Search NASA⌕ Search

SEARCH · Search NASA

Results for “Ground Operational Support System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 991 records · Page 55

Development of CO2 laser Doppler instrumentation for detection of clear air turbulence, volume 1

Modification, construction, test and operation of an advanced airborne carbon dioxide laser Doppler system for detecting clear air turbulence are described. The second generation CAT program and those auxiliary activities required to support and verify such a first-of-a-kind system are detailed: aircraft interface; ground and flight verification tests; data analysis; and laboratory examinations.

Harris, C. E.↗

Maintaining an expert system for the Hubble Space Telescope ground support

The transformation portion of the Hubble Space Telescope (HST) Proposal Entry Processor System converts astronomer-oriented description of a scientific observing program into a detailed description of the parameters needed for planning and scheduling. The transformation system is one of a very few rulebased expert systems that has ever entered an operational phase. The day to day operations of the system and its rulebase are no longer the responsibility of the original developer. As a result, software engineering properties of the rulebased approach become more important. Maintenance issues associated with the coupling of rules within a rulebased system are discussed and a method is offered for partitioning a rulebase so that the amount of knowledge needed to modify the rulebase is minimized. This method is also used to develop a measure of the coupling strength of the rulebase.

Lindenmayer, Kelly↗

Shuttle rendezvous and proximity operations

Shuttle rendezvous and proximity operations trajectory control techniques are reviewed and it is noted that they have been affected by many factors including Shuttle system design constraints such as limited forward RCS and single point radar failures. Crew training requirements and mission operations constraints such as large launch windows, flexibility, and contingency profile interrupts are also integral factors. The resulting trajectory control design primarily uses ground support for the launch and orbit adjust phases, standardized crew techniques utilizing onboard software for the relative navigation flight phase, and mission unique manual control for a flexible proximity operations phase.

Pearson, Don J.↗

Space Shuttle reaction control system thruster metal nitrate removal and characterization

The Space Shuttle hypergolic primary reaction control system (PRCS) thrusters continue to fail-leak or fail-off at a rate of approximately 1.5 per flight, attributed primarily to metal nitrate formation in the nitrogen tetroxide (N2O4) pilot operated valves (POV's). The failures have continued despite ground support equipment (GSE) and subsystem operational improvements. As a result, the Johnson Space Center (JSC) White Sands Test Facility (WSTF) performed a study to characterize the contamination in the N204 valves. This study prompted the development and implementation of a highly successful flushing technique using deionized (DI) water and gaseous nitrogen (GN2) to remove the contamination while minimizing Teflon seat damage. Following flushing a comprehensive acceptance test is performed before the thruster is deemed recovered. Between the time WSTF was certified to process flight thrusters (March 1992) and September 1993, a 68 percent thruster recovery rate was achieved. The contamination flushed from these thrusters was analyzed and has provided insight into the corrosion process, which is reported in this publication. Additionally, the long-term performance of 24 flushed thrusters installed in the WSTF Fleet Leader Shuttle reaction control subsystem (RCS) test articles is being assessed. WSTF continues to flush flight and test article thrusters and compile data to investigate metal nitrate formation characteristics in leaking and nonleaking valves.

Saulsberry, R. L.↗

Shared mission operations concept

Historically, new JPL flight projects have developed a Mission Operations System (MOS) as unique as their spacecraft, and have utilized a mission-dedicated staff to monitor and control the spacecraft through the MOS. NASA budgetary pressures to reduce mission operations costs have led to the development and reliance on multimission ground system capabilities. The use of these multimission capabilities has not eliminated an ongoing requirement for a nucleus of personnel familiar with a given spacecraft and its mission to perform mission-dedicated operations. The high cost of skilled personnel required to support projects with diverse mission objectives has the potential for significant reduction through shared mission operations among mission-compatible projects. Shared mission operations are feasible if: (1) the missions do not conflict with one another in terms of peak activity periods, (2) a unique MOS is not required, and (3) there is sufficient similarity in the mission profiles so that greatly different skills would not be required to support each mission. This paper will further develop this shared mission operations concept. We will illustrate how a Discovery-class mission would enter a 'partner' relationship with the Voyager Project, and can minimize MOS development and operations costs by early and careful consideration of mission operations requirements.

Spradlin, Gary L.↗

NASA Plans for In Situ Resource Utilization (ISRU) Development, Demonstration, and Implementation

The United States (US) National Aeronautics and Space Administration’s (NASA) Artemis Moon to Mars program has four major goals: (1) Returning Americans to the Moon: 1st Woman & 1st Person of Color, (2) Learning to live and work on the Moon, (3) Translating lessons learned so that the United States has capabilities and operational experience for a mission to Mars, and (4) Inspires the next generation of explorers, researchers, scientists, and engineers worldwide. Overarching all of this, the NASA Artemis program also continues to follow Space Policy Directive One (SPD-1) which directs the US to lead an innovative and sustainable exploration program with commercial and international partners. A major objective to achieve the Artemis program goals and SPD-1 is to understand and characterize the resources that exist at these destinations, and to learn how to utilize these resources for sustained human exploration and the commercialization of space. This ability, commonly known as In Situ Resource Utilization (ISRU), involves any hardware or operation that harnesses and utilizes local resources to create products and services for robotic and human explo-ration. The NASA ISRU program is focused on the production of mission consumables and com-modities to enable sustained human exploration, such as rocket propellants, life support consuma-bles, fuel cell reactants, feedstock for manufacturing and construction, and nutrients for food and plant growth. In particular, propellants make up a significant fraction of the mass launched from Earth, are critical to mission success, and can reduce the cost for reusable transportation. Important for enabling long term surface stays, greater independence from Earth, and growing lunar infra-structure are the abilities to perform construction and manufacturing from in situ-derived metals and materials to create and expand on the infrastructure and reduce the logistical resupply needed for sustained surface and space operations. To achieve these ISRU capabilities, NASA, in partner-ship with industry, academia, and international partners has initiated a multi-faceted program which involves (i) Determining Customer Needs (Type and Quantity of Commodities), (ii) supporting ground Development of Hardware and Systems until Ready for Lunar Flight, (iii) utilize Commer-cial Lunar Payload Services (CLPS) flights to fly resource assessment missions with the Science Mission Directorate (SMD), and public-private partnership (PPP) ISRU demonstrations of critical technologies and processes, and (iv) performing commercial-led end-to-end ‘Pilot’ Plant production of commodities and demonstration of usage at a scale and duration that minimizes or eliminates risk for full implementation of ISRU-derived commodities in mission critical applications. This paper will discuss the technologies, mission studies, and accomplishments achieved to date for the ISRU multi-faceted program, and plans for continued ground development and flight missions to reduce the risk of full ISRU implementation.

In situ resource utilization↗

Concept of Operations for a Prospective "Proving Ground" in the Lunar Vicinity

NASA is studying a "Proving Ground" near the Moon to conduct human space exploration missions in preparation for future flights to Mars. This paper describes a concept of operations ("conops") for activities in the Proving Ground, focusing on the construction and use of a mobile Cislunar Transit Habitat capable of months-long excursions within and beyond the Earth-Moon system. Key elements in the conops include the Orion spacecraft (with mission kits for docking and other specialized operations) and the Space Launch System heavy-lift rocket. Potential additions include commercial launch vehicles and logistics carriers, solar electric propulsion stages to move elements between different orbits and eventually take them on excursions to deep space, a node module with multiple docking ports, habitation and life support blocks, and international robotic and piloted lunar landers. The landers might include reusable ascent modules which could remain docked to in-space elements between lunar sorties. The architecture will include infrastructure for launch preparation, communication, mission control, and range safety. The conops describes "case studies" of notional missions chosen to guide the design of the architecture and its elements. One such mission is the delivery of a ~10-ton pressurized element, co-manifested with an Orion on a Block 1B Space Launch System rocket, to the Proving Ground. With a large solar electric propulsion stage, the architecture could enable a year-long mission to land humans on a near-Earth asteroid. In the last case, after returning to near-lunar space, two of the asteroid explorers could join two crewmembers freshly arrived from Earth for a Moon landing, helping to safely quantify the risk of landing deconditioned crews on Mars. The conops also discusses aborts and contingency operations. Early return to Earth may be difficult, especially during later Proving Ground missions. While adding risk, limited-abort conditions provide needed practice for Mars, from which early return is likely to be impossible.

Love, Stanley G.↗

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo↗

A Remote, Human-in-the-Loop Evaluation of a Multiple-Drone Delivery Operation

Over time, advances in unmanned aircraft systems (UAS) have enabled a shift in the operational paradigm from one operator managing one aircraft to that of multiple operators working together to manage multiple aircraft. This shift has highlighted the need for effective human-autonomy teaming methods to maintain manageable workload levels for operators as well as high standards of system performance and safety. This paper presents a study aimed at evaluating whether automation can help operators manage workload during small UAS (sUAS) package delivery scenarios featuring contingency situations. These contingency situations, resulting from unplanned UAS Volume Reservations (UVRs), required flight path reroutes for multiple aircraft simultaneously. The study manipulated the number of aircraft affected by the UVRs and the level of automation support. The presence of terrain conflicts was also controlled within each scenario. Due to the COVID-19 pandemic, subjects were not able to gain direct access to the Ground Control System (GCS). Therefore, the study was conducted using a subject-surrogate paradigm that required subjects to relay commands through a verbal protocol from remote locations outside of the lab to a researcher surrogate who had direct control of the GCS interfaces at the lab location. Results show that the automated support condition was associated with faster reroute response times, more efficient reroute maneuvers, and significantly lower levels of perceived workload than the manual reroute condition. However, the automation support level did not significantly impact pilots’ ability to avoid the UVR successfully; pilots were overwhelmingly capable of avoiding the UVR in all conditions. The presence of terrain conflicts primarily impacted pilot performance by leading to multiple uploads per vehicle, which was not typically required when pilots only needed to maneuver laterally. Although subjects did not have direct control over the GCS, subjective ratings indicate that the displays under test provided them with sufficient information to manage their aircraft and promptly respond to the unplanned UVRs. Overall, the objective and subjective data strongly suggest that the verbal protocol and subject-surrogate paradigm were effective methods for collecting data remotely amid the COVID-19 pandemic.

multi-UAS↗

Operational Modal Analysis of the Artemis I Dynamic Rollout Test and Wet Dress Rehearsal

NASA has developed an expendable heavy lift launch vehicle capability, the Space Launch System (SLS), to support lunar and deep space exploration. The uncrewed Artemis I was the first flight of this new launch vehicle and tested critical systems for the upcoming crewed Artemis II flight to the moon. Accelerations were recorded at a multitude of locations on Artemis, the Mobile Launcher (ML), and the Crawler Transporter (CT)during the rollout of Artemis I from the Vehicle Assembly Building (VAB) to Launch Pad 39B March 2022 and is referred to as the Artemis I Dynamic Rollout Test (DRT). While Artemis I was at Launch Pad 39B, the Wet Dress Rehearsal (WDR) was performed to demonstrate launch readiness and acceleration measurements were also recorded. Finally, Artemis I rolled back from Launch Pad 39B to the VAB in April 2022, where acceleration measurements were also recorded and is referred to as the rollback portion of DRT. Because the forces during rollout and at the launch pad acting on Artemis I, the ML, and the CT are not directly measurable, Operational Modal Analysis (OMA) techniques, instead of traditional Experimental Modal Analysis (EMA) techniques, were used to identify modal characteristics. The OMA analysis of DRT and WDR directly builds upon the lessons learned from the OMA analysis of an earlier rollout of the ML from the VAB. DRT and WDR dynamic characteristics will be used to support SLS Integrated Modal Test finite element model correlation efforts and Exploration Ground System ML and CT finite element model verification and validation, which are part of the Building Block approach the Space Launch System program has implemented. The dynamic characteristics extracted from DRT as well as the rollout acceleration time histories themselves will be used in the development of generic rollout forcing functions that will provide refined estimates of the Artemis IV rollout forces, which will have the heavier and larger SLS Block 1B launch vehicle and Mobile Launcher 2 (ML-2). This paper briefly describes Artemis I, the ML, and the CT physical characteristics, DRT rollout/rollback and WDR data collection, the challenges in implementing OMA techniques due in part to the CT harmonics, and how these challenges were overcome to obtain the Artemis I DRT configuration and WDR configuration modal characteristics.

Apollo↗

Concepts in Distributed Scheduling and Control

To support instrument and experiment operations effectively in the Space Station era, planning, scheduling and control must allow for: interactive, realtime, remote operations; responsive scheduling and rescheduling; support of the full range of distributed science, application and commercial users; interaction and cooperation among distributed users; and efficient use of on-board, communications, and ground-based resources. We suggest conceptual and managerial approaches that address these needs. Specifically, we describe an approach to distributed planning, scheduling and control functions that is based on resources and on a distributed knowledge hierarchy. We describe these functions as components of an integrated management system. We discuss automated scheduling assistants and integration of planning and scheduling functions with realtime operations control. The suggested approach, taken from a users' point-of-view, has resulted in the Science User Resource Planning and Scheduling System (SURPASS). In this paper, we describe the major components of SURPASS and discuss the features of this innovative prototype. Further ideas concerning instrument planning, scheduling, and control may be found in the Space Station Instrument Control System Study.

Hansen, Elaine R.↗

TDRSS multimode transponder program. Phase 2: Equipment development

This report contains a complete description of the TDRS Multimode Transponder and its associated ground support equipment. The transponder will demonstrate candidate modulation techniques to provide the required information for the design of an eventual VHF/UHF transponder suitable for installation in a user satellite, capable of operating as part of a Tracking and Data Relay Satellite (TDRS) systems. Use of geosynchronous TDRS which can serve both low data rate users at VHF and high data rate users at other frequencies has been considered. The effects of radio frequency interference from the earth and of multipath propagation due to reflections from the earth are expected to pose problems for the TDRS system at VHF. Investigations have suggested several modulation techniques that offer promise to overcome these problems.

Cnossen, R. S.↗

Atmosphere, Magnetosphere and Plasmas in Space (AMPS). Spacelab payload definition study. Volume 2: Mission support requirements document. Addendum: Flight 2

The AMPS Flight 2 payload, its operation, and the support required from the Space Transportation System (STS) are described. The definition of the payload includes the flight objectives and requirements, the experiment operations, and the payload configuration. The support required from the STS includes the accommodation of the payload by the orbiter/Spacelab, use of the flight operations network and ground facilities, and the use of the launch site facilities.

Source record↗

NASA Space controls research and technology program

The NASA technological organization is outlined. The Office of Aeronautics and Space Technology (OAST) is one of the four major technical offices that comprise NASA. The Office of Space Science and Applications administers programs directed towards using space-based or related techniques to further understanding of the total universe and to apply that understanding to practical applications in such areas as Astrophysics, Solar System exploration, Earth Sciences, Life Sciences, Communications and Information Systems. The Office of Space Flight administers the programs for all U.S. civil launch capability, plus Spacelab development and operations. The Office of Space Tracking & Data Systems administers the programs that operate and maintain a world-wide network of facilities for data acquisition, processing, and ground to spacecraft communications for all NASA missions. The OAST has primary responsibility within NASA for conducting space research and technology development to support commercial and military as well as NASA space interests.

Mciver, D. E.↗

Current instrument status of the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS)

An upgraded version of AVIRIS, an airborne imaging spectrometer based on a whiskbroom-type scanner coupled via optical fibers to four dispersive spectrometers, that has been in operation since 1987 is described. Emphasis is placed on specific AVIRIS subsystems including foreoptics, fiber optics, and an in-flight reference source; spectrometers and detector dewars; a scan drive mechanism; a signal chain; digital electronics; a tape recorder; calibration systems; and ground support requirements.

Eastwood, Michael L.↗

Cryogenic testing of Planck sorption cooler test facility

A test facility has been upgraded in preparation for testing of two hydrogen sorption cryocoolers operating at 18/20 K. these sorption coolers are currently under development at the Jet Propulsion Laboratory. This work summarizes the scope of the test facility upgrade, including design for cryogenic cooling power delivery, system thermal management, insulation schemes, and data acquisition techniques. Ground support equipment for the sorption coolers, structural features of the test chamber, and the vacuum system involved for system testing will also be described in detail.

Planck sorption cooler↗

Future Trends in Logistics and Sustainment

Airship Industry Study: In 2015, NASA Ames Research Center completed a study of the overall airship industry. The project called for a report that describes airship concepts proposed or projects initiated in recent years, airship performance or capability targets, and the missions these activities were addressing. The resulting report details the principal technical features of these airships, the proposed value/advantages of the features, notional concepts of operation, and challenges associated with such vehicles. The study investigated the current status and near-term prospects of these airship development activities, whether they are active or, if curtailed, the circumstances and possible reasons for that conclusion, including technical, business, or other mitigating factors. This presentation provides highlights of the Airship Industry Study investigations, findings, and recommendations. UAS Carrier Concept: The advantages of utilizing an airship as an airborne carrier for support and deployment of Unmanned Aircraft Systems (UAS) are examined. Whether as a stand-alone platform or in concert with conventional aircraft, the airship UAS carrier provides a number of compelling benefits for both military and civilian missions. As a mobile base it can remain operational despite political fallout that may render ground or ocean based UAS sites unavailable. It offers the psychological impact of a power projection tool that has few geographical limits, and holds promise as a new method for cost-saving intelligence gathering. It is also adaptable for civilian variants for supporting: emergency response, security/surveillance, delivery of medical/food supplies, as well as commercial package delivery to metropolitan and remote communities.

Hochstetler, Ron↗

Lighter-Than-Air (LTA) "AirStation": Unmanned Aircraft System (UAS) Carrier Concept

The advantages of utilizing an airship as an airborne carrier for support and deployment of Unmanned Aircraft Systems (UAS) are examined. Whether as a stand-alone platform or in concert with conventional aircraft, the airship UAS carrier provides a number of compelling benefits for both military and civilian missions. As a mobile base it can remain operational despite political fallout that may render ground or ocean based UAS sites unavailable. It offers the psychological impact of a power projection tool that has few geographical limits, and holds promise as a new method for cost-saving intelligence gathering. It is also adaptable for civilian variants for supporting: emergency response, security/surveillance, delivery of medical/food supplies, as well as commercial package delivery to metropolitan and remote communities. This paper presents the background on airship-aircraft operations, and explores the general airship carrier concept. Additionally, a catalog of contemporary technologies available to support the airship carrier concept are discussed, and essential elements for an Air-Station Development program proposed.

Hochstetler, Ronald D.↗