Search NASA⌕ Search

SEARCH · Search NASA

Results for “performance data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 973 records · Page 54

LCLS-II SRF Cavity Processing Protocol Development and Baseline Cavity Performance Demonstration

The ”Linac Coherent Light Source-II” Project will construct a 4 GeV CW superconducting RF linac in the first kilometer of the existing SLAC linac tunnel. The baseline design calls for 280 1.3 GHz nine-cell cavities with an average intrinsic quality factor Q0 of 2.7·1010 at 2K and 16 MV/m accelerating gradient. The LCLS-II high Q0 cavity treatment protocol utilizes the reduction in BCS surface resistance by nitrogen doping of the RF surface layer, which was discovered originally at FNAL. Cornell University, FNAL, and TJNAF conducted a joint high Q0 R&D program with the goal of (a) exploring the robustness of the N-doping technique and establishing the LCLS-II cavity high Q0 processing protocol suitable for production use, and (b) demonstrating that this process can reliably achieve LCLS-II cavity specification in a production acceptance testing setting. In this paper we describe the LCLS-II cavity protocol and analyze combined cavity performance data from both vertical and horizontal testing at the three partner labs, which clearly shows that LCLS-II specifications were met, and thus demonstrates readiness for LCLS-II cavity production.

Liepe, M.↗

Flexible, Multipurpose Laboratory Advances Building and Thermal Energy Systems: Expanding Evaluation and Development of Grid-Interactive Buildings

Robust hardware and controls are necessary to ensure results match their intent before they can be used broadly. However, this often requires multiple field experiments in a variety of climate zones. In the field, it is more difficult to obtain information on other important factors, such as thermal, grid, and occupant interaction. Gaps also exist in understanding the performance degradation and life cycle of thermal energy systems as they relate to buildings. There is a lack of robust, high-quality performance data for projects at scale; this data can be expensive to produce and often remain proprietary.

30 DIRECT ENERGY CONVERSION↗

AGR-5/6/7 Experiment Monitoring and Simulation Progress

Advanced Gas Reactor (AGR)--5/6/7 is the last of a series of AGR experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of development and qualification of tri-structural isotropic (TRISO) low-enriched fuel for use in high temperature gas-cooled reactors. The test train contains five separate capsules that are independently controlled and monitored. Each capsule contains multiple 12.51 mm long compacts filled with low-enriched uranium carbide/oxide (UCO) TRISO fuel particles. The objectives of the AGR-5/6/7 experiment are to: 1. Irradiate reference-design fuel particles to support fuel qualification. 2. Establish operating margins for the fuel beyond normal operating conditions. 3. Provide irradiated fuel performance data and irradiated fuel samples for post-irradiation examination (PIE) and safety testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Lessons Learned Using Iridium to Communicate with a CubeSat in Low Earth Orbit

This paper presents the design and approval process for operating an Iridium transceiver on orbit and provide on-orbit performance data obtained from a CubeSat platform in Low Earth Orbit (LEO) (500 km orbit). On-orbit data demonstrates that use of a commercial, low-cost Iridium transceiver can serve as a valuable communication approach for low volume telemetry with less than a 30-minute lag for approximately 90% of the time. In this work, we also demonstrate that a radial differential velocity of 7 km/sec corresponding to about a 37.5kHz doppler shift and a distance of less than 2,000 km can be used for mission planning.

42 ENGINEERING↗

Novel Membrane-Based Corrosion Sensors For Operating In Natural Gas Pipelines

Membrane-based electrochemical sensors (MBES) provide an attractive option for real-time continuous humidity and corrosion rate measurements inside of natural gas pipelines. The MBES, can use electrochemical techniques such as linear polarization resistance and electrochemical impedance spectroscopy even when a conductive aqueous phase is intermittent or unavailable. We now present field-test performance data of our MBES operated inside a multiphase water and natural gas flow facility. The MBES measured internal corrosion and conductivity at the top, bottom, and side of the pipe spool. Tests were carried out with flow rates of 4.6, 9.1, and 18.3 m/s, temperatures of 21, 29, and 35 °C, and a pressure of 1000 psia. All sensors followed similar trends in open circuit potential, corrosion rate, and conductivity over time. Neither flow rate, temperature, nor build-up of metal-based solids on the sensor surfaces impacted the quality of the electrochemical measurements. The field-test results confirm that the membrane-based electrochemical sensors are suitable for monitoring internal corrosion of operational natural-gas pipelines.

Duffy, Timothy↗

AGC-4 Disassembly Report

The Advanced Reactor Terminology Graphite Research and Development program is currently measuring irradiated material property changes in several grades of nuclear graphite to predict behavior and operating performance within the core of these new high temperature reactor designs. The Advanced Graphite Creep (AGC) experiment, consisting of six irradiation capsules, will generate the irradiated graphite performance data for the Very High Temperature Reactor operating conditions. All six capsules in the experiment conducted at Idaho National Laboratory will be irradiated in the Advanced Test Reactor, disassembled in the Hot Fuel Examination Facility, and examined at the Idaho National Laboratory Research Center. This is the disassembly report describing the disassembly, shipment, post irradiation inspection, and storage of the graphite specimens contained within the AGC 4 irradiation test series capsule (the fourth irradiation capsule of the series). AGC 4 was irradiated in the Advanced Test Reactor (ATR) East Flux Trap (EFT) during ATR Cycle 157D, 158A, 162A, 162B, 164A, 164B, 166A, and Cycle 166B. Approximately 3.6 dpa was achieved. Desired experiment temperatures were exceeded by at least 100C during the second Cycle of irradiation due to the insertion of the KJRR experiment. The capsule was removed from the ATR and transferred to the Hot Fuel Examination Facility on May 15, 2020 and eventually unloaded into the Hot Fuel Examination Facility (HFEF) Decon Cell through Penetration 2D on February 26, 2021. It was moved to the HFEF Main Cell Window 3M for disassembly on March 15, 2021. Disassembly and specimen extraction began March 18, 2021, and packaging of the graphite specimens was completed on April 16, 2021. Several anomalies were noted, specifically that the radiological dose rates were nominally an order of magnitude higher than that of the previous AGC experiments. This report summarizes the disassembly of the AGC 4 experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

AGR-5/6/7 Experiment Monitoring and Simulation Progress

Advanced Gas Reactor (AGR)--5/6/7 is the last of a series of AGR experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of development and qualification of tri-structural isotropic (TRISO) low-enriched fuel for use in high temperature gas-cooled reactors. The test train contains five separate capsules that are independently controlled and monitored. Each capsule contains multiple 12.51 mm long compacts filled with low-enriched uranium carbide/oxide (UCO) TRISO fuel particles. The objectives of the AGR-5/6/7 experiment are to: 1. Irradiate reference-design fuel particles to support fuel qualification. 2. Establish operating margins for the fuel beyond normal operating conditions. 3. Provide irradiated fuel performance data and irradiated fuel samples for post-irradiation examination (PIE) and safety testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cold Climate Integrated Heat Pump with Energy Storage for Grid-Responsive Control

An air-source integrated heat pump (ASIHP) is a multifunctional unit, capable of space cooling, space heating, and water heating. We developed a packaged cold climate ASIHP, using a multi-stage compressor, capable of working down to -25°C, and providing 100% rated capacity down to -15°C with a heating COP > 2.2. An innovative system configuration and related controls were developed to solve charge balance in the integrated heat pump, smooth charge migration, and mode transition among multiple working modes. Extensive laboratory investigations for individual modes were performed to verify the performance. Its integrated heating capability provides speedy water heating to meet domestic hot water use and store heating energy in a phase change material ceiling/panel. The heating energy storage can be used to shift the load when the electricity price is high. Based on the performance data and a calibrated model from the laboratory testing, we conducted building energy simulations driven by a model predictive control, using EnergyPlus in one U.S. cold climate zone to investigate the grid-responsive control strategy and estimate the utility cost reduction potential.

Shen, Bo↗

AGC-4 Disassembly Report

The Advanced Reactor Terminology Graphite Research and Development program is currently measuring irradiated material property changes in several grades of nuclear graphite to predict behavior and operating performance within the core of these new high temperature reactor designs. The Advanced Graphite Creep (AGC) experiment, consisting of six irradiation capsules, will generate the irradiated graphite performance data for the Very High Temperature Reactor operating conditions. All six capsules in the experiment conducted at Idaho National Laboratory will be irradiated in the Advanced Test Reactor, disassembled in the Hot Fuel Examination Facility, and examined at the Idaho National Laboratory Research Center. This is the disassembly report describing the disassembly, shipment, post irradiation inspection, and storage of the graphite specimens contained within the AGC 4 irradiation test series capsule (the fourth irradiation capsule of the series). AGC 4 was irradiated in the Advanced Test Reactor (ATR) East Flux Trap (EFT) during ATR Cycle 157D, 158A, 162A, 162B, 164A, 164B, 166A, and Cycle 166B. Approximately 3.6 dpa was achieved. Desired experiment temperatures were exceeded by at least 100C during the second Cycle of irradiation due to the insertion of the KJRR experiment. The capsule was removed from the ATR and transferred to the Hot Fuel Examination Facility on May 15, 2020 and eventually unloaded into the Hot Fuel Examination Facility (HFEF) Decon Cell through Penetration 2D on February 26, 2021. It was moved to the HFEF Main Cell Window 3M for disassembly on March 15, 2021. Disassembly and specimen extraction began March 18, 2021, and packaging of the graphite specimens was completed on April 16, 2021. Several anomalies were noted, specifically that the radiological dose rates were nominally an order of magnitude higher than that of the previous AGC experiments. This report summarizes the disassembly of the AGC 4 experiment.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Tank Waste Retrieval Lessons Learned at the Hanford Site

One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the U. S. Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60 percent of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons of this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste to the surrounding soil. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring this waste to the DST system. Retrieval of SST salt-cake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. Regulatory requirements for SST waste retrieval and tank farm closure are established in the Hanford Federal Facility Agreement and Consent Order (HFFACO), better known as the Tri- Party Agreement, or TPA. The HFFACO was signed by the DOE, the State of Washington Department of Ecology (Ecology), and U.S. Environmental Protection Agency (EPA) and requires retrieval of as much waste as technically possible, with waste residues not to exceed 360 ft{sup 3} in 530,000 gallon or larger tanks; 30 ft{sup 3} in 55,000 gallon or smaller tanks; or the limit of waste retrieval technology, whichever is less. If residual waste volume requirements cannot be achieved, then HFFACO Appendix H provisions can be invoked to request Ecology and EPA approval of an exception to the waste retrieval criteria for a specific tank. Tank waste retrieval has been conducted at the Hanford Site over the last few decades using a method referred to as Past Practice Hydraulic Sluicing. Past Practice Hydraulic Sluicing employs large volumes of DST supernatant and water to dislodge, dissolve, mobilize, and retrieve tank waste. Concern over the leak integrity of SSTs resulted in the need for tank waste retrieval methods capable of using smaller volumes of liquid in a more controlled manner. Retrieval of SST waste in accordance with HFFACO requirements was initiated at the Hanford Site in April 2003. New and innovative tank waste retrieval methods that minimize and control the use of liquids are being implemented for the first time. These tank waste retrieval methods replace Past Practice Hydraulic Sluicing and employ modified sluicing, vacuum retrieval, and in-tank vehicle techniques. Waste retrieval has been completed in seven Hanford Site SSTs (C-106, C-103, C-201, C-202, C-203, C-204, and S-112) in accordance with HFFACO requirements. Three additional tanks are currently in the process of being retrieved (C-108, C-109 and S-102) Preparation for retrieval of two additional SSTs (C-104 and C-110) is ongoing with retrieval operations forecasted to start in calendar year 2008. Tank C-106 was retrieved to a residual waste volume of 470 ft{sup 3} using oxalic acid dissolution and modified sluicing. An Appendix H exception request for Tank C-106 is undergoing review. Tank C-103 was retrieved to a residual volume of 351 ft{sup 3} using a modified sluicing technology. This approach was successful at reaching the TPA limits for this tank of less than 360 ft{sup 3}and the limits of the technology. Tanks C-201, C-202, C-203, and C-204 are smaller (55,000 gallon) tanks and waste removal was completed in accordance with HFFACO requirements using a vacuum retrieval system. Residual waste volumes in each of these four tanks were less than 25 ft{sup 3}. Tank S-112 retrieval was completed February 28, 2007, meeting the TPA Limits of less than 360 cu ft using salt-cake dissolution, modified sluicing, in-tank vehicle with high pressure water spray and caustic dissolution. Tanks C-108 and C-109 have been retrieved to 90% and 85% respectively. Modified sluicing was no longer effective at retrieving the remaining 5,000 to 10,000 gallons of residual. A Mobile Retrieval Tool (FoldTrac) is scheduled for installation early in 2008 to assist in breaking up chunks of waste and mobilizing the waste for transfer. Lessons learned from application of new tank waste retrieval methods are being documented and incorporated into future retrieval operations. They address all phases of retrieval including process design, equipment procurement and installation, supporting documentation, and system operations. Information is obtained through interviews with retrieval project personnel, focused workshops, review of problem evaluation requests, and evaluation of retrieval performance data. This paper presents current retrieval successes and lessons learned from retrieval of tank waste at the Hanford Site and discusses how this information is used to optimize retrieval system efficiency, improve overall cost effectiveness of retrieval operations, and ensure that HFFACO requirements are met. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Design and Testing of a Solid-Liquid Interface Monitor for High-Level Waste Tanks

A high-level waste (HLW) monitor has been designed, fabricated and tested at full-scale for deployment inside a Hanford tank. The Solid-Liquid Interface Monitor (SLIM) integrates a commercial sonar system with a mechanical deployment system for deploying into an underground waste tank. The system has undergone several design modifications based upon changing requirements at Hanford. We will present the various designs of the monitor from first to last and will present performance data from the various prototype systems. We will also present modeling of stresses in the enclosure under 85 mph wind loading. The system must be able to function at winds up to 15 mph and must withstand a maximum loading of 85 mph. There will be several examples presented of engineering tradeoffs made as FIU analyzed new requirements and modified the design to accommodate. We will present our current plans for installing into the Cold Test Facility at Hanford and into a double-shelled tank at Hanford. Finally, we will present our vision for how this technology can be used at Hanford and Savannah River Site to improve the filling and emptying of high-level waste tanks. In conclusion: 1. The manually operated first-generation SLIM is a viable option on tanks where personnel are allowed to work on top of the tank. 2. The remote controlled second-generation SLIM can be utilized on tanks where personnel access is limited. 3. The totally enclosed fourth-generation SLIM, when the design is finalized, can be used when the possibility exists for wind dispersion of any HLW that maybe on the system. 4. The profiling sonar can be used effectively for real-time monitoring of the solid-liquid interface over a large area. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗