biennially at all four sites over the life of the program. Monitoring of surface behavior is a first line defense to detecting possible subsurface cavern integrity issues. Over the life of the Bryan Mound site, subsidence rates over abandoned Cavern 3 have continuously been the highest at the site. In an effort to try and understand the subsurface dynamics, specifically over Bryan Mound Cavern 3, interferometric synthetic aperture radar (InSAR) data has been collected since October 2015, which allows for the acquisition of a greater density of data over a higher frequency providing improved spatiotemporal resolution. Currently, satellite images are acquired from two orbit geometries allowing for a 2-D analysis, which provides both the true vertical and east-west horizontal displacement rates. This report serves as an addendum to the 2017 report, Bryan Mound InSAR Analysis, U.S. Strategic Petroleum Reserve, SAND 2017-6679. The latest data display an improvement in point density and precision, providing a higher confidence in the results. The results confirm, as seen in the previous analysis, that the fastest surface deformation is occurring over the southwest region of the site, where abandoned Cavern 3 is located. In addition, the horizontal displacement analyses suggest a geologic feature, such as a fault, may be contributing to the higher rates observed over Cavern 3. A loss in cavern integrity would significantly impact the site surface infrastructure.
Lower to mid-Cretaceous age rock formations were identified on the onshore Mid-Atlantic U.S. Coastal Plain and offshore northern Baltimore Canyon Trough (BCT) that show great potential as reservoirs for carbon sequestration. These targets are constrained using a sequence stratigraphic approach by integration of multi-channel seismic, geophysical well-log, core, and biostratigraphic datasets. In the onshore coastal plain of New Jersey, Delaware, and Maryland, the Lower Cretaceous Waste Gate Formation and mid-Cretaceous Potomac Formation/Group were divided into three major sequences (Waste Gate-Potomac Unit I, Potomac Unit II, and Potomac Unit III). The analysis concluded that Waste Gate-Potomac Unit I sequence is most suitable for carbon storage, as it has thick, correlatable sands in New Jersey and Maryland that are well confined in New Jersey, and could store potentially large volumes of CO2 (~ 8-34 Gt). In the offshore, we evaluate the mid-Cretaceous Logan Canyon Formation which we divide into three sequences (LC3, LC2, and LC1). All three sequences show potential for large volumes of CO2 storage (~5.9 Gt on the Great Stone Dome (GSD); preliminary volume estimates in the MRCSP ATLAS are currently being updated by MAOCSRAP). The Logan Canyon Sands are an excellent target for carbon storage in the offshore Baltimore Canyon Trough; they are thick, correlatable sands with high permeabilities and porosities, and are confined by the thick Dawson Canyon Shale. Sands are particularly thick, porous, and very permeable in wells on the GSD, which provides a great structural trap, and as such is a world-class target for carbon sequestration.
The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA. This demonstration is currently in the injection phase, with the capture unit reaching full operational capacity in June of 2011. The project constructed a twelve mile long, 4-inch diameter pipeline to the injection site starting in July 2011. Drilled in January 2011, a deep characterization well provided geologic data confirming that the test site represented an attractive location for safe, long-term storage of CO 2 . Two Class V Experimental Injection Well underground injection control (UIC) permits were issued in November 2011 and subsequently the project’s injection wells were installed. A robust monitoring, verification and accounting (MVA) plan has been developed to monitor and track the CO 2 plume and the associated pressure field. In association with this field demonstration, the project team is also tasked with the continued characterization of this region’s potential storage reservoirs and cap rock formations. This document serves as the SECARB Phase III work product 1.1.a “Methodology Paper for Upper Cretaceous Sandstone Characterization.” This product will summarize the Project Team’s plans for the Phase III assessment of the Upper Cretaceous Sandstone Reservoir’s CO 2 storage capacity.
Infrasound, or low frequency sound 20 Hz, is produced by a variety of natural and anthropogenic sources. Wind also generates signals within this frequency band and serves as a persistent source of infrasonic noise. Infrasound sensors measure pressure fluctuations, which scale with the ambient density and velocity fluctuations of ground winds. Here we compare four different wind noise reduction systems, or "filters", and make recommendations for their use in temporary infrasound deployments. Our results show that there are two filters that are especially effective at reducing wind noise: (1) a Hyperion high frequency (HF) shroud with a 1 m diameter metal mesh dome placed on top and (2) a Hyperion Four Port Garden Hose shroud with 4 Miracle-Gro Soaker System garden hoses. We also find that placing a 5-gallon bucket over the HF wind shroud should not be done as it provides a negligible decrease in noise up to ~ 1 Hz and then an increase in noise. We conclude that it is up to the researcher to determine which of the other filters is best for their needs based on location and expense. We anticipate this study will be used as a resource for future deployments when a wind noise reduction method is necessary but only needed for a limited time period.
The Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III 1.5 million tonne CO 2 sequestration project is taking place on the eastern side of an oilfield in southwestern Mississippi in the so-called High Volume Injection Test area (HiVIT). The source of CO 2 for the project is the natural CO 2 reservoir at Jackson Dome, Mississippi. We apply the Certification Framework (CF) approach to assess the risk of CO 2 and brine leakage from the deep reservoir to various compartments where impacts could occur. The large depth (~10,000 ft, 3,050 m) of the Tuscaloosa Formation reservoir, presence of extensive thick marine mudstone confining zone, and well-known geology, among other factors, tend to minimize the likelihood of leakage. On the other hand, the large number of plugged and abandoned (P&A) wells provides potential flow paths for leakage upward to potable aquifers and potentially to the ground surface. A review of site characteristics relevant to leakage risk, simulation of the CO 2 injection, and modeling of performance of P&A wells is presented to demonstrate the application of the Certification Framework (CF) for leakage risk assessment in the context of an enhance Oil Recovery (EOR) project.
The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA.
The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage, and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA.
A test site and anthropogenic CO 2 source have been selected for a large-scale demonstration of carbon dioxide separation, capture and sequestration in southwestern Alabama as part of the Southeastern Regional Carbon Sequestration Partnership’s (SECARB) Phase III initiative. The James M. Barry Generating Plant, a major coal-fired power plant in southwestern Alabama, is the selected anthropogenic CO 2 source for the project. The proposed storage test site is located in the Southeast Unit of the Citronelle oil field, which lies at the crest of the Citronelle Dome about 10 miles to the west of the power plant. The proposed storage site appears to be suitable for deep underground injection of CO 2 . An evaluation of the storage capacity and geological integrity of the proposed injection and confining intervals is a critical step in the assessment of the test site. This evaluation is important for several reasons, including project planning, permitting of injection wells, and the design and execution of injection and monitoring operations. Accordingly, the Geological Survey of Alabama (GSA) will conduct a detailed geological evaluation of the Southeast Citronelle Unit that emphasizes the acquisition, interpretation, and analysis of seismic reflection data. The goals of this work are to characterize the geologic structure of the area, verify that no faults are present, determine and analyze the seismic expression of sandstone and shale bodies in the Paluxy target interval, and to assist in the Underground Injection Control (UIC) permitting process.
Infrastructure needs at the SECARB “early” Cranfield test are different from many other CCS sites, because this test is strongly supported by the commercial activities of site host Denbury Onshore LLC. Commercial development by Denbury provided the substantive cost-share required to make the project viable. Denbury contributions fundamental for the project included the retrofit of the former Sonat natural gas pipeline from the Jackson Dome CO 2 source to the center of Cranfield Field, construction of distributory pipelines to take CO 2 to injection wells, and construction of roads and well pads that allowed access for drilling and maintenance of injection wells. In addition, as part of the EOR operations, Denbury constructed a CO 2 separation plant to increase pressure from pipeline pressure to field pressure and support CO 2 recycle, construction of production lines to bring oil, water, CO 2 and gas to the separation plant, and worked over plugged and abandoned (P&A) wells to retrofit them as producers. Producers were used by the SECARB project as monitoring points to observe flood. Denbury’s well test facility allowed monthly quantification of the volumes of fluids produced and reinjected.
The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the USA.
The SECARB Anthropogenic Test at the Citronelle oil field in Mobile County, Alabama is the largest fully integrated coal-fired carbon capture, transportation and storage project in the United States. Constructed and funded by Southern Company and Mitsubishi Heavy Industries, the CO 2 capture facility at Alabama Power’s 2,657-megawatt Plant Barry captures up to 500 metric tons of CO 2 per day, the equivalent emissions from 25 MW of the plant’s power generation. Captured CO 2 is transported to the mature Citronelle oil field atop a 16,380 acre (66.3 km2 of surface area), geologic salt dome. Citronelle oil field is operated by Denbury Onshore, LLC. The CO 2 is injected through ten perforated intervals in the injection well casing at depths ranging from 9,436 ft to 9,800 ft into the porous and permeable sandstones of the Paluxy Formation. This report describes the transportation design and product specifications for captured CO 2 transported from the capture facility to the underground storage reservoir. CO 2 is transported through approximately 12 miles of pipeline from Plant Barry’s capture facility and is injected into the saline aquifer sandstones of the Paluxy formation at Citronelle oil field. The following outlines the details and characteristics of each point of transportation and the quality of CO 2 being transported.
The Southeast Regional Carbon Sequestration Partnership’s (SECARB) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. The capture component of the test takes place at the James M. Barry Electric Generating Plant in Bucks, Alabama. The capture facility utilizes post-combustion amine capture technology licensed from Mitsubishi Heavy Industries America to process flue gas from a coal-fired power unit at Plant Barry. The amount of CO 2 captured using this process is equivalent to the emissions produced when generating 25 megawatts (MW) of electricity. CO 2 captured at the plant is transported by pipeline for underground storage in a saline geologic formation within the Citronelle Dome. This project is one of the first and the largest fully-integrated commercial prototype coal-fired carbon capture and storage projects in the US. This report will highlight the essential pieces necessary to bring CO 2 from the capture facility at Plant Barry to the Anthropogenic Test Site. They are: 1) the capture facility, 2) the pipeline and 3) the well site injection equipment.