Search NASA⌕ Search

SEARCH · Search NASA

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

Model-based predictive control of multi-stage air-source heat pumps integrated with phase change material-embedded ceilings

This paper presents a model-based predictive control strategy to optimize the operations of phase change material (PCM) ceiling panels coupled with a multi-stage air-source heat pump. A three-stage prototype heat pump unit has been built and tested in the laboratory, with the low and medium stages designed for space heating/cooling and the high compression stage dedicated to charging of the PCM energy storage. To facilitate optimal control of the integrated heat pump system, a mixed-integer linear programming formulation is derived through linearization of the heat pump model and a mixed-integer reformulation of the PCM dynamic governing equations. A predictive control strategy is synthesized based on the resultant control formulation and implemented in a receding horizon scheme that optimizes the PCM charging and the zone temperature schedules simultaneously to leverage both the passive (associated with building construction materials) and active (PCM) storage capacities of a building. The control strategy has been tested along with three benchmarking control scenarios using a co-simulation platform for a prototypical detached house in Atlanta, GA. In this study, test results showed that application of the proposed control strategy to the PCM-integrated heat pump could provide 27.1% electricity cost savings while a fine tuned rule-based control strategy could achieve cost savings of 20.4%, compared to a baseline case without PCM storage, under a time-of-use rate tariff.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Particle resuspension: Challenges and perspectives for future models

Using what has become a celebrated catchphrase, Philip W. Anderson once wrote that “more is different” (Science, Vol. 177, Issue 4047, pp. 393–396, 1972). First formulated in the context of condensed matter, this statement carries far beyond the sole limits of solid-state physics. It emphasizes that collective behavior can be more than the mere sum of what happens for elementary constituents or the mere collation of the evolution of each degree of freedom. Said otherwise, complex phenomena can arise out of the interplay between multiple sub-phenomena each of which can be relatively simple. The process of particle resuspension, in which discrete particles adhering on a surface are pulled off and carried away by a fluid flow, is another example involving a web of phenomena pertaining to fluid mechanics, particle dynamics and interface chemistry whose cross-effects create an intricate topic. The purpose of this review is to analyze the physics at play in particle resuspension in order to bring insights into the rich complexity of this common but challenging concern. Following the more-is-different vision, this is performed by starting from a range of practical observations and experimental data. We then work our way through the investigation of the key mechanisms which play a role in the overall process. In turn, these mechanisms reveal an array of fundamental interactions, such as particle–fluid, particle–particle and particle–surface, whose combined effects create the tapestry of current applications. At the core of this analysis are descriptions of these physical phenomena and the different ways through which they are intertwined to build up various models used to provide quantitative assessment of particle resuspension. The physics of particle resuspension implies to hold together processes occurring at extremely different space and time scales and models are key in providing a single vehicle to lead us through such multiscale journeys. This raises questions on what makes up a model and one objective of the present work is to clarify the essence of a modeling approach. In spite of its ubiquitous nature, particle resuspension is still at the early stages of developments. Many extensions need to be worked out and revisiting the art of modeling is not a moot point. The need to consider more complex objects than small and spherical particles and, moreover, to come up with unified descriptions of mono- and multilayer resuspension put the emphasis on solid model foundations if we are to go beyond current limits. Further, this is very much modeling in the making and new ideas are proposed to stimulate interest into this everyday but challenging issue in physics.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

GRADUAL INFLATION OF ACTIVE-REGION CORONAL ARCADES BUILDING UP TO CORONAL MASS EJECTIONS

The pre-coronal mass ejection (pre-CME) structure is of great importance to understanding the origin of CMEs, which, however, has been largely unknown for CMEs originating from active regions. In this paper, we investigate this issue using the wavelet-enhanced EUV Imaging Telescope (EIT) observations combined with the Large Angle and Spectrometric Coronagraph, Michelson Doppler Imager, and GOES soft X-ray observations. Selected for studying are 16 active-region coronal arcades whose gradual inflation lead up to CMEs. Twelve of them clearly build upon post-eruptive arcades resulting from a preceding eruption; the remaining four are located high in the corona in the first place and/or have existed for days. The observed inflation lasts for 8.7 {+-} 4.1 hr, with the arcade rising from 1.15 {+-} 0.06 R{sub sun} to 1.36 {+-} 0.07 R{sub sun} within the EIT field of view (FOV). The rising speed is less than 5 km s{sup -1} most of the time. Only at the end of this quasi-static stage does it increase to tens of kilometers per second over tens of minutes. The arcade then erupts out of the EIT FOV as a CME with similar morphology. This pre-CME structure is apparently unaffected by the flares occurring during its quasi-static inflation phase, but is closely coupled with the flare occurring during its acceleration phase. For four events that are observed on the disk, it is found that the gradual inflation of the arcade is accompanied by significant helicity injection from the photosphere. In particular, a swirling structure, which is reminiscent of a magnetic flux rope, was observed in one of the arcades over 4 hr prior to the subsequent CME, and the growth of the arcade is associated with the injection of helicity of opposite sign into the active region via flux emergence. We propose a four-phase evolution paradigm for the observed CMEs, i.e., a quasi-static inflation phase which corresponds to the buildup of magnetic free energy in the corona, followed by the frequently observed three-phase paradigm, including an initial phase, an acceleration phase, and a gradual phase.

79 ASTRONOMY AND ASTROPHYSICS↗

Lunar campsite concept: Space transfer concepts and analysis for exploration missions

The lunar Campsite concept responds to a perceived need to identify early manned science and exploration missions that require minimal initial funding. The Campsite concept defers the build-up of many infrastructure components without escalating total program costs. The lunar Campsite has been sized nominally for four crew for 42 days (1 lunar night and 2 lunar days), but can be modified to span two lunar nights up to 60 days. Total mission fulfillment requires five Earth-to-LEO launches, four (100 mt class launch vehicle) for the two vehicle assemblies and one (PLS or NSTS) for the crew. The lunar Campsite mission mode is tandem direct using a booster stage and a lander stage. The booster is separated from the lander after the TLI burn and is expended into the Earth's atmosphere. In the Campsite mode, the lander lands on the surface not to be returned. In the crew delivery mode, the lander is guided to a precision landing about 500 m from the Campsite, and with enough propellant to return the crew to Earth. The Campsite consists of a habitat and airlock, body mounted radiators with a surface shield, sun tracking solar arrays, and an Earth-tracking high-gain antenna. The CV is very similar to the campsite delivery vehicle. The CV does not, however, have radiators or solar arrays. The vehicle stacks are essentially common in that they utilize the same structure system and engines, the same propellant tanks, the same 'cut-out' in which the CRV and payloads are incorporated, and the same RCS locations. The booster and lander stage propellant tank propellant capacities are identical and have margins which would allow additional fueling for propulsive capture of the boost stage into Earth orbit. This contractual study was performed to identify Campsite and vehicle interfaces and vehicle requirements, and to surface issues related to the integration of the Campsite and LTV's.

Source record↗

Taming Liquid Hydrogen: The Centaur Upper Stage Rocket

The Centaur is one of the most powerful rockets in the world. As an upper-stage rocket for the Atlas and Titan boosters it has been a reliable workhorse for NASA for over forty years and has played an essential role in many of NASA's adventures into space. In this CD-ROM you will be able to explore the Centaur's history in various rooms to this virtual museum. Visit the "Movie Theater" to enjoy several video documentaries on the Centaur. Enter the "Interview Booth" to hear and read interviews with scientists and engineers closely responsible for building and operating the rocket. Go to the "Photo Gallery" to look at numerous photos of the rocket throughout its history. Wander into the "Centaur Library" to read various primary documents of the Centaur program. Finally, stop by the "Observation Deck" to watch a virtual Centaur in flight.

Dawson, Virginia P.↗

SpaceCube v2.0 Space Flight Hybrid Reconfigurable Data Processing System

This paper details the design architecture, design methodology, and the advantages of the SpaceCube v2.0 high performance data processing system for space applications. The purpose in building the SpaceCube v2.0 system is to create a superior high performance, reconfigurable, hybrid data processing system that can be used in a multitude of applications including those that require a radiation hardened and reliable solution. The SpaceCube v2.0 system leverages seven years of board design, avionics systems design, and space flight application experiences. This paper shows how SpaceCube v2.0 solves the increasing computing demands of space data processing applications that cannot be attained with a standalone processor approach.The main objective during the design stage is to find a good system balance between power, size, reliability, cost, and data processing capability. These design variables directly impact each other, and it is important to understand how to achieve a suitable balance. This paper will detail how these critical design factors were managed including the construction of an Engineering Model for an experiment on the International Space Station to test out design concepts. We will describe the designs for the processor card, power card, backplane, and a mission unique interface card. The mechanical design for the box will also be detailed since it is critical in meeting the stringent thermal and structural requirements imposed by the processing system. In addition, the mechanical design uses advanced thermal conduction techniques to solve the internal thermal challenges.The SpaceCube v2.0 processing system is based on an extended version of the 3U cPCI standard form factor where each card is 190mm x 100mm in size The typical power draw of the processor card is 8 to 10W and scales with application complexity. The SpaceCube v2.0 data processing card features two Xilinx Virtex-5 QV Field Programmable Gate Arrays (FPGA), eight memory modules, a monitor FPGA with analog monitoring, Ethernet, configurable interconnect to the Xilinx FPGAs including gigabit transceivers, and the necessary voltage regulation. The processor board uses a back-to-back design methodology for common parts that maximizes the board real estate available. This paper will show how to meet the IPC 6012B Class 3A standard with a 22-layer board that has two column grid array devices with 1.0mm pitch. All layout trades such as stack-up options, via selection, and FPGA signal breakout will be discussed with feature size results. The overall board design process will be discussed including parts selection, circuit design, proper signal termination, layout placement and route planning, signal integrity design and verification, and power integrity results. The radiation mitigation techniques will also be detailed including configuration scrubbing options, Xilinx circuit mitigation and FPGA functional monitoring, and memory protection.Finally, this paper will describe how this system is being used to solve the extreme challenges of a robotic satellite servicing mission where typical space-rated processors are not sufficient enough to meet the intensive data processing requirements. The SpaceCube v2.0 is the main payload control computer and is required to control critical subsystems such as autonomous rendezvous and docking using a suite of vision sensors and object avoidance when controlling two robotic arms.

Xilinx FPGA↗

Bradwell - The first UK Nuclear Site to Enter Care and Maintenance - 18152

Magnox Ltd, a Cavendish Fluor company, is currently decommissioning twelve nuclear sites on behalf of the UK Nuclear Decommissioning Authority (NDA). Ten of these sites are former Power Stations; the other two are closed Research and Development facilities. An overall strategy for decommissioning the Magnox sites has been agreed between Magnox and the NDA. For all but one of these sites the decommissioning strategy involves an extended quiescent period, known as Care and Maintenance (C and M), during which remaining radiological hazards reduce naturally through radioactive decay. After this quiescent period the sites will be restored to an agreed end state through further decommissioning and clearance work. Sites in C and M will not be permanently manned. They will be passively safe such that prompt action will not be required in response to an alarm or fault. Preparing a nuclear site for C and M involves several inter-related strands of work including definition of the intended physical configuration of the site during C and M (the C and M entry state), establishing a safety case to support that configuration, carrying out the physical works needed to deliver the C and M entry state, preparing arrangements and a team to manage the site during C and M and consolidating the knowledge and information needed to support C and M and final clearance of the site. To enter C and M there needs to be a carefully controlled transition of site, personnel and management system into the agreed C and M configuration. Bradwell, a site on the east coast of England, was selected as part of the overall decommissioning strategy for 'early' entry into C and M; Bradwell is scheduled to enter C and M in late 2018, several years in advance of the next scheduled site, with the intent of carrying learning forward from Bradwell to the subsequent sites. Bradwell is now in the final stages of preparation for C and M. Decommissioning commenced on completion of defueling in 2005. A clearly defined C and M entry state was established early in decommissioning and, through interaction with Regulators and internal and external stakeholders, developed as a shared target, thus providing certainty to the scope of the overall decommissioning project. The site has subsequently been systematically decommissioned to meet this target C and M entry state. All legacy waste has been retrieved and packaged into robust disposal containers, the reactor buildings have a new weather envelope, and much of the site is empty space with concrete hardstanding where facilities used to exist and bare rooms where plant used to operate. The remaining radiological and environmental hazards are not significant. During C and M, which is anticipated to last for 70 years, Bradwell will be managed remotely without the requirement for personnel to be present on site, with the possible exception of an ongoing security presence when the site first enters C and M. In terms of UK decommissioning, many of the projects undertaken at Bradwell were first of a kind. The company operates under a programmed organisational and delivery model, which will enable innovation and learning from Bradwell to be carried forward across the whole Magnox fleet. In addition to decommissioning tools and techniques, processes to manage decommissioning, optimise the C and M entry state to reduce the burden on the UK taxpayer and to transition a site into C and M have been developed. This, in addition to taking people from Bradwell and seeding them into Magnox and the broader UK nuclear industry, should help to provide long term cost savings and delivery efficiencies across the entire NDA estate. This paper describes the journey of Bradwell Site through decommissioning and into C and M, highlighting the innovation and challenges that have contributed to the success of delivering the first UK nuclear site into Care and Maintenance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full Core TREAT Kinetics Demonstration Using Rattlesnake/BISON Coupling Within MAMMOTH

This report summarizes key aspects of research in evaluation of modeling needs for TREAT transient simulation. Using a measured TREAT critical measurement and a transient for a small, experimentally simplified core, Rattlesnake and MAMMOTH simulations are performed building from simple infinite media to a full core model. Cross sections processing methods are evaluated, various homogenization approaches are assessed and the neutronic behavior of the core studied to determine key modeling aspects. The simulation of the minimum critical core with the diffusion solver shows very good agreement with the reference Monte Carlo simulation and the experiment. The full core transient simulation with thermal feedback shows a significantly lower power peak compared to the documented experimental measurement, which is not unexpected in the early stages of model development.

97 MATHEMATICS AND COMPUTING↗

The Development of Catalysts for Upgrading of Pyrolysis Vapor for Refinery Feedstocks and Intermediates: Cooperative Research and Development, CRADA Number CRD-12-00497 (Final Report)

Fast pyrolysis of biomass with vapor phase upgrading (VPU) can produce refinery feedstocks or intermediates that can meet the Department of Energy’s goal of cost-competitive hydrocarbon fuels by 2017. A key technical barrier for this technology is the lack of selective, cost effective catalysts that can produce high yields of fuel-appropriate hydrocarbons from the pyrolysis vapors. In overcoming this barrier, it will be important to engage leading catalyst development companies to devote their resources and expertise to the development of these materials. Thus, we propose a Cooperative Research and Development Agreement (CRADA) between the National Renewable Energy Laboratory (NREL), a world leader in biomass pyrolysis research and Johnson Matthey (JM), a world leader in the production of advanced catalyst materials to develop and test novel catalysts for efficient VPU. Through its Intercat Inc. subsidiary in Savannah, Ga., Johnson Matthey is internationally recognized as a leader in zeolite-based vapor phase upgrading in refinery duties and an emerging developer of biomass conversion technologies. The research and development efforts described in the proposed work will build upon existing collaborations between NREL and JM and play to the strengths of both institutions. NREL will analyze the composition of pyrolysis vapors as an input to catalyst design, screen and test catalysts, characterize the resulting oil and conduct techno-economic analysis. Catalyst samples will be produced and funded by JM. JM will design and synthesize catalysts, characterize fresh and used catalysts and develop catalyst supports needed to achieve commercially meaningful lifetimes. The project will span catalyst development and testing from the fundamental stage using quantum mechanical modeling and chemical reaction analysis to catalyst screening to integrated pilot studies.

09 BIOMASS FUELS↗

UKy-CAER Heat Integrated Transformative CO 2 Capture Process in Pulverized Coal Power Plants

The goal of this Phase II Topical Report is to summarize the work for public domain conducted on project DE-FE0031583. Building upon the Design Basis completed during Phase I and in accordance with the Statement of Project Objectives (SOPO), the University of Kentucky (UK) Center for Applied Energy Research (CAER) (Recipient) along with team members has completed the Front End Engineering Design (FEED) for its advanced, versatile post-combustion CO 2 capture system (CCS) at the 10 MWe large pilot scale to be installed at the Wyoming (WY) Integrated Test Center (ITC), using a heat integrated process with split-rich fed, two-stage stripping and any advanced solvent to enhance the CO 2 absorber performance and lower the cost of CO 2 capture. The proposed project (Phases I-III) involves the design, fabrication, installation, testing and evaluation of a large pilot scale facility that will demonstrate the UK CAER transformative CCS integrated with an operating power plant. The work performed in Phase I, detailed in the Phase I Topical Report that was submitted in March 2019, included formation of a project team, securing the host site, and completing pre-FEED design basis, a cost estimation, a preliminary techno-economic analysis (TEA) and an environmental information volume (EIV). The work performed in Phase II, detailed in this Phase II Topical Report, includes completion of FEEDs, completion of a process risk analysis (PRA), obtaining necessary permits, updating the EIV and TEA, updating the cost and schedule estimate for the Phase III scope of work (SOW) and securing the necessary cost share. Updated information is provided on the current status of the UK CAER CCS technology and the project is ready to begin immediately detailed design, construction and operation of the proposed pilot.

20 FOSSIL-FUELED POWER PLANTS↗

Neutron Damage Calculator [Poster]

The Nuclear Science Users Facilities (NSUF) currently has several experimental reactors participating in the program. These reactors allow users to complete material irradiation and studies of the effects of radiation on those materials. Completing the experiments is a long and costly process, beginning with applying for NSUF funding and support to placing materials in the reactor to post- irradiation examination . The goal of this project is to build a tool that NSUF users can use during the conceptual design phase of their experiment to select a reactor and reactor position which is the most fitting for their needed level of neutron damage. The tool has three main functions: 1) calculate displacements per atom (DPA) for multiple different materials, 2) calculate the time needed to reach the desired DPA, and 3) inform users what position in what reactor will give them the desired radiation damage the most effectively. This work is at the stage of finding displacement cross sections needed to calculate DPA. Future work will include finishing DPA calculations and modifying the current code to be used with other NSUF research reactors.

36 MATERIALS SCIENCE↗

System performance predictions for Space Station Freedom's electric power system

Space Station Freedom Electric Power System (EPS) capability to effectively deliver power to housekeeping and user loads continues to strongly influence Freedom's design and planned approaches for assembly and operations. The EPS design consists of silicon photovoltaic (PV) arrays, nickel-hydrogen batteries, and direct current power management and distribution hardware and cabling. To properly characterize the inherent EPS design capability, detailed system performance analyses must be performed for early stages as well as for the fully assembled station up to 15 years after beginning of life. Such analyses were repeatedly performed using the FORTRAN code SPACE (Station Power Analysis for Capability Evaluation) developed at the NASA Lewis Research Center over a 10-year period. SPACE combines orbital mechanics routines, station orientation/pointing routines, PV array and battery performance models, and a distribution system load-flow analysis to predict EPS performance. Time-dependent, performance degradation, low earth orbit environmental interactions, and EPS architecture build-up are incorporated in SPACE. Results from two typical SPACE analytical cases are presented: (1) an electric load driven case and (2) a maximum EPS capability case.

Kerslake, Thomas W.↗

Application of the Parareal Algorithm for Acoustic Wave Propagation

We present an application of the parareal algorithm to solve wave propagation problems in the time domain. The parareal algorithm is based on a decomposition of the integration time interval in time slices. It involves a serial prediction step based on a coarse approximation, and a correction step (computed in parallel) based on a fine approximation within each time slice. In our case, the spatial discretization is based on a spectral element approximation which allows flexible and accurate wave simulations in complex geological media. Fully explicit time advancing schemes are classically used for both coarse and fine solvers.In a first stage, we solve the 1D acoustic wave equation in an homogeneous medium in order to test stability and convergence properties of the parareal algorithm. We confirmed the stability problems outlined by Bal and Farhat et al. for hyperbolic problems. These stability issues are mitigated by a time-discontinuous Galerkin discretization of the coarse solver. It may also involve a coarser spatial discretization (hp-refinement) which helps to preserve stability and allows more significant computer savings. Besides, we explore the contribution of elastodynamic homogenization to build consistent coarse grid solvers. Extension to 2D/3D realistic geological media is an ongoing work.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Pilot testing of a membrane system for postcombustion CO 2 capture

This final report summarizes work conducted for the U.S. Department of Energy, National Energy Technology Laboratory (DOE) to scale up an efficient post-combustion CO 2 capture membrane process to the small pilot test stage (award number DE-FE0005795). The primary goal of this research program was to design, fabricate, and operate a membrane CO 2 capture system to treat coal-derived flue gas containing 20 tonnes CO 2 /day (20 TPD). Membrane Technology and Research (MTR) conducted this project in collaboration with Babcock and Wilcox (B&W), the Electric Power Research Institute (EPRI), WorleyParsons (WP), the Illinois Sustainable Technology Center (ISTC), Enerkem (EK), and the National Carbon Capture Center (NCCC). In addition to the small pilot design, build and slipstream testing at NCCC, other project efforts included laboratory membrane and module development at MTR, validation field testing on a 1 TPD membrane system at NCCC, boiler modeling and testing at B&W, a techno-economic analysis (TEA) by EPRI/WP, a case study of the membrane technology applied to a ~20 MWe power plant by ISTC, and an industrial CO 2 capture test at an Enerkem waste-to-biofuel facility. The 20 TPD small pilot membrane system built in this project successfully completed over 1,000 hours of operation treating flue gas at NCCC. The Polaris™ membranes used on this system demonstrated stable performance, and when combined with over 10,000 hours of operation at NCCC on a 1 TPD system, the risk associated with uncertainty in the durability of postcombustion capture membranes has been greatly reduced. Moreover, next-generation Polaris membranes with higher performance and lower cost were validation tested on the 1 TPD system. The 20 TPD system also demonstrated successful operation of a new low-pressure-drop sweep module that will reduce parasitic energy losses at full scale by as much as 10 MWe. In modeling and pilot boiler testing, B&W confirmed the viability of CO 2 recycle to the boiler as envisioned in the MTR process design. The impact of this CO 2 recycle on boiler efficiency was quantified and incorporated into a TEA of the membrane capture process applied to a full-scale power plant. As with previous studies, the TEA showed the membrane process to be lower cost than the conventional solvent capture process even at 90% CO 2 capture. A sensitivity study indicates that the membrane capture cost decreases significantly if the 90% capture requirement is relaxed. Depending on the process design, a minimum capture cost is achieved at 30-60% capture, values that would meet proposed CO 2 emission regulations for coal-fired power plants. In summary, this project has successfully advanced the MTR membrane capture process through small pilot testing (technology readiness level 6). The technology is ready for future scale-up to the 10 MWe size.

01 COAL, LIGNITE, AND PEAT↗

Cleanup under Airlock of an Old Uranium Foundry - 13273

Since 2004, AREVA's subsidiary SICN has been conducting the cleanup and dismantling of an old uranium foundry located in the town of Annecy (France). The first operations consisted in the removal of the foundry's production equipment, producing more than 300 metric tons (MT) of waste. The second step consisted in performing the radiological characterization of the 1,600 m{sup 2} (17,200 ft{sup 2}) building, including underground trenches and galleries. The building was precisely inventoried, based on operations records and direct measurements. All sub-surfaces, which needed to be cleaned up were characterized, and a determination of the contamination migration was established, in particular with trenches and galleries. The wall thicknesses to be treated were empirically justified, knowing that the maximal migration depth inside concrete is 5 mm for a liquid transfer vector. All singularities such as cracks, anchoring points, etc. were spotted for a complete and systematic treatment. Building structures not laying directly on the soil, such as floor slabs, were not cleaned up but directly deconstructed and disposed of as waste. The facility was located within the town of Annecy. Therefore, in order to avoid the risk of dusts dispersion and public exposure during the building deconstruction and the soil treatment, a third of the building's surface was confined in a sliding airlock built from a metal structure capable of resisting to wind and snow, which are frequent in this area. This particular structure provided a static confinement over the half of the building which was covered and a dynamic confinement using a ventilation and high efficiency air filtration system, sized to provide 2.5 air changes per hour. The enclosure and its metallic structure is 33 m long (108 feet), 25 m wide (82 feet), and 13 m high (42 feet), for a volume of 10,000 m{sup 3} (353,000 ft{sup 3}). It was made up of a double skin envelope, allowing the recycling of its structure and outside envelope. After cleaning up and dismantling the first portion of the building, the enclosure was repositioned on the second and the last third of the building, by sliding it on support pads. Almost 7,000 m{sup 2} of concrete surface has been treated with no dust dispersion outside the enclosure. After treatment, all the remaining surfaces were controlled by an independent entity to verify their acceptability with regards to residual contamination (less than 0.4 Bq/cm{sup 2} (24 DPM) for alpha contamination and less than 1 Bq/g of total uranium). Approximately 1,900 MT of equipment and waste were generated in batches of 1m{sup 3}, in order to be staged on site, and then characterized and packaged in 20 foot containers for shipment to the final ANDRA repository. The package certification included the verification of the physical and chemical characteristics and the radiological characteristics (mass activity, dose rate, and residual outside surface contamination). Finally, after cleanup and dismantling of the foundry, a concrete slab was poured on the free surface as a clean base for implementation of new activities. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Large Cask, Small Building, AREVA's Safe MLLW Disposal Solution Despite Facility Limitations - 16295

In order to begin decommissioning of a 1950's research reactor, Class C Mixed Low Level Waste (MLLW) had to be removed from the facility and disposed of. The AREVA TN RAM cask, designed and licensed for shipping Type B waste packages, was chosen as the most appropriate shipping solution. Due to the building layout, crane capacity and pool size, the standard TN RAM cask loading process could not be utilized. Unique solutions and approaches had to be developed to complete the project. AREVA designed a smaller liner insert that would house the four MLLW components in a single waste package to solve the problems related to crane capacity and physical pool dimensions. AREVA also designed and fabricated a shield bell to provide radiation shielding while moving the liner insert from the reactor pool to the cask that was staged adjacent to the reactor pool. The AREVA team worked with the disposal facility to cover requirements for disposal of Class B MLLW. This included designing spacers filled with inert material to fulfill the requirement for maximum 10% void space in the waste package. This disposal method for Class C waste met the requirements of macro-encapsulation. Therefore, no additional treatment action was required when disposing of Class C MLLW. AREVA's solution provides a model for disposing MLLW requiring macro-encapsulation in a single waste package. This solution also provides a model for how to adapt large shipping casks and liners to smaller aging commercial, DOE or research facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Main principles used for building up a data bank for the long-term storage and retrieval of scientific space data

Methodological, technical, and practical organizational problems are considered of constructing a long term data bank. Data processing flowcharts are presented which are based on an analysis of the tasks which the data bank must fulfill, an estimate of the existing and predicted data flows in the processing center, and the selection of the data storage media and the forms in which the data are presented. Questions related to the use of standard and special hardware and software in the data bank are discussed. Reasons are presented for the adopted structure of the document-fact type information retrieval system which permits the mechanization and automation of various stages in the retrieval and selection of the data.

Zlotin, G. N.↗

Embedded Active Fiber Optic Sensing Network for Structural Health Monitoring in Harsh Environments

This report summarizes technical progress on the program “Embedded Active Fiber Optic Sensing Network for Structural Health Monitoring in Harsh Environments” funded by the National Energy Technology Laboratory of the U.S. Department of Energy, and performed by the Center for Photonics Technology at Virginia Tech. The objective of this project is to develop a first-of-a-kind technology for remote fiber optic generation and detection of acoustic waves for structural health monitoring in harsh environments. During the project period, which is from April 1, 2013 to Septemeber 30, 2016, three different acoustic generation mechanisms were studied in detail for their applications in building a fiber optic acoustic generation unit (AGU), including laser induced plasma breakdown (LIP), Erbium-doped fiber laser absorption, and metal laser absorption. By comparing the performance of the AGUs designed based on these three mechanisms and analyzing the experimental results with simulations, the metal laser absorption method was selected to build a complete fiber optic structure health monitoring (FO-SHM) system for the proposed high temperature multi-parameter structure health monitoring application. Based on the simulation of elastic wave propagation and fiber Bragg grating acoustic pulse detection, an FO-SHM element together with a completed interrogation system were designed and built. This system was first tested on an aluminum piece in the low-temperature range and successfully demonstrated its capability of multi-parameter monitoring and multi-point sensing. In the later stages of the project, the research was focused on improving the surface attachment design and preparing the FO-SHM element for high temperature environment tests. After several upgrades to the surface attachment methods, the FO-SHM element was able to work reliably up to 600oC when attached to P91 pipes, which are the target material of this project. In the final stage of this project, this FO-SHM sensing system was tested in the simulated harsh environment for its multi-parameter monitoring performance and high-temperature survivability.

20 FOSSIL-FUELED POWER PLANTS↗