Search NASA⌕ Search

SEARCH · Search NASA

Results for “COST PROGRAM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Software Reuse in the Planetary Context: The JPL/MIPL Mars Program Suite

Reuse greatly reduces development costs. Savings can be invested in new/improved capabilities Or returned to sponsor Worth the extra time to "do it right" Operator training greatly reduced. MIPL MER personnel can step into MSL easily because the programs are familiar. Application programs much easier to write. Can assume core capabilities exist already. Multimission Instrument (Image) Processing Lab at MIPL Responsible for the ground-based instrument data processing for (among other things) all recent in-situ Mars missions: Mars Pathfinder Mars Polar Lander (MPL) Mars Exploration Rovers (MER) Phoenix Mars Science Lab (MSL) Responsibilities for in-situ missions Reconstruction of instrument data from telemetry Systematic creation of Reduced Data Records (RDRs) for images Creation of special products for operations, science, and public outreach In the critical path for operations MIPL products required for planning the next Sol s activities

Software Design↗

Software for Tracking Costs of Mars Projects

The Mars Cost Tracking Model is a computer program that administers a system set up for tracking the costs of future NASA projects that pertain to Mars. Previously, no such tracking system existed, and documentation was written in a variety of formats and scattered in various places. It was difficult to justify costs or even track the history of costs of a spacecraft mission to Mars. The present software enables users to maintain all cost-model definitions, documentation, and justifications of cost estimates in one computer system that is accessible via the Internet. The software provides sign-off safeguards to ensure the reliability of information entered into the system. This system may eventually be used to track the costs of projects other than only those that pertain to Mars.

Wong, Alvin↗

Software for Displaying High-Frequency Test Data

An easy-to-use, intuitive computer program was written to satisfy a need of test operators and data requestors to quickly view and manipulate high-frequency test data recorded at the East and West Test Areas at Marshall Space Flight Center. By enabling rapid analysis, this program makes it possible to reduce times between test runs, thereby potentially reducing the overall cost of test operations. The program can be used to perform quick frequency analysis, using multiple fast- Fourier-transform windowing and amplitude options. The program can generate amplitude-versus-time plots with full zoom capabilities, frequency-component plots at specified time intervals, and waterfall plots (plots of spectral intensity versus frequency at successive small time intervals, showing the changing frequency components over time). There are options for printing of the plots and saving plot data as text files that can be imported into other application programs. The program can perform all of the aforementioned plotting and plot-data-handling functions on a relatively inexpensive computer; other software that performs the same functions requires computers with large amounts of power and memory.

Elmore, Jason L.↗

Improving and Expanding NASA Software Cost Estimation Methods

Estimators and analysts are increasingly being tasked to develop better models and reliable cost estimates in support of program planning and execution. While there has been extensive work on improving parametric methods for cost estimation, there is very little focus on the use of cost models based on analogy and clustering algorithms. In this paper we summarize the results of our research in developing an analogy method for estimating NASA spacecraft flight software using spectral clustering on system characteristics (symbolic nonnumerical data) and evaluate its performance by comparing it to a number of the most commonly used estimation methods. The strengths and weaknesses of each method based on their performance are also discussed. The paper concludes with an overview of the analogy estimation tool (ASCoT) developed for use within NASA that implements the recommended analogy algorithm.

Hihn, Jairus↗

Implementing an Information Security Program

The threats to information security have dramatically increased with the proliferation of information systems and the internet. Chemical, biological, radiological, nuclear, and explosives (CBRNe) facilities need to address these threats in order to protect themselves from the loss of intellectual property, theft of valuable or hazardous materials, and sabotage. Project 19 of the European Union CBRN Risk Mitigation Centres of Excellence Initiative is designed to help CBRN security managers, information technology/cybersecurity managers, and other decision-makers deal with these threats through the application of cost-effective information security programs. Project 19 has developed three guidance documents that are publically available to cover information security best practices, planning for an information security management system, and implementing security controls for information security.

blended attack↗

Application of Reconfigurable Avionics for the Bantam Launch Vehicle

The modern aerospace market is placing increasing pressure on launch costs. This is particularly true for small university science payloads, where the cost of the experiment itself is relatively low, and the launch frequency is potentially very high. It is the stated goal of NASA's Bantam Program to reduce dramatically the costs of launching this class of payloads to the order of $1,000,000 per launch for a single 200 pound payload. The envisioned Bantam vehicle is a multi-stage reusable launch system. Meeting the Program's goal for this versatile type of vehicle requires reductions in production cost, maintenance cost, and the operation cost. However, the cost of avionics is a relatively small fraction of the overall cost of launching a payload, and a simple reduction in the avionics costs will not achieve the Bantam goal. Only by reducing weight, volume, and power, while enhancing computational capability can the avionics be used to address the system-level cost reduction requirements.

Wallace, Kevin Shawn↗

ADVANCED CONSTRUCTION TECHNOLOGY INITIATIVE (ACTI)

Advanced reactor technologies have attracted considerable financial support, catalyzing innovation in the nuclear energy landscape. These next generation reactors are designed with enhanced passive safety systems and the potential for cost reductions. As these advanced reactors approach technological maturity, their commercial success also requires focused examination and essential support. Economic assessments in the nuclear energy sector often emphasize construction costs and the risk of scheduling delays as primary contributors to deployment expenditures. Traditionally, vital elements of nuclear energy deployment including civil/structural engineering, design sophistication and automation have been either undervalued or postponed in the development cycles. Additionally, the nuclear industry’s collective experience in nuclear project execution has diminished over the past several decades due to the infrequency of new plant constructions. Hence, The National Reactor Innovation Center’s (NRIC) Advanced Construction Technology Initiative (ACTI) program aims to reduce cost overruns and schedule slippages that have plagued the construction of nuclear power plant projects. With this initiative, NRIC is facilitating the development of advanced nuclear plant construction technologies and approaches through partnerships that would provide game-changing benefits to the construction of advanced nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Strategic Offering for Wind Power Producers Considering Energy and Flexible Ramping Products

The increasing deployments of renewable generation methods, such as wind, affects the flexibility of electric power system operating due to their inherent variability and uncertainty. To mitigate this, power systems need flexible resources. This paper investigates the potential for wind power to provide flexible ramping products in the real-time market, an additional value stream to the energy it provides. The proposed model for wind power’s strategic offering is formulated as a bi-level optimization problem with wind profit maximization at the upper level and the independent system operator’s economic dispatch—considering both the energy balance and the flexible ramping requirement to counter uncertainty—at the lower level. This bi-level model is converted to a mathematical program with equilibrium constraints (MPEC) by recasting the lower level problem with its Karush–Kuhn–Tucker optimality conditions. Then, through strong duality theory and the big-M method, the MPEC model is converted to a mixed-integer linear programming model. The opportunity cost and the price for wind power-providing ramping products are analyzed. Numerical examples based on a 5-bus network are presented to verify the proposed model and concept.

17 WIND ENERGY↗

Large area low-cost space solar cell development

A development program to produce large-area (5.9 x 5.9 cm) space quality silicon solar cells with a cost goal of 30 $/watt is descibed. Five cell types under investigation include wraparound dielectric, mechanical wraparound and conventional contact configurations with combinations of 2 or 10 ohm-cm resistivity, back surface reflectors and/or fields, and diffused or ion implanted junctions. A single step process to cut cell and cover-glass simultaneously is being developed. A description of cell developments by Applied Solar Energy Corp., Spectrolab and Spire is included. Results are given for cell and array tests, performed by Lockheed, TRW and NASA. Future large solar arrays that might use cells of this type are discussed.

Baraona, C. R.↗

The use of COSMIC NASTRAN in an integrated conceptual design environment

Changes in both software and hardware are rapidly bringing conceptual engineering tools like finite element analysis into mainstream mechanical design. Systems that integrate all phases of the manufacturing process provide the most cost benefits. The application of programming concepts like object oriented programming allow for the encapsulation of intelligent data within the design geometry. This combined with declining cost in per seat hardware bring new alternatives to the user.

White, Gil↗

Summary of Results from the Risk Management Program for the Mars Microrover Flight Experiment

On 4 July 1997, the Mars Pathfinder landed on the surface of Mars carrying the first planetary rover, known as the Sojourner. Formally known as the Microrover Flight Experiment (MFEX), the Sojourner was a low cost, high-risk technology demonstration, in which new risk management techniques were tried. This paper summarizes the activities and results of the effort to conduct a low-cost, yet meaningful risk management program for the MFEX. The specific activities focused on cost, performance, schedule, and operations risks. Just as the systems engineering process was iterative and produced successive refinements of requirements, designs, etc., so was the risk management process. Qualitative risk assessments were performed first to gain some insights for refining the microrover design and operations concept. These then evolved into more quantitative analyses. Risk management lessons from the manager's perspective is presented for other low-cost, high-risk space missions.

Shishko, Robert↗

System Cost Analysis for an Interior Permanent Magnet Motor

The objective of this program is to provide an assessment of the cost structure for an interior permanent magnet ('IPM') motor which is designed to meet the 2010 FreedomCAR specification. The program is to evaluate the range of viable permanent magnet materials for an IPM motor, including sintered and bonded grades of rare earth magnets. The study considers the benefits of key processing steps, alternative magnet shapes and their assembly methods into the rotor (including magnetization), and any mechanical stress or temperature limits. The motor's costs are estimated for an annual production quantity of 200,000 units, and are broken out into such major components as magnetic raw materials, processing and manufacturing. But this is essentially a feasibility study of the motor's electromagnetic design, and is not intended to include mechanical or thermal studies as would be done to work up a selected design for production.

33 ADVANCED PROPULSION SYSTEMS↗

NASA Space Biology Research Associate Program for the 21st Century

The Space Biology Research Associate Program for the 21st Century provided a unique opportunity to train individuals to conduct biological research in hypo- and hyper-gravity, and to conduct ground-based research. This grant was developed to maximize the potential for Space Biology as an emerging discipline and to train a cadre of space biologists. The field of gravitational and space biology is rapidly growing at the future of the field is reflected in the quality and education of its personnel. Our chief objective was to train and develop these scientists rapidly and in a cost effective manner. The program began on June 1, 1980 with funding to support several Research Associates each year. 113 awards, plus 1 from an independently supported minority component were made for the Research Associates program. The program was changed from a one year award with a possibility for renewal to a two year award. In 1999, the decision was made by NASA to discontinue the program due to development of new priorities for funding. This grant was discontinued because of the move of the Program Director to a new institution; a new grant was provided to that new institution to allow completion of the training of the remaining 2 research associates in 1999. After 1999, the program will be discontinued.

Sonnenfeld, Gerald↗

A PC program to optimize system configuration for desired reliability at minimum cost

High reliability is desired in all engineered systems. One way to improve system reliability is to use redundant components. When redundant components are used, the problem becomes one of allocating them to achieve the best reliability without exceeding other design constraints such as cost, weight, or volume. Systems with few components can be optimized by simply examining every possible combination but the number of combinations for most systems is prohibitive. A computerized iteration of the process is possible but anything short of a super computer requires too much time to be practical. Many researchers have derived mathematical formulations for calculating the optimum configuration directly. However, most of the derivations are based on continuous functions whereas the real system is composed of discrete entities. Therefore, these techniques are approximations of the true optimum solution. This paper describes a computer program that will determine the optimum configuration of a system of multiple redundancy of both standard and optional components. The algorithm is a pair-wise comparative progression technique which can derive the true optimum by calculating only a small fraction of the total number of combinations. A designer can quickly analyze a system with this program on a personal computer.

Hills, Steven W.↗

Resilient Distribution System Restoration with Equitable Load Shedding

A methodology is proposed for the improvement of electric distribution system resilience to high-impact, low-probability catastrophic events. An approach for dynamic network reconfiguration and coordination of distributed energy resources is introduced to assist in restoration efforts. The problem is formulated as a mixed-integer linear program that minimizes generation costs, the cost of lost load, and costs associated with equitable load shedding, while respecting operational limits of generation, loads, and the network. Constraints are imposed on binary switching variables to ensure equitable load shedding in emergency situations. Numerical validation of the proposed approach is conducted on an example distribution feeder, and case studies are performed to analyze the impact of various parameters in the optimization problem formulation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Long-Term Stewardship at Hanford - 17023

The Hanford Site's Long-Term Stewardship (LTS) Program is responsible for 220 square miles of the Site's River Corridor, which includes 1,527 waste sites, 6 Manhattan Project Era production reactors that have been placed in interim safe storage, and 46 miles of Columbia River shoreline. More than 24,000 cleanup and historic documents have been identified, indexed, and tagged in the LTS records and document libraries. The LTS program, operated by the Mission Support Alliance, LLC (MSA) manages and provides surveillance and maintenance of facilities and institutional controls and all associated monitoring to ensure continued protectiveness of human health and the environment. Since 2010, through collaborative efforts with DOE and its prime contractors, land in 14 geographic areas and six cocooned reactor facilities were transitioned (mid-contract) from the River Corridor Closure Contractor to the LTS program. This accomplishment relied heavily on Site contractors and DOE working together to address challenges. Other stakeholders were informed of LTS progress through the Hanford LTS web site, presentations, and briefings. Hanford's LTS program is responsible for ensuring the protectiveness of cleanup remedies and the management of institutional controls once cleanup objectives have been achieved. LTS accomplishes this by adhering to post-cleanup requirements specified in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA) cleanup decision documents. The LTS program conducted inspection and surveillance and maintenance (S and M) activities of the cocooned 105-F Reactor in October 2014 and the other five reactors in 2015 and 2016. Reactor entries and internal inspections typically are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls, and roof. The cocooning process is designed to protect the reactor for 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The results of the recent 5-year inspections allowed DOE to negotiate an extended 10-year inspection cycle, which led to a $5 million avoidance in lifecycle inspection costs. Hanford's LTS program is successfully shifting from a program focused on transitioning land and waste sites to a program focused on data management and S and M activities for those buildings and waste sites within the program. This paper will highlight the accomplishments and collaborative efforts in addressing the challenges faced by Hanford's LTS program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

California Power-to-Gas and Power-to-Hydrogen Near-Term Business Case Evaluation

Flexible operation of electrolysis systems represents an opportunity to reduce the cost of hydrogen for a variety of end-uses while also supporting grid operations and thereby enabling greater renewable penetration. California is an ideal location to realize that value on account of growing renewable capacity and markets for hydrogen as a fuel cell electric vehicle (FCEV) fuel, refineries, and other end-uses. Shifting the production of hydrogen to avoid high cost electricity and participation in utility and system operator markets along with installing renewable generation to avoid utility charges and increase revenue from the Low Carbon Fuel Standard (LCFS) program can result in around $2.5/kg (21%) reduction in the production and delivery cost of hydrogen from electrolysis. This reduction can be achieved without impacting the consumers of hydrogen. Additionally, future strategies for reducing hydrogen cost were explored and include lower cost of capital, participation in the Renewable Fuel Standard program, capital cost reduction, and increased LCFS value. Each must be achieved independently and could each contribute to further reductions. Using the assumptions in this study found a 29% reduction in cost if all future strategies are realized. Flexible hydrogen production can simultaneously improve the performance and decarbonize multiple energy sectors. The lessons learned from this study should be used to understand near-term cost drivers and to support longer-term research activities to further improve cost effectiveness of grid integrated electrolysis systems.

33 ADVANCED PROPULSION SYSTEMS↗