Search NASA⌕ Search

SEARCH · Search NASA

Results for “LABORATORY OF THE YEAR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

A diffusion-limited reaction model for self-propagating Al/Pt multilayers with quench limits

A diffusion-limited reaction model was calibrated for Al/Pt multilayers ignited on oxidized silicon, sapphire, and tungsten substrates, as well as for some Al/Pt multilayers ignited as free-standing foils. The model was implemented in a finite element analysis code and used to match experimental burn front velocity data collected from several years of testing at Sandia National Laboratories. Moreover, both the simulations and experiments reveal well-defined quench limits in the total Al + Pt layer (i.e., bilayer) thickness. At these limits, the heat generated from atomic diffusion is insufficient to support a self-propagating wave front on top of the substrates. Quench limits for reactive multilayers are seldom reported and are found to depend on the thermal properties of the individual layers. Here, the diffusion-limited reaction model is generalized to allow for temperature- and composition-dependent material properties, phase change, and anisotropic thermal conductivity. Utilizing this increase in model fidelity, excellent overall agreement is shown between the simulations and experimental results with a single calibrated parameter set. However, the burn front velocities of Al/Pt multilayers ignited on tungsten substrates are over-predicted. Finally, possible sources of error are discussed and a higher activation energy (from 41.9 kJ/mol.at. to 47.5 kJ/mol.at.) is shown to bring the simulations into agreement with the velocity data observed on tungsten substrates. Finally, this higher activation energy suggests an inhibited diffusion mechanism present at lower heating rates.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Nonlinear Elimination Applied to Radiation Diffusion

We apply a nonlinearly preconditioned, quasi-Newton framework to accelerate the numerical solution of the thermal radiative transfer (TRT) equations. This framework was inspired by the unpublished method that has existed for years in Teton, Lawrence Livermore National Laboratory’s deterministic TRT code. In this paper, we cast this iteration scheme within a formal nonlinear preconditioning framework and compare its performance against other iteration schemes in the framework. With proper choices of iteration controls for the various levels of the solver, we can recover the standard linearized one-step method, a full nonlinear Newton scheme, as well as the method in Teton. In brief, the nonlinear preconditioning TRT scheme formally eliminates the material temperature equation from the nonlinear system in a nonlinear analog of a Schur complement. This nonlinear elimination step involves solving a decoupled nonlinear equation for each spatial degree of freedom and is therefore inexpensive. By applying a quasi-Newton iteration scheme on the new system, we obtain a three-level iteration scheme that is at least as efficient as commonly used TRT schemes. The new method allows full convergence to the nonlinear backward Euler time-discretized system, increasing accuracy and robustness, while using a similar number of linear iterations as the more common linearized one-step methods Eq. (4).

77 NANOSCIENCE AND NANOTECHNOLOGY↗

Development of a large array of Silicon Drift Detectors for high-rate synchrotron fluorescence spectroscopy

An array of small-area Silicon Drift Detectors (SDD), named Hera, has been developed at Brookhaven National Laboratory (BNL) in the past few years. Its primary application is high-rate spectroscopy at synchrotrons. Each SDD pixel is a 1 mm × 1 mm square to match the footprint of the original diode-based pixel detector called Maia, which was developed for the same application. The replacement of the diode with an SDD allows for better energy resolution at short shaping times and an increased stability of the detector. 32, 96, and 384-channel arrays were designed and fabricated and achieved a Full Width Half Maximum (FWHM) as low as 176 eV at 5.9 keV with peaking time of 1 μs at -13°C. The sensor design, simulation, fabrication, its readout system, and its spectroscopic performance are reported.

47 OTHER INSTRUMENTATION↗

Light detection and cosmic rejection in the ICARUS LArTPC at Fermilab

Abstract The ICARUS-T600 detector is a 760-ton Liquid Argon Time Projection Chamber (LArTPC) currently operating at Fermilab as the Far Detector in the Short Baseline Neutrino (SBN) program. The SBN program is composed of three LArTPCs with a central goal of testing the sterile neutrino hypothesis. After operating for 3-years in the Gran Sasso Underground Laboratory, the ICARUS detector was shipped to CERN where it was outfitted with 360 8” Photomultiplier Tubes (PMTs) for a new optical detection system. The PMT system detects fast scintillation light from charged particles interacting in the Liquid Argon, generating the trigger signal for the full detector and allows 3D reconstruction of events. Now operating at shallow depth, the detector is exposed to a high flux of cosmic rays that can fake neutrino interactions. To mitigate this effect a Cosmic Ray Tagger (CRT) and a 3-meter-thick concrete were installed. Precise timing information from both the PMT and CRT subsystems can help to identify whether an interaction originated from inside or outside of the ICARUS cryostat. This paper reviews a method for cosmogenic background reduction and timing calibration of the CRT and PMT light detection systems in ICARUS.

Instruments & Instrumentation↗

Cryogenics and purification systems of the ICARUS T600 detector installation at Fermilab

This paper describes the cryogenic and purification systems of the ICARUS T600 detector in its present implementation at the Fermi National Laboratory, Illinois, U.S.A. The ICARUS T600 detector is made of four large Time Projection Chambers, installed in two separate containers of about 275 m 3 each. The detector uses liquid argon both as target and as active medium. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions and the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector was previously operated in Italy, at the INFN Gran Sasso Underground Laboratory (LNGS), in a three-year run on the CERN to LNGS Long Baseline Neutrino Beam. For its operation on the Booster and NuMI neutrino beams at Fermilab, for the search of sterile neutrinos and measurements of neutrino-argon cross sections, the detector was moved from Gran Sasso to CERN for the upgrades required for operation at shallow depth with high intensity neutrino beams. The liquid argon containers, the thermal insulation and all the cryogenic equipment have been completely re-designed and rebuilt, following the schemes of the previous installation in Gran Sasso. The detector and all the equipment have been transported to Fermilab, where they have been installed, tested and recently put into operation. The work described in this paper has been conducted as a joint responsibility of CERN and Fermilab with the supervision provided by the ICARUS Collaboration. Design, installation, testing, commissioning and operation are the result of a common effort of CERN, Fermilab and INFN groups.

Cryogenic detectors↗

Understanding the composition of nucleon spin with the PHENIX detector at RHIC

The Relativistic Heavy Ion Collider (RHIC) at Brookhaven National Laboratory (BNL) has just finished 14 years of operation. A significant fraction of these operating years were with polarized proton collisions at 62.4, 200, and 500 GeV center of mass, investigating various aspects of nucleon spin through longitudinal and transversely polarized collisions. These data have helped to address some of the most puzzling and fundamental questions in quantum chromodynamics including: what fraction of the nucleon’s spin originates in the gluon’s helicity contribution?, how polarized are the sea quarks?, and what if any, is the evidence for transverse motion of quarks in polarized protons? These questions have been addressed by the PHENIX detector collaboration. We present in this review highlights of the PHENIX results and discuss their impact.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Supporting Advancement in Weather and Water Prediction in the Upper Colorado River Basin: The SPLASH Campaign

Water is a critical resource that causes significant challenges to inhabitants of the western United States. These challenges are likely to intensify as the result of expanding population and climate-related changes that act to reduce runoff in areas of complex terrain. To better understand the physical processes that drive the transition of mountain precipitation to streamflow, the National Oceanic and Atmospheric Administration has deployed suites of environmental sensors throughout the East River watershed of Colorado as part of the Study of Precipitation, the Lower Atmosphere, and Surface for Hydrometeorology (SPLASH). This includes surface-based sensors over a network of five different observing sites, airborne platforms, and sophisticated remote sensors to provide detailed information on spatiotemporal variability of key parameters. With a 2-yr deployment, these sensors offer detailed insight into precipitation, the lower atmosphere, and the surface, and support the development of datasets targeting improved prediction of weather and water. Initial datasets have been published and are laying a foundation for improved characterization of physical processes and their interactions driving mountain hydrology, evaluation and improvement of numerical prediction tools, and educational activities. SPLASH observations contain a depth and breadth of information that enables a variety of atmospheric and hydrological science analyses over the coming years that leverage collaborations between national laboratories, academia, and stakeholders, including industry.

54 ENVIRONMENTAL SCIENCES↗

Experience With LCLS-II Cryomodule Testing at Fermilab

The Cryomodule Test Stand (CMTS1) at Fermilab has been engaged with testing 8-cavity 1.3 GHz cryomodules designed and assembled for the LCLS-II project at SLAC National Accelerator Laboratory since 2016. Over these three years twenty cryomodules have been cooled to 2K and power tested in continuous wave mode on a roughly once per month cycle. Test stand layout and testing procedures are presented together with results from the cryomodules tested to date. Lessons learned and future plans will also be shared.

43 PARTICLE ACCELERATORS↗

FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton{sup reg.} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200--350 F. Room temperature leak test failures have been experienced in 5 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30--48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200--300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the O-rings displayed a compression set ranging from 51--95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350--400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests that CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures is needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

42 ENGINEERING↗

Injection-locked composite lasers for mm-wave modulation : LDRD 117819 final report.

This report summarizes a 3-year LDRD program at Sandia National Laboratories exploring mutual injection locking of composite-cavity lasers for enhanced modulation responses. The program focused on developing a fundamental understanding of the frequency enhancement previously demonstrated for optically injection locked lasers. This was then applied to the development of a theoretical description of strongly coupled laser microsystems. This understanding was validated experimentally with a novel 'photonic lab bench on a chip'.

42 ENGINEERING↗

FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200-350 F. Room temperature leak test failures have been experienced in 6 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30-48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350-400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests the CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

WindSENSE Project Summary: FY2009-2011

Renewable resources, such as wind and solar, are providing an increasingly larger percentage of our energy needs. To successfully integrate these intermittent resources into the power grid while maintaining its reliability, we need to better understand the characteristics and predictability of the variability associated with these power generation resources. WindSENSE, a three year project at Lawrence Livermore National Laboratory, considered the problem of scheduling wind energy on the grid from the viewpoint of the control room operator. Our interviews with operators at Bonneville Power Administration (BPA), Southern California Edison (SCE), and California Independent System Operator (CaISO), indicated several challenges to integrating wind power generation into the grid. As the percentage of installed wind power has increased, the variable nature of the generation has become a problem. For example, in the Bonneville Power Administration (BPA) balancing area, the installed wind capacity has increased from 700 MW in 2006-2007 to over 1300 MW in 2008 and more than 2600 MW in 2009. To determine the amount of energy to schedule for the hours ahead, operators typically use 0-6 hour ahead forecasts, along with the actual generation in the previous hours and days. These forecasts are obtained from numerical weather prediction (NWP) simulations or based on recent trends in wind speed in the vicinity of the wind farms. However, as the wind speed can be difficult to predict, especially in a region with complex terrain, the forecasts can be inaccurate. Complicating matters are ramp events, where the generation suddenly increases or decreases by a large amount in a short time (Figure 1, right panel). These events are challenging to predict, and given their short duration, make it difficult to keep the load and the generation balanced. Our conversations with BPA, SCE, and CaISO indicated that control room operators would like (1) more accurate wind power generation forecasts for use in scheduling and (2) additional information that can be exploited when the forecasts do not match the actual generation. To achieve this, WindSENSE had two areas of focus: (1) analysis of historical data for better insights, and (2) observation targeting for improved forecasts. The goal was to provide control room operators with an awareness of wind conditions and energy forecasts so they can make well-informed scheduling decisions, especially in the case of extreme events such as ramps.

17 WIND ENERGY↗

NRC Job Code V6060: Extended In-Situ and Real Time Monitoring. Task 4: Detection and Monitoring of Leaks at Nuclear Power Plants External to Structures

In support of Task 4 of the NRC study on compliance with 10 CFR part 20.1406, minimization of contamination, Argonne National Laboratory (ANL) conducted a one-year scoping study, in concert with a parallel study performed by NRC/NRR staff, on monitoring for leaks at nuclear power plants (NPPs) external to structures. The objective of this task-4 study is to identify and assess those sensors and monitoring techniques for early detection of abnormal radioactive releases from the engineered facility structures, systems and components (SSCs) to the surrounding underground environment in existing NPPs and planned new reactors. As such, methods of interest include: (1) detection of anomalous water content of soils surrounding SSCs, (2) radionuclides contained in the leaking water, and (3) secondary signals such as temperature. ANL work scope includes mainly to (1) identify, in concert with the nuclear industry, the sensors and techniques that have most promise to detect radionuclides and/or associated chemical releases from SSCs of existing NPPs and (2) review and provide comments on the results of the NRC/NRR staff scoping study to identify candidate technologies. This report constitutes the ANL deliverable of the task-4 study. It covers a survey of sensor technologies and leak detection methods currently applied to leak monitoring at NPPs. The survey also provides a technology evaluation that identifies their strength and deficiency based on their detection speed, sensitivity, range and reliability. Emerging advanced technologies that are potentially capable of locating releases, identifying the radionuclides, and estimating their concentrations and distributions are also included in the report along with suggestions of required further research and development.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Winter and Breeding Bird Surveys at Los Alamos National Laboratory Progress Report for 2010 to 2012

Los Alamos National Security, LLC (LANS) biologists on the Resources Management Team at Los Alamos National Laboratory (LANL) initiated a multi-year monitoring program for migratory birds in Fiscal Year (FY) 2011 to implement the Biological Resources Management Plan and to comply with Federal laws, Executive Orders, and regulations related to migratory birds. The objective of this on-going study is to monitor patterns and trends of bird abundance and richness over time at LANL. LANS biologists completed a second year of surveys in the winter of 2011 and the summer of 2012. Four habitat types were surveyed for this project and they included 1) mixed conifer forest, 2) ponderosa pine forest, 3) pinyon-juniper woodland and 4) riparian/wetland. Transects were 2.0 to 2.5 kilometers (km) in length and contained nine survey points spaced approximately 250 meters (m) apart. Winter surveys took place in each of the four habitat types in December, January, and February. The summer breeding bird surveys were conducted in each of the four habitat types in May, June, and July.

Basic Biological Sciences(59)↗

Space and Defense Power Systems Maintenance Plan

Los Alamos National Laboratory (LANL) has more than forty years of experience in developing, characterizing, testing, and manufacturing plutonium-238 ( 238 Pu) heat sources. The LANL heat source program has made significant contributions to the United States space, defense, and national security missions, as well as the nuclear-powered artificial heart program. Currently, the Office of Space and Defense Power Systems (SDPS), located in the Nuclear Energy Group (NE-75), funds LANL for the infrastructure and processes used to store, recover, manufacture, and test 238 PuO 2 heat sources. LANL is an approved supplier of the General Purpose Heat Source (GPHS), which is a 238 PuO 2 Fueled Clad designed to provide 62.5 thermal watts. The Light Weight Radioisotope Heater Unit (LWRHU) is another 238 PuO 2 fueled heat source manufactured at LANL. The LWRHU is designed to provide one thermal watt in various locations on a spacecraft. LANL also supports the manufacture of other heat sources for various customers.

07 ISOTOPE AND RADIATION SOURCES↗

Wireless for Steel Energy Efficiency Final Report

Oak Ridge National Laboratory (ORNL) has worked for many years with the U.S. Department of Energy’s (DOE’s) Advanced Manufacturing Office (AMO) and its predecessors, Industrial Technologies Program (ITP) and the Office of Industrial Technology (OIT) to investigate opportunities to realize the potential energy savings identified in the academic studies published over the years. The team from ORNL gratefully acknowledges the support of AMO in the successful completion of this demonstration project.

Energy Analytics↗

2013 Building America Research Planning Meeting Summary

The Building America (BA) Research Planning Meeting was held October 28-30, 2013, in Washington, DC. This meeting provides one opportunity each year for the research teams, national laboratories and Department of Energy (DOE) managers to meet in person to share the most pertinent information and collaboration updates. This report documents the presentations, highlights key program updates, and outlines next steps for the program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Final FY-12 Progress Report on the Cleanup of Irradiated 130 g-U/L Uranyl Sulfate SHINE Target Solutions

During Fiscal Year 2012 (FY-12), Argonne National Laboratory (Argonne) submitted a series of letter reports as the process for periodic cleanup of the SHINE target solution was first down-selected from a variety of options and then developed. These reports, in order of submission, were as follows: Use of Uranyl Peroxide Precipitation as a Means to Clean up Irradiated Uranyl Sulfate Target Solutions (February 28, 2012); UREX Flowsheet for Cleanup of a Spent 130 g-U/L Uranyl Sulfate SHINE Target Solution (March 29, 2012); Addendum to the Letter Report UREX Flowsheet for Cleanup of a Spent 130 g-U/L Uranyl Sulfate SHINE Target Solution of March 29, 2012 (May 18, 2012); and Centrifugal Contactor Operations for UREX Process Flowsheet (May 21, 2012). Results on cleanup development were also presented at the SHINE technical meeting on August 23, 2012. This report will present results from two experiments; the results of the first experiment were presented at that meeting, and the second experiment was performed after the meeting.

Bowers, Delbert↗