Search NASA⌕ Search

SEARCH · Search NASA

Results for “Accelerator components”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Complexity: from Turbulence to Accelerators to Poetry

Though it may seem intuitive at times, the term 'complexity' is multifaceted, often encompassing various interacting aspects and components that follow local rules. This interaction leads to non-linearity, randomness, collective dynamics, hierarchy, and emergence. The phenomenological complexity found in large accelerators has recently been addressed by the Snowmass’21 Future Colliders Implementation Task Force (ITF). In this presentation, we will provide a concise overview of the mathematical constructs employed to assess hierarchical complexity, summarize the key findings from the ITF analysis, and offer a few examples demonstrating how this approach can be applied to analyze certain literaryclassics.

43 PARTICLE ACCELERATORS↗

Analysis of the dependence of surfatron acceleration of electrons by an electromagnetic wave in space plasma on the particle momentum along the wave front

Based on the numerical solution of the nonlinear nonstationary second-order equation for the wave phase on the particle trajectory, the dynamics of surfatron acceleration of electrons by an electromagnetic wave propagating across the external magnetic field in space plasma is analyzed as a function of the electron momentum along the wave front. Numerical calculations show that, for strongly relativistic initial values of the electron momentum component along the wave front g{sub y}(0) (the other parameters of the problem being the same), electrons are trapped into the regime of ultrarelativistic surfatron acceleration within a certain interval of the initial wave phase Ψ(0) on the particle trajectory. It is assumed in the calculations that vertical bar Ψ(0) vertical bar ≤ π. For strongly relativistic values of g{sub y}(0), electrons are immediately trapped by the wave for 19% of the initial values of the phase Ψ(0) (favorable phases). For the rest of the values of Ψ(0), trapping does not occur even at long times. This circumstance substantially simplifies estimations of the wave damping due to particle acceleration in subsequent calculations. The dynamics of the relativistic factor and the components of the electron velocity and momentum under surfatron acceleration is also analyzed. The obtained results are of interest for the development of modern concepts of possible mechanisms of generation of ultrarelativistic particle fluxes in relatively calm space plasma, as well as for correct interpretation of observational data on the fluxes of such particles and explanation of possible reasons for the deviation of ultrarelativistic particle spectra detected in the heliosphere from the standard power-law scalings and the relation of these variations to space weather and large-scale atmospheric processes similar to tropical cyclones.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Development of Simplified Probabilistic Risk Assessment Model for Seismic Initiating Event

ABSTRACT This paper discusses a simplified method to evaluate seismic risk using a methodology built on dividing the seismic intensity spectrum into multiple discrete bins. The seismic probabilistic risk assessment model uses Nuclear Regulatory Commission’s (NRC’s) full power Standardized Plant Analysis Risk (SPAR) model as the starting point for development. The seismic PRA models are integrated with their respective internal events at-power SPAR model. This is accomplished by combining the modified system fault trees from the full power SPAR model with seismic event tree logic. The peak ground acceleration is divided into five bins. The g-value for each bin is estimated using the geometric mean of lower and upper values of that particular bin and the associated frequency for each bin is estimated by taking the difference between upper and lower values of that bin. The component’s fragilities are calculated for each bin using the plant data, if available, or generic values of median peak ground acceleration and uncertainty values for the components. For human reliability analysis (HRA), the SPAR HRA (SPAR-H) method is used which requires the analysts to complete relatively straight forward worksheets that include the performance shaping factors (PSFs). The results are then used to estimate human error probabilities (HEPs) of interest. This work is expected to improve the NRC’s ability to include seismic hazards in risk assessments for operational events in support of the reactor oversight program (e.g., significance determination process).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Prefabricated High-Strength Rebar Systems with High-Performance Concrete for Accelerated Construction of Nuclear Concrete Structures

This project aimed to reduce the field construction times and fabrication costs of reinforced concrete (RC) nuclear structures through the use of: 1) high-strength steel deformed reinforcing bar (rebar); 2) prefabricated high-strength rebar (HSR) assemblies with headed anchorages; and 3) high-strength concrete (HSC). The focus of the project was not to develop new innovations on materials, but rather to fill a major knowledge gap on the effectiveness, code conformity, and viability (i.e., practicality, commercial availability) of existing high-strength materials in nuclear structures, especially in shear walls, their connections/joints, and around penetrations. These advances promote the Nuclear Energy Enabling Technologies Advanced Methods for Manufacturing (NEET-1) goals of accelerating deployment schedules by at least 6 months and reducing component fabrication costs by 20% or more. Toward this vision, the following objectives were identified and completed: Develop limit-benefit and cost-benefit analysis frameworks: The structural and economic limits and benefits of HSR and HSC in nuclear walls were evaluated. Importantly, it was found that modest increases in concrete strength up to 10.0 ksi and rebar yield strength up to 100 ksi result in the most economic designs and improved structural performance (Barbachyn et al., 2017a and Barbachyn et al., 2017b). Also, an industry survey was distributed to determine the cost benefits associated with prefabrication. Importantly, on-site worker-hours are significantly reduced, allowing for significantly accelerated construction schedules (Devine et al. 2018b). Develop an optimization methodology for structural design: An optimization study was deemed not necessary since the trivial solution with maximized use of high-strength materials and prefabrication always resulted in the largest cost and time savings. Instead, the benefits (and limits) of high-strength materials and prefabrication on construction costs and on-site construction time were investigated through a parametric study. Cost-reductions through the use of HSR and HSC were found to be greater than 40%. Also, on-site construction time of nuclear shear walls can be reduced by up to 83% through the use of prefabricated rebar assemblies. Conduct experimental evaluations of nuclear shear walls and wall-foundation joints: A large scale experimental program was completed on shear-critical RC cantilever deep beams. From these experiments, it was demonstrated that increasing rebar yield strength had a greater effect on increasing lateral strength than increasing the concrete compressive strength. Further, using HSR together with HSC resulted in the highest lateral strength and displacement ductility (Devine et al. 2018a). Additionally, large-scale reversed-cyclic lateral load tests were conducted on RC shear walls. It was demonstrated that through the utilization of HSR and HSC, a wall with 55% reduced vertical and horizontal rebar area was able to achieve 91% of the peak lateral strength of a conventional wall using state-of-practice materials with the same geometry. Further, trim reinforcement with headed anchorages around the penetrations proved to be effective. Develop validated numerical simulation models: Numerical modeling was completed in two phases during this project using 3 different finite element software packages. The first phase used existing measured data from previous experimental studies on stocky RC walls to validate simplified predictive models. Models using two different programs were validated based on a database of 38 stocky walls (Barbachyn et al., 2017a). The second phase occurred after experimental testing using a third and more detailed finite element package. Prediction improvements for the initial stiffness, lateral deformations, damage propagation, and failure mechanisms were targeted. The resulting detailed models more accurately predicted the peak lateral strength, initial and secant stiffnesses, lateral deformations, and cracking patterns of the wall test specimens subjected to reversed-cyclic lateral loading as compared to the simplified pretest models. Develop validated design procedures, tools, and criteria: This project evaluated the accuracy of existing closed-form design equations from U.S. building design standards and previous research (Barbachyn et al. 2017a and Devine et al. 2018a). It was shown that the current predictive equations for shear strength capacity need to be revisited as they provide significant scatter and gross overestimates, indicating the potential for unconservative designs. Further, for both the deep beam and shear wall specimens, the numerical models and flexural capacity predictions provided the most accurate strength predictions. Develop cost-effective field construction procedures: To promote the use of prefabricated rebar assemblies, the following construction conditions where prefabrication would be used instead of in-place rebar tying were identified from an industry survey: 1) to save on construction schedule; 2) to improve safety and/or quality control; 3) for areas with heavy rebar congestion; and 4) for structures with significant repetition in rebar layout. All of these conditions directly apply and benefit nuclear construction where construction costs and schedules are extensive, safety and quality are of utmost importance, the reinforcement is extremely dense, and the reinforcement layout is repetitive in many regions of the shear walls. Additionally, an experimental study was conducted to investigate the changes in bar spacing (with respect to code-required rebar spacing and placement tolerances) when a horizontally assembled prefabricated two-dimensional (2D) rebar mat or three-dimensional (3D) rebar cage is lifted (or tripped) to a vertical position. It was found that the bars involved in both the lateral translation of the rebar assemblies (i.e., movement of the assembly in its horizontal position) and the tripping process were most susceptible to large spacing changes, and thus, their positions within the assembly would need to be checked after the placement of the assembly in place within the formwork. Importantly, the spacings of all of the other bars in the assembly were not affected significantly by the lateral translation and tripping process, thereby eliminating the need to recheck their positions within the assembly (Devine et al. 2018b).

36 MATERIALS SCIENCE↗

Accelerated Aging Experiments for Capacitor Health Monitoring and Prognostics

This paper discusses experimental setups for health monitoring and prognostics of electrolytic capacitors under nominal operation and accelerated aging conditions. Electrolytic capacitors have higher failure rates than other components in electronic systems like power drives, power converters etc. Our current work focuses on developing first-principles-based degradation models for electrolytic capacitors under varying electrical and thermal stress conditions. Prognostics and health management for electronic systems aims to predict the onset of faults, study causes for system degradation, and accurately compute remaining useful life. Accelerated life test methods are often used in prognostics research as a way to model multiple causes and assess the effects of the degradation process through time. It also allows for the identification and study of different failure mechanisms and their relationships under different operating conditions. Experiments are designed for aging of the capacitors such that the degradation pattern induced by the aging can be monitored and analyzed. Experimental setups and data collection methods are presented to demonstrate this approach.

Prognostics of Electronics↗

On the origin and behavior of irradiation-induced c-component dislocation loops in magnesium

C-component dislocation loops are one of the unique defects in hexagonal close-packed (hcp) crystals that promote the accelerated growth and void formation under irradiation. In this paper, we report in situ observation of c-component dislocation loop formation in Mg under electron irradiation with emphasis on their atomic structures. Aberration-corrected scanning transmission electron microscopy imaging is utilized to reveal four possible types of double-layer loops, which were identified as different types of stacking fault and dislocation core structures. Triple- and quadruple-layer c-component dislocation loops were also observed. The formation mechanisms of the four types of double-layer loops were revealed via molecular dynamics simulations. The experimentally observed formation rate of the single- and double-layer dislocation loops is controlled by their formation energies. Finally, our direct experimental observations in combination with molecular dynamics simulations provide fundamental insight into the mechanisms governing nucleation and growth of the c-component dislocation loops as well as their interactions, which could potentially help with future development of irradiation-resistant materials.

36 MATERIALS SCIENCE↗

Research, design and development activities on high power pulsed rf/microwave systems and test facilities for particle accelerators

Several high power S Band microwave systems in the peak power range from 2 MW to 6.5 MW and mean power upto 25 kW along with associated waveguide components, pulse power technology were developed in house at RRCAT. These systems have been used extensively in the development of particle accelerators in the country. Several test facilities were developed in house and supplied to tube R and D labs for development, conditioning and evaluation of microwave tubes indigenously under collaborative efforts. RRCAT has also taken up establishing high power test facilities for advanced accelerators. For such used design and development of 45 MW peak power S Band test facility as well as energy doubler scheme is underway. A 1.3 MW pulsed test stand at 352.2 MHz was also successfully designed and developed to qualify devices, subsystems and components developed in-house. The present paper will describe the research, design and development efforts towards the high power pulsed RF/Microwave systems, test facilities and components. The results and performance of these developments are reported. (author)

43 PARTICLE ACCELERATORS↗

Recent Studies in ATF Damping Ring

The damping ring of the Accelerator Test Facility (ATF) at KEK is designed to produce an extremely small vertical emittance beam as a test accelerator for future linear colliders. Development of various system and components for ILC (International Linear Collider) is also an important purpose of this facility. Though most of the beam time of ATF is dedicated to the final focus test project (ATF2), some studies have been performed in the damping ring. Here we report recent effort of low emittance tuning and multi-bunch extraction test of the fast kicker.

43 PARTICLE ACCELERATORS↗

Comparing Cumulative Flight Thermal Fatigue to Ground Test Results for Memory Components on the Mars Curiosity Rover

This paper explores the methods used to examine Mars Curiosity Rover’s flight temperature data in relation to the Package Qualification and Verification (PQV) accelerated thermal cycle life test data in response to flight anomalies. The redundant Rover Compute Element (RCE-A, B) has experienced an inability to mount the flash memory several times. The leading cause of these anomalies is likely the loss of electrical connectivity, which is theorized to be due to cracks on the memory component solder joints by thermal cycle fatigue. To investigate this theory, the number of thermal cycles accumulated in flight was compared to PQV accelerated thermal cycle life test data. The goal of this study was to inform mission operations of the risk associated with thermal cycling damage on the RCE. However, since the RCE-B does not have continuous temperature data from the Platinum Resistance Thermometer (PRT) closest to the flash memory, a model was made to correlate continuous data from two other nearby sensors on the RCE-B to the noncontiguous sensor. Using the Rainflow Counting Algorithm, the reconstituted data was converted into the number of equivalent thermal cycles. The Coffin-Manson Equation was used to compare flight thermal cycles to the PQV test. The accelerated life test showed cracking on the memory component solder joints after 500 cycles of 80°C temperature excursions. This study found that the RCE-A and RCE-B have undergone an equivalent of 144 and 430 cycles of 80°C temperature excursions during flight, respectively.

Bell, Charles↗

Altimetry, ship gravimetry, and the general circulation of the North Atlantic

Gravity accelerations estimated from satellite altimetric mean sea surfaces (Seasat and Geos-3) are compared to ship gravity measurements. Ship gravity are closer to an estimate based on least squares collocation, orbit perturbations, altimetry and terrestrial gravity than to an estimate based on Fourier transforms, orbit perturbations and altimetry only. Both altimetric estimates yield a smoothed picture of the geostrophic component of sea surface currents in the North Atlantic when gravity acceleration data from only nine cruises are subtracted from the altimetric gravity.

Zlotnicki, Victor↗

Computational Methods to Accelerate Development of Corrosion Resistant Coatings for Industrial Gas Turbines

Oxidation resistant overlay coatings protect the underlying superalloy component in industrial gas turbines from oxidation attack. Rate of depletion of the Al-rich β-phase in the bond coat governs the lifetime of these coatings. The applicability of a computational method in accelerating the development of corrosion resistant coatings and significantly reducing the extensive experimental effort to predict coating lifetimes and microstructural changes in three-coated Ni-based superalloys for real operational durations (20–40 kh) was undertaken in the present study. Scanning electron microscopy (SEM), energy dispersive X-ray spectroscopy (EDX), and electron microprobe analysis (EPMA) were employed to characterize MCrAlY-coated superalloy substrates (1483, 247 and X4) after exposure at 900 °C in air + 10% H 2 O for up to 20,000 h. The model predicted the longest coating lifetime for the coating on X4 substrate. Precipitation of γ' in the coatings was correctly predicted for all three coating systems. Additionally, the model was able to predict the formation of topologically close packed (TCP)-phases in the investigated coating systems.

Pillai, Rishi R.↗

Preliminary Study on Two Possible Bunch Compression Schemes at NLCTA

In this paper, two possible bunch compression configurations are proposed and evaluated by numerical simulation in the Next Linear Collider Test Accelerator (NLCTA) at SLAC. A bunch compression ratio up to 20 could be achieved under a perfect condition, without consideration for the timing jitter and other error sources. The NLCTA is a test accelerator built at SLAC, which is approximately 42 meters long and composed of X-band acceleration structures. The main aim of building NLCTA is to develop and demonstrate the X-band rf acceleration technologies for the next generation linear collider, with a relatively high acceleration gradient between 50 MV/m and 100 MV/m. The current operation configuration of NLCTA features a thermionic-cathode electron gun at its starting point which generates an electron beam with an energy of 5 MeV. This is followed by a roughly 1.5 meter long X-band acceleration structure which boosts the electron beam energy to 60 MeV. Then there is a four-dipole magnetic chicane which is 6 meters long and provides a first order longitudinal dispersion of R{sub 56} = -73mm. Next the electron beam passes by several matching quadrupoles and can be accelerated further to 120 MeV through another one-meter-long X-band acceleration structure. After that, there are three small chicanes downstream, with a total first order longitudinal dispersion of R{sub 56} = -10mm. A sketch of the main components of NLCTA is shown in Figure 1, where the total length of this accelerator is 45 meters. Free Electron Lasers (FELs), proposed by J. Madey and demonstrated for the first time at Stanford University in 1970s [2] [3], use the lasing of relativistic electron beam traveling through a magnetic undulator, which can reach high power and can be widely tunable in wavelength. Linac based FEL source can provide sufficient brightness, and a short X-ray wavelength down to angstrom scale, which promises in supporting wide range of research experiments. In order to have an electron beam lasing coherently in an undulator, one needs a very bright beam in all three dimensions. In other words, one needs an electron beam with very short bunch length (high intensity), very small transverse emittance and very small energy spread. Most FELs currently being operated, commissioned, constructed or proposed are based on RF acceleration in a frequency range from L-band ( 1 GHz) to C-band ( 6 GHz). As RF frequency goes higher, wake fields effects tend to be much stronger and jitter tolerances are tighter. To demonstrate that X-band acceleration structures can be applied in constructing an FEL, one could perform bunch compression experiments at NLCTA as a first step, and investigate tolerances on timing jitter, misalignments etc.. Another important point is to evaluate the transverse emittance growth in this bunch compression process. In the following sections, two possible bunch compression schemes are proposed to be tested at NLCTA. Elegant [4] 3-D simulation is performed to evaluate these two schemes, with wake fields, space charge and coherent synchrotron radiation (CSR) effects included. One million macro particles are adopted in the numerical simulations. The simulation starts with an electron beam of 20 pC at a beam energy of 5 MeV. The initial RMS bunch length is taken as 0.5 ps at such a low bunch charge, and the RMS energy spread is 5 x 10{sup -3}. The normalized transverse emittance is 1 mm.mrad.

43 PARTICLE ACCELERATORS↗

GPU algorithms for Efficient Exascale Discretizations

In this paper we describe the research and development activities in the Center for Efficient Exascale Discretization within the US Exascale Computing Project, targeting state-of-the-art high-order finite-element algorithms for high-order applications on GPU-accelerated platforms. Furthermore, we discuss the GPU developments in several components of the CEED software stack, including the libCEED, MAGMA, MFEM, libParanumal, and Nek projects. We report performance and capability improvements in several CEED-enabled applications on both NVIDIA and AMD GPU systems.

97 MATHEMATICS AND COMPUTING↗

From Rindler space to the electromagnetic energy-momentum tensor of a Casimir apparatus in a weak gravitational field

This paper studies two perfectly conducting parallel plates in the weak gravitational field on the surface of the Earth. Since the appropriate line element, to first order in the constant gravity acceleration g, is precisely of the Rindler type, we can exploit the formalism for studying Feynman Green functions in Rindler spacetime. Our analysis does not reduce the electromagnetic potential to the transverse part before quantization. It is instead fully covariant and well suited for obtaining all components of the regularized and renormalized energy-momentum tensor to arbitrary order in the gravity acceleration g. The general structure of the calculation is therefore elucidated, and the components of the Maxwell energy-momentum tensor are evaluated up to second order in g, improving a previous analysis by the authors and correcting their old first-order formula for the Casimir energy.

79 ASTRONOMY AND ASTROPHYSICS↗

Muon Collider design status

Muon Collider (MC) - proposed by G.I. Budker and A.N. Skrinsky a few decades ago - is now considered as the most exciting option for the energy frontier machine in the post-LHC era. A national Muon Accelerator Program (MAP) is being formed in the USA with the ultimate goal of building a MC at the Fermilab site with c.o.m. energy in the range 1.5-3 TeV and luminosity of {approx} 1.5 {center_dot} 10{sup 34} cm{sup -2} s{sup -1}. As the first step on the way to MC it envisages construction of a Neutrino Factory (NF) for high-precision neutrino experiments. The baseline scheme of the NF-MC complex is presented and possible options for its main components are discussed.

43 PARTICLE ACCELERATORS↗

Spatially resolved polarization swings in the supermassive binary black hole candidate OJ 287 with first Event Horizon Telescope observations

We present the first Event Horizon Telescope 1.3 mm observations of the supermassive binary black hole candidate OJ 287. The observations achieved an unprecedented angular resolution of 18 μas and reveal significant structural and polarization variability over just five days, marking the shortest timescale on which such changes have been directly imaged in this source. The inner jet exhibits a twisted ridgeline structure, with features displaying apparent superluminal motions up to about 22 c. The linear polarization maps reveal three main polarized features whose electric-vector position angles (EVPAs) change substantially over the time span of our observations, including a component with a radial polarization consistent with being produced by a recollimation shock. Most notably, we directly resolved two innermost jet components whose EVPAs rotate in opposite directions. The faster component, moving at 2.4 ± 0.9 μas/day (17.4 ± 6.5 c), exhibits counterclockwise EVPA swings of roughly 3.7° per day, while the slower component, with a proper motion of 1.4 ± 0.3 μas/day (10.2 ± 2.2 c), rotates clockwise at approximately 2.5° per day. Previous studies inferred helical magnetic fields in AGN jets from time-resolved or integrated polarization variability but lacked the angular resolution to directly image this effect. Our results provide spatially resolved evidence that a helical magnetic field threads the jet’s collimation and acceleration zone, ruling out models based on the superposition of unresolved components. Our analysis suggests that propagating shocks interact with a Kelvin–Helmholtz plasma instability, illuminating different phases of the helical magnetic field and producing the observed polarization spatial and temporal variability. Moreover, our model naturally accounts for the more rapid polarization rotation observed in the faster moving component. Our model predicts even more rapid swings in polarization, which could be tested with future observations featuring a more densely sampled time coverage.

OJ 287↗

Study on the Impact Characteristics of Submerged CO{sub 2} and O{sub 2} Mixed Injection (S-COMI) in EAF Steelmaking

A new type of oxygen-supplying technology was developed for electric arc furnace (EAF) steelmaking using submerged CO{sub 2} and O{sub 2} mixed injection (S-COMI). S-COMI injects O{sub 2} into the molten steel bath directly by a submerged injector installed in the furnace bed; so the metallurgical reactions can be accelerated with a high utilization ratio of oxygen. However, there has been limited research on the impact characteristics of the S-COMI submerged gas jet in EAF steelmaking. In this study, water model experiments and numerical simulations were carried out to analyze the submerged gas jet behavior, and a theoretical model was built to depict the axis trajectory of submerged gas jet in the liquid bath. The numerical results were validated against the water model experiments to show that the gas flow rate and the installed angle have a significant influence on the jet impact characteristics. The results show that as the gas flow rate increases, the horizontal and vertical penetration distances increase; as the installed angle increases, the horizontal penetration distance increases while the vertical penetration distance decreases. In addition, the erosion mechanism of the element around the submerged injector exit was studied. As the installed angle increases, the velocity component in the vertical direction increases, the fluid flow is accelerated, and the wall shear stress of the underpart of the injector element increases. Therefore, the erosion rate of the upper part of the element decreases, while that of the underpart increases.

36 MATERIALS SCIENCE↗

Accelerating Floating-Point Computations with Intel AMX

Intel AMX is a built-in component of recent Intel CPU architectures, first supported by the Intel Sapphire Rapids in 2023, that enables efficient dense matrix multiplications using mixed precision with low-precision data types. The popularity of mixed-precision algorithms has grown recently, primarily due to their use on GPUs to enhance the efficiency of HPC applications, particularly for the training of large language models. The availability of mixed precision on CPUs represents a cost-effective solution for applications where high speed is not critical. This report shows how to use the Intel AMX accelerator through examples in C++ and Python. The examples will focus on mixed-precision floating-point operations obtained by the use of bfloat16 (or BF16) to accelerate code in single precision. We employ a bottom-up methodology, starting from specific register instructions (TMUL operation) to higher-level applications in libraries such as Intel MKL, PyTorch, and TensorFlow, ensuring a comprehensive understanding of the accelerator's potential. Additionally, we provide insights into the expected performance gains when leveraging the accelerator on the Kestrel HPC machine at the National Renewable Energy Laboratory.

97 MATHEMATICS AND COMPUTING↗