Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

TA55-PMDS Programmatic Maintenance [Slides]

DOE Order 433.1B states: “The contractor must maintain real property assets in a manner that promotes operational safety, worker health, environmental compliance, property preservation and cost-effectiveness while meeting the program mission”. P950 Conduct of Maintenance serves as LANL’s Nuclear Maintenance Management Program specific to M/L 1 and M/L 2 SSC. PA-AP-01108 Maintenance Requirements for Programmatic Equipment defines the process for determining maintenance requirements, as defined in a maintenance plan, for all programmatic equipment owned by the Associate Directorate for Plutonium Science and Manufacturing (ADPSM) utilizing a formal, graded approach to maximize the reliability of permanently-installed programmatic equipment that does not perform a safety function. It bridges the gap between P950 and program equipment.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

ERDF Waste Disposal in the Central Plateau at the Hanford Site (Annual Status Report FY2012)

Washington Closure Hanford (WCH) operates the Environmental Restoration Disposal Facility (ERDF) to dispose of Hanford Site low-level radioactive, hazardous, or dangerous, and low-level mixed waste generated during waste site closures and some remediation activities from other Hanford Site contractors as authorized by the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). A CERCLA record of decision (ROD) (EPA 1995), including amendments (EPA, 1997, 1999, 2002, 2007, 2009), identifies the requirements associated with the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ERDF Waste Disposal in the Central Plateau at the Hanford Site (Annual Status Report FY2011)

Washington Closure Hanford (WCH) operates the Environmental Restoration Disposal Facility (ERDF) to dispose of Hanford Site low-level radioactive, hazardous, or dangerous, and low-level mixed waste generated during waste site closures and some remediation activities from other Hanford Site contractors as authorized by the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). A CERCLA record of decision (ROD) (EPA 1995), including amendments (EPA, 1997, 1999, 2002, 2007, 2009), identifies the requirements associated with the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2019 Performance Assessment Annual Review for the E-Area Low-Level Waste Facility

The Savannah River Site (SRS) E-Area Low-Level Waste Facility (ELLWF) consists of six types of disposal units described in the Performance Assessment (PA) (WSRC, 2008): Low Activity Waste Vault (LAWV), Intermediate Level Vault (ILV), Trenches [Slit Trenches (STs), Engineered Trenches (ETs), and Component-in-Grout (CIG) Trenches], and Naval Reactor Component Disposal Areas (NRCDAs). The ELLWF is a part of the Solid Waste Management Facility (SWMF). SWMF is managed and operated by the SRS Management and Operations prime contractor, Savannah River Nuclear Solutions (SRNS). Within SRNS, the Solid Waste Management (SWM) organization is responsible for operating the SWMF, and the Savannah River National Laboratory (SRNL) is the technical agency responsible for preparing and maintaining the PA. SWMF operations have been performed at SRS since 1952. The mission of the SWMF is to provide storage, processing, disposal, and shipment of radioactive, hazardous, and mixed waste. The SWMF is committed to treat, store, and dispose of these waste products in a manner that protects the environment and the health and safety of the facility worker, the co-located worker, and the offsite general public. Wastes handled in the SWMF include low level waste, transuranic waste, hazardous waste, Toxic Substances Control Act waste, and mixed waste (containing both hazardous and radioactive constituents).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sandia SWiFT Facility Site Operations Manual

The Scaled Wind Farm Technology (SWiFT) site, operated by Sandia National Laboratories for the U.S. Department of Energy’s Wind and Water Power Program, was commissioned in 2013 as a research facility with multiple wind turbines at a scale useful for the experimental study of wake dynamics, advanced rotor development, turbine control, and advanced sensing at production-scale wind farms. This manual provides an overview of facility operations, hazards and safety controls, and emergency response procedures at the site and is required reading for all SWiFT staff and Sandia workers, collaborators, and contractors who perform work on the site.

17 WIND ENERGY↗

Influence of Glycolate Anion on Aqueous Corrosion in DWPF and Downstream Facilities – SCC Testing

Glycolic acid is being evaluated as an alternate reductant in the preparation of High Level Waste for the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS). During processing, the glycolic acid may not be completely consumed with small quantities of the glycolate anion being carried forward to waste facilities. The SRS liquid waste contractor requested an assessment of the influence of the glycolate anion on the corrosion of the materials of construction (MoC) throughout the waste processing system since this concern had not been previously evaluated. The influence of glycolic acid on the occurrence of stress corrosion cracking (SCC) had not been evaluated specifically in the previous testing. The present testing used electrochemical and coupon immersion testing to assess this influence. Additionally, the primary guidance on corrosion for operating DWPF with a formate-based flowsheet is based on testing that utilized test solutions with a small number of constituents. Recent testing used more complex solutions based on flowsheet development for DWPF. Additional electrochemical tests were also conducted to assess the influence of this difference on test results.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2019 Performance Assessment Annual Review for the E-Area Low-Level Waste Facility

The Savannah River Site (SRS) E-Area Low-Level Waste Facility (ELLWF) consists of six types of disposal units described in the Performance Assessment (PA) (WSRC, 2008): Low Activity Waste Vault (LAWV), Intermediate Level Vault (ILV), Trenches [Slit Trenches (STs), Engineered Trenches (ETs), and Component-in-Grout (CIG) Trenches], and Naval Reactor Component Disposal Areas (NRCDAs). The ELLWF is a part of the Solid Waste Management Facility (SWMF). SWMF is managed and operated by the SRS Management and Operations prime contractor, Savannah River Nuclear Solutions (SRNS). Within SRNS, the Solid Waste Management (SWM) organization is responsible for operating the SWMF, and the Savannah River National Laboratory (SRNL) is the technical agency responsible for preparing and maintaining the PA. SWMF operations have been performed at SRS since 1952. The mission of the SWMF is to provide storage, processing, disposal, and shipment of radioactive, hazardous, and mixed waste. The SWMF is committed to treat, store, and dispose of these waste products in a manner that protects the environment and the health and safety of the facility worker, the co-located worker, and the offsite general public. Wastes handled in the SWMF include low level waste, transuranic waste, hazardous waste, Toxic Substances Control Act waste, and mixed waste (containing both hazardous and radioactive constituents).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development and Operation of a High Throughput Computer Hard Disk Drive Recycling Enterprise (CRADA NFE-16-05989)

The aim of this collaborative effort is to develop, construct and operate a high throughput computer hard disc drive (HDD) recycling system. Research conducted as part of the Critical Materials Institute (CMI), a Department of Energy (DOE) Energy Innovation Hub, has revealed the economic rationale and the necessary technology for a potentially viable HDD recycling enterprise. Moreover, the very notion of CMI is the development of replacement sources of rare earth critical materials that enable the U.S. to become less dependent on single source supplies. Focused on end-of-life (EOL) consumer products containing rare earth permanent magnets, this cooperative endeavor will develop, construct and operate a highly automated recycling process. Demonstrating economically viable recycling of high value products is largely an untapped resource in the U.S. Recycling HDDs to recover rare earth magnets and other valuable materials (e.g. aluminum, steel, printed circuit boards, copper, etc.) presents a new opportunity to satisfy U.S. demand for highly desirable commodities. The goal of this cooperative research and development agreement (CRADA) project is to create a commercial HDD recycling enterprise that changes the landscape of rare earth magnet material and magnet availability for U.S. manufacturers. Underpinning this primary goal is the development and demonstration of an economic HDD recycling process that provides a significant and alternative supply of rare earth magnets that is not dependent upon foreign sourcing. Oak Ridge National Laboratory (ORNL) has researched the technology options and down selected specific sub-process technologies based upon throughput and economic potential. The participant, however, brings significant process design, development and operational experience that may result in process improvement or optimization strategies that will be explored in collaboration with the contractor. The final outcome of this CRADA is a system/process for recycling large quantities of HDDs. The technology is available for commercial scale-up.

42 ENGINEERING↗

HIGH EFFICIENCY HIGH DENSITY GAN BASED 6.6KW BI-DIRECTIONAL ON-BOARD CHARGER FOR PEVS

Executive Summary: In the 4th quarter of 2014, a program was formally initiated at Delta Products to develop and commercialize a lightweight, compact and high efficiency bi-directional on-board Charger (OBC) for plug-in electric vehicle use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE- EE0006834. Delta products was the prime contractor to DOE during the three-year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Transphorm, Inc., The Center for Power Electronics Systems (CPES) at Virginia Tech, and Fiat Chrysler Automobiles. The OBC uses novel control schemes enabled by Gallium Nitride (GaN) switches to obtain charger efficiency of 95% and reduce volume and mass by 50% of the existing state-of-the-art silicon (Si) based chargers and inverters. A Si-based bidirectional OBC is typically implemented with two separate modules: a charger and an inverter. A GaN-based bidirectional OBC can integrate both functions into a single module. It will result in substantial reductions in size, weight and cost. This enables the introduction of WBG devices in automotive production programs. The inverter function integrated with PHEV can act as emergency power source in case of power interruption. This increases the power security when the electric infrastructure is damaged by extreme weather conditions. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of OBC prototypes is described in detail. After the program history is reviewed, the key attributes of the resulting OBC are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this OBC to meet or exceed DOE's targets for this program, including: • Construction of a working product-intent prototype of a bi-directional on-board Charger (OBC); • Peak efficiency of 95% and volume reduction of 50% compared to a recent production modules of similar ratings. • Bi-directional operation at 120Vac and 240Vac in vehicle. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.

30 DIRECT ENERGY CONVERSION↗

U.S. Fusion D-Li Neutron Irradiation Facility: Fusion Prototypic Neutron Source (FPNS) Technology Study

A primary engineering challenge for the realization of fusion energy involves the development of high-performance structural and plasma-facing materials with dimensional stability and resistance to neutron degradation of mechanical properties. The harsh fusion environment, including high levels of helium production and other transmutation products along with high operating temperatures, poses an extreme challenge for materials. Identifying materials that can withstand these conditions is a high priority for fusion energy research. Critical to resolving this gap in scientific understanding is developing a neutron source facility with the ability to mimic the extreme conditions in a fusion reactor. Working with the Department of Energy (DOE) Office of Fusion Energy Sciences (FES), Oak Ridge National Laboratory (ORNL) and the Virtual Laboratory for Technology (VLT) organized a workshop to discuss the need for a Fusion Prototypic Neutron Source (FPNS). [1] While there are a variety of uses for FPNS neutrons, the main driver of US interest is expanding the scientific understanding of materials degradation in the deuterium-tritium (D-T) fusion environment. FPNS will help build the scientific foundation required to enable design of a next step fusion device. Using specifications from previous projects as a guide, key parameters were agreed upon for a near term, moderate cost US facility that would be complementary to the more extensive plans of the International Fusion Materials Irradiation Facility (IFMIF). Types of facilities that could potentially meet those criteria were identified. A scoping study for three technologies was initiated to answer three critical questions: 1) Can the concept meet the key parameters, 2) What is the estimated cost, and 3) What is the estimated schedule. One approach selected for the scoping study is a D-Li stripping source similar to the design of the IFMIF but at a lower beam power and atomic displacement rate for cost and schedule reasons. The purpose of this report is to document the results of the D-Li stripping source option study, providing answers to the three questions. The approach to generating a fusion prototypic neutron source using a deuteron beam incident on a flowing lithium target has been studied for more than 40 years. As a result of the research and development recently executed primarily in Europe and Japan, the ability of this approach to meet key parameters (damage parameters, irradiation volume) outlined in the US workshop for a near-term, moderate cost fusion prototypic neutron source facility is not in doubt. The main question that must be answered is the cost of such a facility. As a result, a strong focus was placed on understanding alternatives for developing the facility and their relative costs. The project was broken into four components for the cost estimate: the ion source, accelerator, lithium target system, and conventional facilities. The cost of the accelerator is an important cost driver for the D-Li stripping concept. To fully understand the range of the accelerator cost, multiple alternatives were considered including normal conducting and superconducting linacs and the frequency of the radiofrequency quadrupole. Multiple previous design studies dating from 1989 through 2017 were examined (costs were escalated to 2019 dollars) and compared. After analysis, two options were selected for costing, one superconducting and one room temperature. We found similar project costs for the two accelerator options, on the order of $100M including design and project management but excluding contingency. Including everything except the conventional facilities, the estimate for the neutron source facility is estimated to be $220M without contingency. Additional significant costs for the facility are the conventional costs arising from the need to construct buildings for the accelerator and target facilities, bringing electrical power to the site including a new substation, and removing the heat from the facility using heat exchangers. While ORNL would oversee this work, much of the effort would be executed by contractors. Estimates for this effort was based on similar projects that are currently being executed at ORNL or were executed at ORNL in the recent past. The estimate for conventional facilities for the neutron facility is $173M without contingency, bringing the total project cost to $393M without contingency. With a 50% contingency, the estimated cost is $589M. The estimate range was established using guidance from the Association for the Advancement of Cost Engineering (AACE). Specifically, guidance from recommended practice 17R-97 provides insight on the expected accuracy range of estimates based on the degree of project definition and the position of the project in the stage-gate process or maturity timeline. An AACE Class 5 type estimate is appropriate for concept screening. The expected accuracy range includes a low end of -50% to -20% and a high end of +30% to +100% around the estimated cost. For the D-Li stripping neutron source, a -20% to +100% cost range was applied for a recommended cost range of $471M to $1,179M. Less emphasis was placed on determining the project schedule due to the fact that the project costs were large and may eliminate this option from consideration. The development of the accelerator facility may require on the order of five years without contingency. A more realistic schedule with contingency may be seven years. However, this estimate should be scrutinized in a preconceptual design activity if a more realistic estimate is needed. Finally, one lesson learned in this process is that the requirements for a near-term, moderate cost facility drives the alternative selection toward existing facilities and infrastructure. The D-Li stripping neutron source option requires a green field site due to the lack of existing buildings and infrastructure that can be reused for this effort. As a result, the conventional facilities costs are a significant fraction of the total facility cost. Other neutron source options where buildings, electrical power, and cooling infrastructure already exist may be able to meet the requirements for a near term, moderate cost facility.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Highly Integrated WBG Power Module for Next Generation Plug-In Vehicles

Current inverter technologies used in electric vehicles (EVs) are bulky, heavy, and expensive. The performance of the inverter is also limited by the traditional Si-based semiconductor and packaging technology. These constraints are responsible for extra weight and volume in the vehicle that reduces the driving range along with usable space within the vehicle. Moreover, operating temperature restrictions, and boundaries on the inverter location within the vehicle drastically reduces the inverter performance. Thus an improved inverter design is required for next generation electric vehicles. The objective of this project was to research, develop and demonstrate a highly integrated WBG power module targeting the next generation of plugin hybrid electric vehicles (PHEVs). This power module needed to be functionally and mechanically optimized for General Motors (GM) traction inverter architecture. General Motors was the prime contractor, led the project, and oversaw the design, build, and test of the integrated power module. Virginia Polytechnic Institute and State University (VT) performed modeling and simulation tasks as well as power module design support. Monolith Semiconductor, Inc provided SiC dies and consulted on devices for the inverter. Oak Ridge National Laboratory (ORNL) performed power module technology evaluations, design evaluations of interconnect options, and performed material analysis and cross-sectioning of die activities.

33 ADVANCED PROPULSION SYSTEMS↗

Sensor-Based Energy Modeling (sBEM) D4: Final report

Four residential demonstration homes have been built as part of the ZEBRAlliance and fully instrumented with 50+ sensors collecting 1-minute data and 190+ sensors collecting 15-minute data (over 250 sensors total) with the first year’s worth of data for two houses collected in January, 2011. This sensor data will be mined to develop predictive models of component-level and whole-building energy consumption by utilizing machine-learning techniques in a way that circumvents problems with typical white-box modeling approaches (faulty/time-consuming input building models, energy simulation assumptions, and contractor variability in as-built results). Such a system would constitute an objective, quantitative framework whereby raw sensor data is utilized to determine both a prediction, and thus a variance (i.e. within 10% of predicted 80% of the time), for energy consumption by a residential building. Furthermore, analysis will be conducted to determine the predictive accuracy for a smaller number of sensors.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Concentrating Solar Power Best Practices Study

The primary objective of this Concentrating Solar Power Best Practices Study is to publish best practices and lessons learned from the engineering, construction, commissioning, operations, and maintenance of existing concentrating solar power (CSP) parabolic trough and power tower systems. To accomplish this objective, information was solicited from many owners, operators, and engineering, procurement, and construction (EPC) contractors, independent engineers, and other stakeholders of parabolic trough and central receiver plants (also commonly referred to as power towers). Information was gathered through in-person or online meetings, site visits, and questionnaires sent to participants. The project team held about 50 information-gathering sessions with participants over the course this effort; and in the process, it collected information from participants representing nearly 80% of CSP plants operating worldwide.

14 SOLAR ENERGY↗

Pahute Mesa-Oasis Valley Hydrostratigraphic Framework Model for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada (Rev. 0)

A new, revised three-dimensional (3-D) hydrostratigraphic framework model (HFM) for the Central and Western Pahute Mesa Corrective Action Units 101 and 102 was completed in 2019. The initial (Phase I) model was completed in 2002 and was documented in A Hydrostratigraphic Model and Alternatives for the Groundwater Flow and Contaminant Transport Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nye County, Nevada (BN, 2002). Subsequent flow and transport modeling revealed the need to collect additional data to reduce uncertainties. The Phase II data collection and characterization effort included extensive well drilling and testing activities, and rebuilding of the Phase I 3-D HFM, resulting in the Phase II HFM (NSTec, 2014). Further drilling (Well ER-20-12), data collection, and interpretive work (e.g., Thirsty Canyon Lineament [Wurtz and Day, 2018]) were incorporated into the Pahute Mesa-Oasis Valley (PM-OV) HFM. The PM-OV HFM incorporates the area of interest from the Phase II HFM and adds additional areas, primarily to the north and west with minor additions to the south and east. The new, expanded area matches the PM-OV groundwater basin as defined in Fenelon et al. (2016) and includes Pahute Mesa, a former nuclear testing area at the Nevada National Security Site; and Oasis Valley, a groundwater discharge area downgradient from contaminant source areas on Pahute Mesa. The data and information necessary to build the PM-OV HFM are provided in Navarro (2019). The PM-OV HFM will be used by hydrologic modelers who are tasked with developing a model to determine how contaminants are transported by groundwater flow in an area of complex geology. The model area is large (more than 6,250 square kilometers) and geologically complex, including Paleozoic- to Mesozoic-age structures (e.g., thrust faults, Thirsty Canyon Lineament), at least seven Tertiary-age calderas, several intrusive bodies, and many relatively recent basin-and-range normal faults. Investigators from the U.S. Geological Survey; National Security Technologies, LLC; National Laboratories; and U.S. Department of Energy contractors have organized the more than 300 volcanic units and other rocks in the model area into 77 hydrostratigraphic units (HSUs). The volcanic rocks are subdivided into 42 aquifers, 11 confining units, and 9 composite units (containing both aquifer and confining unit rocks). The underlying pre-Tertiary rocks were divided into 5 HSUs, comprising 2 aquifers and 3 confining units. The model also includes 1 alluvial aquifer unit, 8 intrusive confining units, and 1 granite confining unit. The model depicts the thickness, extent, and geometric relationships of these HSUs (“layers” in the model) along with all the major structural features that control them, including calderas and faults. The most substantive differences between the Phase II HFM and the PM-OVHFM include (1) addition of the new data and resulting revised interpretations from the additional area encompassed by the PM-OV groundwater basin; (2) incorporation of 16 new faults; (3) 12 boreholes from the northern extension; (4) 2 additional caldera-collapse collars; and (5) correlation of the simulated faulting and hydrostratigraphy in the eastern part of the model domain with the delineations represented in the neighboring Rainier Mesa-Shoshone Mountain HFM-Prime and Yucca Flat-Climax Mine HFM. All PM-OV HFM delineations were based on published and unpublished data from geophysical investigations, surface geologic maps, and drill-hole records. Phase II approached model uncertainty using the model-building software to test model configurations and hydrologic consequences using a range of values for parameters such as fault offset amounts and HSU elevations. The PM-OV HFM expands on this approach to encompass the entire PM-OV groundwater basin.

54 ENVIRONMENTAL SCIENCES↗

MST e-News (Fall 2020)

As we just closed the fiscal year, I have been reflecting on the state of the division, and in particular, the health of our budget, staffing plans, and infrastructure. As many of you know, the division has grown in both budget and workforce. Since 2018, the division has grown from 150 to 174 permanent staff (but note, with students, post docs, and contractors—we are a division of 218). As one might imagine, our budget has grown significantly too. In 2018, at year end, we had a budget of $85 million. While I am still collecting some final numbers, all projections indicate that we closed out FY20 at $115 million. This growth has occurred primarily in our applied energy programs as well as Pu Sustainment. However, it is important to note that there have been important contributions to this growth across much of the portfolio, including in our OES, BES, and LDRD programs. With that said, to support this programmatic growth, as a division we have done a tremendous amount of hiring to grow while outpacing attrition. At the same time, we have been establishing numerous new capabilities at TAs -3, -35, and -55. While this is exciting, it means we have some things to carefully consider. We have had numerous capability investments (i.e., new microscopes at TAs -3 and -55, new mechanical testing capabilities at TAs -3 and -35, and new synthesis capabilities across the division). But we are starting to feel the real crunch of the limitations of our aging facilities. Still more, even with this substantial growth, we continue to hire. And I believe that we really need to spend time thinking about mentoring, career development, and retention of our most important investment—our staff.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

TA-55 PA Walkdown

This video will take the place of contractors conducting an onsite visit due to concerns over COVID-19.

99 GENERAL AND MISCELLANEOUS↗

Analysis of Air-Purifying Respirator (APR) and Powered Air-Purifying Respirator (PAPR) Cartridge Performance Testing on a Hanford AP Tank Farm Exhauster Slipstream: Volume 2 Raw Analytical Data

As the Tank Operations Contractor for U.S. Department of Energy operations at the Hanford site in Washington State, Washington River Protection Solutions (WRPS) is responsible for managing highly radioactive wastes stored in tanks at Hanford. WRPS tests air-purifying respirator (APR) and powered air-purifying respirator (PAPR) chemical cartridges commonly used at Hanford Tank Farms to determine the period of time that the cartridges would provide adequate performance for APRs and PAPRs used to protect workers when exposed to a mixture of Chemicals of Potential Concern (COPC) from any vapors exiting headspaces in the storage tanks. The Occupational Safety and Health Administration (OSHA) Standard promulgated in Title 29 of the Code of the Federal Regulations (CFR) 1910.134(d)(3)(iii)(b)(2) specifies that for protection against gases and vapors, employers shall implement a schedule for cartridges to ensure that change-outs occur before the end of service life. The change schedule can be based on objective information or data that ensures cartridge change-outs occur before the end of their service life.[2-5] The primary function of the WRPS Cartridge Test Program is to obtain objective data to determine service lives for the APR and PAPR cartridges used at Hanford Tank Farms. WRPS contracted with Pacific Northwest National Laboratory to analyze the test data and offer an independent analysis and any recommendations. Volume 1 of this report summarizes data analysis of APR and PAPR cartridge testing on vapors from the AP tank farm exhauster. Previous testing of APR cartridges was conducted on the AP exhauster in June 2016. However, an AP exhauster upgrade was completed in September 2016. Two different APR cartridges from SCOTT Safety (Monroe, North Carolina) were assessed for the new AP exhauster source, along with two different PAPR cartridges—one from MSA Safety Inc. (Pittsburgh, Pennsylvania) and another from 3M (Maplewood, Minnesota). Volume 2 provides an introduction to the raw data, including analytical laboratory analysis results that supported the analysis and conclusions documented in Volume 1.

61 RADIATION PROTECTION AND DOSIMETRY↗

Closeout Briefing for PSL Technical Survey of MSTS SCP (JASPER) [PowerPoint]

NNSA Order 56XB (Chapter 13.2) requires the Primary Standards Laboratory (PSL) to perform technical surveys on the integrated contractors participating in the NNSA Standards and Calibration Program. In addition to Chapter 13.2, the surveys check for compliance with ISO/IEC 17025 and the PSLM. The PSL Technical Survey is a joint activity of the NNSA and the PSL. The PSL is responsible for the technical portion of the survey and the NNSA is responsible for the quality portion. The Technical Survey report is issued by the NNSA.

42 ENGINEERING↗