Search NASA⌕ Search

SEARCH · Search NASA

Results for “Likelihood”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

HTTF Core Stress Analysis

In accordance with the need to determine whether cracking of the ceramic core disks which will be constructed and used in the High Temperature Test Facility (HTTF) for heatup and cooldown experiments, a set of calculation were performed using Abaqus to investigate the thermal stresses levels and likelihood for cracking. The calculations showed that using the material properties provided for the Greencast 94F ceramic, cracking is predicted to occur. However, this modeling does not predict the size or length of the actual cracks. It is quite likely that cracks will be narrow with rough walls which would impede the flow of coolant gases entering the cracks. Based on data recorded at Oregon State University using Greencast 94F samples that were heated and cooled at prescribed rates, it was concluded that the likelihood that the cracks would be detrimental to the experimental objectives is small.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Geomagnetic Storms and Long-Term Impacts on Power Systems

Pacific Northwest National Laboratory was commissioned to study the potential impact of a severe GIC event on the western U.S.-Canada power grid (referred to as the Western Interconnection). The study identified long transmission lines (length exceeding 150 miles) that did not include series capacitors. The basic assumption for the study is that a GIC is more likely to couple to long transmission lines, and that series capacitors would block the flow of the induced DC GIC. Power system simulations were conducted to evaluate impacts to the bulk power system if transformers on either end of these lines failed. The study results indicated that the Western Interconnection was not substantially at risk to GIC because of the relatively small number of transmission lines that met this criterion. This report also provides a summary of the Hydro-Québec blackout on March 13, 1989, which was caused by a GIC. This case study delves into the failure mechanisms of that event, lessons learned, and preventive measures that have been implemented to minimize the likelihood of its reoccurrence. Finally, the report recommends that the electric power industry consider the adoption of new protective relaying approaches that will prevent severe GIC events from catastrophically damaging transformers. The resulting changes may increase the likelihood of smaller disruptions but should prevent an unlikely yet catastrophic national-level event.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Top pair production in the dilepton decay channel with a tau lepton

The top quark pair production and decay into leptons with at least one being a τ lepton is studied in the framework of the CDF experiment at the Tevatron proton antiproton collider at Fermilab (USA). The selection requires an electron or a muon produced either by the τ lepton decay or by a W decay. The analysis uses the complete Run II data set i.e. 9.0 fb -1 , selected by one trigger based on a low transverse momentum electron or muon plus one isolated charged track. The top quark pair production cross section at 1.96 TeV is measured at 8.2 ± 1.7 +1.2 -1.1 ± 0.5 pb, and the top branching ratio into τ lepton is measured at 0.120 ± 0.027 +0.022 -0.019 ± 0.007 with statistical, systematics and luminosity uncertainties. These are up to date the most accurate results in this top decay channel and are in good agreement with the results obtained using other decay channels of the top at the Tevatron. The branching ratio is also measured separating the single lepton from the two leptons events with a log likelihood method. This is the first time these two signatures are separately identified. With a fit to data along the log-likelihood variable an alternative measurement of the branching ratio is made: 0.098 ± 0.022(stat:) ± 0.014(syst:); it is in good agreement with the expectations of the Standard Model (with lepton universality) within the experimental uncertainties. The branching ratio is constrained to be less than 0.159 at 95% con dence level. This limit translates into a limit of a top branching ratio into a potential charged Higgs boson.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Cooling Strategies for Vane Leading Edges in a Syngas Environment Including Effects of Deposition and Turbulence

The Department of Energy has goals to move land based gas turbine systems to alternate fuels including coal derived synthetic gas and hydrogen. Coal is the most abundant energy resource in the US and in the world and it is economically advantageous to develop power systems which can use coal. Integrated gasification combined cycles are (IGCC) expected to allow the clean use of coal derived fuels while improving the ability to capture and sequester carbon dioxide. These cycles will need to maintain or increase turbine entry temperatures to develop competitive efficiencies. The use of coal derived syngas introduces a range of potential contaminants into the hot section of the gas turbine including sulfur, iron, calcium, and various alkali metals. Depending on the effectiveness of the gas clean up processes, there exists significant likelihood that the remaining materials will become molten in the combustion process and potentially deposit on downstream turbine surfaces. Past evidence suggests that deposition will be a strong function of increasing temperature. Currently, even with the best gas cleanup processes a small level of particulate matter in the syngas is expected. Consequently, particulate deposition is expected to be an important consideration in the design of turbine components. The leading edge region of first stage vanes most often have higher deposition rates than other areas due to strong fluid acceleration and streamline curvature in the vicinity of the surface. This region remains one of the most difficult areas in a turbine nozzle to cool due to high inlet temperatures and only a small pressure ratio for cooling. The leading edge of a vane often has relatively high heat transfer coefficients and is often cooled using showerhead film cooling arrays. The throat of the first stage nozzle is another area where deposition potentially has a strongly adverse effect on turbine performance as this region meters the turbine inlet flow. Based on roughness levels found on in service vanes (Bons, et al., 2001, up to 300 microns) flow blockage in first stage turbine nozzles can easily reach 1 to 2 percent in conventional turbines. Deposition levels in syngas fueled gas turbines are expected to be even more problematic. The likelihood of significant deposition to the leading edge of vanes in a syngas environment indicates the need to examine this effect on the leading edge cooling problem. It is critical to understand the influence of leading edge geometry and turbulence on deposition rates for both internally and showerhead cooled leading edge regions. The expected level of deposition in a vane stagnation region not only significantly changes the heat transfer problem but also suggests that cooling arrays may clog. Addressing the cooling issue suggests a need to better understand stagnation region heat transfer with realistic roughness as well as the other variables affecting transport near the leading edge. Also, the question of whether leading edge regions can be cooled internally with modern cooling approaches should also be raised, thus avoiding the clogging issue. Addressing deposition in the pressure side throat region of the nozzle is another critical issue for this environment. Issues such as examining the protective effect of slot and full coverage discrete-hole film cooling on limiting deposition as well as the influence of roughness and turbulence on effectiveness should be raised. The objective of this present study is to address these technical challenges to help enable the development of high efficiency syngas tolerant gas turbine engines.

01 COAL, LIGNITE, AND PEAT↗

Development of a First-of-a-Kind Deterministic Decision-Making Tool for Supervisory Control System

Decision-making is the process of identifying and choosing alternatives where each alternative offers a different approach or path to move from a given state or condition to a desired state or condition. The generation of consistent decisions requires that a structured, coherent process be defined, immediately leading to a decision-making framework. The overall objective of the generalized framework is for it to be adopted into an autonomous decision-making framework and tailored to specific requirements for various applications. In this context, automation is the use of computing resources to make decisions and implement a structured decision-making process with limited or no human intervention. The overriding goal of automation is to replace or supplement human decision makers with reconfigurable decision- making modules that can perform a given set of tasks reliably. Risk-informed decision making requires a probabilistic assessment of the likelihood of success given the status of the plant/systems and component health, and a deterministic assessment between plant operating parameters and reactor protection parameters to prevent unnecessary trips and challenges to plant safety systems. The implementation of the probabilistic portion of the decision-making engine of the proposed supervisory control system was detailed in previous milestone reports. Once the control options are identified and ranked based on the likelihood of success, the supervisory control system transmits the options to the deterministic portion of the platform. The deterministic multi-attribute decision-making framework uses variable sensor data (e.g., outlet temperature) and calculates where it is within the challenge state, its trajectory, and margin within the controllable domain using utility functions to evaluate current and projected plant state space for different control decisions. Metrics to be evaluated include stability, cost, time to complete (action), power level, etc. The integration of deterministic calculations using multi-physics analyses (i.e., neutronics, thermal, and thermal-hydraulics) and probabilistic safety calculations allows for the examination and quantification of margin recovery strategies. This also provides validation of the control options identified from the probabilistic assessment. Thus, the thermal-hydraulics analyses are used to validate the control options identified from the probabilistic assessment. Future work includes evaluating other possible metrics and computational efficiencies.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Mapping Correlation of Two Point Sources in the Gamma-Ray Sky

The Fermi Gamma-Ray Space Telescope has been taking data on high energy photons or γ rays since June 11th, 2008, and people have been cataloging and profiling point sources of these γ rays ever since. After roughly one year of being in operation over 1400 sources were cataloged. Now, in 2015 we have 3033 sources cataloged. With the increasing amount of sources it’s important to think about the limitations of likelihood analysis for highly correlated sources. In this paper I will present the problems of using likelihood analysis for sources that are highly correlated as well as show under what circumstances sources can be considered highly correlated. Dark matter over densities may show up as a point source, so it is a necessary step to learn how the two signals will interact to allow for a proper search for dark matter.

79 ASTRONOMY AND ASTROPHYSICS↗

Framework for Modeling High-Impact, Low-Frequency Power Grid Events to Support Risk-Informed Decisions

Natural and man-made hazardous events resulting in loss of grid infrastructure assets challenge the electric power grid’s security and resilience. However, the planning and allocation of appropriate contingency resources for such events requires an understanding of their likelihood and the extent of their potential impact. Where these events are of low likelihood, a risk-informed perspective on planning can be problematic as there exists an insufficient statistical basis to directly estimate the probabilities and consequences of their occurrence. Since risk-informed decisions rely on such knowledge, a basis for modeling the risk associated with high-impact low frequency events (HILFs) is essential. Insights from such a model can inform where resources are most rationally and effectively expended. The present effort is focused on development of a HILF risk assessment framework. Such a framework is intended to provide the conceptual and overarching technical basis for the development of HILF risk models that can inform decision makers across numerous stakeholder sectors. The North American Electric Reliability Corporation (NERC) 2014 Standard TPL-001-4 considers severe events for transmission reliability planning, but does not address events of such severity that they have the potential to fail a substantial fraction of grid assets over a region, such as geomagnetic disturbances (GMD), extreme seismic events, and coordinated cyber-physical attacks. These are beyond current planning guidelines. As noted, the risks associated with such events cannot be statistically estimated based on historic experience; however, there does exist a stable of risk modeling techniques for rare events that have proven of value across a wide range of engineering application domains. There is an active and growing interest in evaluating the value of risk management techniques in the State transmission planning and emergency response communities, some of this interest in the context of grid modernization activities. The availability of a grid HILF risk model, integrated across multi-hazard domains which, when interrogated, can support transparent, defensible and effective decisions, is an attractive prospect among these communities. In this report, we document an integrated HILF risk framework intended to inform the development of risk models. These models would be based on the systematic and comprehensive (to within scope) characterization of hazards to the level of detail required for modeling risk, identification of the stressors associated with the hazards (i.e., the means of impacting grid and supporting infrastructure), characterization of the vulnerability of assets to these stressors and the probabilities of asset compromise, the grid’s dynamic response to the asset failures, and assessment of subsequent severities of consequence with respect to selected impact metrics, such as power outage duration and geographic reach. Specifically, the current framework is being developed to;1. Provide the conceptual and overarching technical paradigms for the development of risk models; 2. Identify the classes of models required to implement the framework - providing examples of existing models, and also identifying where modeling gaps exist; 3. Identify the types of data required, addressing circumstances under which data are sparse and the formal elicitation of informed judgment might be required; and 4. Identify means by which the resultant risk models might be interrogated to form the necessary basis for risk management.

97 MATHEMATICS AND COMPUTING↗

Analysis of Debris Trajectories at the Scaled Wind Farm Technology (SWiFT) Facility

Sandia National Laboratories operates the Scaled Wind Farm Technology Facility (SWiFT) on behalf of the Department of Energy Wind and Water Power Technologies Office. An analysis was performed to evaluate the hazards associated with debris thrown from one of SWiFT’s operating wind turbines, assuming a catastrophic failure. A Monte Carlo analysis was conducted to assess the complex variable space associated with debris throw hazards that included wind speed, wind direction, azimuth and pitch angles of the blade, and percentage of the blade that was separated. In addition, a set of high fidelity explicit dynamic finite element simulations were performed to determine the threshold impact energy envelope for the turbine control building located on-site. Assuming that all of the layered, independent, passive and active engineered safety systems and administrative procedures failed (a 100% failure rate of the safety systems), the likelihood of the control building being struck was calculated to be less than 5/10,000 and ballistic simulations showed that the control building would not provide passive protection for the majority of impact scenarios. Although options exist to improve the ballistic resistance of the control building, the recommendation is not to pursue them because there is a low probability of strike and there is an equal likelihood personnel could be located at similar distances in other areas of the SWiFT facility which are not passively protected, while the turbines are operating. A fenced exclusion area has been created around the turbines which restricts access to the boundary of the 1/100 strike probability. The overall recommendation is to neither relocate nor improve passive protection of the control building as the turbine safety systems have been improved to have no less than two independent, redundant, high quality engineered safety systems. Considering this, in combination with a control building strike probability of less than 5/10,000, the overall probability of turbine debris striking the control building is less than 1/1,000,000.

17 WIND ENERGY↗

A search for the Higgs boson in H→WW→lvlv with 802 fb -1

This thesis documents a search for Standard Model (SM) Higgs boson to WW production in the final state of two charged leptons (e, μ) and two neutrino final state resulting from in pp collisions at √ s = 1.96 TeV. The data collected by the CDF II detector at the Tevatron collider at Fermilab, corresponds to an integrated luminosity of 8.2 fb -1 . This iteration of the analysis incorporated several improvements to increase Higgs sensitivity. We reevaluated lepton isolation values to recover signal events in which leptons mutually spoil each other’s isolation requirements. We additionally incorporated new lepton identification selections, namely likelihood based forward electrons and a better recovery of electrons passing through detector cracks. The base analysis searches for opposite-sign dilepton events. We employed three separately trained neural networks to distinguish signal from background processes for events with 0, one, or two jets. To further increase sensitivity for 0-jet events, we constructed a likelihood ratio discriminant based on Matrix Element calculations as an additional input to the neural network. For the base opposite-sign analysis, summing over all jet multiplicities, we observed 3513 events in data compared with a background expectation of 3409 ± 233 and a signal expectation of 53.6 ± 9.4 for a mass of 165 GeV/c 2 . To further increase signal acceptance, we incorporated several separate search regions in addition to the base analysis. We include subchannels searching for Higgs production in events with low dilepton invariant mass and in events having final states with either same-sign dileptons or trileptons With the combination of the separate analyses, we observed a 95% C.L. upper production limit of 0.77 times the SM expectation for a Higgs mass of 165 GeV/c 2 to be compared with the value for the median of the expected limit (0.78). We additionally present results for eighteen Higgs masses ranging from 110 GeV/c 2 to 200 GeV/c 2 . We excluded at the 95% C.L., a SM Higgs boson in the mass range between 156 and 175 GeV/c 2 .

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Measurement of the ratio $B(t \to W b)/B(t \to W q)$ in $t\bar{t}$ dilepton channel at CDF

My analysis is based on the number of b-jets found in t¯t events using the dilepton sample with at least 2 jets in the final state. The charged leptons could be either electrons or muons. Tau leptons are not included. We use SecVtx algorithm, based on the reconstruction of a secondary vertex in the event, in order to identify a jet coming from b-quark fragmentation (b-tagging). Due to the high purity of the t¯t signal in dilepton events it is possible to perform a kinematic measurement of the t¯t cross section. Our strategy is to use this result to make prediction on the number of t¯t events. We divide our sample in subsets according to dilepton type (combination of the lepton type), number of jets in the final states and events with zero, one or two tags. The comparison between events and the prediction, given by the sum of the expected t¯t estimate and the background yield, in each subsample is made using a Likelihood function. Our measured value for R is the one which maximizes the Likelihood, i.e. gives the best match between our expectation and the observed data. We measure: p¯p!t¯t = 7.05±0.53stat±0.42lumi , R= 0.86±0.06 (stat+syst) and, in the hypothesis of CKM matrix unitarity with three quark generations, | Vtb | = 0.93 ± 0.03. Our analysis on the p¯p!t¯t was performed independently of the official dilepton analisys on the t¯t production cross section. So it represents also a valuable crosscheck for the official analysis. In chapter 1, a brief introduction to the theoretical framework is given. The standard model of elementary particles and the Quantum Cromodynamic theories are introduced. Then the top quark is presented, with a short descpription of its properties, as its mass, its production mode and its cross section. Some previous results on R are listed as well. Later we present the experiment that collected our data, both the collider (chapter 2) and the detector (CDF)(chapter 3). In chapter 4 we describe the physics object reconstruction, so how we collect the detector signals and translate those into physical particles traversing our detector. The event selection is described in chapter 5, where we report the complete list of the selection requirements and we estimate our sample composition. In chapters 6 and 7 we report our results for the t¯t production cross section and R. An indirect measurement for |Vtb| is given as well.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Integrated Risk-Informed Decision-Making for an ALMR PRISM

Decision-making is the process of identifying decision alternatives, assessing those alternatives based on predefined metrics, selecting an alternative (i.e., making a decision), and then implementing that alternative. The generation of decisions requires a structured, coherent process, or a decision-making process. The overall objective for this work is that the generalized framework is adopted into an autonomous decision-making framework and tailored to specific requirements for various applications. In this context, automation is the use of computing resources to make decisions and implement a structured decision-making process with limited or no human intervention. The overriding goal of automation is to replace or supplement human decision makers with reconfigurable decision-making modules that can perform a given set of tasks rationally, consistently, and reliably. Risk-informed decision-making requires a probabilistic assessment of the likelihood of success given the status of the plant/systems and component health, and a deterministic assessment between plant operating parameters and reactor protection parameters to prevent unnecessary trips and challenges to plant safety systems. The probabilistic portion of the decision-making engine of the supervisory control system is based on the control actions associated with an ALMR PRISM. Newly incorporated into the probabilistic models are the prognostic/diagnostic models developed by Pacific Northwest National Laboratory. These allow decisions to incorporate the health of components into the decision–making process. Once the control options are identified and ranked based on the likelihood of success, the supervisory control system transmits the options to the deterministic portion of the platform. The deterministic portion of the decision-making engine uses thermal-hydraulic modeling and components for an advanced liquid-metal reactor Power Reactor Inherently Safe Module. The deterministic multi-attribute decision-making framework uses various sensor data (e.g., reactor outlet temperature, steam generator drum level) and calculates its position within the challenge state, its trajectory, and its margin within the controllable domain using utility functions to evaluate current and projected plant state space for different control decisions. The metrics that are evaluated are based on reactor trip set points. The integration of the deterministic calculations using multi-physics analyses and probabilistic safety calculations allows for the examination and quantification of margin recovery strategies. This also provides validation of the control options identified from the probabilistic assessment. Thus, the thermalhydraulics analyses are used to validate the control options identified from the probabilistic assessment. Future work includes evaluating other possible metrics and computational efficiencies, and developing a user interface to mimic display panels at a modern nuclear power plant.

97 MATHEMATICS AND COMPUTING↗

Lessons Learned "Establishing an Electrically Safe Work Condition" Specifically related to Racking Electrical Breakers

During low voltage electrical equipment maintenance, a bad breaker was identified. The breaker was racked out from the substation cubicle without following the hazardous energy control process identified in the Integrated Work Document (IWD). The IWD required the substation to be in an electrically safe work condition prior to racking the breaker. Per NFPA 70E requirements, electrical equipment shall be put into an electrically safe work condition before an employee performs work on or interacts with equipment in a manner that increases the likelihood of creating an arc flash. Racking in or out a breaker on an energized bus may increase the likelihood of creating an arc flash dependent on equipment conditions. A thorough risk assessment must be performed prior to performing such a task. The risk assessment determines the risk control measures to be put in place prior to performing the work. Electrical Safety Officers (ESO) can assist in performing risk assessments and incorporating risk control measures.

30 DIRECT ENERGY CONVERSION↗

Probability of Encounter Between Ports of Entry (PrEP): Aversion Force-Field “Early Validation” Report

To enhance detection and interdiction of radiological or nuclear material trafficking between primary POEs into the US, The Department of Homeland Security is faced with highly variable smuggling pathways through expansive geographic regions. The goal of this project is to test an approach to estimating likely pathways, as well as the probability of encounter along any given route. Our goal is to test the feasibility of a novel approach based on assessing the adversary’s perception of discovery likelihood over a broad geographic region, and using that result to estimate an “aversion force field” over the same region. The aversion force field is derived from analogies based on the physics of electric charges. Combining the aversion force with the intention of an adversary to reach their destination, generates a route that is consistent with both the adversary’s intention and their aversion to deterrent measures. Phase I is exploratory. Its goal to demonstrate the feasibility of the approach. This report describes progress in an essential part of the approach, specifically, to implement and couple two principle model components: (1) the Bayesian network model of an adversary’s perception of discovery likelihood; and (2) the physics-inspired aversion field model. The objective is to show that the field produced from the two components is plausible and consistent with the assumptions and the data. Figure 1 illustrates the workflow of this phase to the present stage. After collecting preliminary data and implementing each of the two model components, they were separately evaluated. Following this step, the output from the Bayesian network was input to the aversion field solver, and the combined results evaluated as reported here.

97 MATHEMATICS AND COMPUTING↗

Complementary Probes of Dark Energy using Galaxy Clusters

Here, we have built a framework to constrain Dark Energy (DE) using the spatial distributions, number counts, and escape velocities of galaxy clusters in the context of next generation spectroscopic surveys. In the ΛCDM paradigm, galaxy clusters trace the expansion of the Universe in three different ways. (1.) Spatial distribution:The baryon acoustic oscillations (BAO) formed during recombination are imprinted into the spatial distribution of clusters. The locations of the BAO are standard-rulers which map the length-scale of the sound horizon. Statistical measures like the two-point correlation function and the power spectrum can be used to trace the scale of the BAO and thus the expansion history of the Universe.(2.) Number counts: Galaxy clusters are identified as peaks above a threshold in the underlying matter density field. Galaxies attract onto these peaks over time until gravity loses the battle against the accelerating expansion of space. The number and mass of galaxy clusters over time is sensitive to the strength of the DE and the amount of matter in the Universe.(3.) Escape velocity:The radius-velocity phase-space of galaxies within clusters has a sharp edge which traces the escape velocity of galaxies. This escape velocity is a combination of the local Newtonian gravitational potential and the acceleration of the expansion of the Universe. Weak lensing mass profiles of clusters can be used to predict the escape velocity profile from just the gravitational Newtonian component. In an expanding or contracting Universe, the observed phase-space escape velocity surface would be modified from this prediction.We built the large-scale structure covariances from mock catalogs which we can now use in the likelihood analyses to constrain Dark Energy models. We have developed the analytical framework to conduct the joint likelihood analysis of the bias function and the abundance function in order to constrain DE through their redshift evolution.We have investigated a new Dark Energy test that uses the weak lensing prediction of the grav-itational potential compared to the observed escape velocity profile from galaxy clusters. We have made predictions on the improvement in the Dark Energy figure-of-merit from this new test. We have also investigated the predicted enhancements of the cluster escape velocity profiles from modifi-cations to gravity. This effort can help rule out model classes of modified gravity as alternatives to Dark Energy.

79 ASTRONOMY AND ASTROPHYSICS↗

A Business Case for Advanced Outage Management

The Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Program develops and validates technologies that will make the U.S. operating nuclear fleet more efficient and competitive. The program has developed a standard methodology for determining the impact of new technologies in order to assist nuclear power plant (NPP) operators in building sound business cases. This paper presents a generic business case for implementation of technology that supports Advanced Outage Management (AOM). The analysis presented demonstrates that advanced communication and networking and analytical technologies will allow NPP to conduct outages with fewer people in management roles and the remaining people can be more effective and more productive. The benefits are quantified with a rough order of magnitude that provides directional guidance to NPPs that are interested in developing a similar business case. Advanced Outage Management is enabled by a suite of technologies, which are described in further detail in the body of this report. They include: • Mobile Work Packages (MWP) • Computer Based Procedures (CBP) • Personal Digital Assistants (PDA) also referred to as smart devices • Barcode readers • High bandwidth wireless networks • Collaboration software (i.e., OneNote) • Advanced digital displays • Advanced data analytics All the hardware necessary to implement AOM as envisioned in this report is readily available today. Configuration to perform within the plant systems and regulatory boundaries would need to be developed by the NPP. 1. The resulting business case demonstrates benefits in two major categories: 2. Reduction in resources required to manage the outage, a. Increased productivity in outage work that reduces the likelihood of schedule overruns: b. reduce likelihood of bulk work resulting in outage delays c. improved management of critical path single issues, d. improved management of emergent work (improve time to collect data and prepare response) It is important to note that in order to realize these benefits at the scale described in this report requires the plant to rethink how technologies can disrupt current processes; how data might be captured, processed, analyzed and presented with little or no human intervention. In many cases, technology be fully utilized in a way that not only aides productivity, but is utilized towards “work destruction” – elimination of work that is currently performed through a human interface.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Explaining jurisdictional compliance with California’s top-down streamlined solar permitting law (AB 2188)

In the U.S., the process by which residential rooftop solar photovoltaic (PV) system installations are permitted and inspected by an “authority having jurisdiction” (AHJ) varies across AHJs. As the U.S. has roughly 23,000 AHJs with varying degrees of local autonomy, improving the cross-jurisdictional consistency of permitting and inspection is not a straightforward task. One promising approach is a “top-down” streamlined solar permitting (SSP) mandate by U.S. States to their AHJs. This study set out to understand the factors associated with the likelihood that an AHJ either did or did not comply with California’s top-down streamlined solar permitting law, AB2188, and then to consider how these factors might be relevant to the future prospects of top-down SSP outside of California. This report provides background material on AB2188 and tests five hypotheses about the factors that affect the likelihood that an AHJ will comply or not comply with AB2188, as developed from the policy diffusion literature and background knowledge on AB2188 and its implementation.

14 SOLAR ENERGY↗

Supervisory Control System for Multi-Modular Advanced Reactors

The proposed supervisory control system (SCS) may provide considerable benefits to advanced small modular reactors, including reduced plant staffing, optimized maintenance activities, greater plant availability, and higher operating efficiency. The SCS makes risk-informed decisions based on (1) a probabilistic assessment of the likelihood of success given the status of the plant/systems and component health, and (2) a deterministic assessment between plant operating parameters and reactor protection parameters to prevent unnecessary trips and challenges to plant safety system—one measure of SCS success. The probabilistic portion of the decision-making engine of the SCS is based on the control actions associated with an advanced liquid-metal reactor (ALMR) Power Reactor, Innovative, Small Module (PRISM). Within the SCS, the probabilistic assessment provides a ranking of viable control actions; however, certain instructions generated by the probabilistic model only include an abstract notion of action without specifications. For instance, one instruction may be to reduce power without specifying how much reduction is needed. The prognostic/diagnostic models incorporate the health of components into the decision-making process. Once the control options are identified and ranked based on the likelihood of success, the SCS transmits the options to the deterministic portion of the platform. The performance-based system models assess and rank each of the probabilistically identified control actions by taking into account the physical behavior (current and projected) of the system. The performance-based decision making module receives inputs from the probabilistic decision-making module and the ERM module to generate a single solution. Interfaces to these modules are defined later in the section. A utility theory algorithm factors into the decision making by estimating the distance from and approach to a trip setpoint for each control option. If the magnitude of a negative utility value increases rapidly as the system approaches the trip setpoint, that option is not likely to be the preferred option. This can lead to a re-ranking of the control options. The SCS then transmits a control signal(s) to a component or system and informs the operator of actions taken based on the action chosen. The SCS successfully coupled probabilistic and performance-based system models to arrive at optimal control decisions based on the actual status of the plant and components. The automatic, autonomous, and real-time performance requirements for a control system were met by the SCS. The value of coupling probabilistic and performance-based system models was demonstrated by the re-ranking of control options based on the use of a utility algorithm. The use of ERM monitors provides added value to the SCS as demonstrated by the re-ranking of control options based on a components degraded state.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hydrogen Plant Hazards and Risk Analysis Supporting Hydrogen Plant Siting near Nuclear Power Plants. Final report

Nuclear power plants (NPPs) are considering flexible plant operations to take advantage of excess thermal and electrical energy. One option for NPPs is to pursue hydrogen production through high temperature electrolysis as an alternate revenue stream to remain economically viable. The intent of this study is to investigate the risk of a high temperature steam electrolysis hydrogen production facility (HTEF) in close proximity to an NPP. This analysis evaluates a postulated HTEF located 1 km from an NPP, including the likelihood of an accident and the associated consequence to critical NPP targets. This analysis shows that although the likelihood of a leak in an HTEF is not negligible, the consequence to critical NPP targets is not expected to lead to a failure at a distance of 1 km. Furthermore, the minimum separation distance of the HTEF is calculated based on the target fragility criteria of 1 psi defined in Regulatory Guide 1.91.

08 HYDROGEN↗