Search NASA⌕ Search

SEARCH · Search NASA

Results for “MONITOR PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Intercomparison of Various Algorithms in Determining Convective and Stratiform Precipitation

The paper presents the intercomparison of various algorithms in determining the convective and stratiform precipitation in tropical convection. The latent heat released from precipitation is the driving mechanism for the general circulation of the atmosphere and exhibits different vertical profile in convective and stratiform regimes of the tropical convection. The primary goal of this paper is to evaluate the performance of the operational convective/stratiform algorithm that is employed by the NASA Tropical Rainfall Measuring Mission (TRMM) ground validation program. The operational algorithm is based on the texture of radar reflectivity field at constant altitude. The TRMM ground validation program continuously monitors the tropical convection through ground based radar and rain gauge network at selected sites around the tropics and generates the rainfall products including the convective/stratiform rainfall map that can readily be used by the TRMM satellite program. An evaluation and improvement of these rainfall products requires additional measurements that can be available through field campaigns. The data used in this study was collected during the second phase of the Texas Florida Underflights (TEFLUN-B) field campaign in East Central Florida, a primary site of the TRMM ground validation program. The TEFLUN-B field campaign was conducted in August and September 1998 in support of the NASA Tropical Rainfall Measuring Mission (TRMM) satellite observations. An objective of the TEFLUN-B field campaign was to obtain the ground based precipitation measurements of Florida convection at different temporal and spatial scales. The field campaign had various components of precipitation measurements including dual wavelength precipitation profiler, various types of disdrometers and rain gauges, collocated about 40 km southwest of Melbourne NEXRAD radar. In this study, we examine the profiler based reflectivity and Doppler velocity and the disdrometer based drop size distribution observations to evaluate the operational scanning radar (i.e. NEXRAD) based convective/stratiform algorithm.

Tokay, Ali↗

The Lake Charles CCS Project

The Lake Charles CCS Project is a large-scale industrial carbon capture and sequestration (CCS) project which will demonstrate advanced technologies that capture and sequester carbon dioxide (CO{sub 2}) emissions from industrial sources into underground formations. Specifically the Lake Charles CCS Project will accelerate commercialization of large-scale CO{sub 2} storage from industrial sources by leveraging synergy between a proposed petroleum coke to chemicals plant (the LCC Gasification Project) and the largest integrated anthropogenic CO{sub 2} capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Lake Charles CCS Project will promote the expansion of EOR in Texas and Louisiana and supply greater energy security by expanding domestic energy supplies. The capture, compression, pipeline, injection, and monitoring infrastructure will continue to sequester CO{sub 2} for many years after the completion of the term of the DOE agreement. The objectives of this project are expected to be fulfilled by working through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 includes the studies attached hereto that will establish: the engineering design basis for the capture, compression and transportation of CO{sub 2} from the LCC Gasification Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Hastings oil field in Texas. The overall objective of Phase 2, provided a successful competitive down-selection, is to execute design, construction and operations of three capital projects: (1) the CO{sub 2} capture and compression equipment, (2) a Connector Pipeline from the LLC Gasification Project to the Green Pipeline owned by Denbury and an affiliate of Denbury, and (3) a comprehensive MVA system at the Hastings oil field.

01 COAL, LIGNITE, AND PEAT↗

Monitoring Oceanic Islands Via Radarsat Imaging Radar

Oceanic islands represent an often overlooked aspect of the land surface of Earth, yet they are sensitive, natural laboratories for investigating the impacts of environmental change on landscapes and land-cover systems. For this reason, we have utilized the Canadian Space Agency's RADARSAT satellite to initiate a program for monitoring the landscapes of approximately 20 oceanic islands as part of the RADARSAT Background Mission. To date, we have analyzed high resolution SAR images of 12 islands that extend from the Arctic, throughout the Atlantic and Southern Indian oceans, and into the equatorial Pacific. We have selected islands for monitoring on the basis of their known or suspected history of landscape change in association with environmental factors or anthropogenic effects.

Garvin, James B.↗

The Relationship of Hydrology in the Green River to Colorado Pikeminnow Populations

The Federally listed Colorado Pikeminnow (CP) (Ptychocheilus Lucius) has been declining in the Green River Basin over the last 20 years. Muth et al. (2000) recommended flows and temperatures to benefit endangered fish species downstream of Flaming Gorge Dam on the Green River. The recommendations identified a range of flows during the base flow period (flows that occur after the annual snowmelt runoff period, usually from early summer to the following spring) that were intended to benefit CP. The recommendations indicated that the mean flow for the summer–winter period should be established each year on the basis of anticipated hydrologic conditions, but adjustments could be made if hydrologic conditions change. Flow should gradually decline from peak flow to base flow, with the base flow reached by early to middle summer (depending on hydrologic conditions) and maintained through February. The rate of decline should depend on rates of decline in Yampa River flows and the recommended rates of decline for dam releases. No specific recommendations were made for base flow variation in Reach 1, but variation around the annual mean base flow should be restricted to achieve recommended levels of variation in Reach 2 (middle Green River) (Table 5.5 in Muth et al. 2000). Implementation of the flow and temperature recommendations served as the proposed action for an EIS on Flaming Gorge Dam operations. A Biological Assessment of the impacts on endangered species of implementing the recommendations was prepared and a Biological Opinion that called for development of a study plan to examine the effects of implementation. Projects to address this evaluation were identified in the Green River Study Plan and have been conducted since then. The purpose of the Study Plan was to identify and recommend to the Recovery Program those monitoring or research projects necessary for implementation and evaluation of the flow and temperature recommendations. Those projects included studies to evaluate the anticipated effects of implementing the recommendations (including potential adverse effects identified in the 2006 Biological Opinion) and studies to examine recognized uncertainties of the recommendations. A new recovery program summer base flow study plan was approved in September of 2020 to evaluate stable and elevated summer base flows below Flaming Gorge Dam intended to benefit CP spawning and rearing success. Anecdotal observations suggest CP production may have been higher in years prior to flow restrictions for endangered fish. Based on long-term CP monitoring data in the Green River, Bestgen and Hill (2016) concluded that CP would benefit from higher summer baseflows (1,700-3,000 ft 3 /sec) with flows above or below associated with lower abundance of age-0 CP. Therefore, flexibility in the ROD is currently being utilized to establish higher stable summer base flows in an attempt create more advantageous conditions for spawning and rearing CP. These fish recovery flows are restrictive to WAPA in the summer months, therefore it is necessary to conduct an analysis of historic river data relationships to CP abundance to better understand if the recommended fish flows (elevated and stable base flows) are necessary for fish recovery.

54 ENVIRONMENTAL SCIENCES↗

INTERFEROMETRIC MONITORING OF GAMMA-RAY BRIGHT AGNs. I. THE RESULTS OF SINGLE-EPOCH MULTIFREQUENCY OBSERVATIONS

We present results of single-epoch very long baseline interferometry (VLBI) observations of gamma-ray bright active galactic nuclei (AGNs) using the Korean VLBI Network (KVN) at the 22, 43, 86, and 129 GHz bands, which are part of a KVN key science program, Interferometric Monitoring of Gamma-Ray Bright AGNs. We selected a total of 34 radio-loud AGNs of which 30 sources are gamma-ray bright AGNs with flux densities of >6 × 10{sup −10} ph cm{sup −2} s{sup −1}. Single-epoch multifrequency VLBI observations of the target sources were conducted during a 24 hr session on 2013 November 19 and 20. All observed sources were detected and imaged at all frequency bands, with or without a frequency phase transfer technique, which enabled the imaging of 12 faint sources at 129 GHz, except for one source. Many of the target sources are resolved on milliarcsecond scales, yielding a core-jet structure, with the VLBI core dominating the synchrotron emission on a milliarcsecond scale. CLEAN flux densities of the target sources are 0.43–28 Jy, 0.32–21 Jy, 0.18–11 Jy, and 0.35–8.0 Jy in the 22, 43, 86, and 129 GHz bands, respectively. Spectra of the target sources become steeper at higher frequency, with spectral index means of −0.40, −0.62, and −1.00 in the 22–43 GHz, 43–86 GHz and 86–129 GHz bands, respectively, implying that the target sources become optically thin at higher frequencies (e.g., 86–129 GHz).

79 ASTRONOMY AND ASTROPHYSICS↗

The Mississippi CCS Project

The Mississippi CCS Project is a proposed large-scale industrial carbon capture and sequestration (CCS) project which would have demonstrated advanced technologies to capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. Specifically, the Mississippi CCS Project was to accelerate commercialization of large-scale CO 2 storage from industrial sources by leveraging synergy between a proposed petcoke to Substitute Natural Gas (SNG) plant that is selected for a Federal Loan Guarantee and would be the largest integrated anthropogenic CO 2 capture, transport, and monitored sequestration program in the U.S. Gulf Coast Region. The Mississippi CCS Project was to promote the expansion of enhanced oil recovery (EOR) in the Mississippi, Alabama and Louisiana region which would supply greater energy security through increased domestic energy production. The capture, compression, pipeline, injection, and monitoring infrastructure would have continued to sequester CO 2 for many years after the completion of the term of the DOE agreement. The objectives of this project were expected to be fulfilled through two distinct phases. The overall objective of Phase 1 was to develop a fully definitive project basis for a competitive Renewal Application process to proceed into Phase 2 - Design, Construction and Operations. Phase 1 included the studies that establish the engineering design basis for the capture, compression and transportation of CO 2 from the MG SNG Project, and the criteria and specifications for a monitoring, verification and accounting (MVA) plan at the Soso oil field in Mississippi. The overall objective of Phase 2, was to execute design, construction and operations of three capital projects: the CO 2 capture and compression equipment, the Mississippi CO 2 Pipeline to Denbury's Free State Pipeline, and an MVA system at the Soso oil field.

02 PETROLEUM↗

Satellite Data Processing System (SDPS) users manual V1.0

SDPS is a menu driven interactive program designed to facilitate the display and output of image and line-based data sets common to telemetry, modeling and remote sensing. This program can be used to display up to four separate raster images and overlay line-based data such as coastlines, ship tracks and velocity vectors. The program uses multiple windows to communicate information with the user. At any given time, the program may have up to four image display windows as well as auxiliary windows containing information about each image displayed. SDPS is not a commercial program. It does not contain complete type checking or error diagnostics which may allow the program to crash. Known anomalies will be mentioned in the appropriate section as notes or cautions. SDPS was designed to be used on Sun Microsystems Workstations running SunView1 (Sun Visual/Integrated Environment for Workstations). It was primarily designed to be used on workstations equipped with color monitors, but most of the line-based functions and several of the raster-based functions can be used with monochrome monitors. The program currently runs on Sun 3 series workstations running Sun OS 4.0 and should port easily to Sun 4 and Sun 386 series workstations with SunView1. Users should also be familiar with UNIX, Sun workstations and the SunView window system.

Caruso, Michael↗

Lightweight runtime checking of C programs with RTC

The C Programming Language is known for being an efficient language that can be compiled on almost any architecture and operating system. However the absence of dynamic safety checks and a relatively weak type system allows programmer oversights that are hard to spot. In this paper, we present RTC, a runtime monitoring tool that instruments unsafe code and monitors the program execution. RTC is built on top of the ROSE compiler infrastructure. RTC finds memory bugs and arithmetic overflows and underflows, and run-time type violations. Most of the instrumentations are directly added to the source file and only require a minimal runtime system. As a result, the instrumented code remains portable. In tests against known error detection benchmarks, RTC found 98% of all memory related bugs and had zero false positives. Finally, in performance tests conducted with well known algorithms, such as binary search and MD5, we determined that our tool has an average run-time overhead rate of 9.7× and memory overhead rate of 3.5×.

97 MATHEMATICS AND COMPUTING↗

A simplified approach for creep damage and remaining life calculation for materials surveillance in advanced reactors

High temperature reactor materials will experience a combination of mechanical degradation caused by creep and fatigue and environmental degradation caused by neutron irradiation and, in some cases, exposure to corrosive coolants. A materials surveillance program is one option for ensuring the safe, reliable operation of key reactor components under these conditions. Such a program would monitor the degradation in key material properties over time, using this data to predict how changes in the material properties affect components performance. This could then be used to make plant operational decisions and support eventual plant license extensions. Past work de-scribes such a material surveillance program based on passively actuated mechanical test articles that impose creep-fatigue type loading on test materials driven only by changes in temperature, for example those experienced by components under standard operating cycles. This report focuses on two aspects of the proposed material surveillance program: how to design the test articles to mimic the mechanical response of the corresponding component and how to use ex-situ test data to deter-mine the amount of damaged experienced by the test article (and hence the corresponding compo-nent) in service. Specifically, this report derives and validated simplified methods for both tasks, replacing earlier, more complicated approaches based on simulating the test article response and finding the best specimen design or current damage via complex numerical optimization. The sim-plified methods for each task developed here can be implemented in spreadsheet software and are simple enough for practical use in future operating plants. This report derives the methods (one for sizing and two options for damage inference), verifies the simplified approaches versus more so-phisticated methods, and compares the results of applying the simplified methods to previous re-sults using the complex numerical optimization approach. The report also provides a worked sam-pled problem applying the simplified techniques to a realistic high temperature reactor component.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Monitoring Well Abandonment Completion Report for KARS Park1, Mobil Service Station, and Hypergol Maintenance Material North Solid Waste Management Units: 084, 093, and 090

The intended purpose of the Monitoring Well Abandonment project is to support the Kennedy Space Center (KSC) Environmental Remediation Department’s Resource Conservation and Recovery Act Program by abandoning monitoring wells throughout KSC that have been identified and prioritized as locations that no longer serve usefulness to program. The monitoring wells were abandoned in accordance with the Brevard County Health Departments and St. Johns River Water Management Districts rules and guidelines.

Timothy M Jellett↗

Application of Structured Decision Making to Hanford Site Radiological Air Monitoring - 17924

Radiological air monitoring is a component of an Environmental Surveillance (ES) program that has been in operation at the Department of Energy Hanford Site for several decades. The primary objectives of the ES program are protection of human health and the environment (on and off-site) as well as regulatory compliance. The ES program was designed decades ago when the plutonium-production reactors and related facilities at the Hanford Site were operational and air emissions were more widespread and significant than today. We employed a structured decision making (SDM) approach that integrates science with values and preferences to a Hanford Site air monitoring program decision. Specifically, a decision was necessary pertaining to the possible replacement of three air monitoring stations located in the 100 Area of the Hanford Site because the power line that supports these stations was near the end of its lifecycle. Although focused on this specific decision, the SDM model is more broadly applicable to decisions pertaining to adapting the air monitoring network to current Hanford operations. The value focused thinking approach that underlies SDM facilitates transparent and defensible decision making, and aids in communicating monitoring rationale. Some of the fundamental objectives elicited from the decision makers regarding management options for the three air monitoring stations included maximizing the ability to measure releases, minimizing environmental impacts, and maximizing social and economic sustainability. The fundamental objectives were linked to six objectives that could be measured (quantified) to allow a decision-analytic solution to the decision problem. Value functions and preference weights were developed for each of the objectives measures based on information obtained during a project workshop as well as by review and analysis of environmental data. Lastly, a set of five management options was identified that might achieve at least one of the objectives. A Bayes Network was developed as a solution to the decision problem pertaining to the three air stations (the 3 air stations decision). The Bayes Network describes the decision model graphically, and also serves as the computational engine for the decision analysis. The Bayes Network defines the relationship among the five management options and six objectives measures. In addition to the weights and value functions noted above, key inputs to the Bayes Network include a set of probabilities related to the different model states defined by the network. These include the probability of a significant release occurring, the probability that a release would be detected under each of the five management options, and the probability of achieving the other objective measures under each management option. In this manner the Bayesian Network captures the uncertainty in the components of the decision model. Replacing the three air monitoring stations with thermoluminescent dosimeters was identified as the preferred management option. A brief report was developed documenting the SDM model, including the workshop notes and analyses that were used to develop the objectives and model input variable values. This application demonstrates SDM's utility for supporting monitoring program decisions and, critically, providing a transparent and traceable basis for the decision. This relatively simple SDM model also provides a basis for an SDM model for monitoring decisions related to the more complex and holistic goal of achieving ES program objectives. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

RADIO MONITORING OF THE TIDAL DISRUPTION EVENT SWIFT J164449.3+573451. I. JET ENERGETICS AND THE PRISTINE PARSEC-SCALE ENVIRONMENT OF A SUPERMASSIVE BLACK HOLE

We present continued radio observations of the tidal disruption event Swift J164449.3+573451 extending to {delta}t Almost-Equal-To 216 days after discovery. The data were obtained with the EVLA, AMI Large Array, CARMA, the SMA, and the VLBA+Effelsberg as part of a long-term program to monitor the expansion and energy scale of the relativistic outflow, and to trace the parsec-scale environment around a previously dormant supermassive black hole (SMBH). The new observations reveal a significant change in the radio evolution starting at {delta}t Almost-Equal-To 1 month, with a brightening at all frequencies that requires an increase in the energy by about an order of magnitude, and an overall density profile around the SMBH of {rho}{proportional_to}r{sup -3/2} (0.1-1.2 pc) with a significant flattening at r Almost-Equal-To 0.4-0.6 pc. The increase in energy cannot be explained with continuous injection from an L{proportional_to}t{sup -5/3} tail, which is observed in the X-rays. Instead, we conclude that the relativistic jet was launched with a wide range of Lorentz factors, obeying E(> {Gamma}{sub j}){proportional_to}{Gamma}{sup -2.5}{sub j}. The similar ratios of duration to dynamical timescale for Sw 1644+57 and gamma-ray bursts (GRBs) suggest that this result may be applicable to GRB jets as well. The radial density profile may be indicative of Bondi accretion, with the inferred flattening at r {approx} 0.5 pc in good agreement with the Bondi radius for a {approx}few Multiplication-Sign 10{sup 6} M{sub Sun} black hole. The density at {approx}0.5 pc is about a factor of 30 times lower than inferred for the Milky Way Galactic Center, potentially due to a smaller number of mass-shedding massive stars. From our latest observations ({delta}t Almost-Equal-To 216 days) we find that the jet energy is E{sub j,iso} Almost-Equal-To 5 Multiplication-Sign 10{sup 53} erg (E{sub j} Almost-Equal-To 2.4 Multiplication-Sign 10{sup 51} erg for {theta}{sub j} = 0.1), the radius is r Almost-Equal-To 1.2 pc, the Lorentz factor is {Gamma}{sub j} Almost-Equal-To 2.2, the ambient density is n Almost-Equal-To 0.2 cm{sup -3}, and the projected angular size is r{sub proj} Almost-Equal-To 25 {mu}as, below the resolution of the VLBA+Effelsberg. Assuming no future changes in the observed evolution and a final integrated total energy of E{sub j} Almost-Equal-To 10{sup 52} erg, we predict that the radio emission from Sw 1644+57 should be detectable with the EVLA for several decades and will be resolvable with very long baseline interferometry in a few years.

79 ASTRONOMY AND ASTROPHYSICS↗

Radio Frequency Field Programable Gate Array Implementation of Reflectometry Cable Monitoring

This document describes the development of a field programable gate array (FPGA) radio frequency system on a chip (RF SoC) adaptation and evaluation of the single-board device to perform both Frequency Domain Reflectometry (FDR) and Spread Spectrum Time Domain Reflectometry (SSTDR) for offline and online cable testing. The work builds on and leverages the work of Pacific Northwest National Laboratory (PNNL) in airport millimeter wave technology by using the same development hardware employed in that program. The work is performed under sponsorship from the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program and the task objective is to confirm and demonstrate feasibility to adapt FPGA technology for a cost-effective multiplexed single-board electronic module to perform cable tests that are equivalent to commercial and laboratory test instruments for FDR and SSTDR cable tests. The developed 2-channel (extendable to 7 channels) system was compared to dedicated and proven test instruments and shown to produce equivalent results on a range of cables and with a range of damage types. The FPGA reflectometry test board is one of several technologies that could facilitate implementation of online monitoring of safety critical cable systems.

42 ENGINEERING↗

Critical monitoring of the Cassini Saturn Orbit Insertion maneuver

The Cassini-Huygens spacecraft will have spent seven years since launch by the time it reaches Saturn and its satellites. The primary mission will begin after the Saturn Orbit Insertion (SOI) scheduled for early July 2004. the insertion will require a critical navigational maneuver that involves firing the orbiter's thrusters leading to the capture in the gravity well of the planet. This paper will describe the challenges and plans by the Cassini Program to monitor the Saturn Orbit Insertion Maneuver.

Cassini↗

Advanced gamma ray balloon experiment ground checkout and data analysis

A software programming package to be used in the ground checkout and handling of data from the advanced gamma ray balloon experiment is described. The Operator's Manual permits someone unfamiliar with the inner workings of the software system (called LEO) to operate on the experimental data as it comes from the Pulse Code Modulation interface, converting it to a form for later analysis, and monitoring the program of an experiment. A Programmer's Manual is included.

Blackstone, M.↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

2023 Annual Long-Term Monitoring Report Vehicle Assembly Building Area

This report presents a summary of the groundwater monitoring activities that occurred in February 2024 at two sites in the Vehicle Assembly Building (VAB) Area Long-Term Monitoring (LTM) program at the John F. Kennedy Space Center, Florida. The two sites are Fire Station 3 (formerly Fire Station 6) (FS3) – Solid Waste Management Unit (SWMU) 106 and Launch Complex 39 Observation Gantry Area (LC39OGA) – SWMU 107.

VAB Long-Term Groundwater Monitoring↗

Urban land use monitoring from computer-implemented processing of airborne multispectral data

Machine processing techniques were applied to multispectral data obtained from airborne scanners at an elevation of 600 meters over central Indianapolis in August, 1972. Computer analysis of these spectral data indicate that roads (two types), roof tops (three types), dense grass (two types), sparse grass (two types), trees, bare soil, and water (two types) can be accurately identified. Using computers, it is possible to determine land uses from analysis of type, size, shape, and spatial associations of earth surface images identified from multispectral data. Land use data developed through machine processing techniques can be programmed to monitor land use changes, simulate land use conditions, and provide impact statistics that are required to analyze stresses placed on spatial systems.

Todd, W. J.↗