At least 973 records · Page 54

Decommissioning of the NPP A-1 heavy water management system - 15121

The paper deals with experience and techniques in the application of decontamination technology and remotely controlled robotic devices for the decontamination and dismantling of the heavy water management system during undergoing decommissioning process of the A-1 NPP as well as treatment of arising liquid waste All of these activities are characterized by high level of radioactivity and contamination. During operation of the A-1 NPP the heavy water management system fulfilled several functions: (1) cooling of the moderator, (2) topping up of the moderator in the active zone, (3) drainage, feed and storage of heavy water, (4) capture of leaked heavy water. Closely associated with heavy water management were systems for separation and isotopic purification of heavy water (distilling station, removing organic impurities station, isotopic purification station). The NPP heavy water system is located inside the power block building in several rooms where the inner surface contamination is up to the level of 10 E4 Bq.cm{sup -2}, dose rate up to 15,0 mGy.h{sup -1} and the feeding pipeline contained liquid RAW with high tritium content. Pre-dismantling decontamination of the heavy water management system and associated systems had to be performed with the intention of improving the radiation situation, i.e. reducing contamination of internal surface and dose rates in the vicinity of the equipment. Various sophisticated procedures such as retrieval of sludge using remotely operated devices and loop chemical decontamination of internal surfaces were applied. The generated radioactive waste such as spent decontamination solutions and sludge were immediately solidified on-site into a geo-polymer matrix using a mobile conditioning facility. For dismantling and fragmentation of some devices, mobile robotic systems MT80 and MT15 were applied which had been developed, designed and constructed as general-purpose decommissioning equipment. Special tooling was developed for application with the robots, such as hydraulic shears, circular saw, reciprocating saw, circular pipe cutter and a system for quick tool-change without direct intervention of the operators. Most of the operations are remotely controlled on basis of visual information from four cameras, with consistent radiation protection of the operators. The implementation of partial decommissioning tasks in such hard and unfavorable radiation conditions (moreover accompanied by generation of specific high-content alpha radwaste) has introduced in practice several new unique decontamination and dismantling techniques and new procedures for the effective on-site processing of generated secondary radioactive waste, including sludge and sorbents. These advantageous techniques, equipment and experience will be exploited in the continuation of the A-1 NPP decommissioning process which has been organized according to distinctively licensed phases and are also being applied in the decommissioning of other NPP in Slovakia as well as abroad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Partial Defect Verification of the Pressurized Water Reactor Spent Fuel Assemblies

The International Atomic Energy Agency (IAEA) has the responsibility to carry out independent inspections of all nuclear material and facilities subject to safeguards agreements in order to verify compliance with non-proliferation commitments. New technologies have been continuously explored by the IAEA and Member States to improve the verification measures to account for declared inventory of nuclear material and detect clandestine diversion and production of nuclear materials. Even with these efforts, a technical safeguards challenge has remained for decades for the case of developing a method in identifying possible diversion of nuclear fuel pins from the Light Water Reactor (LWR) spent fuel assemblies. We had embarked on this challenging task and successfully developed a novel methodology in detecting partial removal of fuel from pressurized water reactor spent fuel assemblies. The methodology uses multiple tiny neutron and gamma detectors in the form of a cluster and a high precision driving system to obtain underwater radiation measurements inside a Pressurized Water Reactor (PWR) spent fuel assembly without any movement of the fuel. The data obtained in such a manner can provide spatial distribution of neutron and gamma flux within a spent fuel assembly. The combined information of gamma and neutron signature is used to produce base signatures and they are principally dependent on the geometry of the detector locations, and exhibit little sensitivity to initial enrichment, burn-up or cooling time. A small variation in the fuel bundle such as a few missing pins changes the shape of the signature to enable detection. This resulted in a breakthrough method which can be used to detect pin diversion without relying on the nuclear power plant operator's declared operation data. Presented are the results of various Monte Carlo simulation studies and experiments from actual commercial PWR spent fuel assemblies.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Launch Complex 39B, SWMU 009, 2023 Performance Monitoring and Air Sparge Expansion Construction Completion Report, Kennedy Space Center, Florida

The 2023 Performance Monitoring and Construction Completion Report (PM-CCR) presents the findings, observations, and results for Air Sparging (AS) operations and expansion activities, as well as sitewide groundwater monitoring for Launch Complex 39B (LC39B), Solid Waste Management Unit (SWMU) 009, at Kennedy Space Center (KSC), Florida. The reporting period for activities covered under this PM-CCR is from January 1, 2023, to December 31, 2023. At LC39B, AS operations began in 2017 in the area west of the launch pad, in the liquid oxygen (LOX) tank area located northwest of the launch pad, and in an area outside of the perimeter fence to protect nearby Outstanding Florida Waters (OFW). The LC39B AS system was installed with 279 AS wells to depths ranging from 23 to 60 feet below land surface (bls), including the sump, correlating to top of screen depths ranging from 20 to 57 feet bls. In December 2022, a total of 22 AS wells were abandoned to support launch pad crane operations, and in November 2023, the system was expanded with five additional AS wells installed to 13 or 17 feet bls near the LOX tank. The remedial objective of the LC39B AS Interim Measure (IM) is to actively decrease concentrations of contaminants of concern (COCs) in groundwater, specifically trichloroethene (TCE), cis-1,2-Dichloroethene (cDCE), and vinyl chloride (VC), to less than their respective Natural Attenuation Default Concentrations (NADCs), so LC39B can transition into a Long-Term Monitoring (LTM) program. This PM-CCR presents the following information for LC39B: • AS system operations and maintenance (O&M) (Year 7 of operation) from January 2023 to December 2023, to include AS trailer relocation in March 2023 and subsequent replacement and re-start in June 2023. • Construction completion details for AS system expansion, which included installation of five new AS wells and one new monitoring well in November 2023. As part of expansion activities, soil samples were also collected for petroleum analysis; no exceedances were identified, and no further investigation for petroleum is warranted. • Performance monitoring results for groundwater sampling events conducted in May/June 2023 (30 wells) and November 2023 (31 wells) in the AS IM area and in the Low Concentration Plume (LCP) areas located north and east of the launch pad for volatile organic compound (VOC) analysis. • Sampling results for one monitoring well, LOX-IW0012S, which is sampled for aluminum on an annual basis (May/June 2023). This well was resampled in November 2023 for both total and dissolved aluminum. Due to a communication error with the laboratory, the May/June 2023 sample was analyzed for total aluminum only. • Groundwater sampling results for per- and polyfluoroalkyl substances (PFAS) collected from seven monitoring wells during the May/June 2023 event to further investigate the Former Sewage Treatment Plant #6 and Percolation Pond area, west of the launch pad. O&M and performance monitoring results show that the AS system at LC39B is operating as designed and meeting performance criteria. Overall runtime was 45 percent (%) during the reporting period (January to December), but the operational runtime was 78% during the timeframe when the system could run (June to December). The most significant downtime contributor was post-launch crane operations following the Artemis launch on November 16, 2022, which lasted until June 2023. During that timeframe, the AS trailer at LC39B was relocated to another KSC remediation site (Wilson Corners) and was subsequently replaced with the AS trailer from the Paint & Oil Locker (POL) remediation site at KSC to resume AS system operations. Performance monitoring results in the AS IM and LCP areas continue to show reduction in COC concentrations over time when compared to baseline levels. In 2023, only one monitoring well (MW0048) detected a COC exceeding its NADC (VC at 740 micrograms per liter [µg/L]), which marks the baseline result for this new well installed during system expansion. Across the rest of the site, VC concentrations have declined or remained stable during the 2023 sampling events. Excluding MW0048, the highest VC result in 2023 was during the May/June sampling event with a concentration of 63 µg/L at MW0032, which is located near MW0048 and the AS expansion area by the LOX tank. TCE was detected in select monitoring wells in the IM area in 2023, but only two locations exceeded the State of Florida Groundwater Cleanup Target Level (GCTL): MW0032 (21 µg/L in May/June 2023 and 9.1 µg/L in November 2023) and MW0036 (5.0 µg/L in November 2023). MW0036 is also located near the LOX tank, on the north side, where the AS system is still operational (Zone Z4). cDCE and trans-1,2-dichloroethene concentrations were less than laboratory method detection limits or their respective GCTLs in all wells sampled in 2023. Near the OFW located northwest of the launch complex, all COC concentrations were less than laboratory method detection limits from monitoring wells (MW0039, MW0040, and LOXTA0002S) sampled in 2023. Aluminum results from LOX-IW0012S, which has been sampled routinely since 2006, detected a total aluminum concentration of 3,900 µg/L during the May/June 2023 sampling event. Results from the November 2023 event detected 5,700 µg/L for total aluminum and 5,500 µg/L for dissolved aluminum. These concentrations slightly decreased from the previous year but remain relatively consistent with historical detections. Aluminum will continue to be sampled on an annual basis at this well as results still exceed the GCTL of 200 µg/L and the Upper Limit of the KSC Background Concentration of 280 µg/L. PFAS results detected nine different PFAS compounds (out of 32 analyzed) from seven wells sampled. Two PFAS compounds, perfluorooctanesulfonic acid (PFOS) and perfluorooctanoic acid (PFOA), currently have FDEP Provisional GCTLs of 70 nanograms per liter (ng/L). All seven samples collected resulted in concentrations less than the FDEP Provisional GCTLs for both PFAS compounds; no exceedances were observed. PFOS and PFOA also have assigned United States Environmental Protection Agency (USEPA) Maximum Contaminant Levels (MCLs) of 4 nanograms per liter (ng/L). None of the PFOS results exceeded the USEPA MCLs. PFOA was detected in two samples above the USEPA MCL at concentrations of 5.8 ng/L (ECS-IW0009I) and 5.5 ng/L (ECS-IW0009S). Three other PFAS compounds, perfluorohexanesulfonic acid (PFHxS), perfluoro-n-nonanoic acid (PFNA), and hexafluoropropylene oxide dimer acid (GenX), currently have USEPA MCLs of 10 ng/L. PFHxS, PFNA, and GenX were not detected at concentrations greater than their respective USEPA MCLs in any of the seven wells. PFAS compounds without FDEP Provisional GCTLs or USEPA MCLs were screened against USEPA RSLs. No other detections exceeded their respective USEPA RSLs. Additional PFAS sampling will be conducted as part of a future PFAS Site Assessment. Based on O&M activities and performance monitoring, the following is recommended for LC39B: • Continue with Year 8 AS system operation within Zone Z4, which includes the AS expansion area. Zone Z3, which has been off since 2018, should remain off as no rebound has been observed. Zones Z1 and Z2, which were turned off at the end of 2022, will remain shut down as monitoring well results have consistently been below GCTLs or have low-level detections with stable or decreasing trends (Meeting Minute 2402-M10, Decision 2402-D30). • Continue with performance monitoring in 2024 with the same monitoring well network as 2023, except with the addition of MW0048 in both semi-annual events. Baseline concentrations for this well were collected during the November 2023 performance monitoring event. Semi-annual sampling should be planned for the May 2024 and November 2024 timeframes (Meeting Minute 2402-M10, Decision 2402-D31). • Continue sampling monitoring well, LOX-IW0012S, for aluminum (total and dissolved) on an annual basis in May 2024. It is also recommended to re-develop this well prior to the next sampling event (Meeting Minute 2402-M10, Decision 2402-D32). The above recommendations for LC39B were presented at the February 2024 KSCRT Meeting, with Team consensus reached on the path forward. The contents of this PM-CCR were also presented at this meeting.

Deborah M Wilson↗

Development of Property Composition Models For RPP-WTP LAW Glasses (Final Report)

This report describes the development of property-composition models for low-activity waste (LAW) glasses for the River Protection Project Waste Treatment Plant (RPP-WTP) at the Hanford site. The RPP-WTP will separate Hanford tank wastes into LAW and high-level waste (HLW) streams and each stream will be vitrified separately. The development of LAW and HLW glass formulations for the RPP-WTP has been reported previously and is an ongoing activity. Acceptable formulations must meet a variety of processability, product quality, and waste loading requirements that are dictated either by the RPP-WTP contract or by the characteristics of the particular treatment processes that have been selected. These requirements amount to constraints on the acceptable ranges of certain glass properties. These properties are determined first and foremost by the composition of the glass or glass melt. Thus, while there is no direct way of controlling the glass properties of interest during production, there are simple and extremely effective methods of achieving the same result by instead controlling the glass composition. This basic principle is no different from that used to produce enormous volumes of commercial glass to meet exacting product specifications. An essential difference in waste vitrification, however, is that one of the raw materials (the waste itself) can be subject to considerable compositional uncertainty and variability. Thus, waste vitrification facilities and associated process control systems (of which, the operating envelope in glass formulation space is a key part) must, of course, be designed to be robust with respect to such variations. The determination of quantitative relationships between the glass properties that must be controlled and the glass composition can play an important role in the development of such facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Future of EPA's Waste Estimation Support Tool - 17227

The Environmental Protection Agency's (EPA's) Waste Estimation Support Tool (WEST) is a GIS-based decision support tool for estimating the characteristics, amount, and residual radioactivity of waste generated from remediation and cleanup activities after a radiological incident, including those involving radiological dispersal devices, improvised nuclear devices, and nuclear power plants. WEST has been released to the public and has been used in numerous national level exercises and planning scenarios; however, it continues to be improved and refined to add additional functionality and performance. Since its inception, WEST has undergone a myriad of updates, routinely ensuring compatibility with ESRI's ArcGIS and FEMA's Hazus, a tool for estimating potential losses from earthquakes, wind, and flood events. Furthermore, recent enhancements have added reporting and mapping features and multi-state support. Over time, this progress has strained WEST's Microsoft{sup C} Excel based platform. The inherent limitations of Excel have limited the capacity of WEST and narrowed the scope of potential enhancements. Recent collaborative efforts between the Department of Homeland Security's (DHS's) Science and Technology Directorate (S and T) and EPA will see the introduction of a new software platform for easing memory limitations and new and innovative features for improving the accuracy of waste estimates. The planned enhancements include: 1) Systems approach: measure or predict the outcome of decisions associated with disaster response (e.g., decontamination efficacy vs. waste) and to a greater extent, the overall resource demand (e.g., cost, time, etc.); 2) Custom infrastructure data and international support: accommodate non-US building information where available and also add new data and information on recently used decontamination technologies as applied in a real-world incident; 3) Additional waste factors: addition of waste factors that are unique to wide area scenarios such as vehicles and trees as they will likely contribute in a significant manner to the overall waste stream;4) Site analysis and logistics: apply spatial information and analysis technologies to locate and prioritize potential waste staging or storage sites; and use GIS-based logistics planning to better organize, route, and estimate the cost, time, and logistical requirements (i.e., resource demand) associated with transporting large volumes of waste from a disaster-stricken area to waste staging or storage sites; 5) Decontamination technologies: introduce new decontamination technologies, better understand the feasibility and efficacy of new and preexisting decontamination technologies when applied to a wide area incident, and use historical incidents to ground truth waste results; and 6) Resource demand: ability to estimate resource demand information associated with decontamination technologies, waste staging and storage, and logistical information for transporting waste. This paper will describe the next version of WEST (WEST 4.0), and how the aforementioned enhancements will contribute to improving the planning and response capabilities of the tool. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Does No–Tillage Mitigate Stover Removal in Irrigated Continuous Corn? A Multi–Location Assessment

No-tillage (NT) may ameliorate negative effects on soil properties from corn (Zea mays L.) stover harvest, but few long-term irrigated continuous corn production systems have been evaluated to test this hypothesis. We evaluated three long-term no-tillage sites (4–13 yr) in Nebraska and Colorado that spanned a range of precipitation and soil organic carbon (SOC) levels. We measured SOC, δ 13 C of SOC, soil microbial biomass (SMB) and composition (i.e., phospholipid fatty acids, PLFAs), and water stable aggregation at all sites under stover retention vs. removal (~60%). Surface SOC stocks (0–30- cm depth) increased across the gradient and were 46.4, 57.4, and 63.1 Mg C ha –1 for Colorado, central Nebraska, and eastern Nebraska, respectively. Overall, residue removal decreased SOC stocks by 6% and soil aggregation by 12% in the 0- to 30-cm depth. The δ 13 C signature of SOC indicated less new surface C storage under residue removal in Colorado, but not at the two Nebraska sites. Residue harvest did not decrease SMB or change soil microbial community structure, suggesting that high plant productivity buffered community composition from stover harvest impacts under NT but stimulated microbial activity levels that led to SOC loss. Here, the high rates of stover removal used in this study decreased SOC stocks and aggregation at all sites compared to residue retained treatments, suggesting that no-tillage alone was not sufficient to maintain erosion protection and soil function.

54 ENVIRONMENTAL SCIENCES↗

The effects of stainless steel radial reflector on core reactivity for small modular reactor

Commercial PWR core is surrounded by a radial reflector, which consists of a baffle and water. Radial reflector is designed to reflect neutron back into the core region to improve the neutron efficiency of the reactor and to protect the reactor vessels from the embrittling effects caused by irradiation during power operation. Reflector also helps to flatten the neutron flux and power distributions in the reactor core. The conceptual nuclear design for boron-free small modular reactor (SMR) under development in Korea requires to have the cycle length of 4∼5 years, rated power of 180 MWth and enrichment less than 5 w/o. The aim of this paper is to analyze the effects of stainless steel radial reflector on the performance of the SMR using UO{sub 2} fuels. Three types of reflectors such as water, water/stainless steel 304 mixture and stainless steel 304 are selected to investigate the effect on core reactivity. Additionally, the thickness of stainless steel and double layer reflector type are also investigated. CASMO-4/SIMULATE-3 code system is used for this analysis. The results of analysis show that single layer stainless steel reflector is the most efficient reflector.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Independent Technical Review of the X-740 Groundwater Remedy, Portsmouth, Ohio: Technical Evaluation and Recommendations

Two major remedial campaigns have been applied to a plume of trichloroethene (TCE) contaminated groundwater near the former X-740 facility at the Portsmouth Gaseous Diffusion Plant in Piketon Ohio. The two selected technologies, phytoremediation using a stand of hybrid poplar trees from 1999-2007 and in situ chemical oxidation using modified Fenton's Reagent from 2008-2009, have proven ineffective in achieving remedial action objectives (RAOs). The 'poor' performance of these technologies is a direct result of site specific conditions and the local contaminant hydrogeology. Key among these challenges is the highly heterogeneous subsurface geology with a thin contaminated aquifer zone (the Gallia) - the behavior of the contamination in the Gallia is currently dominated by slow release of TCE from the clay of the overlying Minford formation, from the sandstone of the underlying Berea formation, and from clayey layers within the Gallia itself. In response to the remediation challenges for the X-740 plume, the Portsmouth team (including the US Department of Energy (DOE), the site contractor (CDM), and the Ohio Environmental Protection Agency (OEPA)) is evaluating the feasibility of remediation at this site and identifying specific alternatives that are well matched to site conditions and that would maximize the potential for achieving RAOs. To support this evaluation, the DOE Office of Groundwater and Soil Remediation (EM-32) assembled a team of experts to serve as a resource and provide input and recommendations to Portsmouth. Despite the challenging site conditions and the failure of the previous two remediation campaigns to adequately move the site toward RAOs, the review team was unanimous in the conclusion that an effective combination of cost effective technologies can be identified. Further, the team expressed optimism that RAOs can be achieved if realistic timeframes are accepted by all parties. The initial efforts of the review team focused on reviewing the site history and data and organizing the information into a conceptual model and findings to assist in evaluating the potential of alternative remediation technologies. Examples of the key conceptual findings of the EM-32 review team were: (1) The Gallia represents the most practical target for deployment of in situ remediation treatment reagents - injection/extraction focused in this zone would provide maximum lateral impacts with minimal potential risk of failure or adverse collateral impacts. (2) The slow release of TCE from clay and sandstone into the Gallia represent a long term source of TCE that can re-contaminate the Gallia in the future - technologies that effectively treat the permeable portions of the Gallia, but do not leave residual treatment capacity in the system are unlikely to achieve long term remedial action objectives. CDM, the site contractor, provided important and useful information documenting the status and preliminary results of the on-site technology alternative evaluation. In the CDM evaluation, potential technologies were either retained (or screened out) in two preliminary evaluation phases and a detailed evaluation was performed on the five alternatives that were retained into the final 'detailed analysis' phase. The five alternatives that were included in the detailed analysis were: (1) hydraulic fracturing with EHC (a solid bioremediation amendment), (2) enhanced anaerobic bioremediation, (3) in situ chemical oxidation, (4) electrical resistance heating, and (5) reactive barriers. In several cases, two or three variants were separately evaluated. The review team found the CDM effort to be generally credible and reasonable. Thus, the review team focused on providing additional considerations and inputs to Portsmouth and on amending and refining the alternatives in ways that might improve performance and/or reduce costs. The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-32) to provide an independent technical panel to review previous and ongoing remedial activities designed to address TCE contamination in groundwater at X-740. In 1999, a corrective action was implemented at X-740 to address contamination in the groundwater. The DOE planted poplar trees over 2.6 acres of the groundwater plume. After several years of groundwater monitoring, the results indicated that the benefits of phytoremediation were limited and insufficient to meet remedial objectives. In 2007, an alternative remedial strategy based on in situ oxidative treatment was negotiated with Ohio EPA. During FY2008, three treatment phases of chemical oxidation were completed. The general charter for the independent technical review team is to review the results of s previous and ongoing remedial actions to determine whether the current strategy will be effective in meeting the end points specified in the regulatory work plan.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Uncertainties in Local Intense Precipitation Flood Modeling

In the Task 1 report for the U.S. Nuclear Regulatory Commission (NRC) funded Local Intense Precipitation (LIP) Probabilistic Flood Hazard Assessment (PFHA) Pilot Study, the Pacific Northwest National Laboratory (PNNL) reviewed hydrologic and hydraulic modeling approaches for estimation of LIP flooding and their implementation in readily available simulation software packages (Prasad and Yuan 2020). NRC’s interest is in developing guidance for performing LIP PFHA at nuclear power plant (NPP) sites. This report describes the work done under Task 2 of the study that focused on describing uncertainties associated with LIP flood modeling. Two main types of uncertainties exist in LIP flood modeling: (1) aleatory uncertainties that arise from the inherent natural variability of the hydrometeorological system and (2) epistemic uncertainties that arise from the analysts’ incomplete knowledge of the hydrometeorological and site configuration. Principal sources for aleatory variability in LIP flood simulations at NPP sites include precipitation (i.e., magnitude, duration, and temporal distribution of LIP events), initial conditions (e.g., soil moisture content, stormwater drainage discharge, surface storage), boundary conditions (e.g., upstream discharge, downstream water surface elevations), and long-term temporal trends (e.g., climate change). This report describes approaches used for estimating the aleatory variability in precipitation including precipitation-frequency analysis, numerical weather prediction, and stochastic weather generation. Data sources that can be used to estimate aleatory variability in initial and boundary conditions are also described. Approaches to include effects of long-term trends like those from climate change into estimation of aleatory variability are summarized. Sources of epistemic uncertainty in LIP flood simulations at NPP sites include process representation (e.g., multiple approaches to represent runoff generation, stormwater drainage, and hydraulic routing), site configurations (e.g., site layout, flow features, status of temporary flood protection, blockage of drains), model resolution, and long-term temporal trends (e.g., known/planned site alterations, land-use changes at and in the vicinity of the site). The report describes alternative process representations (methods and models), particularly those implemented in the LIP flood simulation software packages reviewed in Task 1 report, and lists the associated model parameters. Approaches for estimating model parameters when surface and subsurface water exchanges occur are also described.

42 ENGINEERING↗

Direct Feed Low Activity Waste Program Integration - 16638

The mission of Program Integration is to champion and steer the development and implementation of common and consistent programs between the Tank Operating Contract (TOC) contractor and the Waste Treatment Plant (WTP) contractor. TOC is managed by Washington River Protection Solutions LLC (WRPS) and WTP is managed by Bechtel National, Inc. (BNI). The DOE Office of River Protection (DOE ORP) is the Program Owner. WRPS has been actively managing the TOC at the Hanford Site Tank Farms (TF) since 2008. Programs are already developed, verified, and in use for the TOC, whereas WTP is still in the construction phase. WTP Programs are established for construction only, but not developed for commissioning and future operations. An extensive effort is underway at WTP to develop commissioning programs. In order to drive consistency and minimize differences in program requirements between TF, which will feed the tank waste, and WTP, which will receive and treat the tank waste, DOE-ORP requires the two contractors to integrate and collaborate in program development. Advantages of integration are: - Achieves cost and time savings as WTP is able to review existing TOC programs as starting points in development of its programs. - Promotes interfaces with industry counterparts to share experiences, issues, and lessons learned. ? Minimizes difference in program requirements between the companies. - Helps prepare for and ultimately succeed in Operational Readiness Reviews (ORR). Program Integration is a priority for TOC and WTP, and in order to maintain the focus and drive to this effort, a unified One System Program Integration Council (OSPIC) was created in 2012. Membership of the OSPIC consists of senior managers from both companies and the OSPIC chair's report directly to their respective President. Thirty (30) programs are subject to integration, including but not limited to Conduct of Operations, Worker Safety and Health, Quality Assurance, Contractor Assurance, and Environmental Management. Progress of program development and integration efforts are tracked and monitored, and barriers to integration are resolved in a collaborative fashion within both companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Carbon Management Projects (CONNECT) Database and Explorer

Overview The Carbon Management Projects (CONNECT) Toolkit is an online exploratory visualization tool developed by the U.S. Department of Energy's (DOE) Office of Fossil Energy and Carbon Management (FECM) with support from other federal agencies such as the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Transportation (DOT). It provides a single point of access to authoritative information on federal agency investment in a portfolio of research, development, and demonstration (RD&D) projects that have been publicly announced to advance technologies for point source carbon capture, carbon dioxide removal, transport, storage, and conversion, collectively referred to as carbon management. The RD&D programs covered in this tool are authorized by annual congressional appropriations ("Base Program") and the 2021 Infrastructure Investment and Jobs Act (IIJA). The tool also incorporates public information on other federal initiatives, such as the Regional Clean Hydrogen Hubs, and public information released by other government agencies, such as the Environmental Protection Agency's (EPA) and Primacy States’ Underground Injection Control Class VI permits and EPA’s facility level greenhouse gas (GHG) emissions. Developed in a geographic information system, the tool organizes carbon management projects into five groups based on the primary technology that a project aims to advance, each visually represented as a digital layer ("carbon management project layer"). Only federally funded projects are included, which can be awarded projects that are completed or ongoing, or projects that have been selected but are currently under negotiation. Project information can be viewed in the map or in the attribute table below it when turned on. In the map view, each project is displayed at either its host site (for field work), where available, or its performer site (project lead's location, further explained in the table below). Host sites and performer sites are represented in distinct icons. Several reference layers offer additional public information on infrastructural and natural resource environment for carbon management. These reference layers, combined with multiple geographical basemaps, enable users to visualize the carbon management project layers in context. Carbon management project information will be updated monthly based on feedback and information availability. Carbon management project layers Point Source Carbon Capture (PSC) This layer contains DOE-funded projects focused on capturing carbon dioxide (CO2) from power plants or industrial facilities. Carbon Dioxide Removal (CDR) This layer contains DOE-funded projects focused on capturing CO2 from the atmosphere, including direct air capture (DAC) and DAC hubs, direct ocean capture, enhanced mineralization, and biomass carbon removal and storage. For projects with multiple host sites, each of the sites are displayed individually with the project cost and cost sharing information representing the total for the entire project. Carbon Transport This layer contains DOE- and DOT-funded projects focused on CO2 transport. The Transport Research and Development sublayer contains projects that do not involve physical infrastructure; the Proposed Transport Corridor sublayer contains projects for which either a route for the transport infrastructure has been proposed or a general area for the transport infrastructure has been identified. Carbon Storage This layer contains DOE-funded key projects focused on CO2 storage. For projects with multiple field-work sites, each of the sites are displayed individually on the map with the project cost and cost sharing information representing the overall total for the entire project. Carbon Conversion This layer contains DOE-funded projects focused on converting CO2 into economically valuable products. Reference layers The following layers provide additional information in the geographic proximity of carbon management projects. Users should reference the original sources for more details (weblinks provided below and in pop-up windows on the map). Regional Clean Hydrogen Hub and Facility These layers illustrate the approximate areas of the Regional Clean Hydrogen Hubs announced by DOE's Office of Clean Energy Demonstrations (OCED) and the approximate locations of individual facilities that constitute the hubs (see "Where are the H2Hubs located?" on the webpage linked above). EPA Facility Level GHG Emissions (direct emitter) This layer shows direct CO2 emissions from stationary sources in 2022, using data extracted from EPA's Facility Level Information on GreenHouse gases Tool (FLIGHT). Captured and injected CO2 are not deducted from direct emitters’ total emissions. Contact EPA for additional details. Underground Injection Control Class VI permit/permit application This layer shows the locations of CO2 injection wells that are granted or in the process of applying for an Underground Injection Control Class VI permit by EPA or a Primacy State (currently Louisiana, North Dakota, and Wyoming). The URLs for the permits or permit applications are provided in the pop-up windows associated with the well locations. Contact EPA for additional details. Carbon Storage Resource This layer contains information on prospective CO2 storage resources in saline formations and oil and gas reservoirs provided by the National Carbon Sequestration Database and Geographic Information System (NATCARB) spatial database. Contact NETL for additional details. Existing CO2 pipeline This layer shows active CO2 pipelines based on information digitized from the map issued by the Pipeline and Hazardous Materials Safety Administration (PHMSA). Contact PHMSA for additional details.

Carbon Conversion↗

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Results of Inspections of Operation of the ORNL Mock Feed/Withdrawal System

Remote monitoring of process activities is one tool under consideration by the International Atomic Energy Agency (IAEA) to handle increasing demands for conducting verification inspections at safeguarded facilities. The ability for the IAEA to continuously monitor feed and withdrawal (F&W) station operations (e.g., load cells and other process attributes) would provide independent verification of normal plant operations, supply data that would make safeguards more effective and efficient, and enable information-driven inspections. Researchers at Oak Ridge National Laboratory (ORNL) have assembled a mock UF6 F&W system using water in lieu of UF6 to test the feasibility of advanced process monitoring systems and concepts (such as remote monitoring) for safeguards. One use of the F&W mockup involves exploring how a safeguards inspector would interact with the data and use it to perform onsite inspections more effectively, so the researchers divided staff into two groups: operators and inspectors. This paper will discuss this process and the promising results of the inspections that have been performed at the mock facility to verify operator declarations and detect material diversion. This paper also will present the intuitive and user-friendly graphic interface researchers used to analyze the information. Although the data gathered previously came from a computer local to the F&W system, future work will include remote transmission and analysis of the data.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

The role of science supporting the Waste Isolation Pilot Plant.

The presentation briefly addresses three topics. First, science has played an important role throughout the history of the WIPP project, beginning with site selection in the middle 1970s. Science was a key part of site characterization in the 1980s, providing basic information on geology, hydrology, geochemisty, and the mechanical behavior of the salt, among other topics. Science programs also made significant contributions to facility design, specifically in the area of shaft seal design and testing. By the middle 1990s, emphasis shifted from site characterization to regulatory evaluations, and the science program provided one of the essential bases for certification by the Environmental Protection Agency in 1998. Current science activities support ongoing disposal operations and regulatory recertification evaluations mandated by the EPA. Second, the EPA regulatory standards for long-term performance frame the scientific evaluations that provide the basis for certification. Unlike long-term dose standards applied to Yucca Mountain and proposed repositories in other nations, the WIPP regulations focused on cumulative releases during a fixed time interval of 10,000 years, and placed a high emphasis on the consequences of future inadvertent drilling intrusions into the repository. Close attention to the details of the regulatory requirements facilitated EPA's review of the DOE's 1996 Compliance Certification Application. Third, the scientific understanding developed for WIPP provided the basis for modeling studies that evaluated the long-term performance of the repository in the context of regulatory requirements. These performance assessment analyses formed a critical part of the demonstration that the site met the specific regulatory requirements as well as providing insight into the overall understanding of the long-term performance of the system. The presentation concludes with observations on the role of science in the process of developing a disposal system, including the importance of establishing the regulatory framework, building confidence in the long-term safety of the system, and the critical role of the regulator in decision making.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verifiable process monitoring through enhanced data authentication.

To ensure the peaceful intent for production and processing of nuclear fuel, verifiable process monitoring of the fuel production cycle is required. As part of a U.S. Department of Energy (DOE)-EURATOM collaboration in the field of international nuclear safeguards, the DOE Sandia National Laboratories (SNL), the European Commission Joint Research Centre (JRC) and Directorate General-Energy (DG-ENER) developed and demonstrated a new concept in process monitoring, enabling the use of operator process information by branching a second, authenticated data stream to the Safeguards inspectorate. This information would be complementary to independent safeguards data, improving the understanding of the plant's operation. The concept is called the Enhanced Data Authentication System (EDAS). EDAS transparently captures, authenticates, and encrypts communication data that is transmitted between operator control computers and connected analytical equipment utilized in nuclear processes controls. The intent is to capture information as close to the sensor point as possible to assure the highest possible confidence in the branched data. Data must be collected transparently by the EDAS: Operator processes should not be altered or disrupted by the insertion of the EDAS as a monitoring system for safeguards. EDAS employs public key authentication providing 'jointly verifiable' data and private key encryption for confidentiality. Timestamps and data source are also added to the collected data for analysis. The core of the system hardware is in a security enclosure with both active and passive tamper indication. Further, the system has the ability to monitor seals or other security devices in close proximity. This paper will discuss the EDAS concept, recent technical developments, intended application philosophy and the planned future progression of this system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Orange County Government Solar Demonstration and Research Facility

Orange County Florida completed the construction of a 20 kilowatt Solar Demonstration and Research Facility in March 2015. The system was constructed at the Orange County/University of Florida Cooperative Extension Center whose electric service address is 6021 South Conway Road, Orlando, Florida 32802. The Solar Demonstration and Research Facility is comprised of 72 polycrystalline photovoltaic modules and 3 inverters which convert direct current from the solar panels to alternating current electricity. Each module produces 270 watts of direct current power, for a total canopy production of just under 20,000 watts. The solar modules were installed with a fixed tilt of 5 degrees and face south, toward the equator to maximize the amount of sunlight captures. Each year, the electricity generated by the solar array will help eliminate 20 metric tons of carbon dioxide emissions as well as provide covered parking for staff and visitors vehicles. The solar array is expected to generate 27,000 kilowatt hours of electricity annually equating to an estimated $\$$266 savings in the monthly electric bill, or $\$$3,180 annually for the Orange County/University of Florida Cooperative Extension Center. In addition to reducing the electric bill for the Extension Center, Orange County’s solar array also takes advantage of a rebate incentive offered by the local utility, Orlando Utility Commission, which provided a meter that measures the amount of power produced by the solar array. The local utility company’s Solar Photovoltaic Production Incentive will pay Orange County $\$$0.05 per kilowatt hour for the power that is produced by the solar array. This incentive is provided in addition to Net Metering benefits, which is an effort to promote the use of clean, renewable energy on the electric grid. The Photovoltaic Solar Demonstration and Research Facility also serves an educational tool to the public; the solar array is tied directly into a data logger that provides real time power generation accessible for public viewing on an interactive kiosk located in the Orange County/University of Florida Cooperative Extension Center’s lobby where visitors can review “real time” power generation, cost savings and environmental benefits of the system. Site commissioning with the software program was delayed due to Internal Security Software issues within Orange County that needed to be resolved, therefore the “real time” capture of the production data for the solar array using the software program commenced on May 1, 2015. In addition an educational flyer was developed and is available in the Orange County Education Center’s main lobby. The project completed under this grant award assisted Orange County in demonstrating leadership by installing the application of a renewable energy technology combined with energy efficiency measures; resulting in reduced energy costs for the Orange County University of Florida Cooperative Extension Center, and helping Orange County citizens and visitors move towards the goals of greater energy independence and climate protection. The addition of the new Solar Demonstration and Research Facility has advanced the Orange County/University of Florida Cooperative Extension Center’s mission of extending, educating and providing research-based information to residents and visitors of Orange County by demonstrating the application of renewable energy technology combined with energy efficiency measures; resulting in reduced energy costs, and helping Orange County move towards the goal of greater energy independence and climate protection. In 2014, the Orange County Cooperative Extension Center hosted nearly 10,800 visitors to their on-site Exploration Gardens plus 12,686 walk-in visitors to their office plant clinic and other services. The Education Center held 2,217 educational events that were attended by 46,434 adults and youth, but about half of those events occurred off-site. Based on the visitation numbers in 2014 the Orange County Cooperative Extension Center Education is a vital partner to Orange County’s continued outreach and education efforts concerning renewable energy technologies and greenhouse gas emission reduction well in the current 2015 year and future years of operation of the solar array to the future visitors of the Center which help stimulate market demand that will continue to advance the commercialization and the widespread application and use of renewable energy technologies in Orange County and the state of Florida. The project period performance date for this grant was November 1, 2009 through March 1, 2015. The Final Project costs to complete the project as reported in the FINAL SF 425 were $\$$195,512.50 (50% recipient cost share was satisfied as required by grant terms and conditions).

14 SOLAR ENERGY↗

2024 Nasa Lunabotics University Competition: Site Preparation With Bulk Regolith

Introduction: Lunabotics provides accredited institutions of higher learning students (vocational-technical, college, university) an opportunity to apply the NASA systems engineering process to design and build a prototype robot. This robot would be capable of performing the proposed operations on the Lunar surface in support of future Artemis mission goals. Lunabotics features a systems engineering design challenge to engage students in the next phase of hu-man space exploration supporting the Artemis missions. This two-semester event encourages students to design and build an autonomous or telerobotic robot designed to traverse the simulated Lunar surface and complete the assigned construction tasks. The number of teams accepted into this challenge is not predetermined but is based on the scores and overall quality of the Project Management Plans received and other factors. The culmination of the Lunabotics virtual challenge will be the design, build and operation of a functional prototype Lunar robot. Teams are required to submit the following: (1) Project Management Plan, (2) Systems Engineering Paper, a (3) STEM Engage-ment Report, and a (4) Proof of Life Video. This is an optional item, but to qualify for the grand prize a team must also submit a: (5) Presentation and Demonstration. Background: The NASA Lunabotics University Competition was first held in 2010 as a follow on to the NASA Regolith Excavation Challenge [1]. The high level of interest and participation from over 50 universities each year has led to a sustained annual competi-ion cadence: it has been held every May for the past 14 years [2,3]. Over 6,000 students have participated and been inspired to pursue Science, Technology, En-gineering and Mathematics careers (STEM). 2024 Competition: The necessary lunar surface tasks are evolving to meet the NASA Artemis Mission requirements. In the past Lunabotics challenges we gathered data to support Lunar mining for consuma-bles in the Lunar regolith. Now, in 2024, the task is to gather data on Lunar site preparation and construction by designing and building a robot that will traverse the chaotic Lunar terrain and construct a regolith-based berm. The goal is to build a berm structure which would be useful to the Artemis Mission for blast and ejecta protection during lunar landings and launches, shading cryogenic propellant tank farms, providing radiation protection around a nuclear power plant and other mission critical uses. Lunabotics will consist of three separate events this year. The first event is NASA’s Lunabotics Project Development Challenge, where teams submit various deliverables to be scored by judges. The second event will be the University of Central Florida (UCF) Lunabotics Qualification challenge, in the Exolith laboratory, where teams will put their de-signs to the test. The top ten scoring teams from the Qualification challenge are then invited to the third and final event, NASA’s Lunabotics On-Site Challenge at Kennedy Space Center in Florida. This presentation will summarize the results and lessons learned from the NASA Lunabotics University Competition held in May 2024.

Lunabotics↗

TRANSPORTATION CONSIDERATIONS FOR USED FUEL AND ADVANCED NUCLEAR ENERGY TECHNOLOGIES

This study focuses on requirements and challenges pertaining to advanced transportable nuclear energy systems, which are currently in development and feature varying degrees of mobility. These reactors mostly use high-assay low-enriched uranium (HALEU) fuel, and only limited refueling is required during their lifecycles. Due to the smaller source terms, higher burnup fuel, and potentially higher thermal efficiency involved, the waste inventory will be less than that generated by conventional light-water reactors. However, the relevant regulatory requirements must be met when transporting HALEU fuel (whether fresh or used) inside the reactor vessel—mainly the fuel material transportation, siting, and physical protection requirements outlined in US Nuclear Regulatory Commission (NRC) regulations 10 CFR 71 and 73. Spent nuclear fuel (SNF), as well as irradiated fuel (used during any interval of reactor operation), contains highly radioactive materials that generate heat and necessitate special precautions during transportation. This study addresses the challenges that this incurs, and outlines potential solutions.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗