Deep Controlled Source Electro-Magnetic Sensing: A Cost Effective, Long-Term Tool for Sequestration Monitoring
The proposed system was designed to operate as a permanent, autonomous monitoring and data collection system that can provide much higher temporal data density than can be achieved economically with 3-Dimensional (3D) seismic surveys. It can operate over broad areas for long periods of time providing full 3D data sets on a monthly basis at a very low cost. By borrowing techniques commonly used in marine CSEM, structural information from background seismic surveys can be incorporated into the CSEM modeling to provide high resolution models of CO 2 progression within reservoirs. The system uses borehole-based vertical-electric-dipole sources placed at reservoir depths in the formation. The electric and magnetic fields induced by this source are received on the surface using an array of stations. The project was conducted in three phases. Phase I demonstrated the feasibility of the system to collect static/reference data at the Ketzin CO 2 storage pilot site in Germany. In Phase I, numerical modeling was used to determine the optimal configurations and requirements for sensor sensitivity and data accuracy. Based on the model results, existing hardware and software were modified. The CSEM system was then field tested at the Ketzin site. The data were imaged and the results were compared with independent studies of the reservoir and overburden geo-electrical characteristics. Phase II demonstrated the ability to provide sensitive, cost-effective measurement of changes in reservoir properties and changes in the overlying formations using a second round of measurements at the Ketzin site. A prototype autonomous recording system was developed and tested as a subset of the measurement points. Phase III of the project quantified the advantages (and disadvantages) of the fully autonomous data collection subsystems by comparing them with repeated measurements made with mobile stations. The Phase III also provided an additional time point in measuring post-closure changes in and above the Ketzin CO 2 injection site. Validation of the CSEM field survey results were completed using a method such as other alternative and available field site data.