Fuel Cycle Study to Developing a Viable Long Term Nuclear Power Scenario for the UK
Within the UK a closed fuel cycle has been in operation for decades but with the introduction of a new build programme to create 16 GWe capacity using LWR technology and with the closure of the UK's reprocessing industry, an open fuel cycle will be implemented beyond 2020. However, it is expected that 16 GWe nuclear capacity will not be enough for the UK to curb greenhouse gas emissions through increased demand for low carbon electricity, and tackle energy security. As such further nuclear expansion scenarios are being considered between 40 and 75 GWe by 2050. This study evaluates a viable 40 GWe UK nuclear scenario, evaluating the extent to which key drivers can impact a future UK nuclear energy strategy, including; the ability to sustain a relatively high nuclear capacity, fresh uranium availability, accumulation of spent fuel at decommissioning nuclear reactor sites and capacity requirements of future GDF host sites. The thermal reactor open fuel cycle is the de-facto standard around the world for many reasons including the reliance on extremely mature technology, significant operational experience and most importantly a relatively low cost. However, the premise that a thermal reactor open fuel cycle is the correct one to adopt long term is dependent on the notion that large quantities of UO{sub 2} spent fuel can eventually be disposed of in a geological disposal facility and the future availability of fresh uranium. The total amount of available uranium is unknown and if extraction from seawater proves to be economic and practical then any future concerns regarding supply disappear. Spent fuel disposability on the other hand has never been performed on a commercial scale and there is some uncertainty when and whether this can be achieved. This paper will follow from previous work already presented in 2013 [REF] which examined UK fuel cycles involving the transition to a closed fast reactor fleet by the end of this century. The revised scenarios now assume fast reactors are required later in the scenario, in-line with other countries. In addition, the new study has used physics methods originally developed by SKB to assess the physical size of the repository required to dispose of all intermediate and high level waste whilst ensuring temperature limits imposed by the engineered barriers and surrounding geology are adhered to. The disposition of less Am-241 in the repository will no doubt lead to a reduction in GDF footprint. However, this may not be important to GDF design and economics. The purpose of this paper is to also critically review the importance of and put into perspective a smaller GDF footprint and lower fissile inventory. (authors)